Addendum No 1 020525.doc
DOC document 60 KB Posted
- Attached to
- Mainstreet Sidewalk Extension
- Solicitation number
- PE-75450-NONST-2025-000000002
- Issued by
- Wilcox County, Georgia
About this file
This is Addendum No. 1 issued by Engineering Management, Inc. for the City of Helen, Georgia's Mainstreet Sidewalk Extension project (EMI Project No. 21-046) dated February 5, 2025. The addendum addresses two key clarifications: there is no mandatory site visit requirement for this project, and it confirms that Sailors Engineering completed a geotechnical report for the retaining walls where soil nail walls are recommended for shoring.
The addendum modifies the original bidding documents from June 2022 and includes an attached geotechnical report, though the report itself is not included in the provided content. The project overall involves construction of 1,050 linear feet of 6-foot wide sidewalks, 1,020 linear feet of curb and gutter, storm drain structures, and erosion control, with a 120-day completion timeline from Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SEC00030.pdf | ||
| Geotechnical Report with addenda.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. ONE (1)
CITY OF HELEN, GEORGIA
MAINSTREET SIDEWALK EXTENSION
ISSUED FEBRUARY 5, 2025
RE:
CITY OF HELEN GEORGIA MAINSTREET SIDEWALK EXTENSION
EMI PROJECT No. 21-046
Helen, Georgia
FROM:
ENGINEERING MANAGEMENT, INC.
303 SWANSON DRIVE
LAWRENCEVILLE, GA 30046
Cory Brownlee, P.E.
770-962-1387
TO:
PROSPECTIVE BIDDERS
This Addendum forms a part of the Contract Documents and Drawings and modifies the original bidding documents dated June 2022.
The following items of the Request for Bids are modified as part of this Addendum:
Questions & Clarifications
The following are clarifications based on questions received.
1. Is there a mandatory site visit for this project?
Response: No, there is not a mandatory site visit for this project.
2. Was there a Geotechnical report done for areas requiring temporary shoring?
Response: Yes, Sailors Engineering completed a geotechnical report on the design of the retaining walls where soil nail walls are recommended for shoring. Please see the attached report.
END OF ADDENDUM NO. 1