Addendum Four .pdf

PDF 1 MB Posted

Attached to
RFB-35-26 DMA Envelope Restoration Ravenna RC
Solicitation number
RFB-785-2600000036-5
Issued by
Franklin County, Kentucky

About this file

This document is an Invitation to Bid (RFB-35-26) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration, for an Envelope Restoration project at the Ravenna Readiness Center for the Department of Military Affairs in Revenna, Kentucky. Addendum No. Four (4), dated August 19, 2025, provides key modifications to the original bid, including extended substantial completion time from 120 to 270 days, clarification of specific notes related to building restoration, and the addition of Action Bullet to the list of approved manufacturers for exterior security windows.

The addendum, prepared by alt32 Architecture | Design, instructs bidders to acknowledge receipt of the changes in their proposal. The project involves comprehensive exterior restoration work, including cleaning exterior surfaces, tuckpointing mortar joints, replacing sealant joints, reinstalling existing architectural elements, and making specific structural modifications. The bid process requires contractors to coordinate their work with concurrent projects on the same building, ensuring seamless integration of construction activities. The document emphasizes the need for careful coordination and precise execution of restoration tasks across various building elements.

View the file

Other files

File Type Posted
Final_RFB_785_2600000036_2_SO_FORM.PDF PDF
Addendum Three.pdf PDF
Addendum One .pdf PDF
Addendum Two .pdf PDF
Final_RFB_785_2600000036_5_SO_FORM.PDF PDF
Final_RFB_785_2600000036_1_SO_FORM.PDF PDF
Final_RFB_785_2600000036_4_SO_FORM.PDF PDF
Final_RFB_785_2600000036_3_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-35-26

FOR: Envelope Restoration Ravenna Readiness Center Department of Military Affairs Revenna, Kentucky

DATE: August 19, 2025

RFB-785-2600000036

ADDENDUM NO. Four (4)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-35-26 For: Envelope Restoration Ravenna Readiness Center Department of Military Affairs Revenna, Kentucky

Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration

ADDENDUM NO. 4

August 19, 2025

To: All Plan holders

From: alt32 Architecture | Design 310 Old Vine Street, Suite 300 Lexington, KY 40507-1534

Re: RFB-35-26 DMA Ravenna RC Envelop Restoration

This addendum is one (1) Page of 8-1/2 x 11 and one (1) Page of 30x42.

The purpose of this addendum is to clarify further the requirements of the contract documents. The contractors are governed by the information in the addendum as the content becomes part of the contract documents. The bidders shall acknowledge receipt of the addendum in their form of proposal.

Items:

1. Clarification to notes #162 and #152 See attached revised sheet that notes correction to text and keying of notes.

2. Reference specification section 085653-3 Exterior Security Windows: Action

Bullet gets added to the list of approved manufacturers.

https://www.actionbullet.com/

3. Reference Special Conditions 10000. Section 4 Times of Completion:

Substantial Completion shall be extended from 120 to be 270 days.

End of Addendum

LEVEL 1

100' - 0"

T/O MASONRY_03

120' - 8"

T/O MASONRY_02

116' - 0"

LEVEL 11

111' - 5"

151151

158157

158161 161

161 161 161

103102 104

A6

A6

______1 A6

______ 1 A6

A6

LEVEL 1

100' - 0"

T/O MASONRY_03

120' - 8"

ROOF 1

111' - 4"

T/O MASONRY_02

116' - 0"

151151

151151

158158158

EXISTING CHAIN LINK FENCE - NO WORK

THROUGH-WALL VENT - NO WORK

EXISTING CHILLER - NO WORK

LEVEL 1

100' - 0"

T/O MASONRY_03

120' - 8"

ROOF 1

111' - 4"

151 151 151

158 158

101 3 3

A4

A4

A6

LEVEL 1

100' - 0"

T/O MASONRY_03

120' - 8"

ROOF 1

111' - 4"

T/O MASONRY_02

116' - 0"

151151

158 158

164 164

166 166

EXISTING CHAIN LINK FENCE - NO WORK

A4

SALVAGE AND PROTECT EXISTING ANTENNA

EXISTING CHILLER - NO WORK

A6

A4

NEW

DESIGN BASIS: DMI's 1" FLUSH PANEL - 12" FP1012

7-29

7-33

7-29

EXISTING

2" 1"

INTERIOR

EXTERIOR

PAINT ENTIRE INTERIOR FACE

SURFACE OF THIS AFFECTED

CMU WALL.EXISTING CMU

DESIGN BASIS: DMI's 1" FLUSH PANEL - 12" FP1012

2"1"

NEW

7-31

7-29

4-2

EXISTING CMU

7-29

EXISTING

7-33 PAINT ENTIRE INTERIOR

FACE SURFACE OF THIS

AFFECTED CMU WALL.

INTERIOREXTERIOR

DRAWING NO.

AS BUILT DATE

DATEDESCRIPTION OF REVISIONS

REVISION HISTORY OF THIS DRAWING

ACCOUNT NO.

A & E FILE NO.

DRAWING INFORMATION

310 OLD VINE STREET, SUITE 300

LEXINGTON, KY 40507

T: 859.233.4804

PL

O

T

TI

M E:

PHASE

DRAWING DATE

DRAWN BY

CHECKED BY

PHASE

RTA DATE

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

COMMONWEALTH OF KENTUCKY

DESCRIPTION OF REVISIONS DATE

DECA LOG #

8/

/2

4:

:0

PM

A4

DMA Ravenna RC Envelope Restoration

EXTERIOR ELEVATIONS - NEW WORK

095-CCOL-RA04-00

RTA

7-21-2025

RTA

7-21-2025

OH / TD

MS / MB

1/8" = 1'-0"A4

1 EAST ELEVATION - NEW WORK

1/8" = 1'-0"A4

2 NORTH ELEVATION - NEW WORK

1/8" = 1'-0"A4

3 SOUTH ELEVATION - NEW WORK

1/8" = 1'-0"A4

4 WEST ELEVATION - NEW WORK

SHEET NOTES#

NOTE: THIS PROJECT WILL BE BID CONCURRENTLY WITH

ANOTHER PROJECT ON THE SAME BUILDING. CONTRACTORS

FOR EACH PROJECT SHALL BE RESPONSIBLE FOR

COORDINATING THEIR WORK TO AVOID CONFLICTS AND

ENSURE SEAMLESS INTEGRATION OF CONSTRUCTION

ACTIVITIES.

1 1/2" = 1'-0"A4

5 EXTERIOR WALL DETAIL - PLAN VIEW

#-# MATERIAL REFERENCE KEY

1 1/2" = 1'-0"A4

6 EXTERIOR WALL SECTION DETAIL

4-2 CONCRETE MASONRY UNIT - 042000

7-29 METAL WALL PANELS - 074213

7-31 METAL FURRING Z-STRIPS - 074213

7-33 POLYSTYRENE INSULATION - 072100

151 CLEAN ALL EXTERIOR SURFACES WITH

ANTIMICROBIAL CLEANING SOLUTION AND

REMOVE MOLD AND MILDEW STAINS.

POWERWASH ALL EXTERIOR SURFACES.

152 TUCKPOINT ALL MORTAR JOINTS FOR THE

EXISTING BRICK VENEER ON THE HIGH WEST

WALL (DRILL HALL WALL). REPLACE SELECT

BRICK VENEER UNITS AS PART OF ALLOWANCE.

THIS WORK SHALL BE ACCOMPLISHED BEFORE

THE ONSET OF THE NEW ROOF WORK UNDER A

SEPARATE CONTRACT.

153 REMOVE, CLEAN AND REINSTALL EXISTING CAST

METAL CHARACTERS ON THE FRONT OF THE

BUILDING

157 REMOVE EXISTING LOUVER, PAINT EXISTING

LINTEL AND REINSTALL EXISTING LOUVER.

PROVIDE SEALANT AT PERIMETER

158 REPLACE VERTICAL AND/ OR HORIZONTAL

SEALANT JOINTS AND BACKER ROD IN EXTERIOR

BRICK JOINT

160 REMOVE, SALVAGE EXISTNG ACCESS LADDER.

CLEAN, PREP TO RECEIVE NEW PAINT. PAINT

AND PUT IN PLACE

161 INSTALL NEW LINTEL PER SHEET S2.1 AND NEW

FLASHINGS PER SHEET 1/A6

162 REMOVE PORTION OF EXISTING BRICK AND

INSTALL NEW FLASHING. REINSTALL EXISTING

BRICK. INSTALL FLASHING SIMILAR TO HEAD

DETAIL 15/ A6

163 EXISTING LINTEL TO REMAIN. PROVIDE AND

INSTALL NEW FLASHING. PAINT EXISTING LINTEL

164 NEW CONCRETE SIDEWALK, STAIR AND ENTRY

LANDING. SEE SHEET A5

166 INFILL EXISTING WALL OPENING WITH NEW CMU

TO MATCH ADJACENT EXISTING CMU

167 PAINT WHOLE INTERIOR FACE OF EXISTING WALL

THIS ROOM.

ADDENDUM 3

Addendum Four
Addendum 04_250818

File details come from the government source that posted it. Updated .