This is Addendum Five to Request for Bid (RFB) No. RFB-35-25 issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for the Shower House Renovation project at Kentucky State Penitentiary in Eddyville, Kentucky. The addendum provides critical modifications to the original project specifications and drawings that become binding upon contract issuance. Key revisions include requirements for temporary electrical power provision by the electrical contractor, mandatory lead-based paint abatement for all interior shower room walls and concrete floor structures with epoxy coating application, boiler inspection for new piping supporting existing steam-to-water heat exchangers, and detailed site access and security protocols established by the Department of Corrections. The addendum addresses contractor inquiries regarding storage container placement in the lower parking area near Cellhouse 5, vehicle access limitations for concrete cutting equipment, and debris removal procedures, permitting concurrent work by multiple crews with appropriate escorting requirements. Additionally, the specification modifications include deletion of thermally broken window construction requirements, revision of mechanical vent pipe routing to extend vertically up the exterior wall with proper coordination to existing windows and electrical conduits, and application of two coats of Sherwin-Williams Loxon Water Blocking Primer/Finish to all exposed concrete ceiling structures.
The addendum incorporates a comprehensive Mechanical Insulation specification (Section 230700) that establishes detailed requirements for insulation materials, installation procedures, and quality assurance standards across piping systems, equipment, and ductwork. Acceptable insulation materials include flexible elastomeric, polyolefin, semi-rigid fiberglass, and mineral-fiber products from approved manufacturers such as Armacell LLC, Johns Manville, Knauf Insulation, and Owens Corning. Specific insulation thicknesses and jacket types are mandated based on piping service type and size, with particular emphasis on removable insulation blankets for expansion joints and valves two and one-half inches and larger to permit thermal expansion and contraction without damage. Installation requirements mandate tight longitudinal seams, proper adhesive application, vapor barrier sealing at penetrations and hangers, and removal of protective coverings only after system start-up. Field quality control includes random sampling and inspection of insulated pipes, fittings, strainers, and valves to verify compliance, with defective applications requiring complete remediation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-35-25
FOR: Shower House Renovation Kentucky State Penitentiary Department of Corrections Eddyville, Kentucky
DATE: September 26, 2024
RFB-785-2500000036
ADDENDUM NO. Five (5)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-35-25 For: Shower House Renovation Kentucky State Penitentiary Department of Corrections
Susan Ward, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Fund No. 527-CA2N Department of Corrections
PFGW File No. 2281 Kentucky State Penitentiary – Shower House Renovations
Marcum Engineering No. 22676 Eddyville, Kentucky
ADDENDUM NO. 05 009005 - 1
DATE OF ISSUE: September 25, 2024
REQUEST FOR BID NO. RFB-35-25
Shower House Renovations
Kentucky State Penitentiary
Department of Corrections
AGENCY: 527
FUND: CA2N
ARCH FILE NO. 2281
ADDENDUM NO. 05
This Document is an amendment of the original Specifications and/or Drawings and shall be part of and included in the Contract. Wherein this Addendum conflicts with the original Specifications and/or
Drawings, this Addendum shall govern.
PROJECT MANUAL
ITEM NO. 1: PART 1 – ADVERTISEMENT FOR BIDS - ARTICLE J. - SITE VISIT
INFORMATION
a. For interested Contractors, the attached link may be used to access digital site images of the project site. 527-CA2N_KSP Shower Renovations
ITEM NO. 2: SECTION 007300 – SPECIAL CONDITIONS
a. Refer to Article 6–Contractor Provided Temporary Facilities and Controls/Electric
Utilities.
• Electrical Contractor shall provide temporary power as required from the existing electrical panel or provide temporary panel as required to support construction activities.
b. Refer to Article 10–Schedule of Additive Alternates. Refer to Addendum No. 2, Addition of Additive Alternate No. 1.
• In the event that the coating contractor cannot legally complete the remediation of lead-based paint materials, the Contractor shall include pricing for a remediation contractor to complete the removal of the lead-based paint materials. For wall work involving lead-containing paint, the Contractor shall be responsible for following all Federal and State regulations regarding training, worker safety, removal, proper disposal, and/or any other related activities. All interior walls of the Shower Room are to be abated from the floor slab to the underside of the concrete structure above. Remediation contractor to verify acceptable level of roughness with epoxy coating contractor. In addition, the underside of the concrete floor structure shall be abated to provide clean surface for priming/painting.
ADDENDUM NO. 05 009005 - 2
c. Refer to Article 11–Additional Project Completion or Project Close-Out Required.
• A boiler inspection shall be required for new piping supporting the existing steam to water heat exchanger.
d. Refer to Article 12–Special Project Site Security or Access Requirements.
• The Department of Corrections has provided the below written responses to specific Contractor inquiries. Contractor may also refer to attached site access image for location of identified site elements.
1) Storage- Would there be an option for a closed container to be delivered to house tools, materials, etc? I know it was discussed for an enclosed trailer, but I was asked about a Conex, so I wanted to get a written answer.
You could have a Conex box for storage of tools and materials, it would be housed in the lower parking by what is identified as Cellhouse 5 Walls Stand, it’s the parking lot on the right off Hwy 730 and before you get to the entrance station.
2) Concrete cutting/coring- The saw for this needs 480V to run. The Coring company has a truck mounted generator that can supply power to the saws, but I guess my question is, what limitations will be in place for vehicles to enter the job site? Will there be regulations on who can come in at what time? As in, if I am the GC and have a crew working out of my enclosed trailer or what have you, would they have to be packed up and out before the other came in? I’m just trying to make sure I am covering all of the bases and capturing scheduling costs accurately.
If a truck is needed with a concrete saw to perform the work, then KSP will make arrangements for the truck to come in, most likely both crews can work at the same time.
3) Disposal- What is the proposed method for debris removal? Would a dump trailer be sufficient, and how close would we be able to get it? I don’t imagine a roll off would work in this situation.
Either a trailer or dump truck can come on the yard (shower house area) to remove the debris and then will need to be escorted off the yard as soon as the debris is loaded.
You can pull right up beside the building. A small dump truck would better because a truck and trailer mostly likely would involve opening both gates of the sally port to the outside at once, but this can take place if necessary.
SPECIFICATIONS
ITEM NO. 3: SECTION 119821 – DETENTION WINDOWS
a. Delete Paragraph 2.3 G referring to thermally improved or thermally broken window construction.
ITEM NO. 4: SECTION 230700 – MECHANICAL INSULATION
a. Revised the referenced specification section per the attached section.
ADDENDUM NO. 05 009005 - 3
DRAWINGS
ITEM NO. 5: DRAWING SHEET A-1 – SHOWER RENOVATION PLANS
a. Refer to Proposed Reflected Ceiling Plan. Add drawing note to paint all exposed concrete ceiling structure with 2 coats of Sherwin-Williams Loxon Water Blocking
Primer/Finish or equal.
ITEM NO. 6: DRAWING SHEET H-1 – HVAC FLOOR PLANS
a. Revise Mechanical Construction Tag Note 4 to read, “Extend existing 4” PVC sanitary vent pipe from existing 4” PVC vent pipe above floor to bottom of existing structure and through exterior wall. Route 4” PVC vent pipe vertically up exterior wall, tight to wall, and support from existing wall. Extend minimum 12” above roof line. Coordinate with existing windows and electrical conduits.
ATTACHMENTS
1. Special Project Site Access Image
2. Specification Section 230700 – Mechanical Insulation
END OF ADDENDUM NO. 05
Paul Image
Paul Arrow
Paul Typewritten Text
CELLHOUSE 5
WALL STAND
Paul Arrow
Paul Typewritten Text
CELLHOUSE 5
SALLYPORT
Paul Arrow
Paul Typewritten Text
YARD SHOWER
PROJECT SITE
Paul PolyLine
Paul Arrow
Paul Typewritten Text
VEHICLE PATH
Paul Typewritten Text
CONTRACTOR
PARKING
Paul Arrow
Paul Text Box
SPECIAL PROJECT SITE ACCESS
KSP SHOWER REPAIRS
PFGW File No. 2281 Kentucky State Penitentiary - Shower House Renovations
MECHANICAL INSULATION 230700 - 1
SECTION 230700 - MECHANICAL INSULATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Insulation Materials:
a. Flexible elastomeric.
b. Mineral fiber.
2. Adhesives.
3. Sealants.
4. Factory-applied jackets.
5. Tapes.
6. Securements.
1.2 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Shop Drawings:
1. Detail application of protective shields, saddles, and inserts at hangers for each type of insulation and hanger.
2. Detail insulation application at pipe expansion joints for each type of insulation.
3. Detail insulation application at elbows, fittings, flanges, valves, and specialties for each type of insulation.
4. Detail removable insulation at piping specialties, equipment connections, and access panels.
5. Detail field application for each equipment type.
C. Field quality-control reports.
1.3 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Insulation and related materials shall have fire-test-response characteristics indicated, as determined by testing identical products per ASTM E 84, by a testing and inspecting agency acceptable to authorities having jurisdiction. Factory label insulation and jacket materials and adhesive, mastic, tapes, and cement material containers, with appropriate markings of applicable testing and inspecting agency.
1. Insulation Installed Indoors: Flame-spread index of 25 or less, and smoke-developed index of 50 or less.
MECHANICAL INSULATION 230700 - 2
2. Insulation Installed Outdoors: Flame-spread index of 75 or less, and smoke-developed index of 150 or less.
PART 2 - PRODUCTS
2.1 INSULATION MATERIALS
A. Comply with requirements in Part 3 schedule articles for where insulating materials shall be applied.
B. Products shall not contain asbestos, lead, mercury, or mercury compounds.
C. Products that come in contact with stainless steel shall have a leachable chloride content of less than 50 ppm when tested according to ASTM C 871.
D. Insulation materials for use on austenitic stainless steel shall be qualified as acceptable according to ASTM C 795.
E. Foam insulation materials shall not use CFC or HCFC blowing agents in the manufacturing process.
F. Flexible Elastomeric: Closed-cell, sponge- or expanded-rubber materials. Comply with
ASTM C 534, Type I for tubular materials.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Armacell LLC.
b. RBX Corporation.
c. Approved equal.
G. Polyolefin Insulation: Flexible closed cell, minimum nominal density of 1.5 lbs. per cu. ft., thermal conductivity of not more than 0.25 at 75 degrees F mean temperature, minimum compressive strength of 5 psi at 25% deformation, maximum water vapor permeability of 0.0 perm inch, maximum water absorption of 0% by weight and volume, rated for service temperature range of -165 degrees F to 210 degrees F.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Armacell LLC.
b. RBX Corporation.
c. Approved equal.
H. Semi-Rigid Fiberglass Insulation: Minimum nominal density of 3 lbs. per cu. ft., thermal conductivity of not more than 0.28 at 75 degrees F mean temperature, minimum compressive strength of 25 PSF at 10% deformation, rated for service temperature range of 0 degrees F to
MECHANICAL INSULATION 230700 - 3
450 degrees F. Insulation fibers perpendicular to jacket and scored for wrapping cylindrical surfaces..
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Johns Manville.
b. Knauf Insulation.
c. Owens Corning.
d. Approved equal.
I. Mineral-Fiber Board Insulation: Mineral or glass fibers bonded with a thermosetting resin.
Comply with ASTM C 612, Type IA or Type IB. For duct and plenum applications, provide insulation with factory applied FSK jacket. For equipment applications, provide insulation with factory applied FSK jacket. Factory-applied jacket requirements are specified in "Factory-
Applied Jackets" Article.
1. Products: Subject to compliance with requirements, provide one of the following:
a. CertainTeed Corp.; Commercial Board.
b. Johns Manville; 800 Series Spin-Glas.
c. Knauf Insulation; Insulation Board.
d. Owens Corning; Fiberglas 700 Series.
e. Approved equal.
J. Mineral-Fiber, Preformed Pipe Insulation:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Johns Manville.
b. Knauf Insulation.
c. Owens Corning.
d. Approved equal.
2. Type I, 850 deg F Materials: Mineral or glass fibers bonded with a thermosetting resin.
Comply with ASTM C 547, Type I, Grade A, with factory applied ASJ. Factory-applied jacket requirements are specified in "Factory-Applied Jackets" Article.
K. Mineral-Fiber, Pipe and Tank Insulation: Mineral or glass fibers bonded with a thermosetting resin. Semirigid board material with factory applied ASJ complying with ASTM C 1393, Type II or Type IIIA Category 2, or with properties similar to ASTM C 612, Type IB. Nominal density is 2.5 lb/cu. ft. or more. Thermal conductivity (k-value) at 100 deg F is 0.29 Btu x in./h x sq. ft. x deg F or less. Factory-applied jacket requirements are specified in "Factory-Applied
Jackets" Article.
1. Products: Subject to compliance with requirements, provide one of the following:
a. CertainTeed Corp.; CrimpWrap.
b. Johns Manville; MicroFlex.
MECHANICAL INSULATION 230700 - 4
c. Knauf Insulation; Pipe and Tank Insulation.
d. Owens Corning; Fiberglas Pipe and Tank Insulation.
e. Approved equal.
2.2 ADHESIVES
A. Materials shall be compatible with insulation materials, jackets, and substrates and for bonding insulation to it and to surfaces to be insulated, unless otherwise indicated.
B. Mineral-Fiber Adhesive: Comply with MIL-A-3316C, Class 2, Grade A.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Childers Products.
b. Foster Products Corporation.
c. Mon-Eco Industries, Inc.
d. Approved equal.
C. ASJ and FSK Jacket Adhesive: Comply with MIL-A-3316C, Class 2, Grade A for bonding insulation jacket lap seams and joints.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Childers Products.
b. Foster Products Corporation.
c. Mon-Eco Industries, Inc.
d. Approved equal.
2.3 SEALANTS
A. FSK and Metal Jacket Flashing Sealants:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Childers Products.
b. Foster Products Corporation.
c. Mon-Eco Industries, Inc.
d. Approved equal.
2. Materials shall be compatible with insulation materials, jackets, and substrates.
3. Fire- and water-resistant, flexible, elastomeric sealant.
4. Service Temperature Range: Minus 40 to plus 250 deg F.
5. Color: Aluminum.
B. ASJ and PVC Flashing Sealants:
MECHANICAL INSULATION 230700 - 5
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Childers Products.
b. Approved equal.
2. Materials shall be compatible with insulation materials, jackets, and substrates.
3. Fire- and water-resistant, flexible, elastomeric sealant.
4. Service Temperature Range: Minus 40 to plus 250 deg F.
5. Color: White.
2.4 FACTORY-APPLIED JACKETS
A. Insulation system schedules indicate factory-applied jackets on various applications. When factory-applied jackets are indicated, comply with the following:
1. ASJ: White, kraft-paper, fiberglass-reinforced scrim with aluminum-foil backing;
complying with ASTM C 1136, Type I.
2. FSK Jacket: Aluminum-foil, fiberglass-reinforced scrim with kraft-paper backing;
complying with ASTM C 1136, Type II.
2.5 FIELD-APPLIED JACKETS
A. Field-applied jackets shall comply with ASTM C 921, Type I, unless otherwise indicated.
2.6 TAPES
A. ASJ and PVC Tape: White vapor-retarder tape matching factory-applied jacket with acrylic adhesive, complying with ASTM C 1136.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Avery Dennison Corporation.
b. Ideal Tape Co., Inc.
c. Venture Tape.
d. Approved equal.
2. Width: 3 inches.
3. Thickness: 11.5 mils.
4. Adhesion: 90 ounces force/inch in width.
5. Elongation: 2 percent.
6. Tensile Strength: 40 lbf/inch in width.
7. ASJ Tape Disks and Squares: Precut disks or squares of ASJ tape.
B. FSK Tape: Foil-face, vapor-retarder tape matching factory-applied jacket with acrylic adhesive;
complying with ASTM C 1136.
MECHANICAL INSULATION 230700 - 6
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Avery Dennison Corporation.
b. Ideal Tape Co., Inc.
c. Venture Tape.
d. Approved equal.
2. Width: 3 inches.
3. Thickness: 6.5 mils.
4. Adhesion: 90 ounces force/inch in width.
5. Elongation: 2 percent.
6. Tensile Strength: 40 lbf/inch in width.
7. FSK Tape Disks and Squares: Precut disks or squares of FSK tape.
C. Aluminum-Foil Tape: Vapor-retarder tape with acrylic adhesive.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Avery Dennison Corporation.
b. Ideal Tape Co., Inc.
c. Venture Tape.
d. Approved equal.
2. Width: 3 inches.
3. Thickness: 3.7 mils.
4. Adhesion: 100 ounces force/inch in width.
5. Elongation: 5 percent.
6. Tensile Strength: 34 lbf/inch in width.
2.7 SECUREMENTS
A. Aluminum Bands: ASTM B 209, Alloy 3003, 3005, 3105, or 5005; Temper H-14, 0.020-inch-thick, 3/4 inch wide with wing or closed seal.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Childers Products.
b. PABCO Metals Corporation.
c. RPR Products, Inc.
d. Approved equal.
B. Insulation Pins and Hangers:
1. Metal, Adhesively Attached, Perforated-Base Insulation Hangers: Baseplate welded to projecting spindle that is capable of holding insulation, of thickness indicated, securely in
MECHANICAL INSULATION 230700 - 7
position indicated when self-locking washer is in place. Comply with the following requirements:
a. Products: Subject to compliance with requirements, provide one of the following:
1) GEMCO; Perforated Base.
2) Midwest Fasteners, Inc.; Spindle.
3) Approved equal.
b. Baseplate: Perforated, galvanized carbon-steel sheet, 0.030-inch thick by 2 inches square.
c. Spindle: Stainless steel, fully annealed, 0.106-inch- diameter shank, length to suit depth of insulation indicated.
d. Adhesive: Recommended by hanger manufacturer. Product with demonstrated capability to bond insulation hanger securely to substrates indicated without damaging insulation, hangers, and substrates.
2. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch- thick, galvanized-steel sheet, with beveled edge sized as required to hold insulation securely in place but not less than 1-1/2 inches in diameter.
a. Products: Subject to compliance with requirements, provide one of the following:
1) GEMCO; R-150.
2) Midwest Fasteners, Inc.; WA-150.
3) Nelson Stud Welding; Speed Clips.
4) Approved equal.
b. Protect ends with capped self-locking washers incorporating a spring steel insert to ensure permanent retention of cap in exposed locations.
C. Staples: Outward-clinching insulation staples, nominal 3/4-inch- wide, stainless steel or Monel.
D. Wire: 0.062-inch soft-annealed, galvanized steel.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Childers Products.
b. PABCO Metals Corporation.
c. RPR Products, Inc.
d. Approved equal.
2.8 INSULATION INSERTS AND PIPE SHIELDS
A. Construct inserts with calcium silicate or polyisocyanurate (service temperatures below 300 degrees F only), minimum 140 psi compressive strength. Piping 12” and larger, supplement with high density 600 psi structural calcium silicate insert. Provide galvanized steel shield.
Insert and shield to be minimum 180 degree coverage on bottom supported piping and full 360
MECHANICAL INSULATION 230700 - 8
degree coverage on clamped piping. On roller mounted piping and piping designed to slide on support, provide additional load distribution steel plate.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. B-line.
b. Pipe Shields.
c. Value Engineered Products.
d. Approved equal.
B. Where contractor proposes shop/site fabricated inserts and shields, submit schedule of materials, thicknesses, gauges and lengths for each pipe size to demonstrate equivalency to pre-engineered/premanufactured product described above. On low temperature systems, high density rigid polyisocyanurate may be substituted for calcium silicate provided insert and shield length and shield gauge are increased to compensate for lower insulation compressive strength.
C. Precompressed 20# density molded fiberglass blocks, Hamfab or equal, of the same thickness as adjacent insulation may be substituted for calcium silicate inserts with one 1”x6” block for piping through 2-1/2” and three 1”x6” blocks for piping through 4”. Submit shield schedule to demonstrate equivalency to pre-engineered/premanufactured product described above.
D. Wood blocks will not be accepted.
2.9 STEAM EXPANSION JOINT AND VALVE INSULATION BLANKETS
A. Manufacturers: Advance Thermal Corporation, TANI Division B.D. Schiffler, Sprinkman and
Sons. Site fabricated blankets are not acceptabl.e
B. Blanket shall be 16.5 ounces per square yard PTFE (polytetrafluoroethylene) designed for wet and dry steam applications to 600ºF. Jacket shall have coated fabric on both exterior and interior. Wire mesh interior is not acceptable.
C. The Blankets shall be installed to shed water and have a 3-inch wide cinchable rain flap on each end.
D. All seams shall be sewn twice with double locked stitching. One seam shall be sewn with 3-ply
Nomex and the other with 3-ply stainless steel. Hog rings and staples shall not be used.
E. The insulation shall be a 2-inch thick, compressed “E” glass fiber with no chemical binders, held in place with 12 gauge stainless quilt pins which do not puncture the inner surface of the blanket.
F. Blankets shall be designed to allow access to the expansion and ball joints packing cylinder plungers for repacking without removing the blanket.
G. Removable expansion joint blanket shall be constructed to allow the pipe and rigid insulation to expand/contract with the pipe. Blanket shall have a close fit without sagging or gaps.
MECHANICAL INSULATION 230700 - 9
H. Blanket shall allow for normal operation of the valve or joint without removing the cover.
I. Valve blankets shall come in two pieces and cover the valve yoke (if applicable).
J. Blankets shall have D-ring, hook and loop or buckle securing straps. Pins and wire or spring and ring securement is not acceptable.
K. Blankets shall have a stainless steel identifying plaque on the exterior identifying equipment information.
PART 3 - EXECUTION
3.1 PREPARATION
A. Surface Preparation: Clean and dry surfaces to receive insulation. Remove materials that will adversely affect insulation application.
B. Coordinate insulation installation with the trade installing heat tracing. Comply with requirements for heat tracing that apply to insulation.
3.2 GENERAL INSTALLATION REQUIREMENTS
A. Install insulation materials, accessories, and finishes with smooth, straight, and even surfaces;
free of voids throughout the length of equipment, ducts and fittings, and piping including fittings, valves, and specialties.
B. Install insulation materials, forms, vapor barriers or retarders, jackets, and thicknesses required for each item of equipment, duct system, and pipe system as specified in insulation system schedules.
C. Install accessories compatible with insulation materials and suitable for the service. Install accessories that do not corrode, soften, or otherwise attack insulation or jacket in either wet or dry state.
D. Install insulation with longitudinal seams at top and bottom of horizontal runs.
E. Install multiple layers of insulation with longitudinal and end seams staggered.
F. Do not weld brackets, clips, or other attachment devices to piping, fittings, and specialties.
G. Keep insulation materials dry during application and finishing.
H. Install insulation with tight longitudinal seams and end joints. Bond seams and joints with mechanical staples and adhesive recommended by insulation material manufacturer.
I. Install insulation with least number of joints practical.
MECHANICAL INSULATION 230700 - 10
J. Where vapor barrier is indicated, seal joints, seams, and penetrations in insulation at hangers, supports, anchors, and other projections with vapor-barrier mastic.
1. Install insulation continuously through hangers and around anchor attachments.
2. For insulation application where vapor barriers are indicated, extend insulation on anchor legs from point of attachment to supported item to point of attachment to structure. Taper and seal ends at attachment to structure with vapor-barrier mastic.
3. Install insert materials and install insulation to tightly join the insert. Seal insulation to insulation inserts with adhesive or sealing compound recommended by insulation material manufacturer.
4. Cover inserts with jacket material matching adjacent pipe insulation. Install shields over jacket, arranged to protect jacket from tear or puncture by hanger, support, and shield.
K. Apply adhesives and sealants at manufacturer's recommended coverage rate and wet and dry film thicknesses.
L. Install insulation with factory-applied jackets as follows:
1. Draw jacket tight and smooth.
2. Cover circumferential joints with 3-inch- wide strips, of same material as insulation jacket. Secure strips with adhesive and outward clinching staples along both edges of strip, spaced 4 inches o.c.
3. Overlap jacket longitudinal seams at least 1-1/2 inches. Install insulation with longitudinal seams at bottom. Clean and dry surface to receive self-sealing lap. Staple laps with outward clinching staples along edge at 4 inches o.c.
a. For below ambient services, apply vapor-barrier mastic over staples.
4. Cover joints and seams with tape as recommended by insulation material manufacturer to maintain vapor seal.
5. Where vapor barriers are indicated, apply vapor-barrier mastic on seams and joints and at ends.
M. Cut insulation in a manner to avoid compressing insulation more than 75 percent of its nominal thickness.
N. Finish installation with systems at operating conditions. Repair joint separations and cracking due to thermal movement.
O. Repair damaged insulation facings by applying same facing material over damaged areas.
Extend patches at least 4 inches beyond damaged areas. Adhere, staple, and seal patches similar to butt joints.
3.3 PENETRATIONS
A. Insulation Installation at Roof, Floor, Interior Wall and Partition Penetrations (That Are Not
Fire Rated): Install insulation continuously through penetrations.
MECHANICAL INSULATION 230700 - 11
3.4 PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES
A. Insulation Installation at Fire-Rated Wall and Partition Penetrations:
1. Pipe: Install insulation continuously through penetrations of fire-rated walls and partitions.
B. Insulation Installation at Floor Penetrations:
1. Pipe: Install insulation continuously through floor penetrations.
3.5 TANKS, VESSELS, AND PUMPS INSULATION INSTALLATION
A. Mineral Fiber, Pipe and Tank Insulation Installation for Tanks and Vessels: Secure insulation with adhesive and anchor pins and speed washers.
1. Apply adhesives according to manufacturer's recommended coverage rates per unit area, for 50 percent coverage of tank and vessel surfaces.
2. Groove and score insulation materials to fit as closely as possible to equipment, including contours. Bevel insulation edges for cylindrical surfaces for tight joints. Stagger end joints.
3. Protect exposed corners with secured corner angles.
4. Install adhesively attached or self-sticking insulation hangers and speed washers on sides of tanks and vessels as follows:
a. Do not weld anchor pins to ASME-labeled pressure vessels.
b. Select insulation hangers and adhesive that are compatible with service temperature and with substrate.
c. On tanks and vessels, maximum anchor-pin spacing is 3 inches from insulation end joints, and 16 inches o.c. in both directions.
d. Do not over-compress insulation during installation.
e. Cut and miter insulation segments to fit curved sides and domed heads of tanks and vessels.
f. Impale insulation over anchor pins and attach speed washers.
g. Cut excess portion of pins extending beyond speed washers or bend parallel with insulation surface. Cover exposed pins and washers with tape matching insulation facing.
5. Secure each layer of insulation with stainless-steel or aluminum bands. Select band material compatible with insulation materials.
6. Where insulation hangers on equipment and vessels are not permitted or practical and where insulation support rings are not provided, install a girdle network for securing insulation. Stretch pre-stressed aircraft cable around the diameter of vessel and make taut with clamps, turnbuckles, or breather springs. Place one circumferential girdle around equipment approximately 6 inches from each end. Install wire or cable between two circumferential girdles 12 inches o.c. Install a wire ring around each end and around outer periphery of center openings and stretch pre-stressed aircraft cable radially from the wire ring to nearest circumferential girdle. Install additional circumferential girdles along the body of equipment or tank at a minimum spacing of 48 inches o.c. Use this network for securing insulation with tie wire or bands.
7. Stagger joints between insulation layers at least 3 inches.
MECHANICAL INSULATION 230700 - 12
8. Install insulation in removable segments on equipment access doors, manholes, handholes, and other elements that require frequent removal for service and inspection.
9. Bevel and seal insulation ends around manholes, handholes, ASME stamps, and nameplates.
10. For equipment with surface temperatures below ambient, apply mastic to open ends, joints, seams, breaks, and punctures in insulation.
B. Flexible Elastomeric Thermal Insulation Installation for Tanks and Vessels: Install insulation over entire surface of tanks and vessels.
1. Apply 100 percent coverage of adhesive to surface with manufacturer's recommended adhesive.
2. Seal longitudinal seams and end joints.
C. Insulation Installation on Pumps:
1. Fabricate metal boxes lined with insulation. Fit boxes around pumps and coincide box joints with splits in pump casings. Fabricate joints with outward bolted flanges. Bolt flanges on 6-inch centers, starting at corners. Install 3/8-inch- diameter fasteners with wing nuts. Alternatively, secure the box sections together using a latching mechanism.
2. Fabricate boxes from galvanized steel, at least 0.060 inch thick.
3. For below ambient services, install a vapor barrier at seams, joints, and penetrations.
Seal between flanges with replaceable gasket material to form a vapor barrier.
3.6 GENERAL PIPE INSULATION INSTALLATION
A. Requirements in this article generally apply to all insulation materials except where more specific requirements are specified in various pipe insulation material installation articles.
B. Insulation Installation on Fittings, Valves, Strainers, Flanges, and Unions:
1. Install insulation over fittings, valves, strainers, flanges, unions, and other specialties with continuous thermal and vapor-retarder integrity, unless otherwise indicated.
2. Insulate pipe elbows using preformed fitting insulation or mitered fittings made from same material and density as adjacent pipe insulation. Each piece shall be butted tightly against adjoining piece and bonded with adhesive. Fill joints, seams, voids, and irregular surfaces with insulating cement finished to a smooth, hard, and uniform contour that is uniform with adjoining pipe insulation.
3. Insulate tee fittings with preformed fitting insulation or sectional pipe insulation of same material and thickness as used for adjacent pipe. Cut sectional pipe insulation to fit. Butt each section closely to the next and hold in place with tie wire. Bond pieces with adhesive.
4. Insulate valves using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. For valves, insulate up to and including the bonnets, valve stuffing-box studs, bolts, and nuts. Fill joints, seams, and irregular surfaces with insulating cement.
MECHANICAL INSULATION 230700 - 13
5. Insulate strainers using preformed fitting insulation or sectional pipe insulation of same material, density, and thickness as used for adjacent pipe. Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker. Fill joints, seams, and irregular surfaces with insulating cement. Insulate strainers so strainer basket flange or plug can be easily removed and replaced without damaging the insulation and jacket. Provide a removable reusable insulation cover. For below ambient services, provide a design that maintains vapor barrier.
6. Insulate flanges and unions using a section of oversized preformed pipe insulation.
Overlap adjoining pipe insulation by not less than two times the thickness of pipe insulation, or one pipe diameter, whichever is thicker.
7. For services not specified to receive a field-applied jacket except for flexible elastomeric, install fitted PVC cover over elbows, tees, strainers, valves, flanges, and unions.
Terminate ends with PVC end caps. Tape PVC covers to adjoining insulation facing using PVC tape.
8. Stencil or label the outside insulation jacket of each union with the word "UNION."
Match size and color of pipe labels.
C. Insulate instrument connections for thermometers, pressure gages, pressure temperature taps, test connections, flow meters, sensors, switches, and transmitters on insulated pipes, vessels, and equipment. Shape insulation at these connections by tapering it to and around the connection with insulating cement and finish with finishing cement, mastic, and flashing sealant.
D. Install removable insulation covers at in-line instruments, control valves, and unions.
Installation shall conform to the following:
1. Make removable flange and union insulation from sectional pipe insulation of same thickness as that on adjoining pipe. Install same insulation jacket as adjoining pipe insulation.
2. When flange and union covers are made from sectional pipe insulation, extend insulation from flanges or union long at least two times the insulation thickness over adjacent pipe insulation on each side of flange or union. Secure flange cover in place with stainless-steel or aluminum bands. Select band material compatible with insulation and jacket.
3. Construct removable valve insulation covers in same manner as for flanges except divide the two-part section on the vertical center line of valve body.
4. When covers are made from block insulation, make two halves, each consisting of mitered blocks wired to stainless-steel fabric. Secure this wire frame, with its attached insulation, to flanges with tie wire. Extend insulation at least 2 inches over adjacent pipe insulation on each side of valve. Fill space between flange or union cover and pipe insulation with insulating cement. Finish cover assembly with insulating cement applied in two coats. After first coat is dry, apply and trowel second coat to a smooth finish.
3.7 FLEXIBLE ELASTOMERIC INSULATION INSTALLATION
A. Seal longitudinal seams and end joints with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
B. Insulation Installation on Pipe Flanges:
MECHANICAL INSULATION 230700 - 14
1. Install pipe insulation to outer diameter of pipe flange.
2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.
3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with cut sections of sheet insulation of same thickness as pipe insulation.
4. Secure insulation to flanges and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
C. Insulation Installation on Pipe Fittings and Elbows:
1. Install mitered sections of pipe insulation.
2. Secure insulation materials and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
D. Insulation Installation on Valves and Pipe Specialties:
1. Install preformed valve covers manufactured of same material as pipe insulation when available.
2. When preformed valve covers are not available, install cut sections of pipe and sheet insulation to valve body. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.
3. Install insulation to flanges as specified for flange insulation application.
4. Secure insulation to valves and specialties and seal seams with manufacturer's recommended adhesive to eliminate openings in insulation that allow passage of air to surface being insulated.
3.8 MINERAL-FIBER INSULATION INSTALLATION
A. Insulation Installation on Straight Pipes and Tubes:
1. Secure each layer of preformed pipe insulation to pipe with wire or bands and tighten bands without deforming insulation materials.
2. Where vapor barriers are indicated, seal longitudinal seams, end joints, and protrusions with vapor-barrier mastic and joint sealant.
3. For insulation with factory-applied jackets on above ambient surfaces, secure laps with outward clinched staples at 6 inches o.c.
4. For insulation with factory-applied jackets on below ambient surfaces, do not staple longitudinal tabs but secure tabs with additional adhesive as recommended by insulation material manufacturer and seal with vapor-barrier mastic and flashing sealant.
B. Insulation Installation on Pipe Flanges:
1. Install preformed pipe insulation to outer diameter of pipe flange.
2. Make width of insulation section same as overall width of flange and bolts, plus twice the thickness of pipe insulation.
3. Fill voids between inner circumference of flange insulation and outer circumference of adjacent straight pipe segments with mineral-fiber blanket insulation.
MECHANICAL INSULATION 230700 - 15
4. Install jacket material with manufacturer's recommended adhesive, overlap seams at least
1 inch, and seal joints with flashing sealant.
C. Insulation Installation on Pipe Fittings and Elbows:
1. Install preformed sections of same material as straight segments of pipe insulation when available.
2. When preformed insulation elbows and fittings are not available, install mitered sections of pipe insulation, to a thickness equal to adjoining pipe insulation. Secure insulation materials with wire or bands.
D. Insulation Installation on Valves and Pipe Specialties:
1. Install preformed sections of same material as straight segments of pipe insulation when available.
2. When preformed sections are not available, install mitered sections of pipe insulation to valve body.
3. Arrange insulation to permit access to packing and to allow valve operation without disturbing insulation.
4. Install insulation to flanges as specified for flange insulation application.
3.9 FIELD QUALITY CONTROL
A. Perform tests and inspections.
B. Tests and Inspections:
1. Inspect pipe, fittings, strainers, and valves, randomly selected by Engineer, by removing field-applied jacket and insulation in layers in reverse order of their installation. Extent of inspection shall be limited to two locations of straight pipe, two locations of threaded fittings, two locations of welded fittings, two locations of threaded strainers, two locations of welded strainers, two locations of threaded valves, and two locations of flanged valves for each pipe service defined in the "Piping Insulation Schedule, General"
Article.
C. All insulation applications will be considered defective Work if sample inspection reveals noncompliance with requirements.
3.10 DUCT INSULATION SCHEDULE, GENERAL
A. Ducts and Terminal Devices Requiring Insulation:
1. Indoor supply, outside, relief/exhaust, exhaust-air ducts, and louver plenums Mechanical
G03 and Mechanical G0).
B. Items Not Insulated:
1. Factory-insulated flexible ducts.
2. Flexible connectors.
MECHANICAL INSULATION 230700 - 16
3. Vibration-control devices.
4. Factory-insulated access panels and doors.
5. Ductwork in Shower G01.
3.11 INDOOR DUCT INSULATION SCHEDULE (MECHANICAL G03 AND MECHANICAL
G04)
A. Outdoor Air Duct Insulation: Mineral-fiber board with factory-applied FSK Jacket, 2 inches thick and 3-lb/cu. ft. nominal density.
B. Supply Air Duct Insulation: Mineral-fiber board with factory-applied FSK Jacket, 2 inches thick and 3-lb/cu. ft. nominal density.
C. Exhaust Air Duct Insulation: Mineral-fiber board with factory-applied FSK Jacket, 2 inches thick and 3-lb/cu. ft. nominal density.
D. Louver Plenum Insulation: Mineral-fiber board with factory-applied FSK Jacket, 2 inches thick and 3-lb/cu. ft. nominal density.
3.12 PIPING INSULATION SCHEDULE, GENERAL
A. Acceptable preformed pipe and tubular insulation materials and thicknesses are identified for each piping system and pipe size range. If more than one material is listed for a piping system, selection from materials listed is Contractor's option.
B. Items Not Insulated: Unless otherwise indicated, do not install insulation on the following:
1. Underground piping.
2. Chrome-plated pipes and fittings unless there is a potential for personnel injury.
3.13 REMOVEABLE INSULATION BLANKETS: (EXPANSION SLIP JOINT AND VALVES 2-
1/2” AND LARGER)
A. Provide removable reusable insulated cover on new and existing expansion slip joints, ball joints and valves.
B. Install blankets to be field removable without tools.
C. Blankets shall be installed to allow the normal expansion and contraction associated with these systems, without crushing or damaging the blanket.
D. Expansion Joint blankets shall extend over the adjacent rigid insulation to allow for pipe expansion.
E. Blankets shall be installed without sagging or gaps.
F. Blankets shall be installed to shed water.
MECHANICAL INSULATION 230700 - 17
G. Steam system will not be allowed to start up until removable jackets are installed.
3.14 INDOOR PIPING INSULATION SCHEDULE
A. Domestic Hot Water and Domestic Hot Water Recirculation: Insulation shall be one of the following:
1. Flexible Elastomeric, Type 1: ¾ inch thick. Only use for 120 deg F or less on lines that are roughed in at times when water infiltration during construction is possible.
2. Mineral-Fiber, Preformed Pipe Insulation, Type I:
a. For Piping NPS 1-/4 and Smaller: 1 inch thick with factory-applied ASJ Jacket.
b. For Piping NPS 1-1/2 and Larger: 1½ inch thick with factory applied ASJ jacket.
B. Domestic Cold Water: Insulation shall be the following:
1. Flexible Elastomeric, Type 1: ½ inch thick. Only use for 120 deg F or less on lines that are roughed in at times when water infiltration during construction is possible.
2. Mineral-Fiber, Preformed Pipe Insulation, Type I:
a. For Piping NPS 1-1/4 and Smaller: ¾ inch thick with factory-applied ASJ Jacket.
b. For Piping NPS 1-1/2 to 2”: 1 inch thick with factory applied ASJ jacket.
c. For Piping greater than 2”: 2 inch thick with factory applied ASJ jacket.
C. Exposed Sanitary Drains, Domestic Cold Water, Domestic Hot Water, and Stops for Plumbing
Fixtures for People with Disabilities: Insulation shall be the following:
1. Install ADA acceptable guards as specified.
D. Condensate Drains: Insulation shall be the following:
1. Flexible Elastomeric, Type I: ½ inch thick.
E. Low Pressure Steam
1. Piping 3 Inches and Smaller-Mineral-Fiber, Preformed Pipe, Type 1: 2-1/2 inches thick with factory-applied ASJ Jacket.
2. Piping 4 inches and Larger-Mineral Fiber, Preformed Pipe, Type I: 3 inches thick with factory-applied ASJ Jacket.
F. Low Pressure Condensate
1. Piping 1-1/4 Inches and Smaller-Mineral-Fiber, Preformed Pipe, Type 1: 1-1/2 inches thick with factory-applied ASJ Jacket.
2. Piping 1-1/2 inches and Larger-Mineral Fiber, Preformed Pipe, Type I: 2 inches thick with factory-applied ASJ Jacket.
G. Refrigerant Suction and Hot-Gas Lines: Insulation shall be the following:
MECHANICAL INSULATION 230700 - 18
1. Flexible Elastomeric, Type I: ¾ inch thick.
3.15 OUTDOOR PIPING INSULATION SCHEDULE
A. Refrigerant Hot Gas and Suction Piping: Insulation shall be the following:
1. Flexible Elastomeric, Type I: 1 inch thick.
3.16 OUTDOOR, FIELD-APPLIED JACKET SCHEDULE
A. Install jacket over insulation material. For insulation with factory-applied jacket, install the field-applied jacket over the factory-applied jacket.
B. If more than one material is listed, selection from materials listed is Contractor’s option.
C. Refrigerant Piping, Exposed:
1. UV PVC Jacket
END OF SECTION 230700