Addendum 4 Cover Page 11.24.26.pdf

PDF 92 KB Posted

Attached to
HOLT HIGH SCHOOL RENOVATION - BP1
Solicitation number
RFP HOL 270000000416 1
Issued by
Michigan

About this file

This is an addendum cover page for the Holt High School Renovation BP 1 project, issued by Granger Construction Company in coordination with GMB. The addendum modifies the original Contract Documents dated October 29, 2026, and serves as an official amendment binding to all bidders. The key modification announced in this addendum is the revision of the bid submission deadline to December 2nd, 2026 at 10:00 AM EST. The addendum includes three attachments: GMB Addendum 003 dated November 23, 2026; a current list of Pre-Bid Requests for Information (RFIs) dated November 24, 2026; and an updated drawing (A2.2.2H) reflecting changes to carpet installation limits per RFI 23 response. All bidders are required to acknowledge receipt of this addendum on their Bid Proposal form, and questions regarding the addendum should be submitted electronically through Building Connected.

No pricing information, set-asides, incumbent contractor details, or funding sources are specified in this addendum cover page. The document serves primarily as a notification mechanism for the deadline extension and incorporation of related technical modifications and clarifications into the contract documents.

View the file

Other files

File Type Posted
Holt HS Notice To Bidders.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Granger Construction Company Page 1

Holt High School Renovation BP 1 Addendum No. 4

Date: November 24th, 2026

To Drawings, Specifications and Project Manual for Holt High School Renovation BP 1 Dated 10/29/26 as prepared by GMB and Granger Construction Company.

This Addendum shall hereby be and become a part of the Contract Documents the same as if originally bound therein. The following clarifications, amendments, additions, revisions, changes, and modifications change the original Contract Documents only in the amount and to the extent hereinafter specified in this Addendum. Bidders are responsible for becoming familiar with every item of this Addendum.

Each bidder shall acknowledge receipt of this addendum on their Bid Proposal form.

Any questions regarding this addendum should be submitted Electronically on Building Connected

ADDENDUM ATTACHMENTS:

1. GMB Addendum 003 Dated 11/23/26

2. Current list of Pre-Bid RFI’s – Dated 11/24/26

3. A2.2.2H updated per response to RFI 23 – carpet installation limits.

ADDENDUM ITEMS:

ADDITIONAL INFORMATION:

1. Bid submission date and time has been changed to December 2nd, 2026 at 10AM EST.

END OF ADDENDUM