This is Addendum Number Four to the Plans and Specifications for a demolition project issued by Corpus Christi Independent School District (CCISD) in Corpus Christi, Texas, prepared by Lamarr Womack & Associates, LP. The project involves the demolition of six school facilities: Fannin, Kostoryz, Sanders, and Travis Elementary Schools; Browne and Martin Middle Schools; and CIRC (Old Cunningham on Prescott). The addendum, dated June 17, 2026, provides clarifications, specification additions, and plan revisions to the original contract documents. Key clarifications include that contractors must provide their own bid bonds, existing storm drains must remain and be protected during demolition, and a site tour schedule would be provided in a subsequent addendum. The addendum incorporates asbestos inspection reports and abatement specifications for Fannin Elementary (prepared by Sitex, dated June 3 and 6, 2026), Kostoryz Elementary (dated June 12 and 15, 2026), and Browne Middle School (dated June 17, 2026), along with a revised demolition site plan for Old Cunningham Elementary. Contractors are required to furnish performance bonds, payment bonds, and certificates of insurance before commencing work, with work to begin within 10 days of contract execution.

The asbestos inspection report for Fannin Elementary identifies 374 samples of suspect asbestos-containing materials, with findings including floor tile mastic, floor tile, pipe insulation mastic, sink mastic, transite pipe, ceiling tile mastic, and vapor barrier containing greater than one percent asbestos. Materials are currently in good condition and non-friable; however, Sitex recommends removal of all asbestos-containing materials prior to demolition in accordance with NESHAP regulations and Texas Asbestos Health Protection Rules. The removal must be designed by a DSHS-licensed asbestos consultant, performed by DSHS-licensed abatement contractors, and monitored by a DSHS-licensed air monitoring firm. The sample quantities for asbestos-containing materials are estimates only, and contractors are required to conduct independent measurements and cost projections. Liquidated damages apply if work is not completed within the agreed timeframe, and the District reserves the right to approve changes in scope and change orders through Board of Trustees action.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER FOUR June 17, 2026

TO THE PLANS AND SPECIFICATIONS FOR: PAGE 1 OF 549

DEMOLITION OF FANNIN, KOSTORYZ, SANDERS, AND TRAVIS

ELEMENTARY SCHOOLS, BROWNE & MARTIN MIDDLE

SCHOOLS, AND CIRC (OLD CUNNINGHAM ON PRESCOTT)

CORPUS CHRISTI INDEPENDENT SCHOOL DISTRICT

CORPUS CHRISTI, TEXAS

LAMARR WOMACK & ASSOCIATES, LP

711 N. CARANCAHUA, SUITE 404

CORPUS CHRISTI, TX 78401

361/884-7442 FAX: 361/226-4548

This addendum is generally separated into sections for convenience; however, all contractors, subcontractors, materialmen, and other parties shall be responsible for reading the entire addendum.

The failure to list an item or items in all affected sections of this addendum does not relieve any party affected from performing as per instructions, providing that the information is set forth any time, any place in this addendum. These documents shall be attached to and become a part of the contract documents for this project.

CLARIFICATION ITEMS

Item C-1 Section 00100 Instructions to All Interested Offerors, Request for Competitive

Sealed Proposal - ADD Sample – Construction Contract for informational purposes only. (3 pages)

Item C-2 Section 00100 Instructions to All Interested Offerors, Request for Competitive

Sealed Proposal - CLARIFICATION Corpus Christi Independent School District does not provide a Bid Bond form. Contractors are to provide their own Bid Bonds.

Item C-3 Section 00100 Instructions To All Interested Offerors, 15. Examination of

Contract Documents and Site, 15.2 – CLARIFICATION A site tour schedule for additional viewing of the campus sites is to follow with next addendum.

SPECIFICATION ITEMS

Item S-1 Specification 003126 Existing Hazardous Material Information, 1.1 B. – ADD and Asbestos Inspection Report for Fannin Elementary, prepared by Sitex, dated June 3, 2026, attached. (113 pages)

Item S-2 Section 003126 Existing Hazardous Material Information, 1.1 B. – ADD and

Specifications for Asbestos Abatement for Fannin Elementary, prepared by Sitex, dated June 6, 2026, attached. (56 pages)

06-17-2026

ADDENDUM NUMBER FOUR June 17, 2026

TO THE PLANS AND SPECIFICATIONS FOR: PAGE 2 OF 549

Item S-3 Specification 003126 Existing Hazardous Material Information, 1.1 B. – ADD and Asbestos Inspection Report for Kostoryz Elementary, prepared by Sitex, dated June 12, 2026, attached. (119 pages)

Item S-4 Section 003126 Existing Hazardous Material Information, 1.1 B. – ADD and

Specifications for Asbestos Abatement for Kostoryz Elementary, prepared by Sitex, dated June 15, 2026, attached. (56 pages)

Item S-5 Specification 003126 Existing Hazardous Material Information, 1.1 B. – ADD and Asbestos Inspection Report for Browne Middle School, prepared by Sitex, dated June 17, 2026, attached. (143 pages)

Item S-6 Section 003126 Existing Hazardous Material Information, 1.1 B. – ADD and

Specifications for Asbestos Abatement for Browne Middle School, prepared by Sitex, dated June 17, 2026, attached. (56 pages)

PLAN ITEMS

Item P-1 Sheets A100 thru A106 Demolition Site Plans, Site Plan General Notes, Note E.

– CLARIFICATION All existing storm drains to remain and to be protected during demolition. Locations and quantities of existing drainage structures including storm drains, manholes and inlets to be field verified by Contractor.

Item P-2 Sheets A100 thru A106 Demolition Site Plans, Existing Fences and New Fences

– CLARIFICATION Existing fences and new fences can be used for site security. Temporary fences are only as required, if new and existing fences to remain are not around perimeter of project. All fences are to be protected during demolition. Refer to related Item S-5 on Addendum 2.

The entire campus property and existing perimeter fence are not shown on all sheets. The existing fences not shown on some of the plans continue around to enclose the perimeter of each campus.

Item P-3 Sheet A106 Demolition Site Plan, Old Cunningham Elementary – REPLACE sheet with attached revised sheet, Addendum 4. (1 page)

SAMPLE - CONSTRUCTION CONTRACT

THE STATE OF TEXAS §

COUNTY OF NUECES §

The CORPUS CHRISTI INDEPENDENT SCHOOL DISTRICT (hereafter called “Owner”) and _______________________ (hereafter called “Contractor”), hereby agree as follows:

1. Contractor agrees to construct for Owner in accord with the Contract Documents the following: __(“Project”), according to the contract documents prepared by (“Engineer”).

2. Contractor agrees to furnish, at his own expense, all labor, services, materials, tools, equipment and supervision necessary to the full and final completion of the Project, and everything incidental thereto, as shown on the Drawings, stated in the Specifications, or properly inferable therefrom, all in accord with the Contract Documents, as hereafter defined.

3. The Contract Documents consist of this Construction Contract and the following instruments, which are incorporated herein:

a. Request For Competitive Sealed Proposals # FYXX-P-00XX Included in the Project Manual

b. Proposal response

c. Conditions of the Contract (General and Supplemental)

d. Drawings

e. Specifications

f. Addenda and amendments to the foregoing as follows:

(1) Addendum No. 1 dated ________

(2) Addendum No. 2 dated ________

4. Immediately following the execution of this contract and before performing any work, Contractor shall furnish to Owner a valid Performance Bond and Payment Bond, each in the full amount of the contract price on forms promulgated by Owner, written by companies acceptable to and approved by Owner and a required Certificate of Insurance, each in accord with the requirements of the Contract Documents.

5. Contractor shall commence work on or before 10 days from the effective date of this Contract and shall complete the work on or before . Time is of the essence in all phases of the work. If the work is not timely completed in accord with the terms of the Contract Documents, Contractor shall be liable to Owner for damages calculated in accord with the terms and provisions of Article 13 of the Supplemental General Conditions of the Contract. If liquidated damages are assessed according to Article 13, it is expressly agreed that the said sum per day is a fair estimate of the pecuniary damages which will be sustained by the Owner in the event that the work is not completed within the agreed time. Said sum shall be considered as liquidated damages only and in no sense shall be considered a penalty, said damages being caused by additional compensation to personnel, for loss of interest on money, and other miscellaneous increased costs, all of which are difficult to exactly ascertain. Such liquidated damages, if assessed, shall be in addition to, and not in lieu of any other rights or remedies Owner may have against Contractor for failure to timely achieve completion of the work.

6. The total contract price is $_________ dollars ($), which includes the base bid and alternates numbers: N/A.

7. The parties hereto agree that they will take such steps and execute such instruments as may be necessary to enable Owner to claim its exemption from the State of Texas Limited Sales Tax for Materials used in such Project. All savings resulting from such tax exemption shall be for the benefit of the Owner.

6. The Board of Trustees, by majority vote, is the only representative of the

Owner, an independent school district having the power to enter into a contact to approve changes in the scope of the work to approve a change order, or to agree to an extension to the date of completion of the work. The Board may authorize a representative to act on behalf of the Owner in the day-to-day administration of the contract.

Executed in Corpus Christi, Texas, on __________, 202X.

ATTEST: CORPUS CHRISTI INDEPENDENT SCHOOL DISTRICT

By: Date:

President, Board of Trustees

Dr. Roland Hernandez Superintendent of Schools

Reviewed and Approved for Purchasing Compliance

Arnulfo Gonzalez

Director for Purchasing and Distribution

Approved as to legal form:

Brian S. Nelson General Counsel for CCISD

ABC Company 1234 XYZ Street, Corpus Christi, TX 78408

(361) 123-4567

Owner

HOUSTON • CORPUS CHRISTI

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

Asbestos Inspection Report

June 3, 2026

FANNIN ELEMENTARY SCHOOL

2730 GOLLIHAR RD

CORPUS CHRISTI, TEXAS

Prepared for:

CORPUS CHRISTI INDEPENDENT SCHOOL DISTRICT

Prepared by:

SITEX, INC

5233 IH 37 SUITE A-3

CORPUS CHRISTI, TEXAS 78408

(361) 887-9400

PROJECT NUMBER: 23958

June 3, 2026

Mr. Trent Wagner Executive Director of Construction and Project Management Corpus Christi Independent School District 801 Leopard Street Corpus Christi, TX 78401

RE: Asbestos Demolition Inspection Fannin Elementary School 2730 Gollihar Corpus Christi, TX Project Number: 23958

Dear Mr. Wagner:

Enclosed is the report for the asbestos inspection performed at 2730 Gollihar in Corpus Christi, TX. The sampling was performed on May 19 to 25, 2026, by Mr. Paul Kass of Sitex, Inc. Mr. Kass is licensed by the Texas Department of State Health Services as an Asbestos Inspector (#60-2824).

SCOPE OF WORK

The scope of this project was limited to suspect asbestos-containing materials (ACM) specified by the client at the above-referenced property. Three hundred seventy four (374) samples of suspect asbestos-containing materials were collected. State of Texas regulations define asbestos-containing materials as having greater than one per-cent (>1%) asbestos content. Samples of the following materials were found to contain greater than one percent (>1%) asbestos:

1) Floor tile mastic

2) Floor tile

3) Pipe Insulation Mastic

4) Sink Mastic

5) Transite pipe

6) Ceiling tile mastic

7) Vapor barrier

Sink mastic, floor tile mastic and window glaze included in the samples collected in the facility was found to con-tain less than one percent (< 1%) asbestos by approved laboratory analytical methods. In the State of Texas, a material must contain greater than one percent (> 1%) asbestos to be considered as a regulated material. Based upon Environmental Protection Agency (EPA) and Texas Department of State Health Services (DSHS) regula-tions, the sample is less than one percent (< 1%) asbestos and is not defined as an asbestos-containing material by rule, is not regulated by DSHS, and does not require abatement prior to the demolition or renovation of the existing structure.

However, Occupational Safety and Health Administration (OSHA) regulations regarding asbestos fiber exposure to workers does apply to materials containing less than one percent (< 1%) asbestos. The OSHA regulation re-quires each employer to determine the proper respiratory protection for employees, based upon reliable air mon-itoring data. Each employer should evaluate the respiratory hazards based upon their own health and safety programs, which are developed to comply with the current OSHA respiratory requirements. Sitex recommends wet methods, engineering controls during demolition activities, and employee air monitoring to determine proper respiratory protection when dealing with materials containing less than one percent (< 1%) asbestos.

Suspect Materials Tested

Suspect asbestos-containing materials (ACM) were collected according to protocol established by the Texas As-bestos Health Protection Rules (TAHPR) 295.34 (c) for building demolitions and renovations. During the inspection, sampled materials were assigned a sample number and a homogenous area (H.A.) number. Samples were col-lected of each area and the friability and condition of the suspect material was assessed.

Table 1 contains the homogenous area numbers, material types, material descriptions, material locations, condi-tion assessments, and a summary of the analytical results.

Table 2 correlates each sample number to its homogenous area number. Analytical results and a list of definitions can be found following the text of this report.

Analytical Methods

All polarized light microscopy (PLM) lab analyses were performed at SanAir Technologies Laboratory Inc. in North Chesterfield, VA, using standard oil immersion and optical staining techniques. SanAir is an American Industrial Hygiene Association participant laboratory (#162952), a National Institute of Standards and Technology NVLAP-accredited laboratory (#200870) and licensed by the Texas Department of State Health Services (#30-0440) for asbestos laboratory analysis.

RECOMMENDATIONS

Recommendations concerning the asbestos-containing materials (ACM) identified in this limited inspection are based on the following:

1. Condition

2. Friability

3. Potential for disturbance

Condition and Friability

The asbestos-containing floor tile, mastic, vapor barrier, pipe insulation mastic, sink mastic, ceiling tile mastic are in good condition and considered non-friable.

Response Actions

Sitex, Inc. recommends that the condition of these asbestos-containing materials should be monitored. If this material becomes damaged or will be disturbed during renovations, then this material should be removed.

Response Actions for Demolition

According to NESHAP 40 CFR 61 Subpart M, 61.145 and Texas Asbestos Health Protection Rules, 295.60, friable or potentially friable ACM which will be disturbed during demolition, or has the potential to be disturbed, must be removed. Thus Sitex, Inc. recommends that all asbestos-containing materials be removed from the building prior to demolition. A licensed asbestos consultant should be consulted prior to any demolition operations in a building or other structure containing ACM. The project must be designed by a DSHS (Department of State Health Services) licensed asbestos consultant and monitored by a DSHS licensed company.

Use of Licensed Contractors

According to the Texas Asbestos Health Protection Rules, 295.34, the removal of asbestos in projects covered by the regulations require asbestos abatement specifications to be written by a DSHS licensed asbestos consultant and air monitoring be performed by a DSHS licensed air monitoring firm. In addition, a DSHS licensed asbestos abatement contractor must perform the removal.

Upon request from the Client, Sitex, Inc. can develop asbestos abatement specifications and obtain removal bids from multiple licensed abatement contractors. Please contact Stacy Kraatz at 361-887-9400 or by email at sta-cyk@sitexsolutions.com if this service is desired.

DISCLAIMER

The quantities for the asbestos-containing materials (ACM) indicated in Table I of this report (below) are estimates only, based upon scaled diagrams provided by the client and on-site evaluations. Sitex, Inc. assumes no liability for the use or interpretation of said quantities by any subsequent contractors, including, but not limited to, mailto:stacyk@sitexsolutions.com mailto:stacyk@sitexsolutions.com logistical issues, cost overruns and/or budgeting problems. Contractors bidding on removal of these materials should determine and develop cost projections based on their own independent measurements and quantifica-tions.

LIMITATIONS

This sampling report does not guarantee that additional asbestos-containing materials are not present. The scope of this project was limited to the client-specified materials sampled within this report. All other portions of the building not designated in the Scope of Work were specifically excluded. This report does not constitute a com-prehensive asbestos survey.

The following analytical results pertain to only the samples analyzed and may not reflect the actual composition of the entire homogeneous area. Sitex, Inc. assumes no responsibility for any subsequent use or interpretations of these analytical results. This report must not be used to claim product endorsement by NVLAP or any other state or federal government agency.

Please call us if you have any questions regarding this inspection report. We appreciate the opportunity to be of service to you.

Sincerely, Stacy Kraatz Paul Kass Asbestos Consultant (#10-5874) Asbestos Inspector (#60-2824) South Texas Regional Manager Sitex, Inc.

Sitex, Inc.

List of Definitions

Asbestos-Containing Material (ACM) - any material containing more than one percent asbestos (chrysotile asbes-tos, amosite asbestos, crocidolite asbestos, tremolite asbestos, anthophyllite asbestos, actinolite asbestos).

Demolition - the wrecking or taking out of any load-supporting structure member and any related razing, remov-ing, or stripping of asbestos products.

Disturbance - contact which releases fibers from ACM or debris containing ACM including activities which that disrupts the matrix of ACM, render ACM friable, or generate visible debris.

Encapsulation - a method of control of asbestos fibers in which the surface of ACM is penetrated by or covered with a liquid coating prepared for that purpose.

Enclosure - the construction of an airtight, impermeable, semi-permanent barrier surrounding asbestos to prevent the release of asbestos fibers into the air.

Fiber - a particulate form of asbestos, 5 micrometers or longer, with a length-to diameter ratio of at least 3 to 1.

Friable Materials - any material that when dry can be crumbled, pulverized, or reduced to powder by hand pres-sure.

Homogeneous Area - an area of surfacing material or thermal system that is uniform in color and texture.

Intact - means that the ACM has not crumbled, been pulverized, or otherwise deteriorated so that it is no longer likely to be bound with its matrix.

Removal - all operations where ACM is taken out or stripped from structures or substrates, and includes demoli-tion operations.

Renovation - the modifying of any existing structure, or portion thereof.

Repair - overhauling, rebuilding, reconstructing, or reconditioning of structures or substrates, including encapsu-lation or other repair of ACM attached to structures or substrates.

Table I – Sample Materials Summary

Table II – Sample Location / Homogeneous Area Association

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

TABLE I - SAMPLE MATERIALS SUMMARY

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

1 Floor Tile 12x12 White W/Blue Streaks Rooms 1-5,7,8 (Approx 4550 sf) Good No No

2 Floor Tile Mastic Yellow/Brown Rooms 1-5,7,8 (Approx 4550 sf) Good No No

3 Sheet Vinyl Teal Fibrous Material Rooms 1-16 (Approx 384 sf) Good No No

4 Sheet Vinyl Mas-tic

Yellow/Brown Mastic Rooms 1-16 (Approx 384 sf) Good No No

5 Sink Mastic Black Mastic Rooms 1-16 (16 Sinks) Good No No (<1%)

6 Pipe Insulation Mastic

White Mastic Inside Building Below Rooftop Units (Approx 250 ln ft)

Good No YES

7 Drywall White Powder W/Brown Fi-ber

Rooms 1-16, Restrooms (Ap-prox 2566 sf)

Good Yes No

8 Joint Compound White Powder Rooms 1-16, Restrooms (Ap-prox 2566 sf)

Good Yes No

9 Floor Tile 12x12 Cream W/Brown Streaks

Hallways of Rooms 1-16 and Rooms 13-16 (Approx 3250 sf)

Good No No

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

10 Floor Tile Mastic Yellow/Brown Mastic Hallways of Rooms 1-16 and

Rooms 13-16 (Approx 3250 sf) Good No No

11 Ceiling Tile 2x4 Grey Fiber W/White Paint

Hallways and Classrooms of 1-

Good Yes No

12 Carpet Mastic Yellow/Black Mastic Under Carpet of Admin Offices (Approx 1889 sf)

Good No No

13 Sheet Flooring Teal Office Restrooms (Approx 36 sf)

Good No No

14 Sheet Mastic Yellow/Brown Mastic Office Restrooms (Approx 36 sf)

Good No No

15 Sheet Flooring Brown Speck Nurse Restroom (Approx 25 sf) Good No No

16 Sheet Flooring Mastic

Yellow Mastic Nurse Restroom (Approx 25 sf) Good No No

17 Floor Tile 12x12 Cream W/Bronw Flecks

Nurse Office & Closet (Approx 150 sf)

Good No No

18 Floor Tile Mastic Yellow Mastic Nurse Office & Closet (Approx 150 sf)

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

19 Floor Tile 12x12 Cream W/Bronw

Flecks Under Carpet of Lounge (Ap-prox 384 sf)

Good No Yes

20 Floor Tile Mastic Black Mastic Under Carpet of Lounge (Ap-prox 384 sf)

Good No Yes

21 Sink Mastic

Pink Mastic Lounge Sink Good No Yes

22 Sink Mastic Black Mastic Teacher’s Work Room Good No Yes

23 Refractory Ce-ment

White Cementous Material Room 33 Kiln Good No No

24 Transite Pipe Grey Cementous Material Kitchen (Approx. 5 lf) Good No Yes

25 Carpet Mastic Yellow/Green Mastic Under Carpet of Room 33 (Ap-prox. 882 sf)

Good No No

26 Carpet Mastic Yellow/Green Mastic Under Carpet of Library (Ap-prox. 1404 sf)

27 Sink Mastic Grey Mastic Rooms 21,25,34 Good No YES

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

28 Sink Mastic Black Mastic Rooms 17-20,22-24,26-302 Good No No

(<1%) 29 Cove Base Mastic Tan/Black Mastic Perimeter of Halls and Class-rooms of West Building Good No No

30 Ceiling Tile 2x4 Grey Fiber W/White Paint

Suspended Ceiling of West Half of Building

Good Yes No

31 Ceiling Tile 2x4 Grey Fiber W/White Paint

Suspended Ceiling of West Half of Building

Good Yes No

32 Drywall White Powder W/Brown Fi-ber

RR Ceilings, Fur downs of Rooms 17-32, Rooms and Hall-ways of 33-35 (Approx 3020 sf)

Good Yes No

33 Floor Tile 12x12 Cream W/Tan Streaks Hallways, Library Storage, Workroom, Rms 17-32,34,35 (Approx. 11,200 sf)

Good No No

34 Floor Tile Mastic Yellow/Brown/ Black Mastic Hallways, Library Storage, Workroom, Rms 17-32,34,35 (Approx. 11,200 sf)

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

35 Floor Tile 12x12 Yellow W/Yellow

Streaks Designs of Hallways, Library Storage, Workroom, Rms 17- 32,34,35 (Approx 950 sf)

Good No No

36 Floor Tile 12x12 Yellow W/Yellow Streaks

Designs of Hallways, Library Storage, Workroom, Rms 17- 32,34,35 (Approx 950 sf)

Good No No

37 Floor Tile Mastic Yellow/Brown/ Black Mastic Designs of Hallways, Library Storage, Workroom, Rms 17- 32,34,35 (Approx 950 sf)

Good No No

38 Floor Tile Mastic Yellow/Brown/ Black Mastic Designs of Hallways, Library Storage, Workroom, Rms 17- 32,34,35 (Approx 950 sf)

Good No No

39 Floor Tile 12x12 Lt. Blue W/Blue Streaks

Designs of Hallways, Library Storage, Workroom, Rms 17- 32,34,35 (Approx 950 sf)

Good No No

40 Floor Tile Mastic Yellow/Brown/ Black Mastic Designs of Hallways, Library Storage, Workroom, Rms 17- 32,34,35 (Approx 950 sf)

41 Floor Tile 12x12 Cream W/Tan Streaks Room 35,36 (Approx 1394 sf) Good No No

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

42 Floor Tile Mastic Yellow/Black Mastic Room 35,36 (Approx 1394 sf) Good No No

(<1%) 43 Floor Tile 12x12 Yellow W/Cream

Streaks Design of Room 35,36 (Approx 55 sf)

Good No No

44 Floor Tile Mastic Yellow/Black Mastic Design of Room 35,36 (Approx 55 sf)

Good No No (<1%)

45 Floor Tile 12x12 Dk. Blue W/Lt. Blue Streaks

Design of Room 35,36 (Approx 55 sf)

Good No No

46 Floor Tile Mastic Yellow/Black Mastic Design of Room 35,36 (Approx 55 sf)

Good No No (<1%)

47 Sink Mastic Grey Mastic Sinks of 35,36 Good No No

48 Ceiling Tile 2x4 Grey Fiber W/White Paint

Suspended Ceiling of 35,36 Good Yes No

49 Sheet Vinyl Tan Pebble Design Restrooms of 35,36 (Approx 64 sf)

Good No No

50 Sheet Vinyl Mas-tic

Yellow/Bronw Mastic Restrooms of 35,36 (Approx 64 sf)

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

51 Ceiling Tile 2x4 Grey Fiber W/White

Paint Rooms 37,38 Good Yes No

52 Sink Mastic White Mastic Sinks of 37,38 Good No No

53 Sheet Vinyl Tan Pebble Design Restrooms of 37,38 (Approx 64 sf)

Good No No

54 Sheet Vinyl Mas-tic

Yellow/Bronw Mastic Restrooms of 37,38 (Approx 64 sf)

Good No No

55 Floor Tile 12x12 Cream W/Brown Streaks

Rooms 37,38 (Approx 692 sf) Good No No

56 Floor Tile Mastic Yellow/Brown Mastic Rooms 37,38 (Approx 692 sf) Good No No

57 Floor Tile 12x12 Lt. Blue W/Dk. Blue Streaks

Design of Rooms 37,38 (Approx 20 sf)

Good No No

58 Floor Tile Mastic Yellow/Brown Mastic Design of Rooms 37,38 (Approx 20 sf)

Good No No

59 Floor Tile 12x12 Yellow W/Lt. Yellow Streaks

Design of Rooms 37,38 (Approx 20 sf)

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

60 Floor Tile Mastic Yellow/Brown Mastic Design of Rooms 37,38 (Approx

20 sf) Good No No

61 Floor Tile 12x12 Dk. Blue W/Lt. Blue Streaks

Design of Rooms 37,38 (Approx 20 sf)

Good No No

62 Floor Tile Mastic Yellow/Brown Mastic Design of Rooms 37,38 (Approx 20 sf)

Good No No

63 Floor Tile 12x12 White W/Blue Streaks Room 37 (Approx 692 sf) Good No No

64 Floor Tile Mastic Yellow/Brown Mastic Room 37 (Approx 692 sf) Good No No

65 Floor Tile 12x12 Orange W/Brown Streaks

Design of Room 37 (Approx 20 sf)

Good No No

66 Floor Tile Mastic Yellow/Brown Mastic Design of Room 37 (Approx 20 sf)

Good No No

67 Floor Tile 12x12 Blue W/Dk. Blue Streaks

Design of Room 37 (Approx 20 sf)

Good No No

68 Floor Tile Mastic Yellow/Brown Mastic Design of Room 37 (Approx 20

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

69 Floor Tile 12x12 Purple W/Dk. Purple

Streaks Design of Room 37 (Approx 20 sf)

Good No No

70 Floor Tile Mastic Yellow/Brown Mastic Design of Room 37 (Approx 20 sf)

Good No No

71 Floor Tile 12x12 Green W/Dk. Green Streaks

Design of Room 37 (Approx 20 sf)

Good No No

72 Floor Tile Mastic Yellow/Brown Mastic Design of Room 37 (Approx 20 sf)

Good No No

73 Ceiling Tile 2x4 Grey Fiber W/White Paint

Rooms 37,38 Good Yes No

74 Sink Mastic Grey Mastic Sink in 40 Good No No

75 Sheet Vinyl Teal W/White Swirl Pattern Restroom (Approx 100 sf) Good No No

76 Sheet Vinyl Mas-tic

Yellow/Brown Mastic Restroom (Approx 100 sf) Good No No

77 Floor Tile 12x12 Cream W/Brown Streaks

Rooms 39,40 (Approx 1376 sf) Good No No

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

78 Floor Tile Mastic Yellow/Brown Mastic Rooms 39,40 (Approx 1376 sf) Good No No

79 Floor Tile 12x12 Blue W/Dk Blue Streaks

Rooms 39,40 (Approx 20 sf) Good No No

80 Floor Tile Mastic Yellow/Brown Mastic Rooms 39,40 (Approx 20 sf) Good No No

81 Floor Tile 12x12 Dk Blue W/Lt. Blue Streaks

Rooms 39,40 (Approx 20 sf) Good No No

82 Floor Tile Mastic Yellow/Brown Mastic Rooms 39,40 (Approx 20 sf) Good No No

83 Floor Tile 12x12 Yellow W/Dk. Yellow Streaks

Rooms 39,40 (Approx 20 sf) Good No No

84 Floor Tile Mastic Yellow/Brown Mastic Rooms 39,40 (Approx 20 sf) Good No No

85 Ceiling Tile 2x4 Grey Fiber W/White Paint

Cafeteria and Storage Good Yes No

86 Ceiling Tile 12x12 Tan Fiber W/White Paint

Cafeteria and Stage Above Sus-pended Ceiling (Approx. 3986

Good Yes No

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

87 Ceiling Tile Mas-tic Brown/Black/Tan Cafeteria and Stage Above Sus-pended Ceiling (Approx. 3986 sf)

Good No YES

88 Floor Tile 12x12 Blue Tile Border of Cafeteria (Approx.

492 sf)

Good No No

89 Floor Tile Mastic Yellow/Brown Mastic Border of Cafeteria (Approx.

492 sf)

Good No No

90 Floor Tile 12x12 Cream W/Brown Streaks

Cafeteria (Approx. 2758 sf) Good No No

91 Floor Tile Mastic Brown Mastic Cafeteria (Approx. 2758 sf) Good No No

92 Windowpane Glaze

Tan/White Powder Cafeteria Windowpanes (Ap-prox. 47 Windows

Good No No (<1%)

93 Door Sealant White/Tan Cafeteria Door Frames Good No No

94 Vapor Barrier Black Fibrous Mastic South Wall of Cafeteria (Approx 40 lf)

Good No No

95 Vapor Barrier Black Fibrous Mastic Main Building (Approx 11340

Good No YES

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400 • Fax 361.887.9401 • www.envirotestllc.com

2730 Gollihar Rd, Corpus Christi, TX

H.A.* MATERIAL

NAME MATERIAL DESCRIPTION MATERIAL LOCATION CONDITION FRIABLE

ASBESTOS-

CONTAINING

MATERIAL

96 Door Sealant White Bituminous Material Exterior Doors of Main Building Good No No

97 Brick Seam Seal-ant

Grey Bituminous Material Exterior Brick Expansion Seams Good No No

98 Sheet Roofing Black Fiber W/Black Tar and White Pebbles

Roof of Rooms 39-40 Good No No

99 Sheet Roofing Black Fiber W/Black Tar and White Pebbles

Roof of Rooms 35-36 Good No No

100 Sheet Roofing Black Fiber W/Black Tar and White Pebbles

Roof of Rooms 37-38 Good No No

101 Sheet Roofing Black Fiber W/Black Tar and White Pebbles

Roof of Rooms 33-34 Good No No

102 Roofing Black Tar Main Building Roof Good No No

103 Curb Roofing Black Fiber W/White Pebbles and Black Tar

Main Roof Curbs Good No No

* Homogeneous Area

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

TABLE II: SAMPLE NUMBER ⇔ HOMOGENEOUS AREA

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

1. 1 Room 2

2. 1 Room 3

3. 1 Room 4

4. 1 Room 6

5. 1 Room 7

6. 2 Room 2

7. 2 Room 3

8. 2 Room 4

9. 2 Room 6

10. 2 Room 7

11. 3 Room 3

12. 3 Room 6

13. 3 Room 10

14. 4 Room 3

15. 4 Room 6

16. 4 Room 10

17. 5 Room 3

18. 5 Room 6

19. 5 Room 14

20. 6 Room 6

21. 7 Room 3

22. 7 Room 6

23. 7 Room 10

24. 7 Room 11

25. 7 Room 14

26. 8 Room 3

27. 8 Room 6

28. 8 Room 10

29. 8 Room 11

30. 8 Room 14

31. 9 Hallway @ Room 6

32. 9 Room10

33. 9 Room 11

34. 9 Hallway @ Room 13

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

35. 9 Room 14

36. 10 Hallway @ Room 6

37. 10 Room10

38. 10 Room 11

39. 10 Hallway @ Room 13

40. 10 Room 14

41. 11 Hallway @ Restroom

42. 11 Room 2

43. 11 Hallway @ Room 6

44. 11 Room 6

45. 11 Hallway @ Room 8

46. 11 Room 10

47. 11 Room 16

48. 12 Reception

49. 12 Assistant Principal

50. 12 Principal

51. 12 Police

52. 12 Conference

53. 13 Restroom 2

54. 13 Restroom 2

55. 13 Restroom 1

56. 14 Restroom 2

57. 14 Restroom 2

58. 14 Restroom 1

59. 15 Nurse Restroom

60. 15 Nurse Restroom

61. 15 Nurse Restroom

62. 16 Nurse Restroom

63. 16 Nurse Restroom

64. 16 Nurse Restroom

65. 17 Nurse Office

66. 17 Nurse Office

67. 17 Nurse Office

68. 18 Nurse Office

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

69. 18 Nurse Office

70. 18 Nurse Office

71. 19 Lounge

72. 19 Lounge

73. 19 Lounge

74. 20 Lounge

75. 20 Lounge

76. 20 Lounge

77. 21 Lounge

78. 22 Teacher’s Work Room

79. 23 Room 33 Kiln

80. 24 Kitchen

81. 25 Room 33

82. 25 Room 33

83. 25 Room 33

84. 26 Library

85. 26 Library

86. 26 Library

87. 27 Room 87

88. 27 Room 88

89. 27 Room 89

90. 28 Room 17

91. 28 Room 23

92. 28 Room 26

93. 28 Room 29

94. 29 Teacher’s Work Room

95. 29 Room 17

96. 29 Room 21

97. 29 Room 25

98. 29 Room 29

99. 29 Room 34

100. 29 Hallway @ Room 21

101. 30 Teacher’s Work Room

102. 30 Room 17

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

103. 30 Room 21

104. 30 Room 25

105. 30 Room 29

106. 30 Room 34

107. 30 Hallway @ Room 21

108. 31 Room 17

109. 31 Room 21

110. 31 Room 25

111. 31 Room 29

112. 31 Room 33

113. 31 Room 34

114. 31 Boy’s RR

115. 32 Room 17

116. 32 Room 21

117. 32 Room 25

118. 32 Room 29

119. 32 Room 33

120. 32 Room 34

121. 32 Boy’s RR

122. 33 Workroom

123. 33 Room17

124. 33 Room 21

125. 33 Room 25

126. 33 Room 29

127. 33 Room 34

128. 33 Hallway @ Room 21

129. 34 Workroom

130. 34 Room17

131. 34 Room 21

132. 34 Room 25

133. 34 Room 29

134. 34 Room 34

135. 34 Hallway @ Room 21

136. 35 Workroom

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

137. 35 Room17

138. 35 Room 21

139. 35 Room 25

140. 35 Room 29

141. 35 Room 34

142. 35 Hallway @ Room 21

143. 36 Workroom

144. 36 Room17

145. 36 Room 21

146. 36 Room 25

147. 36 Room 29

148. 36 Room 34

149. 36 Hallway @ Room 21

150. 37 Teacher’s Workroom

151. 37 Room17

152. 37 Room 21

153. 37 Room 25

154. 37 Room 29

155. 37 Room 34

156. 37 Hallway @ Room 21

157. 37 Workroom

158. 38 Room17

159. 38 Room 21

160. 38 Room 25

161. 38 Room 29

162. 38 Room 34

163. 38 Hallway @ Room 21

164. 39 Teacher’s Workroom

165. 39 Room17

166. 39 Room 21

167. 39 Room 25

168. 39 Room 29

169. 39 Room 34

170. 39 Hallway @ Room 21

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

171. 40 Workroom

172. 40 Room17

173. 40 Room 21

174. 40 Room 25

175. 40 Room 29

176. 40 Room 34

177. 40 Hallway @ Room 21

178. 41 Room 35

179. 41 Room 36

180. 41 Room 36

181. 42 Room 35

182. 42 Room 36

183. 42 Room 36

184. 43 Room 35

185. 43 Room 36

186. 43 Room 36

187. 44 Room 35

188. 44 Room 36

189. 44 Room 36

190. 45 Room 35

191. 45 Room 36

192. 45 Room 36

193. 46 Room 35

194. 46 Room 36

195. 46 Room 36

196. 47 Room 35

197. 47 Room 35

198. 47 Room 36

199. 48 Room 35

200. 48 Room 35

201. 48 Room 36

202. 49 Room 35

203. 49 Room 35

204. 49 Room 36

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

205. 50 Room 36

206. 50 Room 36

207. 50 Room 36

208. 51 Room 37

209. 51 Room 38

210. 51 Room 38

211. 52 Room 37

212. 52 Room 37

213. 52 Room 37

214. 53 Room 37

215. 53 Room 38

216. 53 Room 38

217. 54 Room 37

218. 54 Room 38

219. 54 Room 38

220. 55 Room 38

221. 55 Room 38

222. 55 Room 38

223. 56 Room 38

224. 56 Room 38

225. 56 Room 38

226. 57 Room 38

227. 57 Room 38

228. 57 Room 38

229. 58 Room 38

230. 58 Room 38

231. 58 Room 38

232. 59 Room 38

233. 59 Room 38

234. 59 Room 38

235. 60 Room 38

236. 60 Room 38

237. 60 Room 38

238. 61 Room 38

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

239. 61 Room 38

240. 61 Room 38

241. 62 Room 38

242. 62 Room 38

243. 62 Room 38

244. 63 Room 37

245. 63 Room 37

246. 63 Room 37

247. 64 Room 37

248. 64 Room 37

249. 64 Room 37

250. 65 Room 37

251. 65 Room 37

252. 65 Room 37

253. 66 Room 37

254. 66 Room 37

255. 66 Room 37

256. 67 Room 37

257. 67 Room 37

258. 67 Room 37

259. 68 Room 37

260. 68 Room 37

261. 68 Room 37

262. 69 Room 37

263. 69 Room 37

264. 69 Room 37

265. 70 Room 37

266. 70 Room 37

267. 70 Room 37

268. 71 Room 37

269. 71 Room 37

270. 71 Room 37

271. 72 Room 37

272. 72 Room 37

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

273. 72 Room 37

274. 73 Room 39

275. 73 Room 39

276. 73 Room 40

277. 74 Room 40

278. 74 Room 40

279. 74 Room 40

280. 75 Restroom

281. 75 Restroom

282. 75 Restroom

283. 76 Restroom

284. 76 Restroom

285. 76 Restroom

286. 77 Room 39

287. 77 Room 39

288. 77 Room 40

289. 78 Room 39

290. 78 Room 39

291. 78 Room 40

292. 79 Room 39

293. 79 Room 39

294. 79 Room 40

295. 80 Room 39

296. 80 Room 39

297. 80 Room 40

298. 81 Room 39

299. 81 Room 39

300. 81 Room 40

301. 82 Room 39

302. 82 Room 39

303. 82 Room 40

304. 83 Room 39

305. 83 Room 39

306. 83 Room 40

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

307. 84 Room 39

308. 84 Room 39

309. 84 Room 40

310. 85 Cafeteria

311. 85 Cafeteria

312. 85 Cafeteria

313. 85 Cafeteria

314. 85 Cafeteria

315. 86 Cafeteria

316. 86 Cafeteria

317. 86 Cafeteria

318. 86 Cafeteria

319. 86 Cafeteria

320. 87 Cafeteria

321. 87 Cafeteria

322. 87 Cafeteria

323. 87 Cafeteria

324. 87 Cafeteria

325. 88 Cafeteria

326. 88 Cafeteria

327. 88 Cafeteria

328. 89 Cafeteria

329. 89 Cafeteria

330. 89 Cafeteria

331. 90 Cafeteria

332. 90 Cafeteria

333. 90 Cafeteria

334. 90 Cafeteria

335. 90 Cafeteria

336. 91 Cafeteria

337. 91 Cafeteria

338. 91 Cafeteria

339. 91 Cafeteria

340. 91 Cafeteria

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

341. 92 Cafeteria

342. 92 Cafeteria

343. 92 Cafeteria

344. 93 Cafeteria

345. 93 Cafeteria

346. 93 Cafeteria

347. 94 South Cafeteria Wall

348. 95 Outside Room 32

349. 95 Outside Room 20

350. 95 Outside Room 9

351. 96 Door a @ Room 32

352. 96 Door a @ Room 9

353. 96 Door a @ Room 5

354. 97

Exterior @ Room 32

355. 97

Exterior @ Room 11

356. 97

Exterior @ Room 5

357. 98 Roof of 39

358. 98 Roof of 39

359. 98 Roof of 40

360. 99 Roof of 35

361. 99 Roof of 35

362. 99 Roof of 36

363. 100 Roof of 37

364. 100 Roof of 38

365. 100 Roof of 38

366. 101 Roof of 33

367. 101 Roof of 34

368. 101 Roof of 34

369. 102 Roof Above Room 32

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

2730 Gollihar Rd, Corpus Christi, TX

SAMPLE # H.A.* SAMPLE LOCATION

370. 102 Roof Above Library

371. 102 Roof Above Cafeteria

372. 103 Curb Above Room 32

373. 103 Curb Above Library

374. 103 Curb Above Cafeteria

* Homogeneous Area

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

Sample Location Diagrams

280,281,282 283,284,285

23,28 32,37

25,30 35,40

5,10 13,16

4,9 12,15,18 20,23,27

3,8 2,7,11,14,17 21,26

1,6,43

350,355

31,36,43

34,39

24,29 33,38

55,58

53,54 56,57

81,82,83 112,119

79,89

94,101,122,129, 136,143 150,157 164,171

59,60,61 62,63,64

65,66,67 68,69,70

71,72,73 74,75,76

84,85,86 370,373 353,356

341,344

100,107,128,135 142,149,156,163

170,177

88,97,104, 110,117,125, 132,139,146 153,160, 167 174

95,102,108,115 123,130,137,14 4,151,158,165, 87,96,103 109,116,124, 131,138,145 152,159 166,173

274,275,286,287, 289,290,292,293, 295,296,298,299, 301,302,304,305, 307,308,357,358

276,277,278,279, 288,291,294,297, 300,303,306,309, 179,180,182,183 185,186,188,189 191,192,194,195, 198,201,204,207, 178,181,184,187, 190,193,196,197, 199,200,202,203 205,206,360,361, 114,121

99,106,113,120, 127,134,141,148, 155,162,367,368

98,105,111,118 126,133,140,147 154,161,168,175

208,211,214,217,244, 245,246,247,248,249, 250,251,252,253,254, 255,256,257,258,259, 260,261,262,263,264, 265,266,267,268,269, 270,271,272,273,363

209,210,212,213,215, 216,218,219,220,221, 222,223,224,225,226, 227,228,229,230,231, 232,233,234,235,236, 237,238,239,240,241, 242,243,364,365

310,311,312,313,314, 315,316,317,318,319, 320,321,322,323,324, 325,326,327,328,329, 330,331,332,333,334, 335,336,337,338,339, 340, 343,346 342,345

348,351,354

371,374

369,372

CORPUS CHRISTI OFFICE: 5233 IH 37 Suite A-3 • Corpus Christi, Texas 78408 • Voice 361.887.9400

Polarized Light Microscopy Laboratory Analytical Results

SanAir ID#: 26031190

Project #: 23958 Project Name: CCISD Fannin Elementary Report Date: 6/2/2026

Analysis Report prepared for SITEX Inc.

Dear M.P. Kass, We at SanAir would like to thank you for the work you recently submitted. The 374 sample(s) were received on Thursday, May 28, 2026 via FedEx. The final report(s) is enclosed for the following sample(s): 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56, 57, 58, 59, 60, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 84, 85, 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, 105, 106, 107, 108, 109, 110, 111, 112, 113, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, 134, 135, 136, 137, 138, 139, 140, 141, 142, 143, 144, 145, 146, 147, 148, 149, 150, 151, 152, 153, 154, 155, 156, 157, 158, 159, 160, 161, 162, 163, 164, 165, 166, 167, 168, 169, 170, 171, 172, 173, 174, 175, 176, 177, 178, 179, 180, 181, 182, 183, 184, 185, 186, 187, 188, 189, 190, 191, 192, 193, 194, 195, 196, 197, 198, 199, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, 213, 214, 215, 216, 217, 218, 219, 220, 221, 222, 223, 224, 225, 226, 227, 228, 229, 230, 231, 232, 233, 234, 235, 236, 237, 238, 239, 240, 241, 242, 243, 244, 245, 246, 247, 248, 249, 250, 251, 252, 253, 254, 255, 256, 257, 258, 259, 260, 261, 262, 263, 264, 265, 266, 267, 268, 269, 270, 271, 272, 273, 274, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 314, 315, 316, 317, 318, 319, 320, 321, 322, 323, 324, 325, 326, 327, 328, 329, 330, 331, 332, 333, 334, 335, 336, 337, 338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 348, 349, 350, 351, 352, 353, 354, 355, 356, 357, 358, 359, 360, 361, 362, 363, 364, 365, 366, 367, 368, 369, 370, 371, 372, 373, 374.

These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information

Sample conditions:

- 3 samples in Discrepancy w/ COC condition. (#11, #12, #13)

- 371 samples in Good condition.

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

23958Project Number:

P.O. Number:

Project Name: CCISD Fannin Elementary

5/25/2026Collected Date:

5/28/2026 10:15:00 AMReceived Date:

6/2/2026 5:13:14 PM

26031190 SanAir ID Number

FINAL REPORT

SITEX Inc.Name:

Address: 1525 S. Broadway

St. Louis, MO 63104

713-782-4411Phone:

Analyst: Tallert, Jonathan | O'Connell, Christopher | Williams, Darien | Mayes, Jean | Dunville, Reece | Parker, Sarah | Magalis, Lane | Armitage, Morgan | Hogrefe, Sarah | Moore, Brandi | Campbell, Grace

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers 1 / 26031190-001 Floor Tile 12x12 W/ Streaks Rooms 1-5, 7, 8 Room 2

White Non-Fibrous

Homogeneous

100% Other None Detected

2 / 26031190-002 Floor Tile 12x12 W/ Streaks Rooms 1-5, 7, 8 Room 3

White Non-Fibrous

Homogeneous

100% Other None Detected

3 / 26031190-003 Floor Tile 12x12 W/ Streaks Rooms 1-5, 7, 8 Room 4

White Non-Fibrous

Homogeneous

100% Other None Detected

4 / 26031190-004 Floor Tile 12x12 W/ Streaks Rooms 1-5, 7, 8 Room 6

White Non-Fibrous

Homogeneous

100% Other None Detected

5 / 26031190-005 Floor Tile 12x12 W/ Streaks Rooms 1-5, 7, 8 Room 7

White Non-Fibrous

Homogeneous

100% Other None Detected

6 / 26031190-006 Floor Tile Mastic Rooms 1-5, 7, 8 Room 2, Mastic/Leveler

Various Non-Fibrous

Heterogeneous

100% Other None Detected

7 / 26031190-007 Floor Tile Mastic Rooms 1-5, 7, 8 Room 3

Yellow Non-Fibrous

Homogeneous

100% Other None Detected

8 / 26031190-008 Floor Tile Mastic Rooms 1-5, 7, 8 Room 4

Yellow Non-Fibrous

Homogeneous

100% Other None Detected

9 / 26031190-009 Floor Tile Mastic Rooms 1-5, 7, 8 Room 6

Yellow Non-Fibrous

Homogeneous

100% Other None Detected

10 / 26031190-010 Floor Tile Mastic Rooms 1-5, 7, 8 Room 7, Mastic/Leveler

Various Non-Fibrous

Heterogeneous

100% Other None Detected

Analyst:

Analysis Date: 6/2/2026 Date: 6/2/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

23958Project Number:

P.O. Number:

Project Name: CCISD Fannin Elementary

5/25/2026Collected Date:

5/28/2026 10:15:00 AMReceived Date:

6/2/2026 5:13:14 PM

26031190 SanAir ID Number

FINAL REPORT

SITEX Inc.Name:

Address: 1525 S. Broadway

St. Louis, MO 63104

Analyst: Tallert, Jonathan | O'Connell, Christopher | Williams, Darien | Mayes, Jean | Dunville, Reece | Parker, Sarah | Magalis, Lane

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers 11 / 26031190-011 Sheet Vinyl Material Rooms 1-16 Room 3

Green Non-Fibrous

Homogeneous

100% Other None Detected

12 / 26031190-012 Sheet Vinyl Material Rooms 1-16 Room 6

Green Non-Fibrous

Homogeneous

100% Other None Detected

13 / 26031190-013 Sheet Vinyl Material Rooms 1-16 Room 10

Green Non-Fibrous

Homogeneous

100% Other None Detected

14 / 26031190-014 Sheet Vinyl Mastic Mastic Rooms 1-16 Room 3

Yellow Non-Fibrous

Homogeneous

100% Other None Detected

15 / 26031190-015 Sheet Vinyl Mastic Mastic Rooms 1-16 Room 6, Mastic/Leveler

Various Non-Fibrous

Heterogeneous

100% Other None Detected

16 / 26031190-016 Sheet Vinyl Mastic Mastic Rooms 1-16 Room 10, Mastic/Leveler

Various Non-Fibrous

Heterogeneous

100% Other None Detected

17 / 26031190-017 Sink Mastic Mastic Rooms 1-16 (16 Sinks) Room 3

Black Non-Fibrous

Homogeneous

100% Other < 1% Chrysotile

18 / 26031190-018 Sink Mastic Mastic Rooms 1-16 (16 Sinks) Room 6

Black Non-Fibrous

Homogeneous

100% Other < 1% Chrysotile

19 / 26031190-019 Sink Mastic Mastic Rooms 1-16 (16 Sinks) Room 14

Black Non-Fibrous

Homogeneous

100% Other < 1% Chrysotile

20 / 26031190-020 Pipe Insulation Mastic Mastic Inside Building Below Rooftop

White Fibrous

Homogeneous

98% Other 2% Chrysotile

Analyst:

Analysis Date: 6/2/2026 Date: 6/2/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

23958Project Number:

P.O. Number:

Project Name: CCISD Fannin Elementary

5/25/2026Collected Date:

5/28/2026 10:15:00 AMReceived Date:

6/2/2026 5:13:14 PM

26031190 SanAir ID Number

FINAL REPORT

SITEX Inc.Name:

Address: 1525 S. Broadway

St. Louis, MO 63104

Analyst: Tallert, Jonathan | O'Connell, Christopher | Williams, Darien | Mayes, Jean | Dunville, Reece | Parker, Sarah | Magalis, Lane

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers 21 / 26031190-021 Drywall Powder W/ Fiber Rooms 1 -16, Restrooms Room 3

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

22 / 26031190-022 Drywall Powder W/ Fiber Rooms 1 -16, Restrooms Room 6

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

23 / 26031190-023 Drywall Powder W/ Fiber Rooms 1 -16, Restrooms Room 10

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

24 / 26031190-024 Drywall Powder W/ Fiber Rooms 1 -16, Restrooms Room 11

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

25 / 26031190-025 Drywall Powder W/ Fiber Rooms 1 -16, Restrooms Room 14

White Non-Fibrous

Homogeneous

5% Cellulose 95% Other None Detected

26 / 26031190-026 Joint Compound Powder Rooms 1 -16, Restrooms Room 3

White Non-Fibrous

Homogeneous

100% Other None Detected

27 / 26031190-027 Joint Compound Powder Rooms 1 -16, Restrooms Room 6

White Non-Fibrous

Homogeneous

100% Other None Detected

28 / 26031190-028 Joint Compound Powder Rooms 1 -16, Restrooms Room 10, Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

28 / 26031190-028 Joint Compound Powder Rooms 1 -16, Restrooms Room 10, Texture

White Non-Fibrous

Homogeneous

100% Other None Detected

29 / 26031190-029 Joint Compound Powder Rooms 1 -16, Restrooms Room 11, Joint Compound

White Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 6/2/2026 Date: 6/2/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

23958Project Number:

P.O. Number:

Project Name: CCISD Fannin Elementary

5/25/2026Collected Date:

5/28/2026 10:15:00 AMReceived Date:

6/2/2026 5:13:14 PM

26031190 SanAir ID Number

FINAL REPORT

SITEX Inc.Name:

Address: 1525 S. Broadway

St. Louis, MO 63104

Analyst: Tallert, Jonathan | O'Connell, Christopher | Williams, Darien | Mayes, Jean | Dunville, Reece | Parker, Sarah | Magalis, Lane

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers 29 / 26031190-029 Joint Compound Powder Rooms 1 -16, Restrooms Room 11, Texture

White Non-Fibrous

Homogeneous

100% Other None Detected

30 / 26031190-030 Joint Compound Powder Rooms 1 -16, Restrooms Room 14

White Non-Fibrous

Homogeneous

100% Other None Detected

31 / 26031190-031 Floor Tile 12x12 W/ Streaks Hallways Of Rooms 1-16 And Rooms

Cream Non-Fibrous

Homogeneous

100% Other None Detected

32 / 26031190-032 Floor Tile 12x12 W/ Streaks Hallways Of Rooms 1-16 And Rooms

Cream Non-Fibrous

Homogeneous

100% Other None Detected

33 / 26031190-033 Floor Tile 12x12 W/ Streaks Hallways Of Rooms 1-16 And Rooms

Cream Non-Fibrous

Homogeneous

100% Other None Detected

34 / 26031190-034 Floor Tile 12x12 W/ Streaks Hallways Of Rooms 1-16 And Rooms

Cream Non-Fibrous

Homogeneous

100% Other None Detected

35 / 26031190-035 Floor Tile 12x12 W/ Streaks Hallways Of Rooms 1-16 And Rooms

Cream Non-Fibrous

Homogeneous

100% Other None Detected

36 / 26031190-036 Floor Tile Mastic Mastic Hallways Of Rooms 1-16 And Rooms 13

Various Non-Fibrous

Homogeneous

100% Other None Detected

37 / 26031190-037 Floor Tile Mastic Mastic Hallways Of Rooms 1-16 And Rooms 13

Various Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 6/2/2026 Date: 6/2/2026

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | LabReports@SanAir.com

23958Project Number:

P.O. Number:

Project Name: CCISD Fannin Elementary

5/25/20…