This is Addendum #3 to RFP2627-06 BP#8A for a Larson Middle School renovation project. The addendum addresses modifications and clarifications to the original request for proposals, issued by the responsible school district or municipality. The document serves to amend specific terms, requirements, or specifications outlined in the base RFP, ensuring all prospective bidders operate under identical conditions and have access to the same updated information prior to proposal submission. The addendum typically clarifies ambiguities, adds or removes requirements, provides additional technical specifications, or responds to questions submitted during the bidding process. All contractors and subcontractors are required to acknowledge receipt of this addendum and incorporate its requirements into their proposals by the established submission deadline.
The specific details regarding pricing adjustments, payment terms, budget allocations, funding sources, set-asides, and contract award criteria should be referenced within the addendum document itself. Any modifications to timeline expectations, site visit requirements, pre-bid conferences, or technical specifications outlined in the original RFP are superseded by the provisions stated in this addendum and must be strictly adhered to by all bidders to ensure proposal compliance and eligibility for contract award consideration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Troy Schools District
RFP #2627-06
BP#8A Larson Middle School Renovation - Addendum #3
November 24th, 2026
Content Included in this Addendum:
Cover Page (1 Page)
Barton Malow Write Up (10 Pages)
TMP Addendum #3 Write-Up (71 Pages)
TOTAL PAGES: 82 Pages
Troy Schools District – BP#8A Larson Middle School Renovation
Addendum #3 Bidder Clarifications
A. General Clarifications
• NEW BID DUE DATE
o ALL BIDS WILL BE DUE ON BUILDING CONNECTED ON 12/2/26 @ 2PM
• Addendum #1 has been postponed and will be issued as a Bulletin after award B. Clarifications and Additions to Work Scopes
• Masonry Scope o Add – Mason to provide demo for modified openings at existing door and window locations. Tooth in block and install new lintels as needed (demo contractor is still responsible for removing door and frame as noted).
o Add – Mason to provide demo and toothing of block at new openings in existing block walls
• Sitework Scope o Add – Provide SESC controls along entire perimeter fence o Add – provide inlet filters in all existing structures within bounds of work
C. RFI Responses
Pre-Bid RFI #1 Q: Casework substitution request A: No substitutions accepted. Bid per drawings and specifications
Pre-Bid RFI #2 Q: Specification Section: 12 32 16 – Manufactured Plastic Laminate Casework
1. Mobile Casework Storage Configuration – Elevations 9 & 10/A7.2 Interior Elevations 9 & 10 on Sheet A7.2 illustrate typical mobile casework within the Active Labs.
Could you please confirm that the mobile casework is intended to include open shelving with Gratnells storage totes, as opposed to enclosed cabinet storage?
2. Mobile Casework Casters – Elevations 9 & 10/A7.2 Interior Elevations 9 & 10 on Sheet A7.2 illustrate typical mobile casework within the Active Labs.
Could you please confirm that the mobile casework is intended to include 4" Shark Wheel casters throughout the Active Labs?
3. Mobile Casework Side Panels and Supports – Elevations 9 & 10/A7.2 Interior Elevations 9 & 10 on Sheet A7.2 illustrate typical mobile casework within the Active Labs.
Could you please confirm that the mobile casework is intended to include perforated metal pegboard side panels, along with metal support rails and corner guards?
A: Question 1: Sheets A9.1A and A9.1B call out TMI Specialty Casework type Q2052 as the mobile casework in the Active Labs. Please refer to this mobile casework type for additional information.
Question 2: Yes, the mobile casework requires casters Question 3: Sheets A9.1A and A9.1B call out TMI Specialty Casework type Q2052 as the mobile casework in the Active Labs. Please refer to this mobile casework type for additional information.
Pre-Bid RFI #3 Q: Drawing A0.1A reflects that the sloped slab is to be saw cut and remain. The costs to saw cut and leave vs. the cost to remove the slab completely would be about equal and provide a better base for the new work. Please advise if we should include removal as an alternate or base bid.
On drawing A0.1E, in the band room, keynotes 25, 26, and 43 are shown. 25 is to remove storefront, there is no storefront reflected on the demo plan for this space. Please clarify.
A: Refer to Demo Note 31 and Addendum #2, which indicates that the complete removal is base bid.
Demo note 25 was accidentally included; there is no storefront demolition in the Existing Band Room.
Pre-Bid RFI #4 Q: Can you provide a cut through the life skills C125 ceiling? Are the areas highlighted in yellow existing beams? Or are these clouds with ACT3 and FT1 fascia trim conditions?
A: The areas highlighted in yellow are the bottom of trusses
Q: What is the length of AB1 Turf straight baffles? The specs (098436) say as indicated on drawings.
Drawings do not indicate length that can be found.
A: Refer to sheets A6.3 and A6.4 for dimensions, AB1 Turf Straight Baffles are to be 4’-2” in length
Q: What is the height of AWP1 wall panels? The specs (098433) call for a width of 56” but no height.
Does (1) 56” wide x unknown height panel go on each wall where indicated?
A: AWP1 wall panel heights and installation instructions are found in specific note #6 on Sheet A10.1E.
Pre-Bid RFI #5 Q: ACT 5H is called out as Armstrong Calla 48” x 48” tiles. Armstrong no longer offers a 4’x4’ in the Calla product. (We just had this same issue on the Troy Athens bid and the architect changed the tile to Armstron Lyra). Can you put in an RFI to see if they want to make the same change on this project?
A: 4’ X 4’ Armstrong Lyra is acceptable for ACT-5H.
Pre-Bid RFI #6 Q: 1. A10 series in the plans (A10.1D,E and F) all show various references to VWC2 and VG2, but we are not sure how long/tall these graphics need to be, and what the installation surfaces are.
Please clarify.
2. Please indicate the marked difference between VWC’s and VG’s. Are these different materials?
A: Question 1: VWC is not in the project. The tag on sheet A10.1E will be eliminated, since it is the same wall as indicated in A10.1F/F102. The graphic should cover the entire expanse of the wall, from floor to ceiling. This is typical for all areas that VG is noted.
Question 2: VWC will be eliminated from the project. VG are applied vinyl graphics. See specification 10 1400 Wall Graphics.
Pre-Bid RFI #7 Q: Section 10 1419 – Dimensional Letter Signage: I am not seeing any dimensional letters included in the construction plans. Please indicate where these will be in the drawings, and indicate size and quantity A: Vinyl numbers and panel signage is included (see AD.5) but we do not have dimensional letter signage on this project. Specification section 10 1419 will be removed from the specification in Addendum #3.
Pre-Bid RFI #8 Q: Areas to receive White SonaSpray are called out to receive paint PT 11. PT-11 listed in interior paint spec is called out to be Peppercorn SW 7064.
SW 7064 is listed as Passive . Can we confirm if the color is Peppercorn or Passive being used in these areas?
Also, please confirm that this is intended that the paint is to be a contrasting color to White K-13.
A: Question 1: PT11 is Peppercorn SW 7674 Question 2: Areas called out to receive ASI (Acoustic Spray Insulation) will not receive PT11
Pre-Bid RFI #9 Q: Please provide additional details for the AWP1 located in the practice rooms. Are they to go floor to ceiling and wall to wall? There are no interior elevations.
A: AWP1 wall panels height and installation instructions can be found in specific note #6 on Sheet A10.1E
Pre-Bid RFI#10 Q: Substitution Request – Mod Interiors A: No substitutions accepted. Bid per drawings and specifications
Pre-Bid RFI #11 Q: 1. 093000 Hard Tile specification on page 6 shows high performance grout and epoxy grout to be installed. There is no indication where the epoxy grout is being installed and where the high performance grout is being installed. There is a price difference in high performance grout and epoxy.
Please advise as to what grout is to be installed with what ceramic tiles.
2. 093000 Hard Tile specification on page 7 shows Tile Trim Type G: Jolly Brushed Copper Anodized (Tile Top Cap). I do not see where is this being installed? Please advise.
3. 096500 Resilient Flooring specification on page 2 shows RFT1C material and on page 4 shows RFT6 to be used for the Logo. Are they making the logo out of both materials? There are no colors shown for RFT1C material and only 1 color shown for RFT6 logo material. There is no logo design issued for logo layout. Please provide a Logo design drawing and colors selected for RFT1C and RFT6 material. Please confirm how many colors will be incorporated in this logo design so that we can have the manufacturer quote this material.
A: Question 1: Referring to specification 09 3000, paragraph 3.03.D indicates areas to use epoxy grout, which includes floors and walls. Paragraph 2.06A.1 indicates where high performance grout is to be used.
Question 2: This is being installed at the top of CT3 wainscot. Refer to elevations on A7.2 Question 3: RFT1C is no longer in the project. This will be removed in Addendum #3. The logo is solely RFT6. Contact the manufacturer’s representative in the specification for the logo design; this has been coordinated with them
Pre-Bid RFI #12 Q: 1. Based on the plans A11.1A – A11.1F to install new concrete throughout the building, I do not see any areas where it is showing for the Hard Tile to install a mud beds in the toilet rooms where RSF sheet good flooring is being installed and where the Ceramic Tile is being installed. I just want to confirm this is correct; there are no mud beds in the Toilet Rooms?
2. Finish Plan Drawing A10.1E shows Dining Commons E122; there is a note that says to refer to manufacturers flooring layout drawings for floor pattern. Please provide layout drawing so we can calculate RFT1A & RFT1B.
3. Finish Plan A10.1E shows E126 Platform, there is a stair shown in this room. It shows STR1 to be installed on the stair treads. There is no STR1 in the specifications showing what this material is. Please advise. What material is being installed on the stairs?
4. 096500 Resilient Flooring shows RSF1 Noraplan Environcare sheet goods to be “Cold Welded” at the seams. We typically “heat weld” this product. I just wanted to verify this is correct they want the sheet goods to be “Cold Welded” at the seams.
5. Finish Plan drawing A10.1C shows 3 squares within each other in Stem Room C128. What is this?
Is this a stair platform? Please advise.
A: Question 1: There are no mud beds in the toilet rooms Question 2: Please contact manufacturer’s representative for this information Question 3: Please refer to specification section 09 6513 Resilient Bases and Accessories Question 4: Please proceed with cold weld. This was the manufacturer’s recommendation for this application.
Question 5: These lines are to designate space for potential Robotics field. Disregard, as this does not indicate any change of floor finish
Pre-Bid RFI #13 Q: 1) I just want to verify does the wing walls in Toilet Room D116 & D104 receive wall tile? There is no elevation showing these toilet rooms. Please advise.
2) Finish Plan A10.1C shows Toilet Room C132 tag to receive CT4C on the walls. In Toilet Room C132 CT4D is shown to be installed on walls. Please advise as to what ceramic tile is to be installed.
CT4C or CT4D.
3) Are we installing tile on the outer panel of the display case that is covered up by the wall? See Drawing A8.1.
A: Question 1: Yes, the wing walls in D116 and D104 receive wall tile Question 2: The wall tile should be CT4D Question 3: Yes, wall tile should go on the outer panel of the display case. On A8.1, Isometric View No.5 shows extent of tile
Pre-Bid RFI #14 Q: The spec calls for porcelain markerboards to be full height and width of each panel.
1. In order to have this we need to have vertical trim. Is that acceptable?
2. Spec also show tackable surfaces with vinyl fabric wallcovering. Can that be clarified because that won't work with full height and width markerboards?
A: Question 1: Refer to 9-series sheets, which indicates locations and sizes of markerboards. Based on the sizes specified, vertical trim should not be needed Question 2: Refer to 9-series sheets, in combination with specification information. Tackable surfaces are separate from markerboard surfaces.
Pre-Bid RFI #15 Q: Locker type L4 (and L5 for ADA version) for the corridors are both drawn and listed in the keynote as 15" wide. However, the specification indicates only 12 wide. Can you confirm if 15 wide is correct?
Locker type L2 is listed as a 3-tier in the plan keynotes but as a 2-tier in the specification. There is no elevation to confirm which is intended. What tier is needed?
Locker type L3 is listed as 60" high in the plan keynotes but as 72" high in the specification. Again, there is no elevation provided to check. Which height is needed for L3?
Locker type L6 is missing from the specification entirely. The keynote puts their use as storage.
Should these match the type for Corridor, or Athletic that are specified, or can a spec for Storage type be provided?
The plan notes and locker scope make reference to lockers being removed and reinstalled, but based on what is actually indicated on the plans, it appears all indicated lockers are new. Can you confirm no need to save and reinstall existing lockers?
There are 2 small locations where lockers are unmarked. The rooms (D114 and E146) are broadly marked as existing. Please confirm there is no work required for these locations as far as locker scope would be concerned?
A: Please see Spec changes indicated in Addendum #3 that address these questions
- Locker Type L4 must be 15” wide
- Locker Type L2 must be 3-tier
- Locker Type L3 mush be 60” high
- Locker Type L6 was added to the specifications in Addendum #3
- There is no need to save and reinstall existing lockers; all lockers are to be new
- There is no work required/there is no locker scope in Rooms D114 and E146
Pre-Bid RFI #16 Q: ACT 2 is spec’d for 2x2 standard white grid and Calla High NRC #2844 square edge tile. This act is shown correctly in some areas, band rooms, locker rooms etc. However, it also lists this ACT for the 2x4 clouds in multiple area's including life skills, digital apps, media center etc – Calla NRC seems to not come in 2x2 A: Calla is available in 2x2
Pre-Bid RFI #17 Q: The Bid Category 27 scope references several Division 27 specification sections; however, the specifications provided identify Division 27 as "Not Used."
Could you please provide the following sections?
A: o 27 0000 – General Technology Requirements o 27 1000 – General Cabling Requirements o 27 1116 – Racks and Cabinets o 27 1300 – Backbone and Outdoor Cabling o 27 1500 – Data and Voice Horizontal Cabling specs and scope of work are uploaded to files tab on Building Connected
Pre-Bid RFI #18 Q: Please confirm the approved manufacturers for copper cabling, fiber-optic cabling, connectivity, racks, and associated telecommunications equipment.
Additionally, please confirm whether Belden and Hubbell systems are acceptable, as WaTech is certified to install both.
A: Refer to specifications section 27 1300 – backbone and outdoor cabling. Manufacturers are in 27 1300, 27 1500 and 27 1116
Pre-Bid RFI #19 Q: -Required single-mode fiber classification (OS2 or other).
-Required multimode fiber classification (OM3, OM4, or other).
-Required fiber cable jacket ratings and construction.
-Required connector types (LC, SC, etc.).
-Whether fusion-spliced pigtails or field-installable connectors are required.
-Minimum service-loop lengths at the MDF, IDFs, and fiber entrance.
A: -• Use single mode fiber for distances exceeding 500m and all outdoor applications.
-• All multi-mode fiber is to be OM4 for distances up to 500m.
- • Each fiber must be individually jacketed. Indoor is continuous, armored, plenum-rated, tight-buffered -• LC connections are required.
-• All pig tails and patch cables are to match the type of fiber optic cable installed. All fiber is to be fusion spliced; no field terminations or mechanical splices will be accepted. Indoor cable sheath and accessories are to follow the following color designation: OM4 Violet, Singlemode Yellow.
-• Copper cabling has service loops identified in section 27 1000 under 3.2-L. For fiber, each service loop is to be 20’ minimum.
Pre-Bid RFI #20 Q: -Required copper certification standards and testing parameters.
-Whether fiber requires Tier 1 OLTS testing, Tier 2 OTDR testing, or both.
-Required test documentation and reporting format.
-Any specific installer certifications or qualifications A: -• Cable shall be solid copper. Cabling shall be certified as a complete system with other components required herein to achieve manufacturers cabling system extended warranty.
-• Refer to Section 27 1300 – Backbone and Outdoor Cabling, Article 3.8, Field Quality Control.
Paragraph 3.8.C covers the fiber OTDR requirement.
-• Cable test results are to be provided in hard copy format as well as a PDF organized by building and telecommunication room.
-• Any required permits, licenses, inspections, approvals, and fees for the work shall be secured and paid for by the Contractor. All work shall conform to all applicable codes, rules, and regulations.
Perform all tests required by state, city, county and/or other agencies having jurisdiction. Provide all materials, equipment, etc., and labor required for tests.
Pre-Bid RFI #21 Q: -Whether all five four-post racks shown in the enlarged telecom room plans are new contractor-furnished equipment.
-Required rack manufacturer, dimensions, and accessories.
-Fiber enclosure and patch panel requirements.
-Ladder rack furnishing and installation responsibilities.
-Grounding, bonding, and cable management requirements.
-Confirmation that the existing IDF 1 wall rack is to remain.
A: -• Yes, all four-post racks are new contractor-furnished.
-• Refer to Section 27 1116 – Racks and Cabinets, Articles 2.1 through 2.6 and 3.2, for required manufacturers, dimensions, and accessories. Quantities and locations are per the drawings.
-• Refer to 27 1300 – Backbone and Outdoor Cabling, Article 2.3, Fiber Optic Cabling Backbone.
Paragraph 2.3.B covers the termination standards.
-• Refer to Section 27 1500 – Data and Voice Horizontal Cabling, Article 1.2.H (responsibility) and Article 2.8 (cable tray requirements).
-• Refer to Section 27 1116 – Racks and Cabinets, Articles 2.1.E (grounding terminations), 2.2.A.3 (wire management), 2.5 (power strips and ties) and 3.2 (installation, grounding and mounting).
-• Yes. The IDF 1 enlarged plan on T3.E carries the note “Existing wall rack, leave in place.”
Pre-Bid RFI #22 Q: The bid schedule only lists lockers as part of Area A interior fitout and Area D locker rooms, are the remaining corridor lockers in B, C, D being done in the same phase as A?
A: This should coincide with the installation of ceiling tiles for Area B and C
Pre-Bid RFI #23 Q: For ACT5, it lists Calla as the tile, however they do not make the Call in 4X4 increment.
A: Bid all ACT5 as Lyra
Pre-Bid RFI #24 Q: It appears some of the exterior and vestibule existing to remain doors are to be receiving new hardware I wanted to confirm if some of these are to be within the glazing scope? As well as if you can clarify which door numbers we would be responsible for.
A: Existing interior doors are assumed to be hollow metal or wood. Exterior doors are aluminum or FRP provided by the Glazing contractor
Pre-Bid RFI #25 Q: On the door schedule it has some doors labeled as fire rated but the glazing labeled is 1/4" clear tempered. Will these need to be fire rated glass? Or GL-2 as labelled. This is consistent across the door schedule A: If a door has a rating on the door schedule, assume the glass carries the same rating
Pre-Bid RFI #26 Q: You have the steel contractor doing the shoring and demolition for the removal of the existing columns and the remainder of the steel demolition. Are you wanting the demolition contractor to remove and salvage the beams where the new columns are being installed?
A: No, steel contractor will remove and replace beams where new columns are being installed. Demo is responsible for all other structural demo
Pre-Bid RFI #27 Q: On page A0.1C, there is a cut that refers to 2/A4.3. This detail shows the floor slab remaining, however on the demo sheet, it shows it to be removed. Please clarify.
A: It is being removed and replaced with new concrete
Pre-Bid RFI #28 Q: There are no details on the demo sheet for keynote 29 below the band room. I went to check the floor plan, A1.1E, and noticed there are several doors where the opening for the new door is widened, this is not reflected on the demo. Which trade is responsible for widening the openings?
A: Mason contractor for widening opening where new frame is changed
Pre-Bid RFI #29 Q: Regarding the tectum wall panels in spec 098433 2.02 – part 9.B mounting accessories calls for wood furring and acoustical insulation behind the panels which is armstrongs mounting method C-20.
However in the product description its call for them to be direct mounted and the .4 NRC can be met with the direct mount attachment.
The question is does the architect want them mounted to 1 ½” furring with insulation behind the panels, or direct mounted to the wall?
A: Provide the wood furring and acoustical insulation
Pre-Bid RFI #30 Q: Girt removal behind existing metal panels (Demo note 59) (Detail 4 on A4.1) Demo Composite Elevation Plan states the metal wall panels remain. The girt appears to be tied into the panel. How are we to shore / brace the metal wall panels that are to remain? Also, the Composite New Work Plan shows new metal wall panels. Please clarify.
A: This is the responsibility of the demo contractor. The new panels attached directly to the existing metal panels are to remain.
Pre-Bid RFI #31 Q: Who is responsible for Landscape removals within the existing courtyard?
A: Demo contractor
Pre-Bid RFI #32 Q: Who is providing backfill for the pool and cafeteria locations?
A: Concrete contractor
Pre-Bid RFI #33 Q: Who is responsible for the removal of substrate beneath existing stepped concrete floor? What is the composition of the existing fill material?
A: Demo contractor. Assume existing fill is sand.
Pre-Bid RFI #34 Q: Who is responsible for metal deck roof openings (demo note 30) A: New openings are to be cut by the structural steel contractor. Layout will be by MEP.
Pre-Bid RFI #35 Q: Please clarify Zone 1 Selective Demolition scope of MEP demo:
Which bid division is responsible for notes E, F, K, O, and Q on the plumbing demo sheets?
A: Notes E and F - responsibility of demo contractor. Cut/cap, make safe, and air gapping provided by Plumbing contractor.
Note O - included in zone 2 and all demo is by MEP Notes K and Q - MEP underground demo
Pre-Bid RFI #36 Q: Which bid division is responsible for note A on the mechanical piping demo sheets?
A: Demo contractor is responsible for all in Zone 1 demo locations. MEP to cut/cap, make safe, and air gap
Pre-Bid RFI #37 Q: Please confirm that the existing pre-cast concrete walls and windows above are to be removed between col lines AC/A7 and between col lines CD/CU at col line 69. It is not marked with note 6 on the demolition plans A: Yes, these are to be removed by the demo contractor
Pre-Bid RFI #38 Q: At the existing cafeteria, is the terrazzo flooring to remain? There is note 23 to prep recessed floor for infill. Which bid division is responsible for the prep?
A: Concrete contractor is responsible to prep
Pre-Bid RFI #39 Q: Demo, Zone #1 vs. Zone #2: Please confirm the area limits of Zone #1 and Zone #2 A: Provided in Addendum #2
Pre-Bid RFI #40 Q: Demo, "MEP" in Zone #1: 002227.01 5.a states the Demolition contractor removes all in-wall and above-ceiling MEP in Zone #1. Does "MEP" include existing low voltage/technology cabling? Also, the Demolition scope includes "demo of all existing technology devices as indicated on plans." Does that mean devices only, or devices and cable back to the closet?
A: Yes, low voltage contractor is responsible for demo of cabling back to closets. Demo contractor will be responsible to demo devices
Pre-Bid RFI #41 Q: Exposed ceilings: In open/exposed-structure areas, 27 1000 requires cable in conduit. Is J-hook routing acceptable where cable is not visible from the floor, or is conduit required in all exposed areas?
A: If there is no code requirement, J hook routing is acceptable if not visible from the floor
Pre-Bid RFI #42 Q: Pathway: Will the EC provide a box and conduit/stub at every outlet shown on the T-series drawings, including ceiling-mounted WAPs, cameras and speakers in accessible-ceiling areas?
A: Yes
Pre-Bid RFI #43 Q: Firestopping: Please confirm that sealing is required at penetrations of non-rated, full-height (to deck) walls as well as rated walls, per 27 1000 ("fire and smoke stopping through all partitions") A: Sealing is required at all fire and smoke rated walls
Pre-Bid RFI #44 Q: Faceplates: 27 1500 calls for Decora-style stainless faceplates. Is a standard stainless keystone faceplate acceptable?
A: Provide Decora-style stainless
Pre-Bid RFI #46 Q: Keynote 17 on A0.1A-A0.1D and A0.2 reads 'Remove structural column. Provide temporary shoring. See structural drawings for re-support of structure.' Section 002205 (Metal Fabrications), item 22, assigns temporary shoring and the demolition and disposal of existing columns to that package. Please confirm that structural column removal, temporary shoring and re-support are by others and not part of BP#8A Demolition A: Correct. Structural column removal, temporary shoring, and re-support are by others. Removal of foundations at these locations are by demo contractor
Pre-Bid RFI #47
Q: Please provide slab thicknesses and reinforcing for the slab removals under keynotes 7 (supported slab over tunnel), 9, 31 and 49 (pool deck). The pool slab is listed only as 'reported 6 in.
based on field verification.' Are cores or GPR available? If not, what thickness should bidders assume? These set saw depths and equipment within fixed 5- and 10-day slab windows A: Assume 6”
Pre-Bid RFI #48 Q: Our understanding of the BP#8A pool scope: remove pool equipment and associated piping (keynote 50), remove pool deck slab and walls (keynote 49) and demolish the pool slab. Sheet A3.3 calls for removing the top 2'-0" of the pool walls and placing compacted engineered sand fill with a 4" slab; S0.0 requires 95% Modified Proctor (ASTM D-1557). Please confirm: (a) Placement and compaction of fill and the 4" slab are by Earthwork (002233) and Concrete, not Demolition. (b) The demo keynote says 'prep for concrete infill' while A3.3 shows sand fill. (c) Is the pool floor to remain, or to be broken/perforated for drainage before fill, and by whom? (d) Confirm wall cut depth of 2'-0".
A: A - Responsibility of Concrete contractor B - Concrete over sand fill C - Concrete contractor to provide drainage holes in bottom of pool D - Yes, this contractor will provide wall cut depth of 2'
Pre-Bid RFI #49 Q: A0.1F calls for removal of the stepped concrete floor slab with sawcutting at walls to remain, but the draft schedule shows no sawcut/remove-floor window for Area F. When is this work planned? Is the pool slab/deck removal included in the Area E window (Aug 19-25, 2027)?
A: No slab/deck removal is called out in Area F. The pool slab/deck is in Area D
Pre-Bid RFI #50 Q: A0.1D calls for removal of athletic lockers as indicated and the remaining lockers to be prepped for electrostatic painting. The plan does not clearly distinguish which lockers remain. Please identify (by room and count, or a marked-up plan) which athletic lockers are removed and which remain. Is surface prep of remaining lockers by Demolition or by the painting contractor?
A: All hashed lockers are to be removed that are indicated on the drawings. Surface prep is provided by others.
Pre-Bid RFI #51 Q: The documents call for the following items to be salvaged: doors, hinges and hardware (keynote 13); ACT grid ceilings; lockers (salvage, recoat, reinstall); food service equipment; roof hatches;
exterior roof access ladders; instrument lockers; decorative lights over serving lines; brick/masonry block for tooth-in; panelboards and transformers; air-cooled chiller, chilled water pumps, boiler and pumps (return to Owner). Section 002202 assigns salvaged doors to the carpentry contractor and FRP doors to the glazing contractor. Please confirm, item by item, which are removed by Demolition, which are removed by the installing trade, who reinstalls each, and where on-site storage is provided.
A: Doors and hardware by respective contractors. Food service equipment by food service contractor. Roof hatches by steel contractor. Roof access ladders by roofing contractor. Instrument lockers by demo contractor, reinstalled by casework contractor. MEP salvage items by respective MEP trades.
Pre-Bid RFI #52 Q: The demolition work scope requires Zone #1 to be substantially complete within 6 weeks of project start. Is this a contract milestone carrying liquidated damages? Are there interim completion dates per area? Demolition will add shifts as needed to meet the schedule A: The contract requirements are listed in the draft contract and A232 General Conditions in the Project Manual. Interim completion dates can be found on the schedule in Addendum #2
Pre-Bid RFI #53 Q: Is the building fully vacant from June 10 to September 15, 2027? What are the permitted work hours, and are second shifts, nights and weekends allowed so Demolition can add shifts to meet the schedule?
A: Yes. Site hours are 6AM-4PM Monday through Friday. The intent of the project is to not have second shift or weekend work. Any contractor will be responsible for Barton Malow supervision time if second shift or weekend work is required due to being behind schedule. This does not apply to added scope.
Pre-Bid RFI #54 Q: Sheet A0.3 shows the penthouses removed, including the walls, louvers, panels, doors, framing, columns and curbs. MD5.1 calls for all mechanical equipment, ductwork, piping and controls in the penthouses to be removed, with open ends capped. Please confirm:
(a) The Mechanical (002223) and Electrical (002226) trades will remove all equipment, piping, ductwork, controls and electrical gear from the penthouses, and will disconnect and make the area safe, before BP#8A Demolition removes the penthouse enclosures.
A: MEP will be responsible to cut/cap, make safe and the removal of any salvaged items. Removal of the remainder of equipment, ductwork, and piping is by the demo contractor at the same time as MEP removal
Pre-Bid RFI #55 Q: Low voltage contractor is responsible for installing low voltage/control wiring of electrified door hardware. Correct?
A: Yes
Pre-Bid RFI #56 Q: Wood blocking for storefronts and curtain walls at masonry wall heads and jambs, or where not within new steel stud walls like the examples below would be furnished and installed by the glazing contractor. Correct?
A: All wood blocking shown on drawings is the responsibility of the carpentry contractor. Glazing contractor to provide shims as needed for installation
Pre-Bid RFI #57 Q: Who is responsible for 2x wood nailers and plywood? Who is responsible for flat rigid insulation A: All items are the responsibility of the carpentry contractor
Pre-Bid RFI #58 Q: Metal panel contractor is responsible for the metal furring channels for their metal panel attachment, not the carpentry contractor. Please confirm.
A: Correct. Metal panel contractor is also responsible for plywood and substructure directly behind Ludiwci Tiles
Pre-Bid RFI #59 Q: Can you confirm the ceiling type required for the area with varying tile sizes? Is this ACT-5? If so, which specific ACT-5 tile should be used, since the specifications list eight different ACT-5 options?
A: ACT-5 comes in a number of colors and sizes. Sizes as indicated are on the drawings (ie 2X2, 2X4, etc). Colors are indicated by letter (ACT5B and ACT5D)
T M P A R C H I T E C T U R E I N C W W W . T M P - A R C H I T E C T U R E . C O M https://tmparchitecture.sharepoint.com/sites/2022/22100/SPECS/05 ADDENDA/Addendum 3/22100_261120_BP8_ADD3.docx
Addendum Date November 20, 2026 Project Name Troy School District – Larson Middle School TMP Project No(s). 22100 Bid Package No. 8A Addendum No. Three (3)
The Bidding Documents are modified, supplemented, or augmented as follows and the Addendum is hereby made a part of the proposed Contract Documents.
The following Drawing(s) and Attachment(s) are issued with this Addendum:
Drawing No(s).: AC.2, AD.1, AD.2, A0.1E, A1.1C, A1.1E, A10.1C, A10.1D, A10.1E, FSE-1.1, FSE-2.1, FSE-3, MD2.0D, MD2.1D, M2.0D, M2.1D, E3.1A, E3.1B, E3.1C, E3.1E, E3.1F
Attachment(s): Specification Section(s): 09 6500, 09 8129, 10 5113, 11 4000
Item No. Specification Changes
SC-1 Refer to Section No. 09 6500 – RESILIENT FLOORING (reissued):
A. Refer to Paragraph 2.02.A. Deleted RFT1C from project.
B. Refer to Paragraph 2.02.F.6. Clarified intent for logo.
SC-2 Refer to Section No. 09 8149 – SPRAYED ACOUSTIC INSULATION (reissued):
A. Refer to Paragraph 2.02.A.8. Revised product color.
SC-3 Refer to Section No. 10 5113 – METAL LOCKERS (reissued):
A. Revised L-2 to 3-tier and compartment height to 20 inch B. Revied L-3 height.
C. Revised L-4 & L5 width.
D. Added L-6 Locker type.
SC-4 Refer to Section No. 11 4000 – FOOD SERVICE EQUIPMENT (reissued):
A. Item # 17 was changed from Steamer to Griddle top Range.
B. Itemized proposal form was removed.
November 20, 2026 Troy School District – Larson Middle School TMP Project No. 22100 Bid Package No. 8A Addendum No Three (3) Page 2 of 4
Item No. Architectural Drawing Changes
AD-1 Refer to Drawing No. AC.2 (reissued):
A. Added general note to clarify roofing insulation, as indicated.
AD-2 Refer to Drawing No. AD.1 (reissued):
A. Refer to Door Schedule. Revised door heights to 6’-10”, as indicated.
AD-3 Refer to Drawing No. AD.2 (reissued):
A. Refer to Door Schedule. Revised door heights to 6’-10”, as indicated.
AD-4 Refer to Drawing No. A0.1E (reissued):
A. Refer to Existing Band Room. Removed Demolition Note #25, as indicated.
AD-5 Refer to Drawing No. A1.1C (reissued):
A. Refer to Rooms C106, C107, C125, and C129. Added dimensions for clarity, as indicated.
B. Refer to Media Center C103. Added wall tag to clarify Wall Type 2K above glazing, as indicated.
AD-6 Refer to Drawing No. A1.1E (reissued):
A. Refer to Dining Commons E122. Added dimensions for clarity, as indicated.
B. Refer to Dining Commons E122. Added wall tags to clarify Wall Type 2K, as indicated.
AD-7 Refer to Drawing No. A10.1C (reissued):
A. Refer to Toilet C132. Revised tile designation for wall base in Room
Finish Legend.
AD-8 Refer to Drawing No. A10.1D (reissued):
A. Refer to Ex Locker Room D113. Revised paint color designation for wall finish in Room Finish Legend.
AD-9 Refer to Drawing No. A10.1E (reissued):
A. Refer to Corridor F102. Eliminated duplicate wall finish tag.
TMP Project No. 22100
Addendum No Three (3) Page 3 of 4
Item No. Food Service Drawing Changes
FS-1 Refer to Drawing No. FSE-1.1 (reissued):
A. Steamer item # 17 was changed to Griddle Top Range as indicated.
FS-2 Refer to Drawing No. FSE-2.1 (reissued):
A. Electrical connection E17 was removed as indicated.
FS-3 Refer to Drawing No. FSE-3 (reissued):
A. Utility connection P17 was removed.
B. Utility connection IW7 was removed.
C. Gas supply BTU was changed as indicated.
D. Note added for plumber to install lead filters. Filters provided by FSEC
Item No. Mechanical Drawing Changes
MD-1 Refer to Drawing No. MD2.0D (reissued):
A. Revised floor drain key notes placements and hatching for clarification of demolition scope, as indicated.
MD-2 Refer to Drawing No. MD2.1D (reissued):
A. Revised floor drain key notes placements and hatching for clarification of demolition scope, as indicated.
MD-3 Refer to Drawing No. M2.0D (reissued):
A. Revised plumbing layout to include pipe caps for clarification, as indicated.
MD-4 Refer to Drawing No. M2.1D (reissued):
A. Revised the designation of the floor drain from Existing FD to new with the FD-1 designation, as indicated.
Item No. Electrical Drawing Changes
ED-1 Refer to Drawing No. E3.1A (reissued):
A. Revised camera locations and quantities, as indicated.
B. Revised speaker locations and quantities, as indicated.
TMP Project No. 22100
Addendum No Three (3) Page 4 of 4
ED-2 Refer to Drawing No. E3.1B (reissued):
A. Added camera, as indicated.
B. Revised speaker locations, as indicated.
ED-3 Refer to Drawing No. E3.1C (reissued):
A. Revised speaker location, as indicated.
ED-4 Refer to Drawing No. E3.1E (reissued):
A. Revised speaker locations and quantities, as indicated.
ED-5 Refer to Drawing No. E3.1F (reissued):
A. Revised speaker locations and quantities, as indicated.
***END OF ADDENDUM NO.3 - BID PACKAGE NO.8A***
TMP Architecture, Inc. TMP22100
11-20-2026 ADDENDUM NO. 3 RESILIENT FLOORING
BID PACKAGE NO. 8A 09 6500-1
SECTION 09 6500 - RESILIENT FLOORING
PART 1 GENERAL
1.01SECTION INCLUDES
A. Resilient sheet flooring.
B. Resilient tile flooring.
1.02 REFERENCE STANDARDS
A. ASTM F1344 - Standard Specification for Rubber Floor Tile; 2021a.
B. ASTM F1516 - Standard Practice or Sealing Seams of Resilient Flooring Products by Heat
Weld Method (when Recommended); 2018.
C. ASTM F1859 - Standard Specification for Rubber Sheet Floor Covering Without Backing;
2021a.
1.03 ADMINISTRATIVE REQUIREMENTS
A. Preinstallation Meeting: Conduct a preinstallation meeting before starting work of this section.
1. The following are required to attend:
a. Architect.
b. Construction Manager.
c. Installer.
d. Manufacturer's Representative.
e. Owner's Representative.
2. Meeting shall review:
a. Design intent.
b. Mock-ups.
c. Substrate preparations.
d. Installation methods and instructions.
1.04 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements for submittal procedures.
B. Product Data: Provide data on specified products, describing physical and performance characteristics; including sizes, patterns and colors available; and installation instructions.
C. Shop Drawings: Indicate seaming plans and floor patterns.
D. Verification Samples:
1. Resilient Sheet Flooring: Submit 3 samples, 6 by 9 inch in size for each color and pattern specified.
2. Resilient Tile Flooring: Submit 3 samples, full size, for each color and pattern specified.
E. Sustainable Design Submittal: Submit VOC content documentation for flooring and adhesives.
F. Maintenance Data: Include maintenance procedures, recommended maintenance materials, and suggested schedule for cleaning, stripping, and re-waxing.
G. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
1. See Section 01 6000 - Product Requirements, for additional provisions.
2. Extra Flooring Materials: Quantity equal to 2 percent of total installed, but not less than one box or roll for each type and color.
1.05 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing specified flooring with minimum 5 years documented experience.
B. Installer Qualifications: Company specializing in installing specified flooring with minimum 5 years documented experience.
1.06 MOCK-UP
A. Construct mock-up(s) of designs to serve as basis for evaluation of design aesthetics and workmanship.
1. One mockup.
2. Use same materials and methods for use in the work.
3. Locate where directed.
BID PACKAGE NO. 8A 09 6500-2
4. Minimum size: 12 feet by 12 feet.
B. See Section 01 4000 - Quality Requirements for additional requirements.
C. Obtain approval of mock-up by Architect before proceeding with work.
D. Approved mock-up may remain as part of the Work.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Upon receipt, immediately remove any shrink-wrap and check materials for damage and the correct style, color, quantity and run numbers.
B. Store all materials off of the floor in an acclimatized, weather-tight space.
C. Maintain temperature in storage area between 55 degrees F and 90 degrees F.
D. Protect roll materials from damage by storing on end.
E. Do not double stack pallets.
1.08 FIELD CONDITIONS
A. Store materials for not less than 48 hours prior to installation in area of installation at a temperature of 70 degrees F to achieve temperature stability. Thereafter, maintain conditions above 55 degrees F.
PART 2 PRODUCTS
2.01 SHEET FLOORING
A. RSF1Rubber Sheet Flooring: 100 percent rubber composition, color and pattern through total thickness.
1. Products:
a. nora by Interface; noraplan environcare: www.interface.com.
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1859, Type 1, without backing.
3. Thickness: 3mm.
4. Sheet Width: 48 inch minimum.
5. Seams: Cold welded.
6. Integral coved base with cap strip.
a. Height: 36 inches.
7. Surface Texture: Smooth.
8. Color: 7037 Fun Run.
9. Manufacturer's Representative: Sofia Davila - (347) 633-0577.
B. Welding Rod: Solid bead in material compatible with flooring, produced by flooring manufacturer for heat welding seams, and in color matching field color unless otherwise indicated.
2.02 TILE FLOORING
A. RFT1Rubber Tile: Homogeneous, color and pattern throughout thickness.
1. Products:
a. nora by Interface; norament arago: www.interface.com.
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 19.76 by 39.53 inch nominal.
4. Total Thickness: 3.5 mm.
5. Texture: Relief structure.
6. Installation Pattern: Refer to Interface Design Studio Case Number 02011439.
a. Refer to drawings for size and locatio of RFT1C logo.
7. Colors: .
a. RFT1A: 5177 Balance (Field)
b. RFT1B: 5175 Unity (Accent)
8. RFT1C specified for logo application. Refer to drawings for size and location.
a. Logo to be factory cut, as recommended by manufacturer.
b. Artwork to be provided by Owner.
BID PACKAGE NO. 8A 09 6500-3
9. Manufacturer's Representative: Sofia Davila - (347) 633-0577. **ADD3** B. RFT2Rubber Tile: Homogeneous, color and pattern throughout thickness.
1. Products:
a. nora by Interface; norament kivo: www.interface.com.
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 39.53 by 39.53 inch nominal.
4. Total Thickness: 2.7 mm.
5. Texture: Smooth.
6. Installation Pattern: 1/3 offset.
7. Colors: Architect to select from manufacturer's full range of colors.
8. Manufacturer's Representative: Sofia Davila - (347) 633-0577.
C. RFT3 Rubber Tile: Homogeneous, color and pattern throughout thickness.
1. Products:
a. nora by Interface; noraplan convia: www.interface.com.
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 24.015 by 24.015 inch nominal.
4. Total Thickness: 2 mm.
5. Texture: Smooth.
6. Installation Pattern: 1/3 offset..
7. Colors: 7352 Lava Rock.
8. Manufacturer's Representative: Sofia Davila - (347) 633-0577.
D. RFT4 Rubber Tile: Homogeneous, color and pattern throughout thickness.
1. Products:
a. Tarkett; Johnsonite Color Splash, Custom Color: www.https://commercial.tarkett.com/
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 24 by 24 inch.
4. Total Thickness: 3.175 mm.
5. Texture: Hammered/Forged.
6. Installation Pattern: 1/3 offset.
7. Pattern: Speckled 5% Density
8. Colors: Custom Color to include:
a. Field Color: 32 Pebble
b. Chip Color: VN5 The Blues
c. Chip Color: 08 Icicle
d. Chip Color: 69 Sterling Silver
e. Reference Quote Number: 16329
9. Manufacturer's Representative: Jennifer Conway - (248) 639-8161.
E. RFT5 Rubber Tile: Homogeneous, color and pattern throughout thickness.
1. Products:
a. nora by Interface; norament satura: www.interface.com
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 39.53 by 39.53 inch, nominal.
4. Total Thickness: 3.5 mm.
5. Texture: Hammered.
6. Installation Pattern: 1/3 offset.
7. Colors: Arcturus.
8. Manufacturer's Representative: Sofia Davila - (347) 633-0577.
BID PACKAGE NO. 8A 09 6500-4
F. RFT6 Rubber Tile: Homogeneous, color and pattern throughout thickness.
1. Products:
a. nora by Interface; norament grano: www.interface.com
b. Substitutions: Not permitted.
2. Minimum Requirements: Comply with ASTM F1344, of Class corresponding to type specified.
3. Size: 39.53 by 39.53 inch, nominal.
4. Total Thickness: 3.5 mm.
5. Texture: Hammered.
6. Installation Pattern: Logo; Refer to drawing provided by manufacturer.
a. Logo to be factory cut, as recommended by manufacturer.
b. Artwork to be provided by Owner. **ADD3**
7. Color: Architect to select from manufacturer's full range.
a. Design Intent: Blue.
8. Manufacturer's Representative: Sofia Davila - (347) 633-0577.
2.03 ACCESSORIES
A. Subfloor Filler: Cement based rapid drying smoothing and finishing compound; type recommended by adhesive manufacturer. Moisture resistant, Low VOC.
B. Primers and Adhesives: Waterproof; types recommended by flooring manufacturer.
C. Filler for Coved Base: Plastic.
D. Floor Moldings, Stair Coverings, and Resilient Base: Refer to Section 09 6513 - Resilient
Bases and Accessories.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that surfaces are flat to tolerances acceptable to flooring manufacturer, free of cracks that might telegraph through flooring, clean, dry, and free of curing compounds, surface hardeners, and other chemicals that might interfere with bonding of flooring to substrate.
B. Cementitious Subfloor Surfaces: Verify that substrates are ready for resilient flooring installation by testing for moisture and alkalinity (pH).
1. Test in accordance with Section 09 0561 - Common Work Results for Flooring
Preparation.
C. Mat bond tests are required. This test determines the compatibility of flooring with the substrate and may provide an indication of the presence of excessive moisture or other contaminates.
D. A water droplet test for absorbency of the concrete or cementitious substrate is always recommended when using nora ED120 or nora AC 100 adhesive.
3.02 PREPARATION
A. Prepare floor substrates as recommended by flooring and adhesive manufacturers.
B. Prohibit traffic until filler is fully cured.
C. Clean substrate.
D. Apply primer as required to prevent "bleed-through" or interference with adhesion by substances that cannot be removed.
3.03 INSTALLATION - GENERAL
A. The installation area must be fully enclosed, weather tight, and climate controlled between 63 degrees Fahrenheit and 75 degrees Fahrenheit and 40% to 60% ambient relative humidity (RH) for at least 48 hours prior, during and 72 hours after installation.
B. Starting installation constitutes acceptance of subfloor conditions.
C. Install in accordance with manufacturer's written instructions.
D. Adhesive-Applied Installation:
BID PACKAGE NO. 8A 09 6500-5
1. Fully adhere resilient floor finishes to substrates using a full spread of adhesive completely covering substrate.
2. Spread only enough adhesive to permit installation of materials before initial set.
3. Fit joints and butt seams tightly.
4. Set flooring in place, press with heavy roller to attain full adhesion.
E. Where type of floor finish, pattern, or color are different on opposite sides of door, terminate flooring under centerline of door.
F. Scribe flooring to walls, columns, cabinets, floor outlets, and other appurtenances to produce tight joints.
G. Install flooring in recessed floor access covers, maintaining floor pattern.
H. At movable partitions, install flooring under partitions without interrupting floor pattern.
I. Coordinate with Section 09 6513 - Resilient Bases and Accessories for installation of floor moldings, stair coverings, and resilient base.
3.04 INSTALLATION - SHEET FLOORING
A. Installed sheet flooring shall be without open cracks, raising and puckering at joints, bubbling, telegraphing of adhesive spreader marks, and other imperfections.
B. Unless otherwise indicated lay flooring with joints and seams parallel to longer room dimensions, to produce minimum number of seams. Lay out seams to avoid widths less than 1/3 of roll width; match patterns at seams.
C. Install resilient sheet flooring in floor patterns indicated on Drawings.
D. Cut sheet at seams in accordance with manufacturer's instructions.
E. Seal seams by heat welding per ASTM F1516.
1. Permanently fuse joint together using welding rod.
2. Finish seams flush with adjacent flooring material.
F. Coved Base: Install as detailed on drawings, using coved base filler as backing at floor to wall junction. Extend sheet flooring vertically to height indicated, and cover top edge with metal cap strip.
3.05 INSTALLATION - TILE FLOORING
A. Mix tile from containers to ensure shade variations are consistent when tile is placed, unless otherwise indicated in manufacturer's installation instructions.
B. Installed floor tile shall be without open cracks, bubbling, telegraphing of adhesive spreader marks, and other imperfections.
C. Install resilient tile in floor patterns indicated.
D. Where no patterns are indicated, lay flooring with joints and seams parallel to building lines to produce symmetrical pattern.
3.06 CLEANING
A. Remove excess adhesive from floor surfaces without damage.
B. Clean in accordance with manufacturer's written instructions.
1. Seal resilient floor finishes only when recommended by resilient floor finish manufacturer.
2. Wax resilient floor finishes only when recommended by resilient floor finish manufacturer.
a. Apply not less than two coats as recommended by manufacturer.
3. Do not seal or wax luxury vinyl tile.
C. Clean resilient flooring not more than 5 days prior to Substantial Completion in accordance with resilient flooring manufacturer's instructions
3.07 PROTECTION
A. Prohibit traffic on resilient flooring for 48 hours after installation.
B. After cleaning, place protective coverings over finish floors; do not remove coverings until Date of Substantial Completion.
END OF SECTION 09 6500
11-20-2026 ADDENDUM NO. 3 SPRAYED ACOUSTIC INSULATION
BID PACKAGE NO. 8A 09 8129-1
SECTION 09 8129 - SPRAYED ACOUSTIC INSULATION
PART 1 GENERAL
1.01SECTION INCLUDES
A. Cellulosic insulation applied to underside of structure, and elsewhere as indicated.
1.02 REFERENCE STANDARDS
A. ASTM C423 - Standard Test Method for Sound Absorption and Sound Absorption Coefficients by the Reverberation Room Method; 2023.
B. ASTM C518 - Standard Test Method for Steady-State Thermal Transmission Properties by
Means of the Heat Flow Meter Apparatus; 2021.
C. ASTM C739 - Standard Specification for Cellulosic Fiber Loose-Fill Thermal Insulation; 2017.
D. ASTM D1622/D1622M - Standard Test Method for Apparent Density of Rigid Cellular Plastics;
2020.
E. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials;
2023d.
F. ASTM E736/E736M - Standard Test Method for Cohesion/Adhesion of Sprayed Fire-Resistive
Materials Applied to Structural Members; 2019.
G. ASTM E859/E859M - Standard Test Method for Air Erosion of Sprayed Fire-Resistive Material
(SFRMs) Applied to Structural Members; 1993 (Reapproved 2020).
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data on product characteristics and performance criteria.
C.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .