This document is an Addendum to the solicitation issued by the Florida Fish and Wildlife Conservation Commission (FWC) for the Triple N Hydrologic Restoration Phase III and IV project (FWC 23/24-124C). The addendum provides responses to questions submitted by potential bidders and includes a revised bid form. The project consists of constructing restoration features for Phase III and IV, per the provided plans and specifications. Bid responses are due no later than 3:30 PM (ET) on Thursday, September 5, 2024. Bidders will be required to submit a 5% bid guarantee if the bid amount is equal to or greater than $100,000, and additional documentation if the bid amount exceeds $200,000 or $500,000. The contract will be awarded to the lowest responsive and responsible bidder.
The revised bid form includes a base bid for Phase III and an alternate bid for Phase IV, as well as a unit price for repairing damaged areas along the paved road. Bidders are advised that the contractor may install a temporary crossing at the borrow area and Donovan Crews Road, but it must be removed and the area restored to pre-construction conditions. The contractor will be held responsible for any damage to the paved roads caused by their operations and will be required to repair the roads to their original or better condition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2-Cal. of Events.pdf | ||
| Addendum 1-Cal. of Events.pdf | ||
| FWC 23.24-124C-T&Cs.pdf | ||
| FWC 23.24-124C-ITB.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Florida Fish and Wildlife Conservation Commission
Commissioners Rodney Barreto Chairman Coral Gables
Steven Hudson Vice Chairman Fort Lauderdale
Preston Farrior Tampa
Gary Lester Oxford
Albert Maury Coral Gables
Gary Nicklaus Jupiter
Sonya Rood St. Augustine
Office of the Executive Director Roger A. Young Executive Director
Charles “Rett” Boyd Assistant Executive Director
George Warthen Chief Conservation Officer
Jessica Crawford Chief of Staff
850-487-3796
850-921-5786 FAX
Managing fish and wildlife resources for their long-term well-being and the benefit of people.
620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676
Hearing/speech-impaired:
800-955-8771 (T) 800-955-8770 (V)
MyFWC.com
DATE: AUGUST 28, 2024
ADDENDUM NO.: 3
BID NO.: FWC 23/24-124C
BID TITLE: TRIPLE N HYDROLOGIC RESTORATION PHASE III
AND IV
UPDATE: QUESTIONS AND ANSWERS, AND REVISED BID FORM
The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 23/24-124C, “TRIPLE N HYDROLOGIC
RESTORATION PHASE III AND IV”.
All responses to the subject solicitation must be received no later than 3:30 PM (ET) on Thursday, September 5, 2024.
A response received after the exact time specified will not be considered.
Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.
Sincerely, Dale Eastmond, FWC Procurement Manager
FWC SOLICITATION ADDENDUM 2
BEGIN ADDENDUM
QUESTION #1
Is there a bid tabulation with estimated quantities available for this project and will it be supplied?
ANSWER #1
No, there is not. The contractor shall estimate these quantities based on the design drawings.
QUESTION #2
Can you provide the CADD file link for this project?
ANSWER #2
Yes, CADD files will be provided to the bidders that have submitted the confidentiality exemption form.
QUESTION #3
Can you confirm whether the haul road will need to be repaired if damaged during the duration of the project?
ANSWER #3
Contractors shall provide a unit price per square yard for repairing damaged areas along the paved road per the detail provided in this addendum. See Detail 1 and the revised bid sheet. The extent of damage will be evaluated and determined by FWC once the trucking operation is complete.
Any other damage made by the contractor's operation shall be repaired to a condition equal to or better than the existing condition at no additional charge to the FWC.
QUESTION #4
Will the contractor be allowed to construct a temporary crossing at the Borrow Area and Donovan Crews Road to minimize the haul distance and having to improve the road through the swamp area west of the borrow?
ANSWER #4
The contractor will be permitted to install a temporary crossing. The temporary crossing must not impede the water flow in the canal and must be fully removed by the contractor when work is finished. The canal and surrounding area must be restored to pre-
FWC SOLICITATION ADDENDUM 3
construction conditions after work is complete. FWC will not supply culverts. If deemed appropriate, the contractor may use clean fill from this project borrow site to help construct the temporary crossing. Rough location for the temporary crossing: 28.055801, -81.011332.
QUESTION #5
With the amount of heavy traffic from the Borrow area to Phase 4, it is safe to assume there will be a lot of damage to the thin asphalt on Donovan Crews Road and the Shell Road through the shooting range. Will the contractor be held accountable for the damage? If so, how would we quantify this?
ANSWER #5
See answer #3.
QUESTION #6
- What are we to do with any remaining embankment that is not used for fill in other areas?
ANSWER #6
Any embarkment not marked to be removed shall remain in their original state. All unusable material obtained from an embankment should be disposed of off-site as indicated in General Note No. 15 of sheet G002, “all required clearing and grubbing, rubble, debris, silt, and other unusable or unsuitable material shall be removed and properly disposed of off-site at the contractor's expense.”.
QUESTION #7
- Will the contractor have unimpeded access daily throughout the site and shooting range?
ANSWER #7
The contractor will be given combinations to locked gates within the designated work area and along designated access routes. The contractor may not access any of the property that is not part of the designated working area or designated access routes. The contractor will not be permitted to access the property or operate during any Special Opportunity Hunts (Special Opp General Gun: Sep 28-Oct 4, Oct 12-Oct 18; Special Opp Muzzleloading: Oct 31-Nov 3; Special Opp Spring Turkey: Mar 15-Mar 21, Mar 29-Apr 4, Apr 12-Apr 18).
FWC SOLICITATION ADDENDUM 4
QUESTION #8
- Are there any known locations of endangered species or nests that will need to be avoided during construction?
ANSWER #8
FWC staff will mark all known wildlife features to be avoided. The contractor must contact site manager, Jared Draxler (407-709-5263), if wildlife or wildlife features such as gopher tortoises or their burrows are identified while working. The contractor will not be financially responsible for the relocation of wildlife but will be held accountable for harming wildlife due to negligence.
QUESTION #9
In the Phase IV drawings, pages C302 and C303 the typical sections call for “sand-cement rip rap” it seems to show 2 rows of bags stacked. Is there a desired thickness?
There doesn’t appear to be any dimensions to estimate how bags will be needed.
ANSWER #9
As indicated on the drawings, the sand cement riprap thickness is 2 rows stacked.
Length-wise, the bags extend from the top of the pipe to a minimum of 5 feet away after reaching the existing grade, at both ends. The width of the riprap is equal to the pipe size plus 30 inches minimum, on each side.
Material shall follow FDOT Specification Section 530-2.1 and FDOT Approved Product List.
QUESTION #10
- Can you please provide us with the CADD files for this project?
ANSWER #10
See answer #2
Herbert.Franklin Line
Herbert.Franklin Line
Herbert.Franklin Text Box Detail 1
Josh Stringer Sticky Note Accepted set by Josh Stringer
Josh Stringer Sticky Note Completed set by Josh Stringer
Josh Stringer Sticky Note Completed set by Josh Stringer
Josh Stringer Sticky Note Completed set by Josh Stringer
Revised: 3.19.2024 FWC 23/24-124C Terms & Conditions Page 1
EXHIBIT 2: BID FORM
The Commission objects to and shall not consider any additional terms or conditions submitted by a Contractor, including any appearing in documents attached as part of a Contractor’s response. Contractor agrees that any additional terms or conditions, whether submitted intentionally or inadvertently, shall have no force or effect on the Contract Documents contained herein. Failure to comply with Contract Documents, including those specifying information that must be submitted with a bid, may be grounds for rejecting a bid.
The undersigned, hereinafter called "Bidder", having visited the site of the proposed project and familiarized themself with the local conditions, nature and extent of the work, and having examined carefully the Contract documents, proposes to furnish all labor, materials, equipment and other items, facilities, and services for the proper execution and completion of Triple N Hydrologic Restoration Phase III and IV (FWC 23/24-124C) at 595 Donovan Crews Road Saint Cloud, FL 34773, in full accordance with any drawings and specifications prepared by the firm of AECOM Technical Services, Inc. 2090 Palm Beach Blvd. Suite 600 West Palm Beach, FL, 33409), for the following bid price:
Base Bid: Construction of Triple N Phase III restoration features, per the plans and specifications.
Base Bid Total (Lump Sum): $
With foregoing as a Base Bid, the following costs of alternate bids are submitted in accordance with the drawings and specifications.
Alternate No. 1: Construction of Triple N Phase IV restoration features, per the plans and specifications.
Add Alternate No. 1 Cost (Lump Sum): $
Total Bid Price (Add Base Bid and Alternate No. 1 together): $
If more or less work is required than that qualified by the specifications and drawings, the following unit price shall be applicable.
ITEM UNIT PRICE (PER SQUARE YARD)
Repair of damaged areas along paved road.
Revised: 3.19.2024 FWC 23/24-124C Terms & Conditions Page 2
The Bidder hereby agrees that:
The above bid shall remain in full force and effect for a period of sixty (60) calendar days after the time of the opening of this bid and that the Bidder will not revoke or cancel this bid or withdraw from the competition within the said sixty (60) calendar days.
In the event the contract is awarded to this Bidder, he will enter into a formal written Contract with the Owner in accordance with the accepted bid within five (5) calendar days after said contract is submitted to him and, if applicable, will furnish to the Owner a Contract Performance Bond and a Labor and Material Payment Bond with good and sufficient sureties, satisfactory to the Owner, in the amount of 100% of the accepted bid, the form of which is shown by EXHIBITS 6 AND 7 of the Conditions of the Contract and terms of which shall fully comply with Section 255.05, Florida Statutes. The Bidder further agrees that in the event of the Bidder's default or breach of any of the agreements of this bid, the said bid deposit shall be forfeited as liquidated damages.
☐ If bid amount is equal to or greater than $200,000: Bidder confirms Pre-Qualification by the Florida Fish & Wildlife Conservation Commission per Section titled Pre-Qualification to Submit a Bid
Acknowledgement is hereby made that this bid includes required permit fees as directed in the section titled “Permits”.
Acknowledgement is hereby made of receipt of the following addenda issued during the bidding period:
Addendum No. Dated
THE FOLLOWING FORMS OR DOCUMENTS SHALL BE COMPLETELY FILLED OUT AND
SUBMITTED WITH THIS BID FORM. THE BID MAY BE REJECTED FOR FAILURE TO INCLUDE ALL
THESE FORMS OR DOCUMENTS.
All submissions shall include:
1. Signed Bid Form (Exhibit 2)
2. List of Subcontractors (Exhibit 3)
3. References (Exhibit 4)
4. Bid Guaranty in the amount of 5% of the Bid, including Alternates (if bid amount is equal to or greater than $100,000.00)
5. Form Experience Questionnaire, Financial Information, & Project Supervision (Exhibit 5).
In addition to the requirements above, if the bid amount is equal to or greater than $200,000.00, the submission shall also include:
Revised: 3.19.2024 FWC 23/24-124C Terms & Conditions Page 3
6. Bidder hereby agrees to establish or have an active office, or an ongoing project, which office or project is located within 300 road miles of the project site.
In addition to the requirements above, if the bid amount is equal to or greater than $500,000.00, the submission shall also include:
7. Bidder hereby agrees to perform no less than 15% of the construction work utilizing its own employees.
8. Bidder must complete requirements of Item 15 in the Experience Questionnaire, Financial
Information, & Project Supervision (Exhibit 5).
9. Bidder must provide proof, in its Experience Questionnaire, Financial Information, & Project
Supervision (Exhibit 5), or attached to that form, that it has successfully completed no less than two (2) projects of similar size and complexity within the last three (3) years.
Florida Construction Industries Licensing Board Certification:
(Name of Holder) (Certificate No.)
In witness whereof, the Bidder has hereunto set his/her signature and affixed his/her seal this day of , 20 .
(SEAL)
Signature:
Print Name:
Title:
Company:
Physical Address:
Email:
Phone Number:
Federal Employee Identification Number (FEIN):
Revised: 3.19.2024 FWC 23/24-124C Terms & Conditions Page 4
END ADDENDUM
| Addendum 3 QA_REVISED BID FORM |
| Question #1 |
| Answer #1 |
| Question #2 |
| Answer #2 |
| Question #3 |
| Answer #3 |
| Question #4 |
| Answer #4 |
| Question #5 |
| Answer #5 |
| Question #6 |
| Answer #6 |
| Question #7 |
| Answer #7 |
| Question #8 |
| Answer #8 |
| Question #9 |
| Answer #9 |
| Question #10 |
| Answer #10 |
| Donovan Crews Road Section_HF |
| Revised Bid form |
| The Bidder hereby agrees that: |
| In addition to the requirements above, if the bid amount is equal to or greater than $200,000.00, the submission shall also include: |
| In addition to the requirements above, if the bid amount is equal to or greater than $500,000.00, the submission shall also include: |
File details come from the government source that posted it. Updated .