This Addendum No. 3 document, issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration, provides clarifications and modifications to Invitation to Bid (RFB) No. RFB-45-27 for Russellville Armory Renovations managed by the Department of Military Affairs in Russellville, Kentucky. The project encompasses comprehensive renovation work including HVAC systems, electrical systems, plumbing, interior finishes, doors, and associated equipment. The addendum, dated August 19-20, 2026, consists of thirty-two items addressing questions and providing clarifications on specifications and drawings originally dated June 24, 2026. Key clarifications include confirmation that prevailing wages do not apply; there is no existing fire sprinkler system; patch panels shall be replaced; Internet Service Provider fiber shall be owner-provided; fire alarm and security system installation is outside project scope; traffic control measures are required; and new kitchen exhaust hood will replace the existing hood. The addendum includes revised specification sections for GSA vault doors, sectional doors, and residential appliances, along with updated drawings for HVAC, electrical, mechanical, interior finish, and architectural details.

The addendum modifies several technical specifications and adds approved manufacturers for various components, including additional lighting fixture manufacturers, hollow metal door options, and phenolic toilet compartment suppliers. Specific equipment modifications include the addition of DOAS unit 131 and an additional Energy Recovery Ventilator to the scope, relocation of certain units, and replacement of the kitchen hood with residential-style equipment to be provided and installed by the General Contractor. The document incorporates detailed specifications for vault doors meeting GSA and Federal standards, sectional overhead doors with electric operation, and residential appliance requirements including a 30-inch undercabinet exhaust hood. All addendum modifications and attachments must be acknowledged on final bid documents, ensuring bidders incorporate these changes into their proposals.

View the file

Other files

File Type Posted
Addendum 2.pdf PDF
Addendum 1.pdf PDF
Final_RFB_785_2700000047_4_SO_FORM.PDF PDF
Final_RFB_785_2700000047_2_SO_FORM.PDF PDF
Final_RFB_785_2700000047_3_SO_FORM.PDF PDF
Final_RFB_785_2700000047_1_SO_FORM.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF KENTUCKY

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

INVITATION TO BID NO: RFB-45-27

FOR: Russellville Armory Renovations Department of Military Affairs Russellville, Kentucky

DATE: August 20, 2026

RFB-785-2700000047

ADDENDUM NO. Three (3)

BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING

UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.

Item 1: Refer to attached addendum for all additions, deletions, and/or changes to specifications and/or drawings.

END OF ADDENDUM

Invitation to Bid No. RFB-45-27 For: Russellville Armory Renovations Department of Military Affairs Russellville, Kentucky

Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration

P a g e | 1 of 3

T000-LASTNAME-

INT

INDIANA | ILLINOIS | KENTUCKY | OHIO

haferdesign.com

ADDENDUM

Project: RFB-45-27 DMA Russellville Renovations Addendum No.: 003

600 Armory Drive

Russellville, KY 42276 Date: August 19, 2026

Owner: Commonwealth of Kentucky Project Number: 2512-339

403 Wapping Street

Fankfor, KY 40601 Contract for: ALL

The original specifications and drawings dated June 24, 2026 for the project noted above are amended as noted in this Addendum Number 003. Receipt of this addendum and any subsequent addenda must be acknowledged on the final bid documents. This addendum consists of thirty two item(s) and attachment(s).

CLARIFICATIONS:

1-1 Prevailing wages DO NOT apply to this project.

1-2 Building is not occupied. Water service is available. Existing toilets and sinks may be utilized by workers if they are available prior to demolition of restrooms and existing sanitary sewer piping.

1-3 There is NOT an existing fire sprinkler system, and none is planned for in this project.

1-4 GC to provide and install residential style kitchen hood. Refrigerators, freezers, ice maker and kitchen area shelving will be Owner supplied, GC installed. Refer to revised Specification Section 113013, attached.

1-5 QUESTION: Note 1 on drawing E2.1 indicates that the racks will be used. Does that apply to patch panels as well? With age of the existing and new technologies available we recommend replacing.

ANSWER: Patch panels shall be replaced. Reference notes 13, 16, & 18 on sheet E1.3 and the Information Outlet Jack Legend on sheet E1.1 for additional information.

1-6 QUESTION: Per on site visit notice existing fiber at current rack location. Will fiber for the ISP be in our scope? If the fiber is in EC scope will new be required from demarc to new data room?

ANSWER: ISP fiber shall be owner provided. Note 16 on sheet E1.3 has been updated.

1-7 QUESTION: Will new support build from ground up to support the existing Generator docking station be acceptable?

ANSWER: Yes, new support build from ground up to support existing generator docking station is acceptable.

1-8 QUESTION: Per my conversation with electrical engineer, I am requesting more detailed information concerning the installation of the new armory vault. The images on the document represent a new installation we have existing installation.

ANSWER: For additional information concerning the new armory vault, coordinate with Boone National Guard Center. Contact information can be found on sheet E2.2.

P a g e | 2 of 3

1-9 QUESTION: To clarify all work associated with installation of new fire alarm systems and security systems will be others. This not limited to permitting, conduit, wire, and device installation. Unless shown in bidding documents.

ANSWER: Yes, all work associated with the installation of a new fire alarm system and security system is outside the scope of this project.

1-10 QUESTION: Note 31 on drawing E2.1 calls for fiber and multi strand copper from new data room to field location. What kind/spec of fiber is required and same question about “multi-strand” copper is required?

ANSWER: Note 31 has been updated on sheet E2.1.

1-11 QUESTION: Do we need to include traffic control measures for the work across Armory Drive.

ANSWER: Traffic controls measures do need to be included.

1-12 QUESTION: On sheet U1.1, the concrete headwall is to splash onto the property across the street. When looking at Google Earth, there appears to be a chain link fence on that property. Does the new headwall get installed on the other side of that fence? Has this been discussed with this property owner? ANSWER: The headwall will go between the road (Armory Drive) and the fence. The drain will follow the same storm flow drain line as existing.

1-13 Question On Sheet E1.3 – First Floor Electrical Demolition Plan, note #3,5,6 & 7 indicate removal of the disconnects and associated wiring for the HVAC equipment. Since the disconnect ratings are not specified in the notes or existing panel schedules, we have assumed 20A/2P disconnects. Please confirm ANSWER: Notes 3, 5, 6, and 7 state circuits and equipment will be disconnected and removed complete back to source of feed. Contractor shall be responsible for visiting the building and site to become familiar with the existing conditions.

1-14 QUESTION: On Sheet E4.1 – One-Line & Bussing Diagram, note 5 & 6 indicate that certain equipment, along with associated wiring, is to be removed. Since the disconnect ratings, locations, and equipment details are not provided, we have assumed the disconnect ratings based on the corresponding breakers and removed the disconnects and associated wiring. Please confirm.

ANSWER: Note 5 states circuits and equipment will be disconnected and removed complete back to source of feed. Contractor shall be responsible for visiting the building and site to become familiar with the existing conditions.

1-15 .QUESTION: On Sheet E1.3- First Floor Electrical Demolition Plan, note #13 states that all existing voice, data, and fiber cabling is to be removed and new cabling provided for the existing and new voice/data/fiber locations. Please confirm whether this requirement applies to all low-voltage cabling throughout the building or only to the relocated equipment room.

.Moreover, please confirm whether the new cabling from the rack to each outlet is required to be installed in conduit, or if conduit only needs to be stubbed up to the accessible ceiling.

ANSWER: Yes, the data equipment racks are being relocated, all new cabling is required. Per sheet E1.1, cabling shall be installed in conduit, see detail.

SPECIFICATIONS:

1-16 General Conditions: Subsection 11.2.4 – Job superintendent may be designated at the work site safety officer.

1-17 Refer to Specification Section 081113 HOLLOW METAL DOORS, add Mesker as approved manufacturer.

1-18 Replace Specification Section 08 11 14 GSA VAULT DOOR in its entirety. Additional door and signage information provided in Subsections 3.13 and 3.14.

1-19 Add Specification Section 08 36 13 SECTIONAL DOORS in its entirety.

1-20 Refer to Specification Section 087100 DOOR HARDWARE. The following items manufactured by

Architectural Builders Hardware are acceptable products. Flush bolt 18555, Overhead parallel arm holder 3500 series, continuous hinge A110WTHD, continuous hinge A240HD, barrel hinge A500, push

P a g e | 3 of 3

Attachments: Specification Section 08 11 14 GSA VAULT DOOR revised 8/18/26 Specification Section 08 36 13 SECTIONAL DOORS added 8/18/26 Specification Section 113013 RESIDENTIAL APPLIANCES revised 8/18/26 A4.2 SECTIONS AND DETAILS revised 08/18/26 ID1.1 FINISH PLAN revised 08/18/26 ID1.2 FINISH LEGEND AND ROOM FINISH SCHEDULE revised 08/18/26 M1.1 FIRST FLOOR HVAC DEMOLITIONPLAN revised 08/18/26 M2.1 FIRST FLOOR HVAC PLAN revised 08/18/26 M2.2 FIRST FLOOR HVAC PIPING PLAN revised 08/18/26 M2.3 ROOF HVAC PLAN revised 08/18/26 M3.1 HVAC DETAILS revised 08/18/26 M4.1 HVAC SCHEDULES revised 08/18/26 M5.1 TEMPERATURE CONTROL DEVICES revised 08/18/26 E1.2 LIGHTING FIXTURE SCHEDULE revised 08/18/16 E1.3 FIRST FLOOR ELECTRICAL DEMOLITION PLAN revised 08/18/26 E2.1 FIRST FLOOR POWER AND SYSTEMS PLAN revised 08/18/26 E4.1 ONE-LINE & BUSSING DIAGRAMS revised 08/18/26

By: Russell Fredrick

CC: Distributed through Ecomm.

plate AB-70F, pull hardware AB111xAB70B or AB70C, door stop AB400 series, door and wall protection PP050 – 0.50” thick.

1-21 Refer to Specification Section 102113.17 PHENOLIC TOILET COMPARTMENTS. Add Scranton Products, Metpar Phenolic as an approved product.

1-22 Replace Specification Section 113013 RESIDENTIAL APPLIANCES with Section 113013 revised 08/18/26.

DRAWINGS:

1-23 Refer to revised Drawing LS1.1. Fire extinguishers shown are existing and are to remain. GC to provide Knox Box.

1-24 Refer to revised Drawing A4.2. Existing upper air grille to remain.

1-25 Refer to revised Drawing ID1.1 for revisions to Finish Floor Plan 1-26 Refer to revised Drawing ID1.2 for revisions to Finish Schedule and Resinous Flooring Types RF01 and

RF02.

1-27 Refer to revised Drawings M1.1, M2.1, M2.2, M2.3, M3.1, M4.1 and M5.1 for the addition of DOAS unit 131 1-28 Refer to revised Drawing E1.2. Additional lighting fixture manufactures have been added.

1-29 Refer to revised Drawing E1.3 and E4.1. Kitchen hood will be replaced.

1-30 Refer to revised Drawing E2.1 and E4.1. An additional Energy Recovery Ventilator has been added to the scope.

1-31 Refer to revised Drawing E2.1. Relocation of RH-127, RH-131, and DOAS-131.

1-32 Refer to revised Drawing E4.1. Circuit for Assembly Hall exhaust fan in Panel B to remain.

Commonwealth of Kentucky Finance & Administration Cabinet Department of Facilities & Support Services Division of Engineering & Contract Services DMA-Russellville Renovations

Account No.: 095-CC79-RU04-00 Architect's Project No. 2512-339

GSA VAULT DOOR Revised 08/18/26 081114 - 1 OF 6

SECTION 081114 - Vault Doors {GSA Regulation AA-D0-600D)

FEDERAL SPECIFICATION DOOR, VAULT, SECURITY

1. SCOPE AND CLASSIFICATION

1.1 Scope. This specification covers security vault doors which are designed to conform to the minimum standards for physical security equipment as required by the Information Security Oversight Office Directive governing the safeguarding of national security information. The doors provide protection against unauthorized entry for the periods of time specified in 1.2.1.

1.2 Classification. The vault doors under this specification shall be of the following Classes, types, styles and designs, as specified (see 6.2).

1.2.1 Classes.

(1) Class 5-V - Vault door shall be resistant to 20 man-hours surreptitious entry, 30 man-minutes covert entry and 10man-minutes forced entry.

{2} Class 5-A - Armory door shall be resistant to 30 man-minutes covert entry and 10 man-minutes forced entry.

(3) Class 5-B - Ballistic door shall be resistant to 20 man-hours surreptitious entry, 30 man-minutes covert entry, 10 man-minutes forced entry, ballistic resistant.

1.2.2 Types.

Type IR -Right opening swing; with optical device.

Type IL - Left opening swing; with optical device.

Type IIR -Right opening swing; without optical device.

Type IIL -Left opening swing; without optical device.

Type IIIR - Double leaf; active right opening swing.

Type IIIL - Double leaf; active left opening swing

1.2.3 Styles.

(1) Style H -Hand change combination lock.

(2) Style K -Key change combination lock.

1.2.4 Design.

(1) Design S -Single lock.

(2) Design B -No exterior hardware. (Types I and II only)

2. APPLICABLE DOCUMENTS

2.1 Government publications. The following documents form a part of this specification to the extent specified herein. Unless otherwise specified, the issue in effect on the date of invitation for bids or request for quotation shall apply.

Federal Specifications:

FF-L-2740 Lock, Combination.QQ-C-320 Chromium Plating (Electro-deposited).QQ-P-416 Plating, Cadmium, (Electro-deposited).TT-C-490 Cleaning Methods and Pretreatment of Ferrous Surfaces for Organic Coatings.

Federal Standards:

Fed. Std. No. 123 - Marking for Domestic Shipment (Civil Agencies). Fed. Std. No. 595 - Colors.

(Activities outside the Federal Government may obtain copies of Federal Specifications, Standards and Handbooks as outlined under General Information in the Index of Specifications and Standards and at the price indicated in the Index. The index which includes cumulative supplements, as issued, is for sale on a subscription basis by the Superintendent of Documents, Department of Facilities & Support Services

GSA VAULT DOOR Revised 08/18/26 081114 - 2 OF 6

U.S. Government Printing Office, Washington, DC, 20402.

(Single copies of this Specification and other Federal Specifications are available from: General Services Administration, Federal Supply Service, Specifications Section (3FP-E), Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407,Tel - (202)619-8925.)

(Sample panels of the standard colors are obtainable, without charge, from the Business Service Center, Federal Supply Service, General Services Administration, Washington, DC 20407, or from the Business Service Center of the nearest Regional Office.)

Military Standards:

MIL-STD-129 - Marking for Shipment and Storage.

(Copies of Military Specifications and Standards are available from: DODSSP - Customer Service, Standardization Document Order Desk, 700 Robbins Avenue, Bldg.

4D, Philadelphia, PA 19111-5094, Tel 215.697.2179)

2.2 Other publications. The following documents form a part of this specification to the extent specified herein. Unless aspecific issue is identified, the issue in effect on the date of invitation for bids or request for proposal, shall apply.

American National Standards Institute (ANSI)/American Society for Quality (ASQ): ANSI/ASQ Z1.4 - Sampling Proceduresand Tables for Inspection by Attributes (Application for copies should be addressed to ANSI, 11 West 42nd Street, NY 10036.)

American Society for Testing and Materials (ASTM):

ASTM B633 - Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel.

(Application for copies should be addressed to the American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959)

Underwriters Laboratories (UL):

UL 752 -Standard For Safety For Bullet-Resistive Equipment.

UL 768 - Combination Locks: For locking control of safes, chests, vaults, and similar products.

3. REQUIREMENTS

3.1 Qualification. The vault doors furnished under this specification shall be products which have been tested and have passed the qualification tests and inspections specified in section 4, and have been listed on or approved for listing on the applicable Qualified Products List (QPL).

The Government testing facility for the General Services Administration reserves the right to test the vault door in accordance with standards that are privileged to the Government.

3.1.1 Qualification suspension.

3.1.1.1 Development of entry techniques. The doors qualified under this specification will be continually tested by the Government during the term of qualification to determine whether the surreptitious, covert or forced entry protection afforded by the doors should or can be improved.

If at any time, entry techniques are developed within the framework of the specification which affect a door's security integrity, it shall be removed from the QPL.

3.1.1.2 Change in specification requirements. This specification will be reviewed by the Government to determine whether the specification requirements should or can be changed to improve product quality. If, at any time, requirements are changed and such changes affect the qualification status of a qualified door, it shall be removed from the QPL and the manufacturer will be required to modify the product to the extent necessary to comply with specification changes and have the product requalified.

Department of Facilities & Support Services

GSA VAULT DOOR Revised 08/18/26 081114 - 3 OF 6

3.2 Materials. Materials used in the door's construction shall be as specified herein. Materials not specified shall be of good commercial quality, suitable in all respects for the purpose intended.

3.2.1 Steel. Steel used in the door shall be of the type, thickness and strength to meet all applicable requirements of this specification. Steel shall be free from rust, scale, pits, buckles and other imperfections that might adversely affect the appearance or the serviceability of the finished product.

3.2.2 Face hardware. The face hardware, excluding combination locks, shall be satin finished anodized aluminum, type 430 corrosion resistant steel or satin finished chromium plating on steel or on die-cast zinc, brass or bronze. The exposed surfaces of all hardware used on a single unit shall be finished to match each other within the limits of the base material and protective coating used. The exposed surfaces of all face hardware shall be free of sharp edges, burrs, pits, nicks or scratches that penetrate the protective plating or anodizing.

3.2.3 Finishing materials.

3.2.3.1 Enamel and lacquer. The final coat for the door shall be either baked enamel, air dried, textured finish, powder coat finish, nitrocellulose lacquer or water reducible coating. The quality of the final coat and its application shall be in accordance with good commercial standards and practices. The color shall be gray, color No. 26134, of Federal Standard No.595.

3.2.3.2 Chromium plating. Chromium plating shall be in accordance with Class I, Type II of QQ-C-

320.

3.2.3.3 Cadmium plating. Cadmium plating shall be in accordance with Class 1, Type I of QQ-P-416.

3.2.3.4 Zinc plating. Zinc plating shall be in accordance with ASTM B633.

3.3 Construction and design.

3.3.1 Design. The design shall provide for an end product that is practical, durable, and acceptable in general appearance. The doors shall be hinged to swing right or left, as specified (see 6.2).

3.3.2 Assembly. The door frame shall be considered a part of the door for purposes of entry resistance testing and shall afford the same security protection as that of the door. Protection for the extended locking bolts shall be built into the door frame. The overall width of the door frame shall not exceed the width of the clear door opening by more than 410 mm. The door frame for single leaf doors shall be designed to mount in a structural wall opening ranging from 1190 to 1240 mm wide and 2080 to 2110 mm high. The door frame for double leaf doors shall be designed to mount in a structural wall opening of 2210 to 2260 mm wide and 2080 to 2110 mm high. The double leaf door frame shall allow adjustment for variations in the wall opening of 12

mm. The door shall be assembled in such a manner as to preclude the removal or loosening of any of the door's components when the door is closed and locked, except that the hinges shall be removable from the outside. All welding and brazing shall be sound, without porosity and shall accomplish secure and rigid joints in proper alignment. All protruding or depressed welds on the door's exterior surface shall be filled and sanded or ground smooth. The door and frame shall be in perfect alignment and operation of the locking mechanism, including the locking bolts, shall be smooth and positive without binding or jamming of parts. The door shall withstand the test in

Department of Facilities & Support Services

GSA VAULT DOOR Revised 08/18/26 081114 - 4 OF 6

4.4.8.1.Clear door opening. The vault door assembly shall be of one size. When installed, the single leaf door shall have a clear door opening of 1980 mm high and 1015 mm wide. When installed, the double leaf door shall have a clear door opening of 1980 mm high and 2000 mm wide. A forming tolerance of +3 mm shall be permitted.

Otherdoor sizes may be approved at the request of the manufacturer based upon documented agency requirements.

3.3.3 Wall thickness. The door assembly shall be adaptable to one of the following wall thicknesses, as specified (see 6.2): 150 mm; 205 mm; 255 mm; or 305 mm. The assembly design shall provide a +15 mm adjustment to allow for variations in the nominal wall thickness (see 6.4).

3.3.4 Door frame. The door frame shall be non-grout type and the frame and door shall be mounted so that there shall be not more than 3 mm clearance between the door and the door frame. The frame shall be designed so that when attached to the wall, the wall clamping bolts will be exposed only on the inside of the vault. The frame shallhave leveling and adjusting screws to compensate for building sag which may occur at any time in the future.

3.3.5 Door pull and throw bolt handles. The door pull and throw bolt handles shall be of the material specified in paragraph 3.2.2. They shall be not less than 100 mm in length and of designs consistent with their intended usage.

The handles shall be without burrs, nicks, scratches, and sharp edges. A door pull shall be securely and firmly attached to both the door front and the door interior. Throw bolt handles shall be firmly attached to the front of the door. Door pulls and throw bolt handles shall be attached so they withstand loosening in testing and in operation during the service life of the door. The door pull handle on the front of the door may be integral with the throw bolt handle. Removal of the handle arbor shall be controlled only from the inside of the door. The throw bolt handle shall require not more than 20 Newton-meters torque to engage or disengage the bolt work mechanism, and the initial force required to swing the unlocked door from any position shall not exceed 45 Newtons at the operating handle.

3.3.5.1 Alarm Sensor Mounting Plate. A 1/8 inch thick, offset, 3 inch x 6 inch mild steel mounting plate shall be' welded on the frame directly perpendicular to a similar plate mounted on the top, opening side back cover of the vault door to facilitate the mounting of intrusion detection sensors.

3.3.6 Door stop. A door stop to prevent the door's face hardware from striking wall surfaces shall be furnished with the door. The stop shall be designed to be wall mounted unless otherwise specified (See 6.2 ). The stop shall be ableto withstand hard usage. The stop shall not scratch or scar the door's painted finish when the door is swung open against it.

3.3.7 Door striker. The door shall have a striker on both the front and hinged edges to minimize play or shake in thedoor when in the locked condition. The fit of the door to the striker on both the front and hinged edges shall be such that there is not more than 1 mm play or shake in the door when the bolts are thrown to the locked position.

3.3.8 Door hinges. The door shall be mounted to the frame by not less than two anti-friction bearing hinges, sodesigned to allow the door to be opened approximately 180 degrees. The hinges shall be removable from the outside.

Department of Facilities & Support Services

GSA VAULT DOOR Revised 08/18/26 081114 - 5 OF 6

3.3.9 Door threshold. The door threshold shall be designed to provide a ramp at the door threshold of approximately 6 mm to permit free swing of the door after its installation. If receptive cups, ports, or grooves areused, they shall be recessed not less than 12 mm below the bolt in its extended position to prevent dirt or other substances from obstructing the locking mechanism.

3.3.10 Back cover plate. Back cover plates of not less than 1.5 mm thickness shall completely enclose the back of the door. The back plates shall be firmly and securely fastened to the door and shall be reinforced or attached by a method to prevent sagging, bulging, or distortion. The back plates shall be easily removed by one person for service purposes by the use of common hand tools and shall weigh less than 20.4 kg (45 lbs). The back shall have an opening covered by an inspection plate. The opening, with the inspection plate removed shall be large enough and positioned so as to allow maintenance of the door's combination lock and cam assembly.

3.3.11 Alarm Sensor Mountinq Plate. A 1/8 inch thick, offset, 3 inch x 6 inch mild steel mounting plate shall be welded on the back cover plate directly perpendicular to a similar plate mounted on the top, opening side of the door frame of the vault door to facilitate the mounting of intrusion detection sensors.

3.3.12

3.4 Lock. The lock shall be in accordance with the following paragraphs:

3.4.1 Combination lock. Class 5V and Class 5B, Design S doors, shall have a Style H or Style K lock, as specified (see 6.2). The lock shall meet the requirements of FF-L- 2740. The lock design or installation shall not compromise the integrity of the door.

3.4.2 Armory door lock. Class 5-A, Design S doors shall have a lock which meets the requirements of Federal Specification FF-L-2937. The lock design or installation shall not compromise the integrity of the door.

3.4.3 Lock installation. The lock's dial ring shall be mounted so as to be flush to the surface of the door. The attachment of the dial ring shall be firm and secure without movement or side play. The lock case shall be firmly and securely attached to the door by suitable and effective means so that there is no movement or side play to the lock case. The lock shall not be modified in any manner from the formation supplied by the lock manufacturer, except that the spindle may be cut to proper length.

3.5 Locking mechanism. The engaging bolts shall be of a design, size and material strength to withstand the applicable tests in Section 4. The bolts shall operate easily and smoothly, without binding or jamming. The bolts shall not dent or otherwise deface the door frame in their movement. The attaching linkage shall be channeled, strapped or welded. The locking mechanism shall have a detent to lock the bolts in the open position when the bolts are retracted and the door swung open. The detent shall be designed so that it cannot be inadvertently tripped, permitting the bolts to be thrown to the engaged position. The locking mechanism shall be designed such that, with the vault door in the open position, the lock can be lockedso when the door is pulled shut from the inside, the vault door will immediately lock in the closed position.

3.6 Locking mechanism and lock mounting drawings. Complete, exploded view drawings of the locking mechanism and lockmounting, with individual parts indexed, shall be furnished by the manufacturer upon specific request of the purchaser.

3.7 Resistance to entry techniques.

Department of Facilities & Support Services

GSA VAULT DOOR Revised 08/18/26 081114 - 6 OF 6

3.7.1 Surreptitious, covert and forced entry techniques. The vault door shall withstand the applicable tests in

4.4.8 for not lessthan the periods of time specified hereunder.

(1) Class 5-V - Vault door shall be resistant to 20 man-hours surreptitious entry, 30 man-minutes covert entry and 10man-minutes forced entry.

{2} Class 5-A - Armory door shall be resistant to 30 man-minutes covert entry and 10 man-minutes forced entry.

(3) Class 5-B - Ballistic door shall be resistant to 20 man-hours surreptitious entry, 30 man-minutes covert entry and10 man-minutes forced entry.

3.8 Ballistic resistance. The Class 5B doors shall pass the test in 4.4.8.4.

3.9 Escape device. Each vault door shall have an escape device which shall be permanently installed on the inside face of thedoor. The device shall permit ready escape for persons locked inside the vault area. Access to the device shall only be from the inside the vault, and its design shall be such that under normal operating conditions it can not be activated from the outside. A decal shall be permanently affixed to the inside face of the door frame outlining, in easily read letters, completely understandable instructions for activating the device to open the door.

Neither the design of the device nor its installation shall affect the door's resistance to entry techniques. The escape device shall allow the door to be returned to the fully secure condition following egress from the vault. The escape device shall pass the escape device operational test in paragraph 4.4.8.5.

3.10 Optical device. When specified, the door shall have a wide angle optical device. The purchaser should indicate whether the device should permit observation from inside to outside of the vault or vice versa (See 6.2). The optical device shall be installed in such a manner so as not to affect the door's security protection. The device shall be located in the door approximately five feet above the inside vault floor and as close to the center of the door as practicable.

However, in no case shall it be closer than 205 mm to the clear opening edge of the door either on the hinged or front edge.

3.11 Lubrication. Moving parts requiring lubrication shall have a permanent type lubricant applied which is suitable to thevaried climatic conditions likely to be encountered during the service of the product.

3.12 Pretreatment and finish.

3.12.1 Pretreatment. All exterior and interior ferrous metal surfaces shall be treated for painting in accordance with any type in TT-C-490. Special attention shall be given to the door's interior to assure all welds are clean and that allslag, spatter, and dirt accumulation is removed.

3.12.2 Finish. The final coat used for the finish shall be as specified in 3.2.3.1 and it shall be applied to all exterior and interior metal surfaces except plated metal. The minimum total finished film thickness of the final coat shall benot less than 0.025 mm.

The finish shall level out to produce uniform exposed surfaces without runs, wrinkles, grit, areas of thin or no film, or separation of color.

A textured or crinkle finish may be used. Special attention shall be given to insure that all surfaces are adequately protected against rust. The final finish shall withstand the test in 4.4.8.5 without evidence of cracking, flaking, or loss of adhesion of the finish. Two test panels of 0.9 mm thick steel shall be furnished with the sample door for the purpose of the test. One panel shall be prepared to reflect the inner coating and one to reflect the outing coating.

Department of Facilities & Support Services

GSA VAULT DOOR Revised 08/18/26 081114 - 7 OF 6

3.12.3 Plating. Bolts, screws, nuts, and similar hardware shall be made to resist rust by electrogalvanizing or by zinc, cadmium, or chromium plating as specified in 3.2.3.

3.13 Labels. Each door furnished under this specification shall bear the applicable labels specified hereunder.

3.13.1 General Services Administration label. The label shall be affixed to the outside face of the door. The label shall have a silver background and red letters not less than 3 mm in height. The label shall show the following:

A. For the Class 5-A.door:

GENERAL SERVICES ADMINISTRATION

APPROVED ARMORY VAULT DOOR

MANUFACTURER'S NAME

13.13.2 Cabinet identification and contract number. This label or labels shall be affixed to the inside face of the door. The label shall show, in easily read letters, the manufacturer's name and address, the door's model and serial numbers, date of manufacture, and the Government contract number.

3.13.3 Number label. All vault doors under this specification shall have a number label securely affixed to the front face of the product. The label attachment shall not degrade the door security. The label shall be mounted on the door frame above or to the left side of the door. The label shall be nominal 0.020 inch thick, satin finished aluminum and shall be 2-1/2 by 11/16 inches. The label numbering system shall be established by the manufacturer to provide non-repetitive numbers. The label characters (numbers or letters) shall be minimum 3/16 inches high and shall be embossed.

3.13.4 Warning label. A warning label shall be affixed to the inside face of the door so as to be clearly visible when the door is open. The label shall -show, in red lettering not less than 1/8 inch high, the following:

Notice: Any modification of this door not in accordance with Federal Standard 809 will invalidate the GSA approval and the GSA approval label shall be removed.

3.14 Assembly drawing and parts list. A parts list of all door parts which may be subject to subsequent replacement because of wear or damage shall be furnished with each door delivered under contract. The parts list shall clearly identify the parts by description, location and part number. When necessary, assembly drawings shall be, provided to show the location of the parts.

The parts list shall be printed on heavy paper or other suitable material and bonded by glue or adhesive to an inside surface of the door in a location accessible to maintenance personnel.

END OF SECTION - 081114

Commonwealth of Kentucky Account No.: 095-CC79-RU04-00 Finance & Administration Cabinet Architect's Project No. 2512-339

Department of Facilities & Support Services

SECTIONAL DOORS 083613 / 1 of 6

SECTION 083613 - SECTIONAL DOORS

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Overhead sectional doors, electrically operated.

B. Operating hardware and supports.

C. Electrical controls.

1.2 RELATED REQUIREMENTS

A. Section 079200 - Joint Sealants: Sealing joints between frames and adjacent construction.

B. Section 087100 - Door Hardware: Lock cylinders.

C. Section 260533.13 - Conduit for Electrical Systems: Conduit from electric circuit to operator and from operator to control station.

D. Section 260533.13 - Conduit for Electrical Systems: Empty conduit from control units to door operator.

E. Section 260583 - Wiring Connections.

1.3 REFERENCE STANDARDS

A. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc- Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process; 2025a.

B. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes; 2021.

C. ASTM E283/E283M - Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Skylights, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen; 2019.

D. ASTM E330/E330M - Standard Test Method for Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference; 2014 (Reapproved 2021).

E. DASMA 102 - American National Standard Specifications for Sectional Doors; 2018.

F. ITS (DIR) - Directory of Listed Products; Current Edition.

G. NEMA EN 10250 - Enclosures for Electrical Equipment (1000 Volts Maximum); 2024.

H. NEMA ICS 2 - Industrial Control and Systems Controllers, Contactors and Overload Relays Rated 600 Volts; 2008 (Reaffirmed 2020).

Department of Facilities & Support Services

SECTIONAL DOORS 083613 / 2 of 6

I. NEMA MG 00001 - Motors and Generators; 2024.

J. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having Jurisdiction, Including All Applicable Amendments and Supplements.

K. UL (DIR) - Online Certifications Directory; Current Edition.

L. UL 325 - Standard for Door, Drapery, Gate, Louver, and Window Operators and Systems;

Current Edition, Including All Revisions.

1.4 SUBMITTALS

A. See Section 013000 - Administrative Requirements for submittal procedures.

B. Shop Drawings: Indicate opening dimensions and required tolerances, connection details, anchorage spacing, hardware locations, and installation details.

C. Product Data: Show component construction, anchorage method, and hardware.

D. Manufacturer's Installation Instructions: Include any special procedures required by project conditions.

E. Manufacturer's qualification statement.

F. Installer's qualification statement.

G. Operation Data: Include normal operation, troubleshooting, and adjusting.

H. Maintenance Data: Include data for motor and transmission, shaft and gearing, lubrication frequency, spare part sources.

I. Specimen warranty.

1.5 QUALITY ASSURANCE

A. Manufacturer Qualifications: Company specializing in manufacturing the products specified in this section with minimum three years of documented experience.

B. Installer Qualifications: Company specializing in performing work of type specified and with at least three years documented experience.

C. Comply with applicable code for motor and motor control requirements.

D. Products Requiring Electrical Connection: Listed and classified by ITS (DIR), UL (DIR), or testing firm acceptable to authorities having jurisdiction, as suitable for purpose specified.

1.6 WARRANTY

A. See Section 017800 - Closeout Submittals for warranty requirements.

B. Extended Correction Period: Correct defective work within a 2-year period commencing on Date of Substantial Completion.

Department of Facilities & Support Services

SECTIONAL DOORS 083613 / 3 of 6

C. Manufacturer Warranty: Provide 5-year manufacturer warranty for electric operating equipment. Complete forms in Owner's name and register with manufacturer.

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Sectional Doors:

1. C.H.I. Overhead Doors; Model 3217 Flush Sandwich Steel Insulated Doors: www.chiohd.com/#sle.

2. Overhead Door Corporation; Model 430 - Sectional Steel Door: www.overheaddoor.com/#sle.

3. Raynor Garage Doors; EnergyCore Series, Model 3220: www.raynor.com/#sle.

4. Substitutions: See Section 016000 - Product Requirements.

2.2 Performance Requirements

A. Performance: Withstand positive and negative wind loads equal to 1.5 times design wind loads specified by local code without damage or permanent set, when tested in accordance with ASTM E330/E330M, using 10 second duration of maximum load.

B. Air Leakage Rate: Less than 0.40 cfm/sq ft when tested in accordance with ASTM E283/E283M at test pressure difference of 1.57 psf.

C. Thermal Transmittance: U-factor of 0.31 Btu/hr sq ft degrees F, maximum, in accordance with

DASMA 102.

2.3 STEEL DOORS

A. Type SSD-1 - Doors: Flush steel, insulated; standard lift operating style with track and hardware; complying with DASMA 102, Commercial application.

1. Door Panels: Steel construction; outer steel sheet of 26 gauge, 0.016 inch minimum thickness, flush profile; inner steel sheet of 20 gauge, 0.0359 inch minimum thickness, flat profile; core reinforcement _____ inch sheet steel roll formed to channel shape, rabbeted weather joints at meeting rails; polyurethane insulation.

2. Door Nominal Thickness: 2 inches thick.

3. Exterior Finish:

a. Factory finished with acrylic baked enamel; color as selected by Architect.

4. Interior Finish:

a. Factory finished with powder coated finish; color as selected from manufacturer's standard line.

5. Electric Operation: Electric control station.

2.4 COMPONENTS

A. Sill Weatherstripping: Resilient hollow rubber strip, one piece; fitted to bottom of door panel, full length contact.

B. Jamb Weatherstripping: Roll formed steel section full height of jamb, fitted with resilient weatherstripping, placed in moderate contact with door panels.

Department of Facilities & Support Services

SECTIONAL DOORS 083613 / 4 of 6

C. Head Weatherstripping: EPDM rubber seal, one piece full length.

D. Panel Joint Weatherstripping: Neoprene foam seal, one piece full length.

E. Lock: Inside center mounted, adjustable keeper, spring activated latch bar with feature to retain in locked or retracted position; interior and exterior handle.

F. Lock Cylinders: Master keyed to building keying system.

2.5 MATERIALS

A. Sheet Steel: Hot-dipped galvanized steel sheet, ASTM A653/A653M, with G60/Z180 coating, plain surface.

B. Insulation: Foamed-in-place polyurethane, bonded to facing.

1. R-value of 9.1.

2. Same thickness as core framing members.

C. Metal Primer Paint: Zinc molybdate type.

2.6 ELECTRIC OPERATION

A. Electric Operators:

1. Mounting: Side mounted on cross head shaft.

2. Motor Enclosure:

a. Exterior Doors: NEMA MG 00001, Type 4; open drip proof.

3. Motor Rating: 1/3 hp; continuous duty.

4. Motor Voltage: 120 volts, single phase, 60 Hz.

5. Motor Controller: NEMA ICS 2, full voltage, reversing magnetic motor starter.

6. Controller Enclosure: NEMA EN 10250, Type 1.

7. Opening Speed: 12 inches per second.

8. Brake: Adjustable friction clutch type, activated by motor controller.

9. Manual override in case of power failure.

10. See Section 260583 for electrical connections.

B. Wiring Terminations: Provide terminal lugs to match branch circuit conductor quantities, sizes, and materials indicated; enclose terminal lugs in terminal box sized to comply with NFPA 70.

C. Control Station: Provide standard three button (Open-Close-Stop) momentary-contact control device for each operator complying with UL 325.

1. 24 volt circuit.

2. Surface mounted, at interior door jamb.

3. Entrapment Protection Devices: Provide sensing devices and safety mechanisms complying with UL 325.

a. Primary Device: Provide electric sensing edge, wireless sensing, NEMA 1 photo eye sensors, or NEMA 4X photo eye sensors as required with momentary-contact control device.

D. Safety Edge: Located at bottom of sectional door panel, full width; electro-mechanical sensitized type, wired to stop and reverse door direction upon striking object; hollow neoprene covered to provide weatherstrip seal.

Department of Facilities & Support Services

SECTIONAL DOORS 083613 / 5 of 6

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that wall openings are ready to receive work and opening dimensions and tolerances are within specified limits.

B. Verify that electric power is available and of the correct characteristics.

3.2 PREPARATION

A. Prepare opening to permit correct installation of door unit to perimeter air and vapor barrier seal.

B. Apply primer to wood frame.

3.3 INSTALLATION

A. Install door unit assembly in accordance with manufacturer's instructions.

B. Anchor assembly to wall construction and building framing without distortion or stress.

C. Securely brace door tracks suspended from structure. Secure tracks to structural members only.

D. Fit and align door assembly including hardware.

E. Coordinate installation of electrical service. Complete power and control wiring from disconnect to unit components.

F. Install perimeter trim.

3.4 TOLERANCES

A. Maximum Variation from Plumb: 1/16 inch.

B. Maximum Variation from Level: 1/16 inch.

C. Longitudinal or Diagonal Warp: Plus or minus 1/8 inch from 10 ft straight edge.

D. Maintain dimensional tolerances and alignment with adjacent work.

3.5 ADJUSTING

A. Adjust door assembly for smooth operation and full contact with weatherstripping.

B. Have manufacturer's field representative present to confirm proper operation and identify adjustments to door assembly for specified operation.

3.6 CLEANING

A. Clean doors and frames and glazing.

Department of Facilities & Support Services

SECTIONAL DOORS 083613 / 6 of 6

B. Remove temporary labels and visible markings.

3.7 PROTECTION

A. Protect installed products from damage until Date of Substantial Completion.

B. Do not permit construction traffic through overhead door openings after adjustment and cleaning.

END OF SECTION 083613

Department of Facilities & Support Services

RESIDENTIAL APPLIANCES Revised 8/18/26 113013 / 1 of 3

SECTION 113013 - RESIDENTIAL APPLIANCES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Kitchen exhaust ventilation.

1.2 ACTION SUBMITTALS

A. Product Data:

1. Kitchen exhaust ventilation.

B. Product Schedule: For appliances.

1.3 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For each residential appliance to include in operation and maintenance manuals.

1.4 QUALITY ASSURANCE

A. Manufacturer Qualifications: Maintains, within 75 miles of Project site, a service center capable of providing training, parts, and emergency maintenance repairs.

1.5 WARRANTY

A. Special Warranties: Manufacturer agrees to repair or replace residential appliances or components that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Two years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 SOURCE LIMITATIONS

A. Obtain each type of residential appliance from single manufacturer.

Department of Facilities & Support Services

RESIDENTIAL APPLIANCES Revised 8/18/26 113013 / 2 of 3

2.2 PERFORMANCE REQUIREMENTS

A. Electrical Appliances: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Accessibility: Where residential appliances are indicated to comply with accessibility requirements, comply with applicable provisions in the DOJ's 2010 ADA Standards for Accessible Design and ICC A117.1 .

2.3 KITCHEN EXHAUST VENTILATION

A. Overhead Exhaust Hood :Basis of Design: WINFLO MODEL #UR012B30DHP 30" WIDE, DUCTED,STAINLESS STEEL, UNDERCABINET MOUNT (OR EQUAL) - CFCI

1. Type: Wall-mounted, exhaust-hood system.

2. Dimensions:

a. Width: 30 inch.

b. Depth: 22 inch.

3. Exhaust Fan: Variable -speed fan built into hood and with manufacturer's standard capacity as indicated on Drawings.

a. Venting: As indicated on Drawings .

b. Fan Control: Hood -mounted fan switch, with separate hood-light control switch.

4. Duct Type: Manufacturer's standard.

5. Finish: Stainless steel.

6. Features:

a. Permanent, washable aluminum-mesh filter(s).

b. Built-in halogen lighting.

1.2 GENERAL FINISH REQUIREMENTS

A. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

PART 2 - EXECUTION

2.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, power connections, and other conditions affecting installation and performance of residential appliances.

B. Examine roughing-in for piping systems to verify actual locations of piping connections before appliance installation.

Department of Facilities & Support Services

RESIDENTIAL APPLIANCES Revised 8/18/26 113013 / 3 of 3

C. Examine walls, ceilings, and roofs for suitable conditions where overhead exhaust hoods will be installed.

D. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.

E. Proceed with installation only after unsatisfactory conditions have been corrected.

2.2 INSTALLATION

A. Install appliances according to manufacturer's written instructions.

B. Built-in Equipment: Securely anchor units to supporting cabinets or countertops with concealed fasteners. Verify that clearances are adequate for proper functioning and that rough openings are completely concealed.

C. Freestanding Equipment: Place units in final locations after finishes have been completed in each area. Verify that clearances are adequate to properly operate equipment.

D. Range Anti-Tip Device: Install at each range according to manufacturer's written instructions.

2.3 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain residential appliances.

END OF SECTION 113013

Level 1 100' - 0"

INFILL W/ 12" CMU

WHERE DIFFUSERS

AND DUCTS REMOVED 127

LOCKER ROOM

INFILL 8" CMU

WALL WHERE

LOUVERS ARE

REMOVED

EXISTING GYP BD

CEILING GYP BD CEILING

INFILL WHERE HOOD

REMOVED. FINISH

TO MATCH EXISTING

Level 1 100' - 0"

Level 1 100' - 0"

NEW ALUM. SOFFIT

J-TRIM

EXISTING PLATE WELDED TO

WINDOW STL. COLUMNS

7'

/4

4 1/2"

NEW 4" CMU INFILL BETWEEN

EXISTING FRAMING.

NEW PLYWOOD CLOSURE

W/ 2x4 WOOD BLOCKING

NEW PERSONNEL

LOCKERS

EXISTING BRICK FACED

CMU BACKED MASONRY WALL

TRTD WD BLOCKING

NEW BLAST-RESISTANT ALUM.

FRAMED WINDOW FRAME &

GLAZING

BACKER ROD & SEALANT, CONT.

BOTH SIDES

NEW 3 5/8" MTL. STUD FRAMING

AT 16" O.C. FROM EXISTING RUNNER

CHANNELS TO STRUCTURE ABOVE

JOINT SEALANT W/

BACKER ROD

J-TRIM

EXISTING FURRING CHANNELS

EXISTING CEMENT PLASTER

3 5/8" MTL FRAMING BRACES AT 48" O.C.

ALTERNATING DIRECTIONS - ATTACH

TO STRUCTURE ABOVE

EXISTING ROOF STRUCTURE

COMMONWEALTH

T

No.

A

OF

UTNE

K

IHRC

R

TSIGE

C

KC

E

Y

T

RE

D

ES

R U

S D

RFM.L

E

R

EL

C K

I

DRAWING INFORMATION

CHECKED BY

REVISION HISTORY OF THIS DRAWING

DRAWING NO.

AS BUILT DATE

MM/DD/YR

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE

RTA DATE

AS BUILT DATE

06/24/26

MM/DD/YR

DRAWN BY

A&E FILE NO. 2512-339

DECA LOG #

ACCOUNT NO.

095-CC79-RU04-00

DESCRIPTION OF REVISIONS DATE

DESIGNED BY

06/24/26

DMA RUSSELVILLE RENOVATIONS

SECTIONS AND DETAILS

A4.2

JMS

RMF

RMF

1/8" = 1'-0"

BUILDING SECTION 1

3/8" = 1'-0"

FOOD PREP 120 NORTH WALL

1" = 1'-0"

SECTION AT LOCKER ROOM WINDOW

1 ADDENDUM NO. 3 08/18/26

ASSEMBLY

HALL

STORAGE

FOOD

STORAGE

118 SCULLERY

FOOD PREP

MECHANICAL

EQUIPMENT

UNIT

STORAGE

ARMS VAULT

OFFICE

OFFICE

OFFICE

MECHANICAL

EQUIPMENT

WELLNESS

MEN'S

RESTROOM

SHOWER

VESTIBULE

LOCKER

ROOM

RECRUITER

WOMEN'S

RESTROOM

SHOWER

STORAGE

DATA

CLASSROOM

CLASSROOM

CORRIDOR

MAINTENANCE

STORAGE

RF01

RF01

CPT01

CPT01

CPT01 RF01

RF01

RF01

CPT01

SC01

RF01

RF02

RFO2

CPT01 CPT01

RF01

SC01

SC01

SC01

RF02

RF02

1 1

RF02

COMMONWEALTH

T

No.

A

OF

UTNE

K

IHRC

R

TSIGE

C

KC

E

Y

T

RE

D

ES

R U

S D

RFM.L

E

R

EL

C K

I

DRAWING INFORMATION

CHECKED BY

REVISION HISTORY OF THIS DRAWING

DRAWING NO.

AS BUILT DATE

MM/DD/YR

COMMONWEALTH OF KENTUCKY

FINANCE AND ADMINISTRATION CABINET

DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES

DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION

FRANKFORT, KENTUCKY

DESCRIPTION OF REVISIONS DATE

RTA DATE

AS BUILT DATE

06/24/26

MM/DD/YR

DRAWN BY

A&E FILE NO. 2512-339

DECA LOG #

ACCOUNT NO.

095-CC79-RU04-00

DESCRIPTION OF REVISIONS DATE

DESIGNED BY

06/24/26

DMA RUSSELVILLE RENOVATIONS

FINISH PLAN

1D1.1 Author

Checker

Designer

1/8" = 1'-0"

FIRST FLOOR PLAN

FINISH PLAN REFERENCE NOTES

1 ROLLER WINDOW SHADE, RWS01.

GENERAL INTERIOR FINISH NOTES

A. ALL INTERIORS NOTES, SCHEDULES AND LEGENDS

REFERENCE ABCD LEGEND. REFER TO VIEW HEADER OF

ROOM FINISH SCHEDULE.

B. PROVIDE RESILIENT OR METAL TRANSITION STRIP AT ALL

FLOORING MATERIAL JUNCTURES. WHERE MATERIALS

TRANSITION AT DOORS CENTER OF TRANSITION TO BE

LOCATED ON CENTER OF DOOR. REFER TO DETAILS FOR

TYPICAL FLOOR MATERIAL TRANSITIONS. COLOR SELECTED

BY ARCHITECT FROM MANUFACTURES FULL RANGE OF

COLORS.

C. ALL EXPOSED GYP. CEILINGS AS WELL AS UNDERSIDE AND

FACES OF BULKHEADS, AND SOFFITS TO BE PAINTED, REFER

TO FINISH SCHEDULE FOR CEILING FINISHES AND REFLECTED

CEILING PLANS FOR CEILING MATERIAL EXTENTS AND FINISH

REQUIREMENTS. COORDINATE ANY PAINT FINISHES WITH

ARCHITECT IN FIELD BEFORE PROCEEDING WITH FINISH

WORK.

D. REFER TO DOOR SCHEDULE FOR CLARIFICATION OF DOOR

MATERIALS. ALL HOLLOW METAL DOORS AND HOLLOW METAL

FRAMES TO BE PAINTED BOTH SIDES, [PT00]; [COLOR

SELECTED BY ARCHITECT FROM MANUFACTURES FULL RANGE

OF COLORS].

E. ALL EXPOSED GYP WALLS TO…