Addendum__3_32A0611.pdf
PDF 106 KB Posted
- Solicitation number
- 32A0611
- Issued by
- Mendocino County, Torrance City, Mendocino CDP, California
About this file
This is Addendum No. 3 for Invitation for Bid (IFB) #32A0611 issued by the California Department of Transportation (Caltrans) for Insulation and Siding Installation services in Ukiah, CA, dated December 23, 2024. The addendum addresses a single contractor question regarding HVAC equipment handling during the installation process. Specifically, Section 6.I of the Scope of Work Exhibit A has been revised to clarify that contractors must remove and secure all plumbing, electrical bracketry, and HVAC equipment that is affixed to the existing paneling, then re-affix these components to the new panel where needed.
The addendum maintains that all other terms and conditions in the original IFB remain unchanged and in full effect. No pricing terms, funding requirements, or other contractual modifications were included in this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_Solicitation_32A0611.pdf | ||
| Addendum__2_32A0611.pdf | ||
| Addendum__1_32A0611.pdf | ||
| Addendum__4_32A0611.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th STREET, MS-65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
FAX (916) 227-6155
TTY 711
INTERNET http://www.dot.ca.gov/dpac
Making Conservation A California Way of Life.
December 23, 2024 Addendum No. 3
Invitation for Bid (IFB) # 32A0611
Insulation and Siding Installation in Ukiah, CA
NOTICE TO ALL PROSPECTIVE BIDDERS:
Addendum No. 3 is being issued for the above-referenced IFB. Bids for this work shall be with the full understanding of this Addendum.
The following represents questions submitted for this IFB and the Department’s responses.
Question 1:
Do Contractor need to remove and reset of all/any HVAC equipment?
Answer 1:
Yes. Scope of Work Exhibit A Section 6.I has been revised to read:
I. All plumbing, electrical bracketry, and HVAC equipment affixed to the existing paneling shall be removed and secured, then re-affixed to the new panel where needed.
All other terms and conditions set forth in the IFB remain in full force and effect.
Sincerely, Gurinder Kaur Contract Analyst