Addendum 2 to RFQu-23-48102
178 KB Posted
- Attached to
- ON-CALL ENGINEERING of STREAM MODELING SERVICES
- Solicitation number
- RFQu-23-48102
- Issued by
- Cobb County, Georgia
About this file
This is Addendum No. 2 to Request for Qualifications (RFQu-23-48102) issued by the City of Marietta, Georgia for on-call engineering services related to stream modeling. The original RFQu solicits proposals from qualified firms experienced in stream and non-stream modeling projects across Tiers 1-3. A pre-proposal conference was held on Wednesday, August 10, 2022, at 10:00 AM in the 2nd Floor Conference Room at City Hall, located at 205 Lawrence Street, Marietta, Georgia 30060. Addendum No. 2, dated August 26, 2022, addresses clarifications and questions raised by prospective proposers following the release of Addendum No. 1. All prospective proposers must sign Addendum No. 2 and include it with their proposal submission.
Key clarifications in Addendum No. 2 include the following: cover letters may be included in proposals up to one page in length; subcontractor basic company information should be submitted in Section C.4 of the proposal; the Release and Indemnity Agreement (Attachment 2) may be executed by the prime contractor on behalf of subcontractors, or each subcontractor may execute the form independently; the Drug Free Workplace Certification (Attachment 3) is required for all firms working on the project; and each proposing team must include at least one qualified professional, either a Certified Floodplain Manager (CFM) or a Georgia Professional Engineer (P.E.) competent in stormwater and HEC-RAS modeling, with the possibility that one team member may satisfy both requirements. All other terms and conditions of the original RFQu remain unchanged.
Text of this file
THE CITY OF MARIETTA
MARIETTA, GEORGIA
August 26, 2022
ADDENDUM NO. 2
FOR
RFQU-23-48102
REQUEST FOR QUALIFICATIONS
FOR
ON-CALL ENGINEERING FOR STREAM MODELING SERVICES
All prospective proposers are hereby advised to make the changes to the RFQu documents in their possession as shown and/or described in the attached information:
Change, replace, add or delete the following in the above referenced bid:
Recent questions asked after release of Addendum #1:
1. Can Cover Letter be included in the proposal?
Yes, up to one page
2. Should the sub-contractor’s basic company information be included in Section A.1. or
Section C.4 of the proposal
3. Does only the prime need to provide the following forms?
▪ Attachment 2 Release and Indemnity Agreement - Prime can choose to indemnify the sub otherwise each sub will need to execute the form
▪ Attachment 3 Drug Free Workplace Certification This form is required for all firms working on the project
4. Item B.2. on page 8 directs consultants to refer to Section 7 of Exhibit I for a list of Key Team Leaders required for each project, however there is no Section 7 included in Exhibit I nor is there a list of Key Team Leaders. Could the city please provide the list of Key Team Leaders consultants must provide?
a. A CFM (Certified Floodplain Manager)
b. And/or A Georgia P.E. competent in Stormwater/HEC-RAC Each proposing Team must have one of the above. It is possible that one Team member qualifies as both.
All other terms and conditions will remain the same.
All prospective proposers must sign this Addendum 2 below and include with your proposal.
Signature: __________________________________________________________________
Name: ___________________________________________________________________
Firm: ____________________________________________________________________
Date: ____________________________________________________________________
Shelly Drewry
Purchasing Agent II
Other files
| File | Type | Posted |
|---|---|---|
| OC Eng Stream Modeling 7_28_22 | — | |
| Award Information | — | |
| ADDENDUM 1 RFQu_23_48102 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .