This is Addendum #2 to an Invitation to Bid (ITB) issued by the Oregon Department of Fish and Wildlife for the Salmon River Hatchery Holding Pond Improvement project (Engineering Project No. 15-029, ITB S-63500-00000893). The addendum, dated October 19, 2021, modifies technical specifications and project timelines established in the original solicitation. Key modifications include removal of AISC certification requirements for welding services, with welding qualifications now required to comply with AWS D1.1/D1.1M structural welding code standards. The project start date has been established as 7 calendar days from issuance of the Notice to Proceed, with onsite work commencing no sooner than December 1, 2021, following the conclusion of the trapping season. The ITB closing date remains October 28, 2021, at 2:00 PM, with prospective bidders required to submit written questions or protests by close of business on October 20, 2021. The addendum constitutes a material change to the solicitation and must be acknowledged by offerors per Section H of the ITB.
The addendum document includes clarifications from the mandatory pre-bid conference held on October 13, 2021, addressing contractor responsibilities and project scope. Contractors are required to remove and store existing PVC fish return piping and later reinstall it, fabricate all metal pieces shown in contract documents, and complete floor elevation modifications to improve ergonomic safety for hatchery staff operations. The contractor's responsibility for embedded I-beam depths in the concrete floor slab remains undetermined pending further site assessment. The document does not specify contract pricing, funding sources, set-asides, or incumbent contractor information, as this addendum functions solely to clarify and modify technical requirements and schedule parameters of the original solicitation documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Legal Advertisement~4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #2 ITB S-63500-00000893
Date: October 19, 2021
Oregon Department of Fish and Wildlife
ADDENDUM #2
ITB S-63500-00000893
Engineering Project No.: 15-029
Salmon River Hatchery Holding Pond Improvement
This addendum modifies the solicitation document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original solicitation document and shall become part of the work required.
Deleted language is shown within [brackets]. New language is show in Bold and Underlined.
New Attachments or Sections deleted in their entirety and replaced will not show [brackets] or Bold and Underlined, they will be labeled, “REVISED.”
ADDENDUM
1. Amend Attachment A-Technical Specifications, Section 05 12 00 Structural Steel Framing to remove references to AISC certification for welding services. Section 05 12 00 Structural Steel Framing, Paragraph 1.4 Quality Assurance shall be removed in its entirety and replaced with the following REVISED Section 1.4 Quality Assurance:
REVISED 1.4 QUALITY ASSURANCE
A. RESERVED.
B. RESERVED.
C. Welding Qualifications: Qualify procedures and personnel according to
AWS D1.1/D1.1M, "Structural Welding Code - Steel."
D. RESERVED.
E. Preinstallation Conference: Conduct conference at Project site.
F. Building Code:
1. International Code Council (ICC):
a. Oregon Structural Specialty Code and associated standards, latest adopted edition, including all amendments, referred to herein as building code.
2. Project Start Date noted in the Bid Summary, Project Completion Dates shall be modified as follows:
PROJECT START DATE: 7 calendar days from issuance of Notice to Proceed. Onsite work will start after the end of the trapping season, no sooner than December 1st, 2021.
ITB CLOSING DATE AND TIME:
Remain unchanged: October 28, 2021 at 2:00 PM
Prospective Bidders have until Close of Business on October 20, 2021 to submit written questions or protests regarding this Addendum.
This addendum constitutes a MATERIAL CHANGE to the solicitation. Its receipt by the Offeror is to be acknowledged per Section H of the ITB.
Addendum prepared by:
Julie L. Cone julie.l.cone@odfw.oregon.gov
End of Addendum #2 mailto:julie.l.cone@odfw.oregon.gov
ODFW CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS
The following provides ODFW’s answers to questions asked during the Mandatory Pre-Bid conference held on October 13, 2021 and received from prospective Offerors. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.
1. QUESTION: Will the PVC fish return pipe need to be removed by the Contractor?
RESPONSE: Yes, this pipe shall be removed by the Contractor and stored onsite until the Contractor reinstalls the pipe.
2. QUESTION: What is the pipe used for?
RESPONSE: The pipe is to return fish to the river upstream of the hatchery.
3. QUESTION: Why is the floor being raised?
RESPONSE: Currently fish must be lifted overhead to place into the PVC pipe. The change in the floor elevation marked on the Plans is to ergonomically improve the worksite and increase safety for the hatchery staff.
4. QUESTION: Does the Contractor provide fabrication services for the various metal items shown in the Plans?
RESPONSE: Yes, the Contractor is to provide all of the metal pieces shown in the Contract Documents.
5. QUESTION: How deep do the embedded I beams go into the concrete floor?
RESPONSE: It is undetermined how deep these beams extend into the floor slab.
END OF QUESTIONS/CLARIFICATIONS
| ITB CLOSING DATE AND TIME: |
| Remain unchanged: October 28, 2021 at 2:00 PM |
| Prospective Bidders have until Close of Business on October 20, 2021 to submit written questions or protests regarding this Addendum. |
| julie.l.cone@odfw.oregon.gov |