Addendum #2 Revised Pricing Sheet.pdf

PDF 1 MB Posted

Attached to
Blue Ridge Community College Ceiling Tiles Project
Solicitation number
80-80-BRCC202404
Issued by
Hyde County, North Carolina

About this file

This document is Addendum #2 to the solicitation for the Blue Ridge Community College Ceiling Tiles Project in Henderson County, North Carolina. The addendum revises the pricing sheet to reflect the addition of Alternate 2 for painting the ceiling grids and an add/deduct option for attic stock pricing. It also provides details on various scope changes, including reworking the ceiling grid in certain areas, replacing vinyl sheetrock tiles, and installing trim plates for air hose penetrations. The contractor will be responsible for moving furnishings, except in two specific storage rooms, and may use the equipment room for storage as long as equipment access is maintained.

The revised pricing sheet requires the contractor to provide a base bid as well as separate material and labor breakdowns. Alternate 1 allows for a reduction in the noise reduction coefficient (NRC) of the ceiling tiles, and Alternate 2 covers the cost to paint the ceiling grids. The add/deduct pricing is for providing attic stock on a per-case basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 Henderson Ceiling Tile

Revised Pricing Sheet to reflect the addition of Alternate 2 and Add/Deduct pricing (last page of the Addendum 1)

102D: Rearrange grid due to tiles that were pieced in when the partition wall was removed.

Provide and install trim plates for the air hose penetrations in the ceiling tiles

Vinyl sheetrock in (1) men’s & (1) women’s restroom: Contractor convert the grid to 2x2 and will replace the existing vinyl sheetrock tiles with new vinyl sheetrock tiles

101A (EHSI office): Rework grid due to existing splices in the main T bars

Vertical Areas with Ceiling Tiles: Replace with regular, non-tegular tiles in order to prevent exposed raw edges from tiles being cut. Color and smooth texture to match the new tegular tiles being installed in the horizontal ceilings.

The awarded contractor must provide a cost breakdown for “Hallways & Restrooms”, and “Offices/Classrooms”. This is for BRCC’s internal accounting purposes only.

Alternate 2 Paint Ceiling Grids: Paint existing horizontal and vertical ceiling grids to match the color of the new cross Ts being installed for the 2x2 conversion. Contractor to allow paint to dry thoroughly before installing the new tiles

Add/deduct: price per case for attic stock

113 & 119 storage rooms – instructor will empty if required by the contractor

Contractor will be responsible for moving any furnishings with the exception of the previously mentioned 113 & 119 storage rooms.

The Contractor may use the equipment room for storage as long as access to the equipment is not blocked for maintenance purposes.

Revised Pricing Sheet

Contract will be awarded based on the Base Bid

BASE Bid:

Material/Labor Breakdown (Material and Labor should equal the Base Bid):

Material $_______________

Labor $_______________

Alternate 1 Cost Difference to Reduce the Ceiling Tile NRC to 55 – 70 (instead of NRC of 85 as specified in the Base bid)

Alternate 2 Paint Ceiling Grids: Paint existing horizontal and vertical ceiling grids to match the color of the new cross Ts being installed for the 2x2 conversion. Contractor to allow paint to dry thoroughly before installing the new tiles

Add/deduct: price per case for attic stock