This document is an addendum to an Invitation for Bids for the 2024 Shoulder Widening Project in Lamar County, Georgia. The project includes shoulder widening on Johnstonville Road (6.95 miles) and Van Buren Road (5.85 miles) within Lamar County. The work will involve 5,490 tons of asphalt shoulder paving on Johnstonville Road, 4,620 tons of asphalt shoulder paving and 15 tons of spot leveling on Van Buren Road, and edge line paint striping. Sealed bids were originally due on April 4, 2024 but have been extended to April 29, 2024. The addendum also provides answers to questions related to work hours, pavement specifications, milling, grading, grassing, and signage requirements.
The project will be funded with 2024 LMIG and SPLOST funds. Contractors will be required to provide a smooth shoulder with no edge drop-offs greater than 1.5 inches, and will be responsible for any necessary grassing on disturbed areas. Portable or permanently mounted MUTCD-compliant signs may be used as needed based on the contractor's means and methods of construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final March 1 2024 Advertisement Letter Only .docx | DOCX document | |
| Addendum _1 Lamar Co 2403_01 BID 2024 Shoulde.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAMAR COUNTY GEORGIA
2403-01 BID: 2024 SHOULDER WIDENING PROJECT
ADDENDUM #2
April 16, 2024
Contract and Project Advertisement Addendums, Bid Date Extension and Answers to
Questions are described below and include the following: The dates for submitting sealed bids as referenced in the Project Advertisement, Conformed Contracted Bid Document and previous Addendums is extended as follows.
Sealed bids will be received at the office of the Chairman (in Lamar County Administration
Building) up to 2:00 p.m., April 29, 2024, at which time they will be opened and publicly read.
Question (paraphrased): What are the work hours for this project?
ANSWER: No restrictive or special work hours are specified.
Question (paraphrased): You are calling for 19mm mod and current GDOT Specs, however, there is not a 19mm mod in the current GDOT specifications. Could you clarify if you want 19mm or 12.5mm for shoulder widening?
ANSWER: Revise and change the pay item number and description for the 19 MM Superpave to 12.5 MM Superpave as shown below. The quantity remains the same and will typically be installed in 2 lifts for a total thickness of 4”. As a reminder, areas prepared for pavement widening cannot not be left open without the use of traffic control. All areas prepared for pavement widening shall be paved daily as the work progresses.
REMOVE
402-3195 RECYCLED ASPH CONC 19 MM MOD, TYPE II, GP1 or 2, INCL BITUM MATL & H LIME
REPLACE WITH/ADD
402-3113 RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 1 or 2, INCL BITUM MATL & H LIME
Lamar County, Georgia Bid 2403-01: 2024 Shoulder Widening Project
Addendum #2, page 2 of 2 April 16, 2024
Question (paraphrased): Will a milling item be provided for this job?
ANSWER: A separate milling item will not be provided. The contractor may determine the most appropriate method of accomplishing the work in a satisfactory manner, which may include milling, direct excavation, saw cutting, blading with a motor grader with a cutter blade or comparable equipment and or a combination of methods. The contractor’s method of accomplishing the pavement removal should provide a relatively smooth edge cut within the pavement area that does not have excessive gouges or breakouts along the edge of the pavement removal.
Question (paraphrased): Johnstonville Rd has a railroad crossing, are we required to start and stop relative to the railroad crossing?
ANSWER: The County will provide start and stop points on both sides of the railroad crossing so that railroad coordination is not required for work in the railroad right of way or near the rails.
Question (paraphrased): Will a grading and/or grassing item be provided for this job?
ANSWER: No separate grassing item is provided for this work. Magnitude of need will vary with contractor’s means and methods of preparing for pavement widening and may not be needed if milling type equipment is utilized. The contractor will be required to provide a smooth shoulder with no edge drop offs greater than 1.5” with grassing on disturbed areas as necessary. There is no separate payment for this work if required.
Question (paraphrased): Are portable advanced warning signs or post mounted ones required for this job?
ANSWER: Portable MUTCD compliant signs may be used if appropriate. If work by the contractor results in soft shoulders or drop-offs greater than 1.5” along the shoulder and where the shoulder repair is delayed permanently mounted signage is warranted.
Question (paraphrased): Are low/soft shoulder signs required?
ANSWER: The need will vary depending on the contractor’s means and methods of construction. These will be required if the shoulder disturbances are excessive due to the use of grading for pavement widening and or if pavement edge drop-offs greater than 1.5’ need to be corrected.