This document is an addendum for an Invitation to Bid (ITB) issued by the Florida Department of Transportation (FDOT) District Two Procurement Office for the Baker and Alachua County Rest Area Building and Facilities Painting project. The addendum provides answers to additional questions received and updates the procurement timeline. The revised timeline shows that bids are due by 2:00 PM local time on May 19, 2022, and the public bid opening will be held at 2:30 PM on the same day. The intended award decision will be posted on May 24, 2022. The project scope includes painting interior and exterior areas of the rest area buildings, with minor repairs such as filling, sanding, and replacing rotted wood as needed. The contractor will also be responsible for caulking, treating carpenter bee holes, and painting the signs and picnic table frames.

Regarding pricing, the addendum states that up to 200 board feet of wood replacement will be included in the base bid, with any additional amounts compensated at $10.00 per board foot. An elastomeric masonry paint is specified for the picnic tables, and the contractor should follow the manufacturer's recommendations for repairing deep gouges on the composite tables. The Department will address the decorative lattice work prior to the painting work.

View the file

Other files

File Type Posted
DOT-ITB-22-2022-JB.pdf PDF
Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Department of Transportation

RON DESANTIS

GOVERNOR

1109 S. Marion Avenue

Lake City, FL 32025-5874

JARED W. PERDUE, P.E.

SECRETARY

Improve Safety, Enhance Mobility, Inspire Innovation www.fdot.gov

DISTRICT TWO

PROCUREMENT OFFICE

ADDENDUM 2

DOT-ITB-22-2022-JB

Baker and Alachua County Rest Area Painting

Addendum No. 2 hereby incorporates the following:

1. Provides Answers to Additional Questions received.

2. Section 2) TIMELINE is updated with the following date changes.

ACTION / LOCATION

DATE LOCAL TIME

BIDS DUE (ON OR BEFORE)

Please submit bids to:

D2.Purch@dot.state.fl.us

5-19-2022 2:00 PM

PUBLIC OPENING

FDOT District Two Procurement Office 1109 South Marion Avenue Lake City, Florida 32025-5878

5-19-2022 2:30 PM

POSTING OF INTENDED DECISION/AWARD 5-24-2022 5:00 PM

The Respondent must acknowledge receipt of this Addendum by completing and returning to the Procurement Office with its proposal package by or before the time and date of the proposal opening. Failure to do so may deem the Respondent non-responsive.

Company Name

Signature

Date Failure to file a protest within the time prescribed in subsection 120.57(3), Florida Statutes, or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes.

mailto:D2.Purch@dot.state.fl.us

Note: All written questions are reproduced in the same format as submitted by the Respondent.

Question Answer

1. Will there be any allowed rain days? How will those days be verified, which reporting location?

1. Weather days will be allowed provided they are appropriately documented and confirmed. Please reference the QA, Inspection, Documentation, and Reporting Section of project scope.

2. Do you have a guideline that details the definition of “minor” repairs?

2. Minor repairs include filling, sanding, texturing of defects and blemishes and replacement of rotted wood pieces. Carpentry work may be necessary. Contractor should review site to assess quantities needed. Also see response to Questions 7 and 8.

3. Are storage rooms, control rooms, Vending machine “Vendor/ repair” access areas to be painted?

3. Storage rooms, plumbing chases and hidden access/maintenance areas are not to be painted. All other interior and exterior areas are to be painted, including office space and vending area(s).

4. Are both sides of the doors to be painted even if a room is excluded from scope of work.

4. Yes, all doors and frames are to be painted on both sides.

5. Do you have a list of any rooms/ areas to be excluded from the scope of work?

5. See previous response. Recommend a site visit to review locations and scope of work.

6. During building prep work is window caulking included in the scope? Do you have any specifications on the type and brand to be used should recaulking be performed?

6. Caulking is included as an incidental. Acrylic Latex caulk and/or Acrylic Latex Caulk with Silicone shall be used.

7. There are sections of wood that will require replacement. Some areas can be completed with partial removal and replacement.

There are areas that will need a complete replacement. This will refer to the definition of “minor” repair.

7. Yes, replacement of damaged/rotted wood is included in the scope of the contract.

To reduce risk of unforeseen work not being accounted for contractor should assume that 200 board feet of replacement is included in the base bid. Any replacement over 200 board feet (per rest area pair) will be compensated at $10.00 per board foot installed. Documentation and pre-authorization for any overruns must be approved by the owner prior to work being done.

8. Spalding repair- again referencing “minor”

8. Assume this refers to concrete spalls/defects. This includes minor filling, sanding, and texturing of surface blemishes, gouges, and missing pieces of masonry. No structural work is included.

9. Due to the season and geographic area humidity and dew can be present until 10am. Should our standard north Florida weather present itself is it possible to move or extend the work hours till 6:30 or 7pm for the duration of the project?

9. Alternate hours will be considered based upon weather, work progress, and or other job-related factors.

10. Some concrete flooring is stained.

Are any stained floors, walk areas, or picnic bench area to be included?

10. No flooring will be painted.

11. Signs are not to be painted obviously. Are the stands or frames of signs to be painted?

11. Yes.

12. Will you require that any carpenter bee holes be treated prior to caulking? This question is just to ensure proper procedure and help with cost analysis.

12. Yes, treated and patched as needed.

13. What is the product for the masonry picnic table painting?

13. An elastomeric masonry, stucco, and brick paint shall be used.

14. Is there a specified product to fill any gouges /carvings in the masonry picnic tables?

14. Standard concrete patch or hydraulic cement is acceptable.

15. What is the recommended method to address the composite picnic tables with deep gouges?

15. Please follow manufacturer’s recommendations for product used.

16. Is the memorial bench included in the scope of work? What is the planned procedure for the bench?

16. Bench is not included in this scope of work.

17. There is decorative lattice work on a main building. The lattice is damage in several areas. I am not sure how available replacement materials are of this type. What is the planned course of action? If like items can not be obtained is complete removal or removal and replacement with similar style an option?

17. The Department will address the latices prior to the painting work.