Addendum #2.pdf

PDF 86 KB Posted

Attached to
TRANSITIONAL LIVING FACILITY HVAC REPLACEMENT
Solicitation number
ARFQ 0512 WSH2700000005 5
Issued by
Kanawha County, West Virginia

About this file

This is Addendum #2 to solicitation ARFQ WSH2700000005 issued by the State of West Virginia for a Transitional Living Facility HVAC Replacement project. The addendum serves to reiterate to vendors that a mandatory pre-bid meeting was held on September 9, 2026, at 1:00 p.m. EDT, with additional details available in the solicitation's TCA-Instructions To Vendors Submitting Bids-Section 2A and WV-36. All provisions of the original solicitation and other addenda remain in full force and effect unless specifically modified by this addendum.

Vendors are required to acknowledge receipt of all addenda issued for this solicitation by completing and submitting an Addendum Acknowledgement form with their bid to expedite document processing. Failure to acknowledge addenda may result in bid disqualification. The acknowledgement form requires vendors to check boxes confirming receipt of addenda numbers 1 through 10, provide their company name, include an authorized signature, and note the date of submission. Vendors are cautioned that only information issued in writing and added to specifications by official addendum is binding, and verbal representations made during discussions with state personnel are not binding.

View the file

Other files

File Type Posted
WV72 Drug Free Coversheet.pdf PDF
BondLaborMat.pdf PDF
RFQ Specifications.docx DOCX document
Purchasing Affidavit.pdf PDF
BondPerform.pdf PDF
Bid Bond Form.pdf PDF
Exhibit B - Project Plans.docx DOCX document
WV73 Drug Free Affidavit.pdf PDF
Final_ARFQ_0512_WSH2700000005_1_WV_ARFQ_FORM.PDF PDF
WV43.pdf PDF
Bid Bond Instructions.pdf PDF
Addendum #1.pdf PDF
WV36.pdf PDF
Exhibit C.pdf PDF
HIPPA-BAA.pdf PDF
OSAFederalFundsContractClauseAddendum.pdf PDF
Exhibit A - Pricing Page.xlsx XLSX spreadsheet
TCA.pdf PDF
Final_ARFQ_0512_WSH2700000005_2_WV_ARFQ_FORM.PDF PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER: ARFQ WSH2700000005

Addendum Number: 2

The purpose of this addendum is to modify the solicitation identified as ARFQ WSH2700000005 (“Solicitation”) to reflect the change(s) identified and described below.

Applicable Addendum Category:

[ ] Modify bid opening date and time

[ ] Modify specifications of product or service being sought

[ ] Attachment of vendor questions and responses

[ ] Attachment of pre-bid sign-in sheet

[ ] Correction of error

[X] Other

Description of Modification to Solicitation: To reiterate to Vendors that there was a Mandatory Pre-Bid Meeting on 09/09/2026 at 1:00 p.m. EDT. Please refer to the solicitations TCA-Instructions To Vendors Submitting Bids-Section 2A. and WV-36.

Additional Documentation: Documentation related to this Addendum (if any) has been included herewith as Addendum #1 and is specifically incorporated herein by reference.

Terms and Conditions:

1. All provisions of the Solicitation and other addenda not modified herein shall remain in full force and effect.

2. Vendor should acknowledge receipt of all addenda issued for this Solicitation by completing an Addendum Acknowledgement, a copy of which is included herewith. Failure to acknowledge addenda may result in bid disqualification. The addendum acknowledgement should be submitted with the bid to expedite document processing.

ADDENDUM ACKNOWLEDGEMENT FORM

SOLICITATION NO.: ARFQ WSH2700000005

Instructions: Please acknowledge receipt of all addenda issued with this solicitation by completing this addendum acknowledgment form. Check the box next to each addendum received and sign below.

Failure to acknowledge addenda may result in bid disqualification.

Acknowledgement: I hereby acknowledge receipt of the following addenda and have made the necessary revisions to my proposal, plans and/or specification, etc.

Addendum Numbers Received:

(Check the box next to each addendum received)

[ ] Addendum No. 1 [ ] Addendum No. 6

[ ] Addendum No. 2 [ ] Addendum No. 7

[ ] Addendum No. 3 [ ] Addendum No. 8

[ ] Addendum No. 4 [ ] Addendum No. 9

[ ] Addendum No. 5 [ ] Addendum No. 10

I understand that failure to confirm the receipt of addenda may be cause for rejection of this bid. I further understand that any verbal representation made or assumed to be made during any oral discussion held between Vendor’s representatives and any state personnel is not binding. Only the information issued in writing and added to the specifications by an official addendum is binding.

Company

Authorized Signature

Date

NOTE: This addendum acknowledgement should be submitted with the bid to expedite document processing.

File details come from the government source that posted it. Updated .