Addendum #2.pdf

PDF 142 KB Posted

Attached to
Engineering Services
Solicitation number
S-KS0050-00009205
Issued by
Marion County, Oregon

About this file

This document is Addendum #2 to a Request for Proposals (RFP) issued by the City of Silverton, Oregon for City Engineering Services, Project #PN24-1088. The addendum modifies the original scope of work, specifications, and deadlines. Key changes include a reduction in the estimated monthly time requirement for contract engineers from 80 to 40 hours, a change from facultative lagoon to conventional activated sludge plant, and a change from membrane filtration to conventional filtration plant. The agreement terms have also been updated, with the attached written agreement no longer required to be signed, and the ARPA project language removed.

The RFP is seeking proposals for engineering services for the City of Silverton, located in Marion County, Oregon. The RFP closing date remains unchanged at February 8, 2024, at 2:00 PM. Pricing terms, set asides, incumbents, funding requirements, and other salient information are not provided in the addendum.

View the file

Other files

File Type Posted
Engineering Services.pdf PDF
ATTACHMENT G.pdf PDF
City Engineer RFP Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS

CITY OF SILVERTON

City Engineering Services

Addendum # 2

Project # PN24-1088

Addendum #2 Issue Date: 1/26/2024

RFP Issue Date: 1/5/2024 RFP Closing Date and Time: 2/8/2024 at 2:00 PM

RFP Closing Date and Time: No Change

Project # PN24-1088

This Addendum is issued to the above referenced RFP and forms a part of the contract documents and modifies the original scope of work, specifications and drawings, requirements, and deadlines. Except as changed by this Addendum, all terms, conditions, scope of work, plans, specification, requirements and deadlines in the original RFP and previous addenda remain unchanged.

PLEASE NOTE THE FOLLOWING MODIFICATIONSTO THE ABOVE

REFERENCED RFP:

Question Initial RFP provided an estimated time requirement of 80 hours a Month for engineers. Correction rough estimate, contract Engineers are anticipated to average a total of 40 hours per a month.

Question In the proposal content section remove facultative lagoon and add conventual activated sludge plant.

Question In the proposal content section remove membrane filtration and add conventional filtration plant.

Question Under the contract section it says to sign the proposer will be expected to sign the attached written agreement.

Correction disregard the language that says attached agreement. The agreement will be worked out after selection.

Question Under the contract section it says the written agreement will include terms for ARPA projects. Correction disregard the ARPA language and content.

End of Addendum

REQUEST FOR PROPOSALS
Addendum # 2
Project # PN24-1088

End of Addendum