This is an Addendum #2 to a Request for Bids for the Addams Elementary School Playground Improvements project issued by South Redford, Michigan. The bid due date remains Monday, November 23, 2026, at 11:30 AM Local Time. Prospective bidders must contact Michelle Kerns at michelle.kerns@southredford.org or (248) 921-3929 to schedule site visits, as access to the building requires an appointment. The addendum clarifies three key project requirements through a questions and answers format.

The addendum addresses project scope and design clarifications relevant to bidder submissions. The project is subject to sales tax and is not tax-exempt per article 2.3.1.10. A border for the playground area is not required. Regarding shade structures over the main playground structure, the material selection and provision shall be determined by the bidder as part of their design proposal, allowing flexibility for bidder innovation and cost optimization in the shade solution.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 2

Project: Addams Elementary School Playground Improvements

Bid Due date: Monday, November 23, 2026, at 11:30 AM Local Time (unchanged)

I. General Information

1. For questions contact Michelle Kerns at michelle.kerns@southredford.org or (248) 921-

3929.

2. Any bidder wanting to visit the site, contact Michelle Kerns at michelle.kerns@southredford.org or (248) 921-3929 to schedule a time. Bidders are not allowed to visit the building without an appointment.

II. Questions & Answers

Q1. Is the project sales tax exempt?

A1. Per article 2.3.1.10 This project is NOT exempt from taxes.

Q2. Is a border for the playground area required?

A2. No border is required.

Q3. Should there be a shade over the main structure and if so what material should be provided.

A3. This shall be determined by the bidder as part of the design.