Addendum 2

86 KB Posted

Attached to
City of Holly Springs Depot Renovation Project
Solicitation number
RFB2023-03
Issued by
Cherokee County, Georgia

About this file

This is an Addendum 2 to a Request for Bids (RFB #2023-03) issued by the City of Holly Springs, Georgia for the Depot Renovation Project. The project involves demolition and replacement of existing wood decks, ramps, and railings on the exterior of a building, as well as demolition and raising of an existing restroom to the level of the meeting room. The bid date is September 20, 2023.

The addendum clarifies two key specifications for the project. First, all references in the plans to 5/4x6 decking board specifications shall instead utilize 2x6 #2 Prime Decking Pressure Treated with Micronized Copper Azole (MCA), with all surfaces treated after installation with "Seal-Once" Marine Premium Wood Sealer or an approved equivalent applied according to manufacturer specifications. Second, all fasteners shall be galvanized screws sized in accordance with industry standards. Bidders are required to acknowledge receipt of this addendum by checking the appropriate space on the addendum certification document and making any necessary changes in ink to their bids.

Text of this file

September 12, 2023

ADDENDUM TO ADVERTISED CONTRACT

Project Name: City of Holly Springs Depot Renovation Project

Project Number: RFB # 2023-03

City: City of Holly Springs

Addendum Number: 2

Bid Date: September 20, 2023

The following changes are hereby made to this request for bids. The bidder is responsible for making any necessary changes in ink in the bid. Bidders shall acknowledge this addendum by checking the appropriate space on the addendum certification document.

Questions/Clarifications

1. All references in the plans of the 5/4x6 decking board specification shall be with 2x6 #2 Prime Decking Pressure Treated - Micronized Copper Azole (MCA). After installation all surfaces shall be treated with “Seal-Once” Marine Premium Wood Sealer or approved equal applied as per manufacturer specifications.

2. All fasteners shall be galvanized screws and sized per industry standards.

Other files

File Type Posted
Invitation to Bid —
Addendum No. 1 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .