This is Addendum No. 2 to a Request for Proposal issued by the Michigan Department of Technology, Management and Budget for the Green Oaks Training Center (GTC) Facility Equipment Storage Building, with project file number 472/26360.KMM. The project requires design and construction of a wood-framed pole barn with metal exterior similar to a pre-engineered Morton building to serve as equipment and vehicle storage at a corrections facility. The facility must accommodate 10 tons of loose salt storage and include soil boring and geotechnical analysis as part of the scope. The building's placement on the site is the responsibility of the selected professional services contractor (PSC), with administration preferring the southeast corner location as discussed during the pre-bid walkthrough. The proposal due date is September 3, 2026, and the anticipated construction duration is 180 calendar days. Existing site drawings will be provided to the awarded contractor.

The construction budget for this project is $400,000. All personnel working on the project must obtain MDOC (Michigan Department of Corrections) LEIN clearance and comply with MDOC policies and standards. The project does not require planning approval from Green Oak Township or its board of trustees, does not include parking areas or vehicle repair services, and does not require continuous construction observation. Plumbing utilities, water, sanitary sewer, storm sewer, and natural gas are available at the site. The project must conform to applicable building codes and MDOC standards specific to correctional facility requirements. One GPR survey is to be included in the bid. Bidders must include all necessary security and compliance measures associated with working at a corrections facility.

View the file

Other files

File Type Posted
Project Statement 26360.pdf PDF
LEIN Request 26360.pdf PDF
RFP Billable Rate 26360.pdf PDF
Addendum 1 26360.pdf PDF
SAMPLE Billable Rate Contract (Rev 04-25).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 2

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

8/25/2026

PROJECT NAME

Green Oaks Training Center (GTC) Facility Equipment Storage Building

FILE NUMBER

472/26360.KMM

PROJECT DIRECTOR

Kurt Maiberger

PROPOSAL DUE DATE:

9/3/2026

ADDENDUM ITEMS:

Please note the following clarifications:

C1) Structure should be wood framed pole barn with metal exterior similar to pre-engineered Morton building.

Please note the following RFI answers:

Q1) Should we include 1 or 2 GPR surveys for the two potential locations of the building?

A1) Include 1 GPR survey with your bid.

Q2) Is the placement of the building on the site one of the project tasks?

A2) Yes.

Q3) Does the Administration have any current thoughts on where they would like the building to be?

A3) Yes, it was discussed during the pre-bid walk through. Located on the southeast corner of the site.

Q4) Are there any extant soil borings or site drawings, and if so, can those be made available at this time?

A4) Yes there are existing site drawings and they will be provided to the PSC that gets the contract. PSC is required to perform soil boring/geotechnical analysis for building.

Q5) Besides vehicle storage, are there any other programmatic elements that are desired for the building such as an office, workshop, or restroom?

A5) No.

Q6) Will there be a parking area/lot outside of the building included in this work?

A6) No.

Q7) What capacity of salt is to be stored?

A7) 10 tons.

Q8) Will the salt be loose or in containers?

A8) Loose.

http://www.buy4michigan.com/

Q9) Will plans need to be approved by Green Oak Twp, planning and Township Board of Trustees?

A9) No.

Q10) What are the requirements for entering the site with testing equipment (Badge, additional security checks, equipment declarations, etc.)?

A10) LEIN check for workers.

Q11) What is the anticipated duration of construction?

A11) 180 calendar days.

Q12) Are plumbing utilities, water, sanitary sewer, storm sewer, and natural gas available?

A12) Yes.

Q13) Are there extant drawings depicting the as-built existing site conditions, including utilities?

A13) Yes.

Q14) Will vehicle repairs be made inside the building?

A14) No.

Q15) Will provisions for maintenance and service equipment be required? (Compressed air, hot and cold water, oil interceptor(s), etc.)

A15) No.

Q16) Are there any particular building systems that are required such as pre-engineered buildings?

A16) A pre-engineered building would be preferred, similar to Morton.

Q17) Are there any particular building materials that are required such as metal panel?

A17) A pre-engineered building would be preferred, similar to Morton. Wood structure with metal panel.

Q18) Can the building be conventionally “stick-built?”

A18) A pre-engineered building would be preferred, similar to Morton. Wood structure with metal panel.

Q19) Is a masonry building option a possibility?

A19) No.

Q20) What is the construction budget?

A20) $400,000.

Q21) Is Continuous Construction Observation required for desired?

A21) No.

Q22) Are there additional standards or codes beyond the Building Code that are required since the building in question is at a Corrections facility?

A22) MDOC standards should be included in the project.

Q23) What are the security requirements?

A23) All persons working on the project are to be MDOC Lein cleared and follow MDOC policy.

The proposal due date remains unchanged.

APPROVED BY:

PROJECT DIRECTOR Kurt Maiberger DATE: 8/25/2026