Addendum 1 - Woodside Elementary Improvements.pdf

PDF 1 MB Posted

Attached to
ELEMENTARY IMPROVEMENTS
Solicitation number
RFP-WOP-250000003178-3
Issued by
Ottawa County, Michigan

About this file

This document is a comprehensive bid package for the Woodside Elementary Improvements project by West Ottawa Public Schools, located in Holland, Michigan. The project involves renovations to an existing elementary school, with construction scheduled to begin on December 20, 2025 (during Christmas Break) and substantial completion targeted for August 7, 2026. The bid is structured with 13 separate bid categories including sitework, concrete, masonry, metals, general trades, roofing, aluminum storefronts/glazing, flooring, painting, mechanical, and electrical work. A pre-bid meeting was held on October 8, 2025, with bid submissions due on October 21, 2025, at 10:30 A.M., followed by mandatory post-bid interviews from October 27-29, 2025.

The project includes a $150,000 concrete allowance for removing and replacing existing concrete paving, and is not a prevailing wage project. Bidders must submit a 5% bid bond, sworn familial disclosure statement, and Iran Disclosure Act compliance form. The construction will involve interior renovations, with mechanical work scheduled during second shift after Christmas Break while maintaining school occupancy during normal hours. Bidders are required to have at least 10 years of experience, be licensed and insured in Michigan, and demonstrate financial capability to complete the work. The project will be overseen by Fritz Wahlfield Construction as the Construction Manager and GMB Architecture + Engineering as the Architect/Engineer.

View the file

Other files

File Type Posted
Woodside Drawings.pdf PDF
Invite_Front_Ends.pdf PDF
Woodside Project Schedule Gantt Chart.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: 10/10/2025

Owner: West Ottawa Public Schools

Project Name: Woodside Elementary Improvements

Location: 2591 N. Division Ave., Holland, MI 49424

CM No.: 356-025

A/E No.: 5-6250

ADDENDUM NO. 01

SPECIAL NOTE:

The Notice to Bidders, Instruction to Bidders, General Conditions of the Contract Construction, Supplementary

Conditions of the Contract for Construction, and all modifications and previously issued Contract Documentation are a part of the Addendum.

SCOPE OF WORK:

The following items are changes, additions, deletions, clarifications and/or errors and omissions in the plans and specifications and shall be considered by each Bidder regarding their proposal submitted. This document and all its entirety shall be considered part of the Contract Documents.

NOTICE TO ALL BIDDERS:

It is the responsibility of the Bidder to take note of all items covered in this Addendum. It is the responsibility of the

Bidder to review all documentations in total regarding their scope of work and any work that will interface with their scope of work.

ATTACHMENTS:

Specifications: GMB Addendum 001

Drawings: GMB Addendum 001

Other: Front Ends Pre-Bid Walk-Thru Minutes & Attendance

WEST OTTAWA PUBLIC SCHOOLS

Woodside Elementary Improvements

SPECIFICATIONS CLARIFICATIONS / REVISIONS:

(Refer to A/E Remarks)

SHEET CLARIFICATIONS / REVISIONS:

(Refer to A/E Remarks)

OTHER:

ITEM NO. 1: FRONT ENDS (ALL CHANGES NOTED IN RED/YELLOW)

Refer to scope of work changes noted in this Addendum which includes clarifications to the alternates, an added allowance for Concrete, and other clarifying items to the following Bid

Category’s scope of work: Concrete, General Trades, Aluminum Storefronts & Glazing

ITEM NO. 2: PRE-BID WALK-THRU MINUTES & ATTENDANCE

Pre-Bid walk through minutes and attendance are included in this Addendum.

Looks Good

ADDENDUM

WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 001

5-6250 WOODSIDE ELEMENTARY IMPROVEMENTS OCTOBER 09, 2025

A/E PROJECT 5-6250 PAGE 1 OF2

SECTION 00 91 11.01 - ADDENDUM 001

OWNER WEST OTTAWA PUBLIC SCHOOLS

PROJECT 5-6250 WOODSIDE ELEMENTARY

IMPROVEMENTS

A/E PROJECT 5-6250

PURPOSE THIS ADDENDUM SHALL FORM PART OF THE

BIDDING DOCUMENTS. CHANGES, ADDITIONS,

CLARIFICATION OR DELETIONS HEREIN

SUPERSEDE THE DRAWINGS AND

SPECIFICATIONS. BIDDERS SHALL INCLUDE

ON THE PROPOSAL FORM

ACKNOWLEDGEMENT OF THE RECEIPT OF

THIS ADDENDUM.

ATTACHMENTS

REISSUED SPECIFICATIONS: 06 10 00

REISSUED SHEETS: G2.01, P2.1B, M1.1C, M2.1C,

M3.1B, M9.01, E1.1C, E3.1B, E5.02, E5.10

SHEETS TO ISSUE TO THE BCC: M9.01

ARCHITECT-ENGINEER GMB

616.796.0200

WWW.GMB.COM

CONSTRUCTION MANAGER FRITZ WAHLFIELD CONSTRUCTION

616.784.5833

WWW.WAHLFIELDCONSTRUCTION.COM

ADDENDUM

WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 001

5-6250 WOODSIDE ELEMENTARY IMPROVEMENTS OCTOBER 09, 2025

A/E PROJECT 5-6250 PAGE 2 OF2

SPECIFICATION CLARIFICATIONS / REVISIONS

1.1 SECTION 06 10 00 ROUGH CARPENTRY (REISSUED)

A. See General Requirements in Part 2 for Fire Retardant Treated sheathing requirements.

SHEET CLARIFICATIONS / REVISIONS

2.1 SHEET G2.01 - CODE PLAN - LIFE SAFETY PLAN (REISSUED)

A. See the plumbing fixture legend for updated actual lavatory amounts.

2.2 SHEET P2.1B - UNIT 'B' PLUMBING PLAN (REISSUED)

A. Fixture tags for sinks in Health B110 and in Corridor B113 shall be revised as shown on reissued sheet.

B. Existing floor drains in Girl's Toilet B166 and Boy's Toilet B167 shall be removed/adjusted to the new tile floor finish elevation as noted on reissued sheet.

2.3 SHEET M1.1C - UNIT 'C' MECHANICAL DEMOLITION PLAN (REISSUED)

A. Return air grilles in Gymnasium C132 were replaced by the Owner. Work associated with

Keynote 14 for this area shall be deleted from scope of work. Refer to reissued sheet.

2.4 SHEET M2.1C - UNIT 'C' HVAC PLAN (REISSUED)

A. Return air grilles, R-5, in Gymnasium C132 were replaced by the Owner. Refer to reissued sheet.

2.5 SHEET M3.1B - UNIT 'B' HYDRONIC PLAN (REISSUED)

A. The flow rate for Fan Coil Unit, FCU-25.3, shall be revised to 2.2 GPM as shown on reissued sheet.

2.6 SHEET M9.01 - MECHANICAL SCHEDULES (REISSUED)

A. Refer to Condensing Unit Scheule: Design paramaters for Condensing Unit, CUA-25.5, shall be revised as shown in reissued schedule.

B. Refer to Diffuser Schedule: Return air grille, R-5, shall be deleted from the scope of work as shown in reissued schedule.

2.7 SHEET E1.1C - UNIT 'C' FIRST FLOOR ELECTRICAL DEMOLITION PLAN (REISSUED)

A. Revised plan to include demolition of existing AHUs in unit 'C' mechanical mezzanine.

2.8 SHEET E3.1B - UNIT 'B' FIRST FLOOR LIGHTING PLAN (REISSUED)

A. Revised plan to include type 'S12' fixture outside Vestibule B143 on emergency power.

2.9 SHEET E5.02 - POWER DISTRIBUTION EQUIPMENT SCHEDULES (REISSUED)

A. Revised sheet to include circuit information for plumbing fixture psu in panel 'BPZ'

2.10 SHEET E5.10 - LIGHTING FIXTURE SCHEDULE (REISSUED)

A. Revised lighting fixture schedule for inclusion of additional fixture equivalents.

00 11 13 ADVERTISEMENT FOR BIDS

BID PROPOSAL

Sealed bids, in triplicate, for West Ottawa Public Schools, Woodside Elementary Improvements, will be received at

West Ottawa Public Schools Administration Office, 1138 136 th Ave., Holland, MI 49424 on October 21, 2025 at 10:30

A.M. Any bids received after this date and time will not be accepted or considered. All bids will be opened and read publicly. FAXED OR EMAILED BIDS WILL NOT BE ACCEPTED.

This project is not a prevailing wage project.

All bids must be accompanied by the following;

1. 5% Bid Bond/ Security

2. Sworn and Notarized Familial Disclosure

3. Iran Disclosure Act

SITE INSPECTION

A Pre-bid meeting will be Wednesday, October 8 @ 5:00 P.M. This meeting will take place at Woodside Elementary

School located at 2591 N Division Ave, Holland, MI 49424. This pre-bid walk thru is highly recommended. There will be no other time available to view the site.

BID DOCUMENTS

Bidding documents may be viewed and/or requested via the following:

GMB Architecture + Engineering 85 East Eighth St., Suite 200 Holland, MI 49423 Ph: (616) 796-0200

West Michigan Builders Exchange

678 Front St. NW, Grand Rapids, MI 49504

(616) 949-8650

Please note that vendors are responsible to review information on all drawings and specifications.

BIDDER QUALIFICATIONS

Bidders submitting a proposal for this project shall have the following qualifications:

1. At least (10) years’ experience under the current company’s name.

2. Licensed and insured to perform work in the State of Michigan.

3. Shall have financial resources to complete work under this scope

BID SECURITY

All bids are required to have a bid security or bid bond in the amount of 5% of the bid being submitted. This shall secure the Owner from loss or damage by reason in the occurrence a bid is withdrawn or failure of the successful bidder not entering into Contract with the Owner if the Bid is accepted by the Owner.

The Successful bidder will be asked to secure a Performance, Labor, and Material bond for all work under contract.

Please keep this cost separate on the bid form provided. All bonds shall be from a surety company with an ‘A’ rating.

00 41 00 BID FORM

SUBMIT IN TRIPLICATE

BID TO: West Ottawa Public Schools 1138 136 th Ave.

Holland, MI 49424

ATTENTION: Mr. Chris LaHaie, Assistant Superintendent of Business Services

BID FROM: _______________________________________________________

PROJECT: Woodside Elementary Improvements

The undersigned has familiarized themselves with the local conditions with the cost of the work by having examined the site conditions, and Bidding Documents prepared by GMB Architecture & Engineering (85 East Eighth St. (Suite

200), Holland, MI 49423), and hereby proposes to furnish all labor, materials, taxes, equipment, and services needed for the completion of the work category submitted. All Addendums that have been issued for this project have been recognized and included. The cost for performing work is:

Bid Category Number: _________________

Bid Category Description: ____________________________________________________________

Base Bid Amount: ____________________________________________________________ Dollars

ALLOWANCES: Base Bid includes all allowance cost(s) set forth in Section 01.2100 of the General

Requirements and identified in the Instruction to Bidders.

TAXES: Base Bid includes all applicable taxes, including Michigan Sales Tax.

COST OF BONDS: Bond Cost for Performance, Labor, and Material Bond Cost. This cost must be included in the

Base Bid. Please list the cost of the bond below.

Woodside Elementary Improvements:

PLM Bond Amount ____________________________________________________________ Dollars

ACKNOWLEDGEMENT OF ADDENDA

The following addenda have been received and acknowledged with their execution is included in the base bid cost:

Addendum No. _____ Dated __________ Addendum No. _____ Dated __________

Addendum No. _____ Dated __________ Addendum No. _____ Dated __________

ALTERNATES (MANDATORY TO PROVIDE PRICING AS NEEDED WITH BASE BID)

The following alternates are an add to the Base Bid Cost.

Alternate No. A-1: Woodside Elementary

1. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.

a. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing

b. If alternate is not accepted, install metal closure panel and infill insulation where louvers are removed from the soffit.

Cost: Add/ Delete $___________________________________

VOLUNTARY ALTERNATES

The following is a list of Voluntary Alternates. The owner reserves the right to accept or reject and voluntary alternates.

1. ______________________________________________________________________________

2. ______________________________________________________________________________

UNIT PRICE

1. Unit Price No. 1: NA

BID BOND

Accompanying this bid as required by the instructions to Bidders, is a bid security if the form of (Certified Check, Cashier’s Check, or Bid Bond) in the amount of:

Bid Bond Amount ____________________________________________________________ Dollars

CONSTRUCTION SCHEDULE

The undersigned acknowledges the construction schedule set in the bid documents and that they must be met.

ADDITIONAL WORK

1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractor's own forces. This includes both overhead and profit.

2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This includes both overhead and profit.

CREDIT FOR WORK DELETED FROM CONTRACT

All work deleted from this contract by the Owner should be credited 100% back to the Owner.

AGREEMENT

In submitting this bid, it is understood that the Owner reserves the right to accept or reject any/all bids for any reason.

This bid is valid 60 days from the date of the opening.

Firm: _______________________________________________________________

Date: __________________

By: _____________________________________________________

Signature: ________________________________________________________

Title: ______________________________

Phone: (_______) _____________________

Email: ______________________________________________________

CONTACT INFORMATION

Please list contact information for the person(s) that should receive communication regarding THIS submitted bid, including Post-Bid Invites. (If Additional contacts should also receive communication, please attach a separate sheet listing a Name, Title, Email and Phone Number for each contact)

Name: ___________________________________________________

Title: ____________________________________________________

Email: ___________________________________________________

Phone: (________) ____________________________

FAMILIAL DISCLOSURE STATEMENT

In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing the familial relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.

(_____) No, there is no relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.

(_____) Yes, there is a relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools. Please list the relationship below.

BIDDER BOARD OF EDUCATION MEMBER OR SUPERINTENDENT

Subscribed and sworn this _______________________ day of ___________________________________, 2025.

In the County of ______________________________ In the State of ___________________________________.

By ___________________________________________________________________________

Notary Public Signature

My Commission Expires on: ________________________________ Seal or Stamp:

AFFIDAVIT OF COMPLIANCE IRAN ECONOMICS SANCTIONS ACT

Michigan Public Act No. 517 of 2012

The undersigned, the owner, or authorized officer of the below-named company (the “Contractor”), pursuant to the compliance certification requirement provided in West Ottawa Public Schools Request for Proposal (the “RFP”), hereby certifies, represents, and warrants that the Contractor (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of

2012 (the “Act”), and that in the event the Contractor is awarded a contract by the West Ottawa Public Schools as a result of the aforementioned RFP, the Contractor is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the Contract.

The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School Districts investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.

Contractor: _____________________________________________________

By: _______________________________________________ Title: ____________________________________

Date: __________________________________________________________

This instrument was acknowledged before me on the __________________ day of _____________________, 2025

In the County of ______________________________ In the State of ___________________________________.

By ___________________________________________________________________________

Notary Public Signature

My Commission Expires on: ________________________________ Seal or Stamp:

REQUEST FOR INFORMATION (RFI) DURING BIDDING PHASE

Requests For Information (RFI’s) will ONLY be accepted through a completed RFI form provided on page 9 in the front ends of this project.

Pre-Bid RFI’s deadline: OCTOBER 10, 2025 BY 4:00 P.M.

Please email the completed RFI form to both:

amanda@wahlfieldconstruction.com f3@wahlfieldconstruction.com

The CM will review the RFI before submitting to the AE firm.

Any questions not submitted following this process prior to the deadline will not be answered.

REQUEST FOR INFORMATION (RFI) FORM

Project: Woodside Elementary Improvements Date: ________________

Deadline: OCTOBER 10, 2025 BY 4:00 P.M. Action Requested:

______ Clarification

Attn: Fritz Wahlfield III, Fritz Wahlfield Construction (CM) ______ Direction

______ Approval

Company: __________________________________________________ ______ Alternate

Contact: ___________________________________________________ ______ Other

Email: _____________________________________________________

Phone No:__________________________________________________

Reference Drawing No: __________________________ Detail No: ___________ Spec. Section: ___________

Request Information:

RFI #: _________

CM Recommendation:

By: _______________________________ Date: ________________

AE Recommendation:

By: _______________________________ Date: ________________

BID CATEGORIES INDEX

1. Sitework

2. Concrete

3. Masonry

4. Metals

5. General Trades

6. Metal Roofing/Metal Panel Systems

7. Membrane Roofing

8. Aluminum Storefronts/Glazing

9. LPDA

10. Flooring

11. Painting

12. Mechanical

13. Electrical

BID CATEGORY NO. 01 - SITEWORK

INCLUDE:

1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4533 CODE REQUIRED SPECIAL INSPECTIONS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

32.9219 SEEDING

2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL

CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. All Excavating as shown on pages C0.01, C2.0.

4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material.

5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work.

6. The CM will provide a one time staking of grades, building footprint, and misc. locations.

a. Additional staking will be at the cost of the contractor.

7. Furnish and Install as shown:

a. Site demolition and site clearing as shown on C2.01

b. Excavate and regrade areas as shown on C2.01

c. Seed as shown.

8. Concrete or asphalt cutting to complete work in this scope.

9. Any dewatering necessary to complete this scope of work.

10. Dust control measures for all work in this Bid Category.

11. Daily clean-up at work areas.

12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

13. All work must be done in accordance with MIOSHA Regulations.

14. Warranties as specified.

15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

BID CATEGORY NO. 02 - CONCRETE

1. Complete Concrete and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

03.3511 CONCRETE FLOOR FINISHES

07.2100 THERMAL INSULATION

07.9200 JOINT SEALANTS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all reinforcement as shown.

4. Provide Sealer and Vapor Barrier as specified.

5. Furnish and install all interior & exterior concrete MEP pads as shown.

6. Furnish and Install Exterior Concrete Paving as shown.

7. Furnish and Install Interior Slab on Grade infill as shown on A1.1B and A1.1C.

8. Furnish and install joint sealants at all new exterior concrete paving as shown and specified.

9. Dust control measures for all work in this Bid Category.

10. Daily clean-up at work areas.

11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

12. All work must be done in accordance with MIOSHA Regulations.

13. Warranties as specified.

14. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

15. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

16. Alternate No. A-1: Woodside Elementary

a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.

i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.

ii. If alternate is not accepted, install metal closure panel and infill insulation where louvers are removed from the soffit.

17. Concrete Allowance

a. To remove and replace existing concrete paving with new pour-in-place concrete paving.

This allowance NEEDS to be included in the base bid of this scope.

i. Amount: $150,000.00

BID CATEGORY NO. 03 - MASONRY

1. Complete Masonry and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

04.0511 MASONTRY MORTARING AND GROUTING

04.2000 UNIT MASONRY

07.2100 THERMAL INSULATION

07.2119 FOAMED-IN-PLACE INSULATION

07.2500 WEATHER BARRIERS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc., as shown and/or specified.

4. Grouting solid of new hollow metal frames in masonry.

5. Clean all new masonry.

6. Furnish and Install complete Masonry as shown and specified.

7. Furnish and Install all reinforcement as shown.

8. Demo and tooth in openings called out on Note 1 on pages A1.1A, A1.1B, A1.1C.

a. Furnish and Install CMU and Brick at new openings as shown.

b. Install Lintel as shown. Furnished by others.

9. Cut in Joist Pockets as needed for new joist as shown on pages S3.1A and S3.1B.

10. Furnish and Install Masonry chases as shown on Pages A2.1A, A2.1B, and A2.1C.

11. Furnish and Install new Masonry wall in Rm B100.

12. Masonry Infill in Room A124 as shown.

13. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.

14. Furnish and Install all necessary flashing as shown.

a. Masonry membrane flashing as shown.

15. Flashing and weep holes concealed in masonry work. Includes pre-finished flashings.

16. Cavity wall insulation, this includes all spray insulation at all new exterior walls.

17. Joint Sealants at all CMU wall CJs.

18. Fire safe-ing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the all system, where shown. Include fire safe-ing at existing masonry walls where shown. See code compliance plans for locations.

19. Install lintels as provided for new openings.

20. Provided rebar caps for all exposed rebar ends installed by this contractor.

21. This contractor is responsible for the disposal of excess masonry and masonry related items. I.e., rubble, cut blocks, mortar, etc., into concrete dumpster. Coordinate this with Construction Manager. It is the responsibility of this contractor to provide its own dumpsters as necessary.

22. All work must be done in accordance to the new Silica Regulations.

23. Furnish and install masonry toothing as required for all new openings as shown. Openings may include, but not limited to: doors, windows, louvers, chases and masonry openings for new MEP work.

24. Installation of anchor bolts at top of wall for wood blocking.

25. Dust control measures for all work in this Bid Category.

26. Daily clean-up at work areas.

27. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

28. All work must be done in accordance with MIOSHA Regulations.

29. Warranties as specified.

30. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

31. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

32. Alternate No. A-1: Woodside Elementary

a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.

i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.

ii. If alternate is not accepted, install metal closure panel and infill insulation where louvers are removed from the soffit.

BID CATEGORY NO. 04 - METALS

1. Complete Metals and related work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

05.1200 STRUCTURAL STEEL FRAMING

05.2100 STEEL JOIST FRAMING

05.3100 STEEL DECKING

05.5133 METAL LADDERS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Erect new structural steel as shown on S0.01, S0.03, S3.1A, S3.1B, S3.1C and S7.01.

4. Furnish and Erect structural reinforcing as shown on S0.01, S0.03, S3.1A, S3.1B, S3.1C and S7.01.

5. Furnish and Erect metal deck patching as shown.

6. Furnish New lintels as shown for new mechanical openings.

7. Furnish and Install any shoring needing to complete the work in this scope.

8. Furnish and Install any Fire protection and weld protection needed to complete the work in this scope.

9. All onsite welding must be done by certified welders.

10. Provide Fire Watch for work completed above.

11. Dust control measures for all work in this Bid Category.

12. Daily clean-up at work areas.

13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

14. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

15. Warranties as specified.

16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 05 - GENERAL TRADES

1. Complete General Trades work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

06.1000 ROUGH CARPENTRY

06.2000 FINISH CARPENTRY

06.6100 CAST POLYMER FABRICATIONS

07.9200 JOINT SEALANTS

08.1113 HOLLOW METAL DOORS AND FRAMES

08.1416 FLUSH WOOD DOORS

08.7100 DOOR HARDWARE

10.1100 VISUAL DISPLAY UNITS

10.1419 DIMENSIONAL LETTER SIGNAGE

10.2113.17 PHENOLIC TOILET COMPARTMENTS

10.2800 TOILET, BATH, AND LAUNDRY ACCESSORIES

10.5113 METAL LOCKERS

12.3200 MANUFACTURED WOOD CASEWORK

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Schedule, take delivery, inventory, and store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not noted are to be furnished and installed.

4. Furnish and Install Floor Protection in Areas; Corridors A101, A127, & C101. Vestibules A100, A128, C102, C109, & C112.

a. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44mil.

i. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.

5. Furnish and Install Floor Protection in the following Areas;

a. Unit A (All Rooms and Corridors), Unit B (All Rooms and Corridors), Unit C (All Rooms and

Corridors)

i. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44mil.

ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.

b. Gymnasium C133

i. Floor Protection to be one layer of ½” O.S.B over 6 mil clear poly plastic in area of coverage.

ii. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.

6. Demo as shown on pages A1.1A, A1.1B, A1.1C

a. Notes 1-5, 7-9, 12 -17 and 19.

b. Furnish and Install temporary enclosures at all new exterior openings for doors, windows, and MEP openings. Make enclosures secure from outside and shed water.

c. Include Dumpster services for Demo specified under this scope of work.

i. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

7. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work. Roof Blocking by others.

i. Casework and furnishings blocking as required.

ii. Any doors or window bucks as needed/shown.

8. All lumber to be treated as specified.

9. Joint Sealants at all new door frames, casework, and countertops and any application where drywall meets

CMU walls.

10. Furnish and Install all Hollow Metal Door Frames and Window Frames as shown.

11. Furnish and Install all Hollow Metal and Wood Doors Leafs as shown.

12. Furnish and Install all new Door Hardware as shown.

13. Furnish and Install all new Casework, Millwork, and Countertops as shown.

14. Furnish and Install new marker boards and tack boards as shown.

15. Furnish and Install all new Bath Accessories as specified and shown.

16. Furnish and Install all new Toilet Partitions as specified and shown.

17. Furnish and Install new metal lockers as shown.

a. Includes wood bases as shown.

18. Dust control measures for all work in this Bid Category.

19. Daily clean-up at work areas.

20. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

21. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

22. Warranties as specified.

23. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

24. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

25. Alternate No. A-1: Woodside Elementary

a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.

i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.

ii. If alternate is not accepted, install metal closure panel and infill insulation where

BID CATEGORY NO. 06 - METAL ROOFING/METAL PANEL SYSTEMS

1. Complete Metal Roofing/Metal Panel Systems as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.2100 THERMAL INSULATION

07.2500 WEATHER BARRIERS

07.4113 METAL ROOF PANELS

07.4213 METAL WALL PANELS

07.4213.19 INSULATED METAL WALL PANELS

07.4213.23 METAL COMPOSITE MATERIAL WALL PANELS

07.6200 SHEET METAL FLASHING AND TRIM

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demolition of Existing Standing Seam roof as shown on pages A2.3B, and A2.3D.

a. Make area water sealed prior to installation of new standing seam roof system.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and Install all joint sealants for related work in this scope.

6. Furnish and Install complete roofing system as shown.

a. Standing Seam Metal Roofing System.

i. This includes all metal flashing and copings.

7. Furnish and Install ½” Coverboard with (2) layers of 2.6” Rigid Insulation underneath the Metal Roof System.

a. This includes Ice and Shield as shown.

8. Furnish and Install MCM panels as shown on A2.1B

9. Furnish and Install wood blocking as needed for this scope of work.

10. Daily clean-up at work areas.

11. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer

12. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

13. Warranties as specified.

14. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

15. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

16. Alternate No. A-1: Woodside Elementary

a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.

i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.

ii. If alternate is not accepted, install metal closure panel and infill insulation where

BID CATEGORY NO. 07 - MEMBRANE ROOFING

1. Complete Membrane Roofing as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.2100 THERMAL INSULATION

07.5300 ELASTOMERIC MEMBRANE ROOFING

07.6200 SHEET METAL FLASHING & TRIM

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demolition of existing Membrane roof and insulation as shown on page A2.3A, A2.3B, and A2.3C.

a. Demolition shall be performed so that there is no water damage to existing and new finishes inside the building. All work must remain water tight at the end of the day.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and install new membrane roof system as shown on page A2.3A, A2.3B, and A2.3C.

a. This includes all metal flashings and copings related to this work.

b. This includes flashing in all existing penetrations along with all new penetrations.

6. Furnish and Install ½” coverboard with (2) layers of 2.6” Insulation fastened to the metal deck.

a. This includes the tapered insulation as shown on the drawings.

7. Furnish and Install new wood blocking as shown.

8. Furnish and Install all joint sealants for related work in this scope.

9. Daily clean-up at work areas.

10. Contractor to Meet Project Schedule, this includes weekend work or Daily overtime.

11. Furnish and install complete roofing system as shown.

12. Tie into the existing roofing system as necessary.

13. Provide all warranties as specified.

BID CATEGORY NO. 08 - ALUMINUM STOREFRONTS & GLAZING

1. Complete Aluminum Storefronts & Glazing as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

07.9200 JOINT SEALANTS

08.7100 DOOR HARDWARE

08.8000 GLAZING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all Aluminum Frames and Doors as shown.

a. Including all Door Hardware related to this scope of work.

4. Furnish and Install all Glass and Glazing as shown.

5. Furnish and Install Mirrors as shown.

6. Furnish and Install all joint sealants for related work in this scope.

7. Glass cleaning at substantial completion of the entire project.

8. Furnish and install all storefront systems as shown and specified.

9. Contractor responsible for all field measurements for this scope of work.

10. Provide all hardware specified under this scope.

11. Furnish and install any break metal necessary to complete this scope.

12. Furnish and install egress stickers at all new egress openings.

13. Furnish and install all glazing films as shown.

14. Daily clean-up at work areas.

15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

16. All work must be done in accordance with MIOSHA Regulations.

a. Provide lifting plan for any crane work.

17. Warranties as specified.

18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

Resubmit”, contractor shall reissue the second time with the revisions clouded.

20. Alternate No. A-1: Woodside Elementary

a. Remove existing metal wall panels at the windows at Vestibule B101, Vestibule C127, Multi-Purpose C130, and classrooms as noted in drawings. Replace with 1” metal face insulated panel.

i. Inspect and replace existing weather resistant gypsum board behind panel as required with exterior grade sheathing.

ii. If alternate is not accepted, install metal closure panel and infill insulation where

BID CATEGORY NO. 09 - LPDA

1. Complete LPDA work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

05.4000 COLD-FORMED METAL FRAMING

07.8400 FIRESTOPPING

07.9200 JOINT SEALANTS

09.2116 GYPSUM BOARD ASSEMBLIES

09.2216 NON-STRUCTURAL METAL FRAMING

09.5100 ACOUSTICAL CEILINGS

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Furnish and Install all new metal studs as shown.

a. This includes cold form metal framing and non structural metal framing.

4. Engineered drawings required to be provided for cold form metal framing.

5. Furnish and Install all Gypsum boards as shown.

a. All Gypsum board must be finished as specified for painting.

6. Furnish and Install new Ceilings and Grid as shown on the drawings.

7. Furnish and Install new drywall bulkheads as shown.

8. Furnish and Install all batt insulation as shown on interior partitions as well as any exterior metal stud walls as shown.

9. Furnish and Install firestopping at all rated assemblies as shown on the drawing.

10. Coordinate layout and elevations with the Construction Manager prior to install.

11. Dust control measures for all work in this Bid Category.

12. Daily clean-up at work areas.

13. Contractor to meet Project Schedule, this includes weekend work or daily overtime.

a. Project Manager/Project Foreman required to attend the following meetings:

i. Pre-Construction Kick Off

ii. Bi-Weekly Progress Meeting

iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer

14. All work must be done in accordance with MIOSHA Regulations.

15. Warranties as specified.

16. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.

17. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and

BID CATEGORY NO. 10 - FLOORING

1. Complete Flooring work as shown on the drawings and as specified in the following sections:

SPECIFICATION MANUAL AND FRONT ENDS

00.0101 PROJECT TITLE PAGE

00.0110 TABLE OF CONTENTS

00.0115 LIST OF DRAWING SHEETS

00.4323 ALTERNATES FORM

00.1113 ADVERTISEMENT FOR BIDS

00.4100 BID FORM

00.4323 ALTERNATES FORM

01.0000 GENERAL REQUIREMENTS

01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT

01.1000.0 SUMMARY

01.1000.1 ABBREVIATIONS

01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS

01.1010.2 SCHEDULING

01.1010.3 CONTRACTOR USE OF PREMISES

01.1010.4 SUBSTANTIAL COMPLETION

01.2200 UNIT PRICES

01.2300 ALTERNATES

01.3000 ADMINISTRATIVE REQUIREMENTS

01.3000.1 SUBMITTALS

01.3113 INSURANCE REQUIREMENTS

01.4000 QUALITY REQUIREMENTS

01.4100 REGULATORY REQUIREMENTS

01.4533 CODE-REQUIRED SPECIAL INSPECTIONS

01.5000 TEMPORARY FACILITIES AND CONTROLS

01.5100 TEMPORARY UTILITIES

01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL

01.6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT RESTRICTIONS

01.7329 CUTTING AND PATCHING

01.7700 CLOSEOUT SUBMITTALS

01.9113 GENERAL COMMISSIONING REQUIREMENTS

01.9114 COMMISSIONING AUTHORITY RESPONSIBILITIES

02.4119 DEMOLITION

09.3000 TILING

07.9200 JOINT SEALANTS

09.6500 RESILIENT FLOORING

09.6813 TILE CARPETING

SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.

a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.

3. Demo of Existing flooring and base as shown in note 10 on pages A1.1A, A1.1B, and A1.1C.

4. Include Dumpster services for Demo specified under this scope of work.

a. Dumpsters need to have Plywood Protection as underlayment to protect existing surfaces.

5. Furnish and Install new flooring as shown on the drawings.

a. This includes All Resilient Flooring (including base), Tile Carpeting, and Ceramic Tiling.

b. Responsible for monitoring and procuring methods for humidity control during the installation of the new flooring system.

6. Minor floor prep as needed.

7. Furnish and Install Entrance Floor Mats and Frames as shown.

8. Coordinate layout and elevations with the Construction Manager prior to install.

9. Dust control measures for all work in this Bid Category.

10. Daily…