Addendum #1 - with attachments.pdf
PDF 3 MB Posted
- Solicitation number
- VCS-2025-02
- Issued by
- Tioga County, Cheektowaga CDP, New York
About this file
Addendum No. 1 for the Fair Street Drainage & Sidewalk Improvement Project is issued by the Village of Cold Spring in Putnam County, New York, dated April 9, 2025. The addendum provides key revisions and clarifications to the original bid documents, including changes to the water main specification from ductile iron to 4-inch diameter PVC pipe, updated drawing sheets, and responses to 19 bidder questions. The questions cover topics such as backfill requirements, tree removal restrictions, traffic management, water main and sewer line relocations, utility crossings, and environmental considerations.
The addendum includes revised bid sheets, technical specifications for PVC water pipe and fittings, and updated drawing sheets. Notable clarifications include the Village's consideration of making Fair Street north of the municipal lot one-way during construction, confirmation that there are no Indiana bat or Northern long-eared bat restrictions for tree removal, and guidance on water main shutdowns, which are limited to 4 hours or less. The document also addresses geotechnical information, noting that historical information indicates the area has been filled over time and that the contractor will be responsible for dewatering and ensuring safe working conditions, potentially requiring a well point system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fair Street Drainage - Plans_2025-03-10.pdf | ||
| Fair Street Drainage - Specs_2025-03.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A D D E N D U M NO. 1
April 9, 2025
PROJECT: Proposed Fair Street Drainage & Sidewalk Improvement Project Village of Cold Spring, Putnam County, New York
Contractors bidding the referenced project are advised of the following revisions to the Bid Documents.
1) Revised information regarding the existing water main has been provided. The existing water main is a 4-inch diameter plastic pipe. The Contractor shall use 4-inch diameter PVC pipe for the relocated water main rather than ductile iron pipe. A technical specification for Polyvinylchloride Water Pipe and Fittings (PVCW) has been provided. Drawings Sheets C-1, C-2, C-3, C-4 and C-8 have been revised to reflect the changes to the existing and proposed water main. Additionally, the Bid Sheets have been revised.
Refer to attached replacement and additional documents:
Bid Sheets (C-5 Add.#1 to C-10 Add.#1) Polyvinylchloride Water Pipe and Fittings (PVCW-1 to PVCW-9) Drawing Sheets C-1, C-2, C-3, C-4, and C-8, Revised 4/9/25
Below are questions submitted by bidders, followed by responses to the questions, Q1. Detail 8 on Sheet C-7 shows Storm pipe trench in Fair Street to be backfilled with select granular material around the pipe and 12” above, with suitable backfill above that mechanically tamped. Detail 6 on Sheet C-8 shows the trenches in Fair Street under the concrete road base to be filled with CLSM (NYSDOT Item #204.01). Please advise on which detail is to be used.
Response: The Contractor shall backfill per Detail 8 on Sheet C-7. Additionally, Detail 6 on Sheet C-8 has been revised to refer to Detail 8 on Sheet C-7.
Q2. Item TR Tree Removal shows approximately 5 trees to be removed. Please advise if these trees will be allowed to be removed after the typical deadline of March 31st due to the protection of Northern Long Eared Bats by the NYSDEC.
Response: There is no documented summer occurrence of Northern long-eared bat in Putnam County. The minor tree removal as part of the project is not expected to have an overall adverse effect. All other NYSDEC guidance and recommendations shall be followed to the extent practicable.
ADDENDUM NO. 1
FAIR STREET DRAINAGE AND
SIDEWALK IMPROVEMENTS
VILLAGE OF COLD SPRING
Q3. Please advise if Fair Street can be closed temporarily on certain days such as when the water relocation is done in the middle of the street and also when setting up a crane to set the large drainage structures.
Response: Fair Street is an important truck route and informal hiking trail route. Village is considering making Fair Street north of the municipal lot at 49 Fair Street one-way northbound during construction. The Contractor shall maintain vehicular and pedestrian traffic through the area including at nights and when not on-site. When performing the street crossing, the Village will consider restricting traffic to local traffic only. The Contractor shall restrict street closures to a limited basis and only with advance coordination with the Village.
The Contractor shall prepare a traffic protection plan for review prior to the start of construction.
Q4. Item RR Rip-Rap, Detail 12 on Sheet C-7 states Rip Rap size to be 24” which is NYSDOT Medium to Heavy size stone. The RR spec states 6”-8” size stone which is NYSDOT Lite Stone size. Please advise as to which size stone is required.
Response: The Contractor shall use the 24” rip rap size as specified on the plans.
Q5. Item PVC Polyvinylchloride sewer pipe and fittings, Sheet C-3, lower left corner of page shows an approximate location for the PVC Sewer pipe to be relocated. The size of the pipe is not shown on the drawings or mentioned in the spec. Please advise what the size and type of pipe is of the existing force main. Also, is this pipe to be relocated above or below the new proposed 42” HDPE drain pipes that cross its path?
Response: The Contractor shall verify the size of the pipe in the field. The sewer main connection is assumed to be a 1-inch diameter plastic force main in a 4-inch diameter PVC sleeve serving the park restrooms. The unit price shall be all inclusive. The sewer connection shall be installed over the culvert as shown in the profile on Sheet C-4.
Q6. Are there any PIN numbers of federal funding that would cause New York State Department of Transportation (NYSDOT) certifications? Are there any NYSDOT requirements for precast structures?
Response: The project does not have any PIN numbers as the project is not NYSDOT funded.
However, some of the technical specification reference NYSDOT Standard Specifications which shall be followed.
Q7. Are there any Indiana Bat restrictions regarding tree removal?
Response: The Indiana bat was not identified a species of concern during the environmental review. Refer to the response to Q2 for additional information.
Q8. The DIP spec states a temporary bypass is required before the 4 hr. water shutdown. Will this be required with the limited outages?
Response: The Contractor shall provide a temporary sanitary sewer bypass when connecting the DIP sanitary sewer main as to prevent back-ups in the sewer system. When performing water main installation, shutdowns 4 hours and under may be performed without a temporary bypass.
Q9. If a temporary water by-pass is required, please provide a plan on what is require and what parcels are to be supplied.
Response: Refer to the response to Q8.
Q10. Spec MCS – is Synthetic Micro Fibers required for Monolithic curb and sidewalk?
Response: Synthetic microfibers are not required.
Q11. Rip Rap spec says stone to be 6” – 8” with N140. The detail says d=24” and no N140. Please advise.
Response: Refer to the response to Q4.
Q12. Will the temporary rent-a-fence be removed by others?
Response: Due to the unknown condition of the existing culvert, the culvert has been presumed to be unsafe and the Village has restricted access over the culvert. The Village will have the temporary “rent-a-fence” removed prior to the start of construction. Once the fence is removed, the Contractor shall be responsible for protecting the area and for restricting access.
Q13. What is the thickness of the concrete pavement replacement?
Response: The concrete pavement replacement shall match existing thickness which is purportedly 12-inches thick.
Q14. What is the thickness on both the base and top over the concrete pavement replacement?
Response: A 2-inch top course overlay shall be provided on the concrete pavement.
Q15. General note #9 says to either backfill all trenches daily or steel plate the trench. This is difficult to do with 13.7’ wide trench crossing the road diagonally and re-pouring the concrete pavement from white line to white line. However, page M-33 states the road can be temporarily closed with lighted signs and flashing lights. Can the road be closed during the day, always allowing emergency vehicles access and open to 1 way traffic during non-working hours?
Response: Refer to the response to Q3.
Q16. Please confirm the contractor is not carrying the costs for compaction testing for earthwork and asphalt paving testing.
Response: Unless otherwise stated in the specifications, the costs of special testing shall be the responsibility of the Village.
Q17. The specs say the contractor is taking cylinders for concrete work but doesn’t say who is testing them. Please advise.
Response: Refer to the response to Q18.
Q18. Detail 6/C-8 indicates trenches are backfilled with controlled low strength material 204.01.
Please confirm this does not apply to this project.
Response: Refer to the response to Q1.
Q19. Is there any geotechnical information especially with respect to groundwater elevations?
Response: Geotechnical analyses have not been performed in the project area. Relayed historical information indicates that the area has been filled in overtime to construct the road, the drainage system, and the park. Excavation below the elevation of the tidal water will be required. As a result, the Contractor will be required to dewater as necessary to ensure safe working conditions and for work to proceed diligently. A dewatering plan, which may need to include well points, shall be submitted to the Engineer for review prior to implementation.
P:\Village of Cold Spring\Highway\Fair St Culvert\Bid Documents\Addendums\Addendum #1.docx
BID PROPOSAL
PROPOSED FAIR STREET DRAINAGE & SIDEWALK IMPROVEMENT PROJECT
VILLAGE OF COLD SPRING, NY
C-5 Add.#1
Name of Bidder Email:
Address Telephone:
City, State Zip Fax:
Note: The Lump Sum and Unit Price amount is to be written in both words and numbers. In case of discrepancy, the amount shown in words shall govern. The price shall be in dollars and cents. The Lump Sum amount shall include all labor, materials, equipment, services, etc. required to complete the work in accordance with the Plans, Specifications and all other Contract Documents within the specified completion date
No. BID ITEM UNIT
EST.
QUANT.
UNIT PRICE
(In Numbers)
UNIT PRICE
(In Words)
TOTAL PRICE
BASE BID
BBC Bituminous Base Course TON 265
BTC Bituminous Top Course TON 220
CC Concrete Curb LF 50
CLF Chain Link Fence (8’ Height) LF 515
CLF Chain Link Fence (42” W Gate) EA 3
CLF
Chain Link Fence (12’ W Double Gate)
EA 1
CLF
Chain Link Fence (16’ W Double Gate)
CPP
Corrugated Polyethylene Pipe (12” Dia.)
LF 25
(15” Dia.)
LF 90
(24” Dia.)
LF 230
C-6 Add.#1
EST.
QUANT.
UNIT PRICE
(In Numbers)
UNIT PRICE
(In Words)
TOTAL PRICE
CPP
Corrugated Polyethylene Pipe (30” Dia.)
LF 130
(36” Dia.)
LF 35
(42” Dia.)
LF 1,125
CSG
Crushed Stone and Gravel (“Item 4”)
CY 485
DF Dense Fill CY 45
DR Demolition and Removal LS 1
DS
Drainage Structures – 30” x 30”
(DI #B-7)
Drainage Structures – 48” x 30”
(CB #A-6, CB #B-9)
EA 2
Drainage Structures – 48” x 48”
(CB #B-6)
Drainage Structures – 54” x 54”
(CB #B-2)
Drainage Structures – 48” x 150”
(CB #A-2)
Drainage Structures – 60” x 136”
(CB #A-3)
Drainage Structures – 60” x 171”
(CB #A-4)
Drainage Structures – Offset CB
(CB #B-1)
Drainage Structures – Drain MH
(DMH #B-3, #B-4, #B-5)
EA 3
C-7 Add.#1
EST.
QUANT.
UNIT PRICE
(In Numbers)
UNIT PRICE
(In Words)
TOTAL PRICE
DS
Drainage Structures – Shallow Drain MH (DMH #B-8)
DWA Dewatering LS 1
ELE
Electrical (Sports Light Pole Relocation & Serv. Reconnect.)
LS 1
ELE
Electrical (Utility Pole Relocation)
ESC Erosion and Sediment Controls LS 1
GV Gate Valves (4” Dia.) EA 3
MCS
Monolithic Curb and Sidewalk (5”)
SF 3,740
MCS
Monolithic Curb and Sidewalk (7”)
SF 70
MEE Misc. Earth Excavation CY 10
MPT
Maintenance and Protection of Traffic
PM Pavement Markings (White) LF 3,500
PM Pavement Markings (Blue) LF 300
PM Pavement Markings (Yellow) LF 190
PM Pavement Markings (Symbols) EA 2
PVC
Polyvinylchloride Sewer Pipe and Fittings
LF 40
C-8 Add.#1
EST.
QUANT.
UNIT PRICE
(In Numbers)
UNIT PRICE
(In Words)
TOTAL PRICE
PVCW
Polyvinylchloride Water Pipe and Fittings (4” Dia.)
LF 140
R Restoration NP NP NP NON-PAYMENT NON-PAYMENT
RC
Reinforced Concrete (Headwall #A-1)
LS 1
RC
Reinforced Concrete (Headwall #A-5)
LS 1
RC
Reinforced Concrete (12” Road Base)
CY 90
RC
Reinforced Concrete (Pipe Anchors)
EA 5
RER Rock Excavation and Removal CY 20
RR Rip Rap CY 250
SV Shut-Off Valves EA 2
TR Tree Removal LS 1
TSP Traffic Signs and Posts EA 3
TSS Topsoil and Seed CY 110
UFG
Unclassified Excavation, Filling and Grading (Select Fill)
CY 210
UFG
Unclassified Excavation, Filling, and Grading
LS 1
WSL
Furnish and Install Water Service Line (1” or ¾”)
LF 100
C-9 Add.#1
EST.
QUANT.
UNIT PRICE
(In Numbers)
UNIT PRICE
(In Words)
TOTAL PRICE
Field Change Payment ALLOW. 1 $50,000.00 Fifty Thousand Dollars $50,000.00
TOTAL BASE BID (in words and figures)
ALTERNATE 1: REMOVE CONCRETE BASE INSTALL ASPHALT BASE
BBC Bituminous Base Course (ADD) TON 45
RC
Reinforced Concrete (12” Road Base) (DEDUCT)
CY 90 ( ) ( ) ( )
TOTAL ALTERNATE 1 BID (in words and figures)
ALTERNATE 2: MILL AND PAVE LENGTH OF FAIR STREET
BTC Bituminous Base Course TON 195
PML Pavement Milling SY 1,740
TOTAL ALTERNATE 2 BID (in words and figures)
ALTERNATE 3: RELOCATE SEWER LINE AND SEWER MANHOLES
CESS
Connections to Existing Sewer Structures
EA 2
DF Dense Fill CY 3
DIP
Furnish and Install Ductile Iron Sewer Pipe (8” Dia.)
LF 215
RC
Reinforced Concrete (Pipe Anchors)
EA 4
C-10 Add.#1
EST.
QUANT.
UNIT PRICE
(In Numbers)
UNIT PRICE
(In Words)
TOTAL PRICE
SMH
Furnish and Install Sewer Manholes (48” Dia.)
EA 3
TOTAL ALTERNATE 3 BID (in words and figures)
TOTAL BASE BID + ALT. 1 BID
TOTAL BASE BID + ALT. 3 BID
TOTAL BASE BID + ALT. 1 BID +ALT. 3 BID
TOTAL BASE BID + ALT. 2 BID + ALT. 3 BID
TOTAL BASE BID + ALT. 1 BID + ALT. 2 BID +ALT. 3 BID
The total bid shall be the sum of the extensions (unit price multiplied by estimated quantity, for each item). The estimated quantities are stated here only as a convenience for comparison of bids.
If there are any errors in addition or multiplication, the unit prices for each item shall govern, and the bid comparison will be made on the basis of correct arithmetic applied to these unit prices.
In case of a discrepancy between the unit price in words and the unit price in numbers, the unit prices in words shall govern.
The estimated quantities are not guaranteed and are only for bid comparison purposes and final payment will be made for actual quantities regardless of the estimated quantities contained herein.
The contractor is further advised that the estimated quantities shown in the Bid Sheets may be reduced or deleted in order to ensure that this Contract can be completed within the budget established for this work. In the event that certain work is deleted or reduced, the Unit Price Bid shall remain in effect for this work.
PVCW-1
POLYVINYLCHLORIDE WATER PIPE AND FITTINGS
WORK
Under this item the Contractor shall supply all labor, materials and equipment necessary to furnish and install, polyvinylchloride (PVC) pipe and fittings for water mains. The work shall include but not be limited to saw cutting concrete and asphalt, removal and disposal of asphalt and concrete material and removal and disposal of existing water main as directed by the Engineer. The Contractor shall excavate and maintain the trench, properly install the pipe, backfill and tamp the trench then sterilize and test the new water mains and appurtenances.
The Contractor is advised that water main shutdowns shall not exceed a maximum of four (4) hours per day.
MATERIALS
The polyvinylchloride pipe and fittings, including those required for stubs, shall be Blue Brute DR18 235 psi pressure rated PVC manufactured by IPEX, Inc. or Engineer approved equal. PVC pipe and fittings shall conform to AWWA C900 “Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4 In. Through 12 In. for Water Transmission and Distribution”, AWWA C907 “Injection-Molded Polyvinyl Chloride (PVC) Pressure Fittings, 4 In. Through 12 In. for Water, Wastewater, and Reclaimed Water Service”, and shall be NSF/ANSI Standard 61 certification.
Joints shall be leak-free, water-tight.
Specials, if required, shall conform to the specifications for straight pipe insofar as applicable and to the details indicated on the drawings or bound into the back of the specifications. Fittings, specials, unions, and flanges shall be of the same schedule number and manufactured of the same materials as the pipe.
DESCRIPTION OF SYSTEM
Piping shall be installed in those locations as shown on the Drawings and as directed by the Engineer. The equipment and materials specified herein are intended to be standard types of plastic sewer pipe and fittings for use in transporting potable water.
QUALIFICATIONS
All plastic pipe and fittings shall be furnished by a single manufacturer who is experienced in the manufacture of the items to be furnished. The pipe and fittings shall be designed, constructed, and installed in accordance with the best practices and methods and shall be suitable for the intended service.
PVCW-2
INSPECTION, TESTS, AND ACCEPTANCE
All pipe delivered to the job site shall be accompanied by test reports certifying that the pipe and fittings conform to the above-mentioned ASTM specifications. In addition, the pipe shall be subject to thorough inspection and tests, the right being reserved for the Engineer to apply such tests as he deems necessary.
All tests shall be made in accordance with the methods prescribed by the above-mentioned specifications, and the acceptance or rejection shall be based on the test results.
The Contractor shall furnish all labor necessary to assist the Engineer in inspecting the pipe. Pipe will be inspected upon delivery, and such as does not conform to the requirements of this contract shall be rejected and shall immediately be removed by the Contractor.
HANDLING PIPE
All pipe shall be stored at the site until installation in a manner acceptable to the Engineer which will keep the pipe at ambient outdoor temperatures. Temporary shading shall be provided as required to meet this requirement. Simply covering the pipe or structures which allows temperature buildup when exposed to direct sunlight will not be permitted.
Each pipe unit shall be handled into its position in the trench only in such manner, and by such means as acceptable to the Engineer. Care shall be taken to avoid damaging the pipe and fittings.
INSTALLATION
The preparation and installation of plastic pipe shall be strictly in accordance with the manufacturer’s technical data and printed instructions, AWWA standards, and the requirements herein. Each pipe unit shall be inspected before being installed. No defective pipe shall be laid or placed in the piping, and any piece discovered to be defective after having been laid or placed shall be removed and replaced by a sound and satisfactory piece.
Each pipe shall be cleared of all debris, dirt, etc., before being laid and shall be kept clean until accepted in the completed work.
Pipe shall be laid accurately to the lines and grades indicated on the drawings or required. Care shall be taken to ensure a good alignment both horizontally and vertically. In buried pipelines, each pipe shall have a firm bearing along its entire length.
The centerline of the pipe shall not deviate from a straight line drawn between the centers of the openings at the ends of the pipe by more than 1/16 inch per foot of length. If a piece of pipe fails to meet this requirement for straightness, it shall be rejected and removed from the site. Any pipe unit or fitting discovered to be defective either before or after installation shall be removed and replaced with a sound unit.
PVCW-3
Except as otherwise indicated on the drawings, the pipe shall be supported by compacted crushed stone. No pipe or fitting shall be permanently supported on saddles, blocking, or stones.
Suitable bell holes shall be provided, so that after placement, only the barrel of the pipe receives bearing pressure from the supporting material.
Before any joint is made, the previously installed unit shall be checked to assure that a close joint with the adjoining unit has been maintained and that the inverts are matched and conform to the required grade. The pipe shall not be driven down to the required grade by striking it with a shovel handle, timber or other unyielding object.
All joint surfaces shall be cleaned. Immediately before joining the pipe, the bell or groove shall be lubricated in accordance with the manufacturer’s recommendation. Each pipe unit shall then be carefully pushed into place without damage to pipe or gasket. Suitable devices shall be used to force the pipe units together so that they will fit with a minimum open recess inside and outside and have tightly sealed joints. Care shall be taken not to use such force as to wedge and split the bell or groove ends. Joints shall not be “pulled” or “cramped” unless permitted by the Engineer.
Where any two pipe units do not fit each other closely enough to enable them to be properly jointed, they shall be removed and replaced with suitable units and new gaskets. Details of gasket installation and joint assembly shall follow the directions of the manufacturers of the joint material and of the pipe, all subject to review by the Engineer. The resulting joints shall be watertight and flexible.
All pre-molded gasket joint polyvinylchloride pipe of a particular manufacturer may be rejected if there are more than five unsatisfactory joint assembly operations or “bell breaks” in 100 consecutive joints, even though the pipe and joint conform to the appropriate specifications as hereinbefore specified. If the pipe is unsatisfactory, as determine above, the Contractor shall, if required, remove all pipe of that manufacturer of the same shipment from the work and shall furnish pipe from another manufacturer which will conform to all of the requirements of these specifications.
Open ends of pipe and branches shall be closed with polyvinylchloride stoppers secured in place in an acceptable manner.
After each pipe has been properly bedded, enough gravel shall be placed between the pipe and the sides of the trench, and thoroughly compacted, to hold the pipe in correct alignment. Bell holes, provided for jointing, shall be filled with screened gravel and compacted, and then screened gravel shall be placed and compacted to complete the pipe bedding, as indicated on the drawings.
The Contractor shall take all necessary precautions to prevent flotation of the pipe in the trench.
At all times pipe installation is not in progress, the open ends of the pipe shall be closed with temporary watertight plugs, or by other acceptable means. If water is in the trench when work is to be resumed, the plug shall not be removed until suitable provisions have been made to prevent water, earth, or other substances from entering the pipe.
PVCW-4
Pipelines shall not be used as conductors for trench drainage during construction.
Installation of valves and fittings shall be strictly in accordance with manufacturer’s instructions.
Particular care shall be taken not to overstress threaded connections.
All piping shall have a sufficient number of unions to allow convenient removal of piping and shall be as approved by the Engineer.
Where plastic pipe passes through wall sleeves, the space between the pipe and sleeve shall be sealed with a mechanical sealing element.
All plastic pipe to metal pipe connections shall be made using flanged connections. Metal piping shall not be threaded into plastic fittings, valves, or couplings nor shall plastic piping be threaded into metal valves, fittings or couplings. Only socket to thread adaptors shall be used for threaded connections.
ALLOWABLE PIPE DEFLECTION
Pipe provided under this specification shall be so installed as to not exceed a maximum deflection of 3.5 percent. Such deflection shall be computed by multiplying the amount of deflection (nominal diameter less minimum diameter when measured) by 100 and dividing by the nominal diameter of the pipe.
Upon completion of a section of, including placement and compaction of backfill, the Contractor shall measure the amount of deflection by pulling a specially designed gauge assembly through the completed section. The gauge assembly shall be in accordance with the recommendations of the pipe manufacturer and be acceptable to the Engineer.
Should the installed pipe fail to meet this requirement, the Contractor shall do all work to correct the problem as the Engineer may require at no additional cost to the Owner.
CLEANING
Care shall be taken to prevent earth, water, and other materials from entering the pipelines. As soon as possible after the pipe is installed, the Contractor shall clean out the pipeline and being careful to prevent soil, water, and debris from entering any existing pipe.
CUTTING PAVEMENT
Before making any excavation, the Contractor shall cut the edge of the trench. Ripping of pavement by means of excavating equipment will not be permitted.
In the case of asphalt pavement, cutting of the edge shall be done by means of pneumatic drill with
PVCW-5
spade-shaped bit.
Concrete pavement many initially be cut by pneumatic drill or by a concrete saw. Cuts in concrete pavement for final permanent pavement must be made by a concrete saw.
EXCAVATION OF TRENCH
The Contractor shall excavate a trench to the depth shown on the profiles and to a width one (1’) foot outside the pipe. Enlargements shall be made at the joints to permit proper installation. The Contractor shall not use equipment which will excavate a trench wider than that specified. Hand excavation shall be employed wherever in the opinion of the Engineer, it is necessary for the protection of existing utilities, trees, pavements or other structures.
All excavation shall be by open cut method unless tunneling is authorized by the Engineer.
Excavation of the trench under this item shall include all necessary removal of curbs, gutters, walks and driveways and the cutting and removing of asphalt pavement.
The Contractor shall keep the trenches free from water. This shall be done as part of this item. If under-draining is required by the plans or specifications or authorized by the Engineer, it shall be provided.
At least twenty (20’) feet of trench shall be excavated in front of the previously laid pipe. Trenches shall not remain open overnight without the express approval of the Engineer. Additional depth of trench shall be excavated as required to clear obstructions not shown on the plans.
SHEETING AND BRACING
Trenches shall be properly sheeted, shored and braced as necessary to prevent shifting of materials, to prevent damage to structures, pavement and pipes, and to provide safe working conditions. The Contractor shall be solely responsible for providing and installing and for the adequacy of all sheeting and bracing used and for all damage resulting from its failure or from placing, maintaining and removing it.
If there is a space between the sheeting and the side of the trench, the space shall be backfilled with suitable material thoroughly compacted in place. Where adjacent structures, pavement, or pipes may be damaged by the removal of sheeting, the Contractor shall not remove the sheeting.
All sheeting left in place shall be cut off at least two (2’) feet below the surface of the ground.
Where sheeting or shoring is to be removed, the removal shall be in such a manner as to prevent loss of ground.
Attention is drawn to the New York State Department of Labor Industrial Code Rule #53, and O.S.H.A. regulations. Prefabricated sheeting boxes may be used only with the approval of the Engineer as to the box itself and the method of use.
PVCW-6
PIPE FOUNDATIONS
The pipe shall rest on suitable material and a stable bottom. Soft, spongy or other unstable soil encountered at the invert established shall be excavated and removed. Excavation shall be for a width of two (2’) feet plus the outside diameter of the pipe and to a depth as called for by the Engineer. The pipe shall then receive a foundation of crushed stone, washed gravel, concrete mattress, or such precaution as directed by the Engineer. Stabilization of the trench or other means of pipe support shall be under its own item. Additional depth of trench shall be excavated as required to remove any unsuitable material to provide a stable base.
The pipe shall be handled in a manner such that it will not be damaged or overstressed. Properly designed lifting apparatus shall be used in loading, unloading and lowering pipe into place for laying. Any type of mishandling or damage to the pipe during any phase of the work will be cause for rejection by the Engineer.
The pipe shall be laid in the trench to conform to the line and grade as called for on the plans, providing a minimum of four (4’) feet of cover except as otherwise noted. Each pipe shall be laid on undisturbed ground supported throughout with depressions dug to receive bells and the entire barrel or pipe shall have a uniform bearing from end to end. The use of blocks shall be strictly forbidden, except upon the express approval of the Engineer.
Where excavation has been made below the required grade, such areas shall be backfilled with suitable materials and compacted at the expense of the Contractor. All loose or unsuitable materials shall be removed from the trench bottom.
Where a line goes from one condition of bearing to another, as from rock cut to earth, or from concrete mattress to gravel bed, special care is to be exercised to see that the less firm bearing ground is tamped and secure. Short lengths of pipe may be required in areas where bearing changes.
Cutting of pipe for inserting valves, fittings, and closure pieces shall be done by the Contractor in a neat workmanlike manner. PVC pipe shall be cut only by means of saws, hack saws, wheel type cutters, or milling type cutters. Cuts shall be made carefully by approved methods to produce clean, square cuts, to prevent damage to pipe and to avoid waste. Pipe damaged by the Contractor by improper or careless methods of cutting shall be replaced at the Contractor’s own expense.
Deflections of joints shall not exceed the maximum deflection recommended by the pipe manufacturer, unless ordered by the Engineer.
BACKFILLING
After the pipe has been properly laid and inspected as required, the space between the pipe and the sides of the trench shall be filled to the middle of the pipe with selected materials free from stones and carefully rammed under and around the pipe to give it a firm foundation. Then the trench shall be filled to a point at least one (1’) foot above the pipe with earth free from stones, and carefully
PVCW-7
rammed so as not to disturb the pipe to a compaction at least equal to the surrounding earth. The earth above this point shall be backfilled and compacted in nine (9”) inch layers and addition of water may be required by the Inspector to achieve the required compaction. No stones larger than six (6”) inches in diameter shall be allowed in trench backfill. Unsuitable materials excavated from the trench shall not be allowed as backfill and shall be replaced by suitable material, as approved by the Engineer, under this item.
Unsuitable material shall be as determined by the Engineer and shall include, but not be limited to such materials as, organic materials, roots, stumps, rocks, or bony backfill, clay silt, mud, wood, concrete slabs, or frozen soil.
Excess material and unsuitable material, excavated from the trench, shall be removed from the site as part of this item.
It shall be the responsibility of the Contractor to prevent water, earth, stone, sand or debris of any nature from entering the lines. Should any material accidentally enter the line, it shall be flushed until satisfactorily cleaned.
HYDROSTATIC TEST
Upon completion of the pipe laying or portion thereof, and installation of its appurtenances, the pipe shall be filled with water and tested for its ability to withstand pressure and for leakage.
Hydrostatic pressure and leakage test shall be performed in accordance with AWWA C605 Standards and the following specifications.
The Contractor shall furnish all means and apparatus necessary for getting water into the mains, maintaining pressure, and making all tests and measurements, including pumps, calibrated gauges and meters. The Contractor shall be responsible for expelling all air from the lines, and the installation of taps, corporation cocks, blow-off pipes, riser pipes, curb stops, and similar appurtenances necessary for insertion of water, chlorine solution, air venting or any other testing purpose.
The Contractor shall apply a pressure to the water in the pipe which is at least 1.25 times the normal working pressure along the test section; however, such test pressure shall in no case be less than 150 lbs. per square inch nor more than 250 lbs. per square inch at any part of the line. The test pressure shall be maintained for not less than two (2) hours, and the amount of water, if any, added in order to maintain the test pressure shall be measured. Such loss of water shall not exceed the amount determined by the following formula:
L = ND/P/133,200
in which L = allowable leakage, in gallons per hour N = length of pipeline tested in feet D = nominal diameter of pipe in inches P = average test pressure in lbs. per square inch gauge
PVCW-8
In addition to measurement of make-up water, the pipe and appurtenances shall also be inspected for visual or audible signs of leakage.
In the event the test is not satisfactory, the Contractor shall re-excavate all areas necessary to locate the leakage for repair. All leaks or defects in the joints shall be promptly repaired and all cracked, broken or defective pipes, castings or valves shall be removed and replaced with sound pieces at the expense of the Contractor. There shall be no additional payments for this work. Damage that may occur during the progress of the test shall be repaired at the expense of the Contractor. The testing and repair shall be repeated as many times as necessary until the requirements of this specification are met.
The pipeline shall be tested in sections between main line valves or shorter sections as directed, so that sections may be put in service if required before completion of the entire line. Water for testing mains shall be furnished by the Owner for the first test. If retesting is necessary, any water required shall be at the Contractor’s expense.
STERILIZATION
Before any section of the new main is put in service, it shall be cleaned and thoroughly sterilized in accordance with AWWA C651 “Disinfecting Water Mains”, except that the Tablet Method (Sec. 4.3) will not be permitted. All work prior to commencement shall be approved and coordinated with the Town of Bedford Water Superintendent.
The Contractor shall furnish all necessary labor, materials and equipment for making the sterilization, including disinfecting chemicals and any tapping or piping necessary for inserting of chlorine solution or sampling of water. The Owner will furnish technical assistance and the water for the first test. Any water required for retesting shall be at the Contractor’s expense.
After achievement of the required chlorine residual measured after 24 hours in the pipe, the pipe shall be finally flushed and refilled with fresh water from the Owner’s supply. After being in contact with the pipe for 24 hours, samples of water shall be taken and submitted to the Putnam County Department of Laboratories for bacteriological analysis. If the samples fail to meet the standards of the Putnam County Health Department for drinking water, the water main shall be re-sterilized and the whole procedure repeated until the samples are satisfactory.
TESTING THE PIPE
The Engineer may require any pipe length or portion of a pipe length to be tested for conformance to the material specifications. Such pipe sections shall be furnished and tested at the Contractor’s expense. Failure of any pipe section to meet the specifications may be grounds for rejection of an entire batch or load. In addition to the tests prescribed by the ANSI specifications, the “Preliminary Evidence of Ductility” Test as prescribed by the New York City Department of Water Resources may be used.
PVCW-9
SHUTDOWNS
The Contractor shall not shutdown any portion of the water distribution system for more than four
(4) hours and not without the approval of the Engineer. All preparatory work shall be completed prior to the shutdown of the system. The Contractor shall be responsible for all public health notices, announcements or reports that may be required due to water system shutdown. Any valves in the water system that require to be shut shall be done so by the Water Department.
SUBMITTALS
Shop drawings including piping layouts and schedules shall be submitted to the Engineer in accordance with GENERAL CONDITIONS and shall include dimensioning, fittings, locations of valves and appurtenances, joint details, methods and locations of supports, and all other pertinent technical specifications for all piping to be furnished. The drawings shall be fully dimensioned and contain schedules of all pipe, fittings, valves, equipment, special castings, and other appurtenances.
Shop drawing submittals for piping under this Section shall include all data and information required for the complete piping systems. All dimensions shall be based on the actual equipment to be furnished.
MEASUREMENT AND PAYMENT
The measurement for the quantity of pipe to be paid for under this item shall be the actual number of “LINEAR FEET” of pipe line, of the various sizes laid by the Contractor as measured along the center line of the pipe from joint to joint without regard to the lengths of the individual pieces of pipe or cuts, or joints required.
The payment for this item shall be on a linear foot basis and shall include all labor, materials, and equipment and any miscellaneous expenses for saw cutting concrete and asphalt, removal and disposal of excavated material and existing water mains, excavation and backfilling, tamping; for maintaining and sheeting the trench, for furnishing and laying of the pipe with all required jointing materials.
H :\C ol d
Sp rin g\
-F ai r S t C ul ve rt\ co ve r s he et
\c ov er sh ee t-1
3.
dw g | 4
/9 /2
:3
7:
P M
DRAWING NO. SHEET NO.
OF
DATESCALE
PROJECT
TITLE
DATEREV.
Putnam Business Park 1689 Route 22 Brewster, New York 10509 Tel: (845) 279-2220ENGINEERING, P.C.
JAMES J. HAHN
DESCRIPTION
3/14/24
PROPOSED
FAIR STREET
DRAINAGE & SIDEWALK
IMPROVEMENT PROJECT
VILLAGE OF COLD SPRING, PUTNAM COUNTY, NEW YORK
UNAUTHORIZED ALTERATIONS OR ADDITIONS
TO THIS DRAWING IS A VIOLATION OF SECTION
7209 (2) OF THE NEW YORK STATE EDUCATION
LAW. THIS PLAN IS NULL AND VOID FOR CON-
STRUCTION PURPOSES WITHOUT THE SIGNA-
TURE AND SEAL OF THE DESIGN ENGINEER.
1 4/12/24 PER NYSDEC
2 5/8/24 PER NYSDEC
3 9/16/24 PER NYSDEC, SIDEWALK
4 3/10/25 ISSUED FOR BID
5 4/9/25 ADDENDUM #1
COVER SHEET & NOTES
1" = 20'
C-1 1
SITE
LOCATION MAP
N.T.S.
SOURCE: PUTNAM CO. G.I.S.
DRAWING INDEX
C-2 C-3 C-4 C-5
EXISTING CONDITIONS & DEMOLITION PLAN
SITE PROFILES
DWG. # TITLESHEET #
SIDEWALK & SITE RESTORATION PLAN
EROSION & SEDIMENTATION CONTROL PLAN
C-1
C-6
7 C-7 DETAILS (1)
DETAILS (2)
GRADING & UTILITIES PLAN
8 C-8
DETAILS (3)
GENERAL NOTES
1. All work and materials shall be in accordance with these plans, specifications, any revisions thereto, and the rules and regulations of the Village of Cold Spring.
2. The subsurface information shown hereon is not guaranteed as to accuracy or completeness. The Contractor shall verify the location of all existing utility lines whether in public right-of-way, in easements, or in private property prior to starting any excavation and shall be responsible for the same. The Contractor shall be responsible for contacting the Underground Facilities Protective Organization, pursuant to N.Y.S. Law, 16 NYCRR Code 753.
3. The Contractor shall be responsible for the relocation of any utility service line or valve which is in interference with the proposed work.
4. Existing trees shall be preserved and protected wherever possible and shall only be removed with the approval of the Engineer. Tree roots shall be avoided wherever possible. Where tree roots cannot be avoided, they shall be cut cleanly. Tree roots shall be kept moist while trenches are open.
5. The Contractor shall verify all existing and proposed elevations in the field.
6. The maintenance and protection of traffic schemes, both pedestrian and vehicular, shall be the responsibility of the Contractor. Access to all commercial, institutional and residential parking facilities shall be maintained at all times. A safe means of pedestrian access to and from all points within the contract limit shall be provided.
The Contractor must submit traffic maintenance and staging schemes in writing to the Engineer for approval.
All traffic maintenance devices, including, but not limited, to temporary signs, barricades, steel plates, lights and warning signals, shall be constructed and displayed in accordance with the rules and regulations of the Village of Cold Spring and the Federal MUTCD.
7. The Contractor shall provide the Engineer with a telephone number of the person responsible in the case of an emergency, 24 hours a day, 7 days a week.
8. All damage to public or private facilities caused by the Contractor's operation shall be repaired to the satisfaction of the Owner at the Contractor's expense.
9. Trenches shall not be left open overnight or unattended. At the close of each workday the Contractor shall fill or cover trenches with steel plates to the satisfaction of the Engineer.
10. The Contractor shall submit shop drawings for all works to the Engineer. No construction shall be allowed until the shop drawings are approved.
11. The Contractor shall comply with O.S.H.A. Standard 29 CFR - Part 1926.650, .651 and .652 for all excavations.
12. Refuse from demolition shall become the property of the Contractor. It shall be the Contractor's responsibility to dispose of all construction refuse legally.
13. All drainage pipes shall be smooth-interior high density polyethylene corrugated pipe unless noted otherwise.
Other types of drainage pipes may be used if so approved by the Engineer under special conditions.
14. Any existing pipes which are not shown on these plans which are currently discharging into existing storm drainage facilities designated for removal shall be reconnected to new drainage structures.
15. Existing valves and manhole covers to remain shall be adjusted to finished grades where required.
16. Existing pavement shall be sawcut in a straight line where it is to be bounded by new pavement.
17. The pavement and subbase thicknesses noted on these plans are after compaction.
18. Fill material shall be free from organic matter, loam and frozen material. Soft or spongy areas after compaction shall be removed, the pocket drained and refilled with select material.
19. All existing site features, including, but not limited to, pavement, curbing, grass, landscaping, piping, utility lines, pavement markings, walls, fencing, and structures, disturbed or damaged by construction shall be restored by the Contractor to a condition equal to or better than those currently existing and as directed by the Engineer.
20. Disturbed grass or earth areas shall be provided with 4 inches minimum of topsoil and seeded or sodded as described in the specifications.
WATER MAIN NOTES
1. All work and materials shall be in accordance with the rules and regulations of the municipality, the Putnam County Department of Health and the New York State Department of Health.
2. The municipal water department shall perform all water main shutdowns and reopenings necessary for the proposed work.
3. The duration of water main shutdowns shall be less than 4 hours. The Contractor shall notify the Engineer and municipal water department if water main shutdowns greater than 4 hours will be required.
4. The Contractor shall be responsible for providing temporary water service to all buildings currently connected to the existing water main scheduled for removal. The Contractor shall submit a temporary water supply plan to the Engineer for review and approval prior to construction. The temporary water supply shall be in accordance with the requirements of the Putnam County Department of Health and the New York State Department of Health.
5. All newly installed water main, prior to being placed in service, shall be successfully pressure and leakage tested in accordance with the latest edition of A.W.W.A. Specification Section C-600. The Putnam County Department of Health shall be notified 48 hours in advance of the water main pressure test.
6. All newly installed water main, prior to being placed in service, shall be disinfected and successfully tested in accordance with the latest edition of A.W.W.A. Specification Section C-651-05 except Section 4.3 (Tablet/Granule Method). Microbiological testing shall include results for E. coli, total coliform and heterotrophic plate count. The microbiological test results shall be forwarded to and approved by the Putnam County Department of Health as part of the Certification of Construction prior to placing the water mains in service.
7. Water mains shall have a minimum ground cover of four feet.
8. New water main shall be SDR18 PVC with gasketed bell and spigot joints.
9. Gate valves shall be resilient wedge type (Mueller A-2360 or approved equal).
10. Fittings, tees and crosses shall be ductile iron (class 350).
11. Deflection of the water main joints shall not exceed 50 percent of the maximum deflection recommended by the manufacturer or as ordered by the Engineer.
12. Gate valves with mechanical joints and retainer glands shall be rodded to adjacent tees or crosses. Tie rods may be eliminated if flanged valve/fitting assemblies are used. Gate valves shall be rodded to adjacent water main with split clamps.
13. The Contractor shall submit to the Engineer, shop drawings of curb valves, corporation stops, gates valves, valve boxes, split clamps, couplings, fire hydrants and pipe materials for approval prior to construction.
14. All vertical and horizontal water main bends, tees, reducers, and plugs/end caps, require concrete thrust blocks.
See schedule on drawings.
15. The Contractor shall provide the Engineer with "as-built" drawings of the completed work, prepared as described in the Specifications.
16. Existing water service lines connected to the removed water main are to be reconnected to the new water main.
PROPOSED
FAIR STREET DRAINAGE & SIDEWALK IMPROVEMENT PROJECT
VILLAGE OF COLD SPRING, PUTNAM COUNTY, NY
COVER SHEET & NOTES
9 C-9
EROSION & SEDIMENTATION CONTROL NOTES
1. All erosion control measures downslope of the proposed work area shall be in place as shown on the erosion control drawings prior to the start of construction.
2. Final grades shall be established as quickly as possible and topsoiled and seeded to provide a turf which will stabilize slopes and prevent erosion.
3. Slopes to remain open during construction shall be protected with mulch and staked tobacco netting.
4. Catch basins and drain inlets downstream of disturbed areas shall be protected throughout the construction period and until all disturbed areas are thoroughly stabilized.
5. Soil stockpiles shall not be allowed on steep slopes, in drainage swales or in wetland areas. Soil stockpiles shall be surrounded with silt fencing and seeded.
6. Erosion control measures shall be inspected after each rainfall and shall be cleaned, repaired or replaced as required.
7. The Village's wetland consultant, engineer, or a N.Y.S.D.E.C. field representative may require additional erosion control measures if deemed appropriate to mitigate unforeseen siltation and erosion of disturbed soils.
8. Concrete truck washouts and soil stockpiles shall be located a minimum of 100 feet from a watercourse and shall be contained with adequate sediment and erosion controls.
9. Heavy equipment operation in the water is prohibited. With backhoes and similar heavy equipment, the bucket may enter the water.
10. Dewatering within the cofferdam shall be performed to minimize siltation and turbidity. Water taken from the coffered area shall be passed through settling basins, filter material, or other accepted devices to prevent the discharge of turbid water into the river. Water being returned to the river shall have a concentration of suspended solids no greater than normal background levels present in the waterbody.
11. Only watertight or waterproof forms shall be used. Wet concrete shall not be poured to displace water within the forms.
12. Any temporary cofferdam shall be constructed of materials such as sheet piling, sandbags, or clean gravel that will not contribute to turbidity or siltation of the waterbody.
13. Erosion control blankets must be completely biodegradable material without the use of any plastic in the mesh.
Degradable, photodegradable, UV-degradable, oxo-degradable, or oxo-degradable plastic netting (including polypropylene, nylon, polyethylene, and polyester) materials are not permitted.
14. The Contractor shall only perform work that can be completed and stabilized in the same day so as to avoid excess exposed soils.
PHASE 2
FAIR STREET
M A
T C
H L
IN
E
(T H
IS
S
H E
E T
DRAINAGE STRUCTURE
TO BE REMOVED
STORM PIPE TO
BE REMOVED
CHAIN LINK FENCE
TO BE REMOVED
DRAINAGE STRUCTURE &
PIPES TO BE REMOVED
CB TO BE REMOVED
STORM PIPE TO
BE REMOVED
D.I. TO BE REMOVED
INACTIVE HYDRANT &
LATERAL TO BE REMOVED
SHOULDER PAV'T. &
SUBBASE TO BE REMOVED
CONC. WHEEL STOPS TO
BE REMOVED, RETURN TO
HIGHWAY DEPT. (TYP.)
BOULDERS AT TURNAROUND
PERIMETER TO BE REMOVED,
STORE FOR REINSTALLATION
4" WATER MAIN
TO BE REMOVED
4" WATER MAIN
TO BE REMOVED
DUGOUT TO BE PROTECTED
SPORTS LIGHT POLE
TO BE RELOCATED
FENCE TO BE REMOVED
STORM PIPES
TO BE REMOVED
POLE TO BE RELOCATED
(OR UTILITY RELOCATED
AND POLE REMOVED)
BLEACHERS TO
BE RELOCATED
WHERE DIRECTED
SIGN TO BE REMOVED
(SEE NOTE BELOW)
TREE TO BE
REMOVED
TREE TO BE
REMOVED (TYP.)
TREES & SHRUBS WITHIN EASEMENT
TO BE REMOVED (NOT ALL TREES ARE
GUARANTEED TO BE SHOWN HEREON)
PORTION OF ASPHALT
CURB TO BE REMOVED
MAILBOXES TO BE
RELOCATED AS
DIRECTED BY ENG'R.MAILBOX TO BE
RELOCATED AS
DIRECTED BY ENG'R.
PAV'T. TO BE REMOVED
5 5
EXIST. PROPERTY LINE
EXIST. EASEMENT LINE
EXIST. CONTOUR LINE
EXIST. SPOT ELEVATION
EXIST. WATER MAIN
EXIST. WATER VALVE
EXIST. FIRE HYDRANT
EXIST. SANITARY SEWER MAIN
EXIST. SANITARY MANHOLE
EXIST. CATCH BASIN / DRAIN INLET
EXIST. STORM PIPE
EXIST. UTILITY POLE
LEGEND
EXIST. OVERHEAD WIRE(S)
EXIST. CHAIN LINK FENCE
EXIST. PROPERTY LINE
EXIST. EASEMENT LINE
EXIST. CONTOUR LINE
EXIST. SPOT ELEVATION
EXIST. WATER MAIN
EXIST. WATER VALVE
EXIST. FIRE HYDRANT
EXIST. SANITARY SEWER MAIN
EXIST. SANITARY MANHOLE
EXIST. CATCH BASIN / DRAIN INLET
EXIST. STORM PIPE
EXIST. UTILITY POLE
LEGEND
EXIST. OVERHEAD WIRE(S)
EXIST. CHAIN LINK FENCE
FAIR STREET
M A
T C
H L
IN
E
(T H
IS
S
H E
E T
STORM PIPES
TO BE REMOVED
SHOULDER PAV'T. &
SUBBASE TO BE REMOVED
SIGN TO BE REMOVED
(SEE NOTE BELOW)
15 MPH SIGN TO
BE RELOCATED
SIGN TO BE
REMOVED
TREE TO BE
REMOVED
DIRECTED BY ENG'R.
Scale 1" = 20'
20 0 604020
H :\C ol d
Sp rin g\
-F ai r S t C ul ve rt\ de m ol iti on
\d em ol iti on -1
3.
dw g | 4
/9 /2
:3
7:
P M
DRAWING NO. SHEET NO.
OF
DATESCALE
PROJECT
TITLE
DATEREV.
Putnam Business Park 1689 Route 22 Brewster, New York 10509 Tel: (845) 279-2220ENGINEERING, P.C.
JAMES J. HAHN
DESCRIPTION
3/14/24
PROPOSED
FAIR STREET
DRAINAGE & SIDEWALK
IMPROVEMENT PROJECT
VILLAGE OF COLD SPRING, PUTNAM COUNTY, NEW YORK
UNAUTHORIZED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .