Addendum No. 2 to Request for Proposal – Well Preventative Maintenance

This Addendum No. 2, issued by Long Beach Water Department (LBWD) on September 23, 2022, modifies sections 4.2.1 through 4.2.5 of the original Request for Proposal for well preventative maintenance services. The project involves designing, installing, operating, and maintaining a preventative maintenance system at the Citizens 9 well located on Clark Avenue, approximately 550 feet south of E. Conant Street, in Long Beach, California. The proposed system must enable routine preventative well maintenance without requiring pumping equipment removal and must include cleaning and treatment of the well screen and surrounding water-bearing formation, addressing incrustation and biofouling. Work must comply with American Water Works Association (AWWA) A-100 and National Science Foundation (NSF) 60 & 61 standards. The routine maintenance work shall be performed with minimal well downtime over a few working days, compared to 90 to 120 days for traditional rehabilitation methods. Well production must maintain less than 3% annual yield loss for a minimum of five years, with waiver conditions for recovery variation available under certain circumstances. The proposer must demonstrate extensive, verifiable experience performing similar work for utilities and large public agencies with comparable system complexity.

The deliverables include a comprehensive report detailing techniques, findings, pre-treatment and post-treatment video surveys, rehabilitation work completed, and test results, to be submitted electronically within ten working days of treatment completion. The proposer must provide two digital copies of the video survey on DVD format and four copies of video summary sheets with snapshots within 48 hours of survey completion, all sand test records, and continued routine maintenance services using the installed system. Performance acceptance criteria require well-specific capacity restoration to approximately 10 gallons per minute per foot at the recommended 1,000 gallons per minute pumping rate after the first maintenance service, with subsequent services maintaining current capacity with less than 3% variation. If the well does not achieve reasonably acceptable yields and does not meet waiver conditions following any maintenance service during the contract term, the proposer must conduct another maintenance service at its own cost within 30 calendar days. The proposer is responsible for all system maintenance and repair expenses throughout the contract duration and must supply all necessary labor, materials, equipment, and services. All video surveys must include automatic depth indication at one-foot intervals, pre-disinfected camera equipment, and must be conducted with LBWD Engineer staff approval and presence. Proposers must acknowledge receipt of this addendum by signing and returning it with their proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 23, 2022

NOTICE TO PROPOSERS

ADDENDUM NO. 2

The following changes and/or additions shall be made to the original Request for Proposal (RFP) for Well preventative Maintenance. Please acknowledge receipt of this addendum by signing and returning with your proposal.

As of September 23, 2022:

The following are additions to the Request for Proposal document:

1. Sections 4.2.1- 4.2.5 under section 4.2 Task 2: Non-Optional Work on pages 16 -19 shall be modified to the following:

4.2 TASK 2: NON-OPTIONAL WORK

4.2.1 The work includes furnishing of all labor, materials, tax, equipment, incidentals, and services for the completion of the project. All work shall be coordinated with the Operations staff at the facility. The materials and procedures used to perform the work shall comply with the American Water Works Association (AWWA) and National Science Foundation (NSF) Standards, which include, but not limited to, AWWA A- 100 and NSF 60 & 61, respectively.

4.2.2 The methods and approach to complete the tasks listed below shall be provided in the proposal. Any procedure must be reviewed and acceptable to the LBWD Engineer staff prior to performing and coordinating the work.

4.2.3 The proposed maintenance system shall include, but not be limited, to the following:

• Design, install, operate, and maintain a system at the well that will allow for routine preventative well maintenance without requiring pumping equipment removal. The well head may be modified, if necessary, to implement the system. The Proposer shall clearly indicate in their proposal a detailed approach including all necessary measurements and components for the proposed modifications.

• The routine preventative well maintenance work shall include, at the minimum, cleaning and treatment of the well screen and surrounding water bearing formation (i.e., treatment of incrustation and biofouling), and a means of verifying treatment effectiveness through well video surveying. Sand production shall be verified for the well using a Rossum Sand Tester after the work is complete.

• The routine well maintenance work shall be performed with minimal well downtime, preferably over a few working days compared to the duration experienced with traditional rehabilitation methods, i.e., 90 to 120 working days.

• Well production shall be maintained over time, with expected yield loss less than 3% annually for a minimum of 5 years. Under certain circumstances, waiver conditions for recovery variation may apply as indicated in Section 4.2.4.

4.2.4 The Proposer is expected to have extensive, verifiable experience in performing the scope of work for utilities and/ or large public agencies having systems similar in extent and complexity to LBWD. The services provided by the Proposer shall include, but not be limited to the following:

• Furnish all necessary system components that will allow for routine preventive well maintenance; system shall be designed and installed in accordance with all applicable federal, state, and local codes, rules, and regulations. Provide routine and all other necessary services to maintain the well production against lost yield due to well plugging caused by mineral buildup, physical plugging or biological activities and biofouling. The lost yield should be less than 3% annually. Under certain circumstances, waiver conditions for recovery variation may apply as indicated in Section 4.2.4.

• The system shall be implemented on an existing well: Citizens 9 located on Clark Avenue, approximately 550 feet south of E.

Conant Street, in the City of Long Beach, Los Angeles County, California. See Exhibit A for Site Information.

• Before returning the well to service, perform the necessary tests to determine the post-treatment well performance baseline conditions, which include well video surveying without requiring pump and motor removal, monitoring flow rate, static and pumping water levels, and background water quality (i.e., pH, turbidity, etc.) in the discharged water. The well will be returned to service once the LBWD Engineer staff approves the final results, which shall be reviewed based on the followings, but not be limited to:

o Cleanliness of the well screen and surrounding water bearing formation are proven through color, good quality images of well video surveying. The completion and quality of the video survey shall also allow for full inspection of the well structure before and after the treatment. The video survey shall be conducted throughout the entire length of the casing and screen.

❖ The equipment used shall produce a DVD with an automatic depth indication at 1-foot intervals. The beginning and end of the video shall contain the date and well name. The DVD and DVD case shall be labeled clearly with the date and well name.

❖ The camera shall be disinfected prior to being placed in the well. The proposed camera survey shall receive the LBWD Engineer staff’s approval before being performed. Perform survey in the presence of the LBWD Engineer staff and the Proposer’s hydrologist.

❖ Before running the video survey, the Proposer shall run sufficient potable water (in excess of 10,000 gallons) into the well for a period of 12 to 24 hours prior to the video survey to allow for clear viewing of the well structure. Water shall be obtained by the Proposer at the Proposer’s expense. The LBWD Engineer staff must approve the flow rate and injection period.

o If the proposed system involves controlled chemical pressurizing to remove incrustation from mineral deposits or biofouling by the growth of microorganism, well screen and casing structures must remain intact after the maintenance service.

o There is no significant evidence of sand production (5 ppm or less), as confirmed by a standard Rossum sand test in accordance with the manufacturer’s printed instruction.

❖ A constant flow of water should be maintained at

0.5 gallons per minute (GPM) whenever possible over the duration of measuring period.

❖ The inlet shall be located on the horizontal

❖ centerline of the discharge pipe within four (4) pipe diameters of the wellhead.

❖ At the minimum, the Proposer shall keep sand test records including time, system pressure, totalizer reads, turbidity, volume of sand, flow rate of sand tester, and pumping flow rate.

❖ The test can be concluded when sand production is subsided and stable (5 ppm or less).

❖ The additional steps below will be required based on LBWD’s regular monitoring of the well:

✓ Sand measurement shall be conducted over a period of 60 minutes after startup, at the minimum.

✓ Sand content, time, pump discharge rate, system pressure, totalizer reads, and turbidity shall be also recorded every 5 minutes for the first 20 minutes and every 10 minutes for the last 40 minutes.

o The well specific capacity (gpm/ft) is desirably back to its original value (approximately 10 gpm/ft at the recommended pumping rate of 1,000 gpm) after the first maintenance service. For the following routine maintenance services, the well specific capacity is maintained at its current value, with variation being less than 3% compared to previous routine treatment results.

LBWD may allow recovery variation from this requirement if it is determined from the comprehensive report of the work completed review that the variation is not caused by the workmanship and materials used by the Proposer.

o If, after any of the maintenance service to well Citizens 9 during the Agreement term, the well is not back to reasonably acceptable yields and efficiencies as indicated above and is deemed to not meet the waiver conditions for recovery variation by LBWD Engineer staff, the Proposer shall conduct another maintenance service at its own cost and expense within 30 calendar days written report of the initial service.

o The discharge system including piping, ramps, and all other appurtenances for the discharge flow water rate, volume, duration, and quality follow the National Pollution Discharge Elimination System (NPDES) and the Los Angeles County Flood Control District (LACFCD) permits. LBWD will prepare all permit applications, with the assistance from the Proposer as needed.

• Maintain the system at all times over the duration of the service contract, allowing for reasonable wear and tear. The Proposer shall pay all expenses of maintaining and repairing the system to keep it in peak operating condition.

4.2.5 Deliverables:

• Comprehensive report of the work completed, which shall include, but is not limited to, techniques used to evaluate the well performance before and after the routine maintenance, findings from the evaluation, pre-treatment and post-treatment well video surveys, rehabilitation work completed, test results if any, and recommendations for any necessary future work, as applicable. An electronic copy of the report shall be delivered to the LBWD Engineer within 10 working days after the completion of the treatment event.

• A system installed at the Citizens 9 well site that allows for minimally routine well preventive maintenance as defined in Section 4.2.3.

• Continued routine well maintenance services utilizing the above installed system.

• Provide the LBWD Engineer with two (2) digital copies of the video survey in DVD format and four(4) copies of the video summary sheet with snapshots of important features within the well within 48 hours after the completion of the well video survey. These DVD storage media shall be compatible with the Microsoft Media Player.

• Submit all sand test records at the conclusion of the test(s), together with the comprehensive report as indicated in Section 4.2.5.

Please take a moment to review these changes when developing your proposal.

Prepared By: Armando Arzate Date: 23-Sep-22