Addendum #1-Wartmann Interior Painting.pdf

PDF 566 KB Posted

Attached to
PUBLIC ANNOUNCEMENT FOR Wartmann Interior Painting Project ITB-27-075
Solicitation number
ITB-17437
Issued by
St. Johns County, Florida

About this file

This Addendum #1 is issued by the Florida School for the Deaf and the Blind (FSDB) Purchasing Department for the Wartmann Interior Painting Project, ITB-27-075. The solicitation requests interior painting services for approximately 14,500 square feet across two floors of Wartmann Hall, including dormitory rooms, common areas, offices, hallways, stairwells, storage rooms, and restrooms. Work scope includes surface preparation, repairs, and application of specified Benjamin Moore finishes: Scuff-X Eggshell for interior walls, Alkyd Semi-Gloss Enamel for metal frames only (addendum correction: no metal doors included), and Ultra Spec Ceiling Flat White for ceilings. The mandatory pre-response meeting and site visit is scheduled for November 24, 2026 at 11:00 a.m., with bid responses due December 10, 2026 by 1:45 p.m. The estimated contract execution date is January 7, 2027, with the contractor required to be ready for on-site work by May 28, 2027, and final completion no later than June 21, 2027. The warranty period is one year. Award will be made to the lowest responsive and responsible bidder, with intent to award posting by December 14, 2026.

Responses must be submitted in hard copy format (one original, five copies, and one PDF on USB drive) and must include completed appendices for registration, licensure, liability insurance, and required certifications. Minimum liability insurance is $1,000,000. Vendors without a Florida Chapter 489 state license are eligible to submit but may include a Business Tax Receipt as proof of business authorization. All attendees at the site visit must present valid identification at the FSDB Campus Police Center checkpoint and comply with House Bill 21 badging requirements, including third-party background checks by Fieldprint before campus access. The addendum addresses solicitation corrections and provides answers to vendor questions regarding drawings, specifications, project timeline, badging procedures, insurance requirements, and site visit logistics. Small businesses, certified minority business enterprises, and Florida certified veterans business enterprises are encouraged to participate. Respondents are responsible for monitoring the FSDB website and VIP for all amendments and addenda, as failure to comply with published changes may result in proposal rejection.

View the file

Other files

File Type Posted
Wartmann Interior Painting ITB-27-075.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASING DEPARTMENT

207 SAN MARCO AVENUE

ST. AUGUSTINE, FL 32084

PHONE (904) 827-2364

WWW.FSDBK12.ORG

INVITATION TO BID (ITB)

Wartmann Interior Painting Project

ITB-27-075

Addendum #1

Commodity Code(s):

72151300 Painting and paper hanging services 72151302 Commercial Painting Service 72151303 Industrial painting service 73181104 Painting services 86131502 Painting

November 16, 2026

Addendum #1, ITB-27-075 – Wartmann Interior Painting Project

Page | 2

Solicitation Correction

An error was found in Section 3.1.2.5, there are no metal doors for this project.

Submission of Questions and Written Responses

The following questions were submitted by Greg’s Precision Painting LLC:

Q. “Do you have a drawing of the work that needs to be done, specifications and work through date?”

A. “No drawings are provided at this time. A mandatory site visit is scheduled as posted in the Schedule of Events and Deadlines in the solicitation document. Specifications can be found in Section 3, and the time of performance is noted in the sample contract.”

The following questions were submitted by One Painting Solution LLC:

Q. “Please keep us informed of any amendments or addenda issued for this solicitation. Please confirm the response due date as the MFMP notice we received shows a close date of November 24, 2026 while the solicitation detail page shows December 10, 2026, at 1:45PM.”

A. “The solicitation document states in section 2.2.1 that ‘It is the responsibility of prospective Vendors to check the FSDB website and/or VIP for addenda, notices of decision, and other information or clarifications to this solicitation.’ The VIP advertisement closes on November 24, 2026. The bid response due date is December 10, 2026, as noted in the Schedule of Events and Deadlines.”

Q. “The project schedule table lists an estimated start date of January 7, 2027, while Section 3.1.2.1 states that the contractor must be ready, including badging, by May 28, 2027 with completion by June 21, 2027. Could you please confirm which dates govern the project schedule?”

A. “The estimated start date of the contract is January 7, 2027. In the time between contract execution and work start date of May 28th, the vendor must complete the badging process which can take 4-6 weeks. All badging, materials and equipment must be ready to start work on May 28th; no work may start prior to May 28th.”

Q. “The solicitation requires a Fieldprint background-screening form for each employee before entering the campus. Where can we obtain this form, and by when must it be submitted?”

A. “The badging information is available on our website in the main purchasing folder or upon contract execution, the FSDB Contract Manager will provide the vendor with the forms and information.”

Q. “Could you please confirm the minimum liability insurance limits required for the Certificate of Insurance to be included in Tab 1 of the proposal?”

A. “The minimum liability insurance limit is $1,000,000.”

The following questions were submitted by All Florida Colors Painting:

Q. “Section 3.1.1 states approximately 14,500 square feet. Does this figure refer to the building floor plan area or to the total paintable wall and Ceiling surface? Are floor plans or an estimated wall/ceiling square footage available to bidders?”

A. “The square footage listed in 3.1.1 is the building floor plan area. Vendors will be able to see and measure walls as needed on the site visit.”

Q. “Could FSDB provide the approximate number of metal doors and hollow metal frames to be painted?”

A. “There are no metal doors, only metal frames. A floor plan will be provided to all vendors on the site visit.

Painting/staining of wood doors is not included in the scope of this project.”

Page | 3

Q. “What should be entered in the ‘Contractor’s Florida DBPR license number’ field on the appendices? Is a local

Business Tax Receipt acceptable as proof of licensure?”

A. “If no license is required or available, you may leave the line on appendices blank. You may include a Business

Tax Receipt in your response.”

Q. “Please confirm that replies must submitted in hard copy (original, five copies, and USB) as described in Section

4.”

A. “Correct, please follow all directions as noted in Section 4 of the solicitation document.”

Q. “Will Wartmann Hall be unoccupied during the work period (May 28-June 21, 2027), and will both floors be available at the same time? Will an on-site area be provided for material storage and contractor parking?”

A. “Wartmann will be completely unoccupied and both levels will be available during the work period. An area will be provided for material storage and parking during the project.”

The following questions were submitted by JB Handyman Repairs:

Q. “Can you confirm whether a business without a Chapter 489 state license is eligible to submit a response for this interior painting scope? If eligible, what licensing documentation should be included in the response?”

A. “Vendors without a license are eligible to submit a response for this solicitation. Business Tax Receipt may be included but is not required.”

The following questions were submitted by Coast 2 Coast Contractors LLC:

Q. “Will vendors be permitted to bring more than one company representative to the mandatory pre-response meeting and site visit?”

A. “Yes.”

Q. “Will attendees be permitted to take photographs, measurements and notes of the work areas during the site visit?”

A. “Yes. However, photographs cannot include students.”

Q. “Are there any advance registration, identification or other check-in requirements beyond reporting to the FSDB

Campus Police Center Checkpoint on Genoply Street before the scheduled 11:00 AM meeting?”

A. “No. However, all attendees will be required to present valid identification at the checkpoint.”

Q. “The solicitation lists January 7, 2027 as the estimated contract start or execution date, while section 3.1.1 identifies May 28, 2027 as the date the contractor must be ready to begin on-site work, with completion by June 21, 2027. Could FSDB please clarify the anticipated schedule between contract execution and the start of on-site work, including whether any preparatory activities, mobilization, or other obligations are expected before May 28th?”

A. “In the time between contract execution and start of on-site work, the vendor must obtain badging for all staff that will be on FSDB campus for this project. The badging process can take up to 4-6 weeks to complete. Also during this time, the vendor may procure materials, equipment, etc as necessary for the project. Unfortunately, no work may begin before May 28th as the building will be occupied.”

The following questions were submitted by Disare LLC:

Q. “Please provide the current revised solicitation/addenda link so our document register reflects that correction.”

A. “All documents related to this solicitation may be found on our website, Purchasing | FSDB. Click ‘View Active

Competitive Solicitations’ and navigate to the appropriate project folder.”

Page | 4

Q. “Please advise whether floor plans, a room/ceiling schedule, existing ceiling heights, and a count of metal doors/frames are available.”

A. “A floor plan will be handed out to all vendors attending the Site Visit.”

Q. “Please also confirm whether the mandatory pre-response meeting include access to all areas for measurement and whether any advance visitor registration or badging information must be submitted before November 24th.”

A. “Yes, the site visit will allow access to all areas of building and measurements may be taken. No, there is no advance registration or badging required.

The following questions were submitted by Harper’s Soft Pressure Washing and Painting:

Q. “Please provide the complete solicitation, required forms and current addenda for ITB-27-075, Wartmann

Interior Painting, or direct me to the current project folder. Please identify the current schedule, any required visit and contractor qualifications. I am requesting the documents needed to evaluate and prepare a quote; final scope and pricing will follow review. I would also appreciate your general vendor-registration steps for painting and pressure-washing opportunities.”

A. “All documents related to this solicitation may be found on our website, Purchasing | FSDB. Click ‘View Active Competitive Solicitations’ and navigate to the appropriate project folder. Please refer to the solicitation, section

2.5 for the Schedule of Events and Deadlines and section 4.4.4 for the Vendor Qualifications. All documents and instructions are contained in the solicitation document for submitting a response. We do not maintain plan holder or bid lists. Vendors may monitor the project postings on VIP and/or our website.”

No further questions submitted.

File details come from the government source that posted it. Updated .