This document is an Addendum 1 to RFP #24-10-004 issued by the Oconee County Board of Commissioners for Eagle Tavern Repairs. The scope of work includes replacing the roof, repairing the chimney, replacing the shutters, and painting the exterior of the Eagle Tavern building, as well as replacing the roof of the small building behind it. The pre-bid meeting was held on October 30, 2023, and was mandatory for all prospective bidders. All questions must be submitted by November 3, 2023, and will be answered via an addendum posted by November 8, 2023. The bid submission deadline is 10:00 am on November 16, 2023, and the bid opening will be held publicly at the Administrative Building. The County's preference is to award the project to a single contractor.

The document provides details on the pre-bid meeting, including questions and answers related to siding materials, painting requirements, chimney repairs, and hardware reuse. It also includes a sign-in roster of the attendees at the pre-bid meeting. The document does not mention any pricing terms, set asides, incumbents, funding requirements, or other salient financial information.

View the file

Other files

File Type Posted
Bid Tabulation _ Eagle Tavern Repairs.pdf PDF
RFP_ 24_10_04 Eagle Tavern Repairs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Oconee County Board of Commissioners

Addendum 1

DATE:

TO:

FROM:

RE:

November 1, 2023

All Prospective Bidders

Procurement Officer

Addendum 1, RFP# 24-10-004 Eagle Tavern Repairs

The following changes are to be incorporated into the solicitation documents dated October 17, 2023. All those receiving this addendum should modify their documents to show the below described changes.

1. Pre-Bid Meeting Minutes/Questions & Answers

2. Pre-Bid Meeting Sign-in Roster

All questions shall be directed to Ms. Jessica Ellis, Procurement Officer via email at ocbids@oconee.ga.us

1. Pre-Bid Meeting Minutes/Questions & Answers

Jessica Ellis opening the meeting. Listed below are notes from the meeting and additional procurement procedures.

The meeting was held on October 30, 2023 at the Eagle Tavern located at 26 N Main Street Watkinsville, Georgia 30677. The meeting began at approximately 10:00 am and ended approximately at 10:40 am.

The bid number, description and timeline were announced.

County Representatives included Bobby Reno Facilities Director and Jessica Ellis Procurement Officer.

The meeting was mandatory and attendance was required to qualify as a respondent.

Any additional questions must be submitted in writing and can be emailed to ocbids@oconee.ga.us. The deadline for these questions is 5:00 pm on November 3, 2023.

Any questions received will be answered vis an addendum posted to the County’s website by 5:00 pm on November 8, 2023.

The deadline for bid submissions is 10:00 am on November 16, 2023. Submissions received after this time will not be accepted. Following that deadline, the bid opening will be held at the Administrative Building in the North High Shoals conference room where all submissions received will be opened publicly and announced out loud.

Bobby reviewed the contract and opened the meeting up to questions.

As listed in the scope of work, we are looking to replace the roof, repair the top portion of the chimney, replace the shutters, and paint the exterior of the building.

Project also includes replacing the roof of the small building behind the Eagle Tavern.

When painting, all nails that are starting to stick out need to be pushed back in.

Any wood siding that is starting to split needs to be replaced.

One spot in particular that will need to be replaced is the threshold on the front door to the left.

Please keep in mind more areas that need to be replaced could be uncovered once the project has started.

Q1: There are areas on the lower part of the building where the siding has been replaced. Do you want us to use the same material for any areas we replace?

A1: The siding will need to be replaced with wood similar to the original. The lower areas were replaced with hardy plank board due to the damp conditions and severity of rot to the original wood.

Q2: Do we need to paint the downspouts and gutters?

A2: No. Those will need to stay white.

Q3: Do the gutters and downspouts need to be replace or can we reuse what is already there?

A3: Per the Scope of Work, gutters and downspouts should be replaced.

Q4: What material do the replacement shutters need to be?

A4: The shutters will be painted but the material should be similar to the current shutters.

Q5: Is the building being repainted the same color it is now?

A5: Yes, that is correct.

Q6: Is the decking and railing included in what should be painted?

A6: Yes, it should be included.

Q7: The scope of work states that the top tier of the chimney is to be repaired. However, there are areas on the lower portion of the chimney that the brick and mortar are starting to crack. Please confirm how much of the chimney should be repaired.

A7: Just the top tier that is leaning on the building. Demo should be taken down to the first step out. The brick and mortar of the remaining parts of the chimney should just be cleaned. Overall, it just needs to match.

Q8: Will this project be awarded to one contractor or multiple?

A8: It is the County’s preference to award all aspects of the project to one contractor.

Q9: What condition do the boards need to be in to be replaced?

A9: Any boards that are split, rotted out or so soft nothing will stick should be replaced.

Q10: Should the hardware on the shutters be saved and reused?

A10: Contractor should attempt to reuse as many of the shutter hardware pieces as possible. Any pieces that are unsalvageable should be replaced with something extremely similar.

Q11: Building should have two coats of paint?

A11: Yes, that is correct.

Requesting Department: Facilities RFP Number: 24-10-004

COMPANY REPRESENTATIVE COMPANY NAME PHONE/EMAIL

(770)777-1733 info@myproroofing.com

(770) 725-9000 greg@garlandconstruction.com

(706) 999-0201 jeff@guttersolutionsforyou.com

(706) 474-2660 stan@concreteconstructorsinc.com

(706) 338-7226 donwterry@gmail.com

(706) 254-9478 est@baynedg.com bryce@baynedg.com jason.hairston@smithandco.net jthorpe@certapro.com

(303) 653-6884 connor.thomas@us_belfor.com

(706) 340-2377 sam@missionconstructionco.com projectmanager@yanoverconstruction.com andres@cgscontractors.com ocbids@oconee.ga.us breno@oconee.ga.usBobby Reno

John Thorpe

Jason Hairston

Jessica Ellis

Connor Thomas

Marcelo Sanchez

Andres Villa

Sam Perry

Jeffrey Cope

Brett Williams

Bryce Hawes

Jodi Merrick

Don Terry Jr.

Pre-Proposal Meeting Sign-In Roster

Juan Reyes

Greg Malcom

Date/Time: October 30, 2023 @ 10:00 AM Description: Eagle Tavern Repairs

PLEASE PRINT INFORMATION & ATTACH A BUSINESS CARD

Pro Roofing & Siding

Garland Contractors

Smith & Co

CertaPro Painters

Belfor Property Restoration

Gutter Solutions

Concrete Constructors

Christ Centered Construction

Bayne Development Group

Bayne Development Group

Mission Construction

Yanover Construction

CGS

Oconee County Finance

Oconee County Facilities

Meeting Minutes - Eagle Tavern Repairs
Sign in Sheet - Eagle Tavern Repairs

File details come from the government source that posted it. Updated .