Addendum 1 Questions and Responses.pdf

PDF 211 KB Posted

Attached to
Surface and Groundwater Sampling for PFAS
Solicitation number
RFP FAAA 2027000015 2
Issued by
Denver County, Denver City, Colorado

About this file

This is an Addendum 1 containing questions and responses for Colorado Department of Public Health and Environment (CDPHE) RFP 2027000015 for Surface and Groundwater Sampling for PFAS. The solicitation seeks a single contractor to provide comprehensive PFAS sampling services across Colorado, including sample collection, laboratory coordination, data reporting, and technical support for the state's PFAS grant program. Services encompass multiple sample matrices including treated and untreated drinking water, wastewater, groundwater, surface water, biosolids, soil, and biota samples. The contractor must demonstrate capacity to process a minimum of 1,000 samples annually (combined field and quality control samples) and maintain the ability to service sampling locations statewide, though subcontractors may provide regional support. The initial contract term runs from April 1, 2027 through March 31, 2028, with CDPHE retaining the option to renew for up to four additional one-year periods, not to exceed five years total. Historical sampling has included over 200 public water system samples annually alongside wastewater and surface water sites, though overall sample volume is expected to decrease as initial PFAS rule monitoring requirements are fulfilled, with anticipated distribution of more than 50% public water systems, 25% surface water, and 25% split among remaining matrices.

The contract will be structured as a firm-fixed-price agreement with unit pricing based on regions, per-sample basis, and hourly rates for services provided; CDPHE will not provide a cost template and requests that offerors submit itemized budgets addressing sample analysis, hourly rates for collection and reporting, mileage, supplies, support services, and administrative costs. The contractor is responsible for selecting, subcontracting with, and paying an appropriately accredited laboratory for all required analyses, with all laboratory analysis and sampling material costs covered under the contractor's proposed pricing. Annual budget allocations are $500,000 for Years 1 and 2, $200,000 for Years 3 and 4, and $100,000 for Year 5, representing expenditure caps rather than guaranteed minimum work volumes. CDPHE's preferred analytical method is finalized EPA Method 1633 for all samples except finished drinking water (which uses EPA Method 537.1), and the contractor bears all costs associated with analytical services, sample shipping, chain-of-custody management, and re-analysis of improperly packaged samples. The incumbent contractor is eligible to reapply, and funding derives entirely from the Colorado Senate Bill 20-18 Cash Fund. Evaluation will award 40 points for experience and qualifications, 40 points for work plan, 20 points for budget, and 10 points for references, totaling 110 possible points.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1

COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT

SOLICITATION QUESTIONS AND ANSWERS

Solicitation #: RFP 2027000015 Solicitation Name: Surface and Groundwater Sampling for PFAS

Vendor Question #1: Section V.B: The RFP states that “the Offeror and any potential subcontractors, shall meet all the requirements listed below.” Does each subcontractor, such as a subcontracted analytical laboratory, need to meet every item in Section V.B, or can the Offeror’s team meet the requirements together?

CDPHE Answer #1: The offeror can meet the requirements utilizing subcontractors and does not need to meet all of them as an individual entity.

Vendor Question #2: Section V.B.5: Modified Method 537 is listed for groundwater and surface water.

Will CDPHE accept EPA Method 1633 for groundwater and surface water samples?

CDPHE Answer #2: CDPHE’s preferred method for all samples other than finished drinking water is finalized Method 1633. The preferred method for drinking water is 537.1.

Vendor Question #3: Section V.B.5: Which laboratory accreditations, if any, does CDPHE require for each method and matrix?

CDPHE Answer #3: CDPHE will not contract directly with an analytical laboratory. The contractor is responsible for selecting, subcontracting with, and paying an appropriately accredited/certified laboratory, for the applicable PFAS analytical methods, to perform all required sample analyses. All laboratory analysis and sampling material costs must be covered by the contractor under the awarded contract.

Vendor Question #4: Can CDPHE share an estimated number of samples per year by matrix (treated drinking water, residential wells, wastewater, groundwater, surface water, and biosolids)?

CDPHE Answer #4: Exact sample counts cannot be predicted in advance, as annual sampling depends on grant recipient proposals and evolving department priorities. Historically, the program has collected over 200 public water system samples annually alongside several wastewater and surface water sites. Moving forward, overall sample volume is expected to decrease as initial monitoring requirements under the PFAS rule are fulfilled. However, the distribution across sample matrices should remain consistent with previous years: more than 50% public water systems, 25% surface water, and 25% split among remaining matrices for special projects.

Vendor Question #5: Section V.B.3: Can CDPHE share the PFAS grant program data submittal templates and the required EDD format before proposals are due?

CDPHE Answer #5: CDPHE has provided the data reporting template under the Data reporting tab on the PFAS grant program webpage: https://cdphe.colorado.gov/pfas-projects.

Vendor Question #6: RFP C.2.c. and Exhibit C PA #2 Sub-Activity 6 - Can CDPHE provide more detail and an example of what is required for this requirement?

CDPHE Answer #6: The online inquiry form is a tool that the contractor can use to interface with the grant recipients to obtain additional information (e.g., location, contacts, scheduling) as needed.

Vendor Question #7: RFP V.B.5. and 6. - Shouldn’t EPA 1633A be used for all non-drinking water samples as is specified in Exhibit C PA #3 Standards and Requirements 2. and 3.?

CDPHE Answer #7: Please refer to question #2 above.

Vendor Question #8: The media/sample sources listed in the Primary Activity section of the Draft SOW do not match those in the RFP (for example Soil and Biota). Can you please clarify the sample media list?

CDPHE Answer #8: The potential sample matrices include: finished drinking water from public water systems, finished drinking water from private wells, wastewater, groundwater, surface water, biosolids, soil, biota (e.g., fish tissue).

Vendor Question #9: RFP, Section 4, Budget: The format of the proposal budget is unclear. The list of proposed costs initial imply that per unit costs are all that is needed, but then more ambiguous terms are used such as, items f, g, and h. Will CDPHE provide a cost template and more detailed direction for how the cost proposal should be structured?

CDPHE Answer #9: CDPHE will not provide a cost template, as there are too many variable factors in the project scope (e.g., the number of samples collected, hours required for sample collection, and hours required for data reporting).

The program requests that budgets be submitted using unit costs such as sample analysis costs, hourly labor rates, and supply costs. Offerors shall submit their own itemized budget schedule making sure to address the following:

a. Sample analysis

b. Hourly rate for sample collection

c. Hourly rate for data reporting

d. Hourly rate for additional items in the Draft Statement of Work

e. Mileage rates

f. Supplies provided to grant program participants

g. Support services as requested

h. Administrative costs

A firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractor's cost experience in performing the contract. CDPHE prefers unit pricing based on regions and per sample and sample event basis and cost per hour based on services provided.

Vendor Question #10: Estimated Annual Sampling Quantities - Section III, SOW Work Plan, Primary Activities #2 and #3, Pages 2–4 Please provide the estimated annual number of samples anticipated under this contract, broken down by sample type, including treated drinking water, residential wells, wastewater, groundwater, surface water, biosolids, soil, and biota. Please also identify anticipated quality control samples, including duplicates, blanks, and other required samples.

CDPHE Answer #10: Please refer to question #4 above. A Field Reagent Blank (FRB) for treated drinking water using EPA Method 537.1 is required to be collected with each sample set and it must be analyzed by the laboratory only when target PFAS are detected at or above the reporting limit. Other quality control samples may be collected based on the grant recipient proposals.

Vendor Question #11: Geographic Distribution of Sampling Locations - Section III, SOW Work Plan, PA #2, Pages 2–3 Please identify the anticipated geographic distribution of sampling locations throughout Colorado, including the estimated number of sampling sites and whether any locations are expected to require overnight travel. This information is necessary to establish appropriate labor, transportation, and mobilization costs.

CDPHE Answer #11: Please refer to question #4 above. The program anticipates collecting samples across various matrices statewide, with the highest concentration of sites located in populated areas.

However, the contractor may occasionally be required to travel overnight to access remote regions.

Vendor Question #12: Sampling Frequency and Scheduling - Section III, SOW Work Plan, PA #2, Pages 2– Please clarify whether sampling activities will be conducted on a recurring schedule or assigned individually as grant participant requests are approved. Additionally, please identify the anticipated frequency of sampling events and the minimum advance notification provided to the contractor.

CDPHE Answer #12: Please refer to question #4 above. The program expects both recurring schedules and one-time sample events.

Vendor Question #13: Minimum Sampling Event Quantities - Section III, SOW Work Plan, PA #2, Page 3 Please confirm whether individual sampling assignments may consist of a single sample location or whether CDPHE intends to consolidate sampling activities geographically to minimize mobilization and travel expenses.

CDPHE Answer #13: The program will collaborate with the contractor to consolidate sampling efforts when possible.

Vendor Question #14: Scope of Soil and Biota Sampling - Section III, SOW Work Plan PA #1 and PA #2, Pages 2–3 Please clarify the anticipated requirements for soil and biota sampling, including collection methods, sample types, required equipment, and any specialized qualifications or training. Please also confirm whether these activities are mandatory components of the base contract.

CDPHE Answer #14: Please refer to question #2 above. Soil and biota sampling are expected to represent a small portion of the overall sample distribution and will be conducted as part of special projects in collaboration with other state agencies. Because these projects are currently undefined, specific sample types, collection methods, and equipment requirements are to be determined (TBD) and will be established jointly with partner agencies prior to implementation. No specialized qualifications or additional training beyond standard field sampling protocols are anticipated for the contractor. While these activities fall within the scope of the base contract, they will be executed on an as-needed basis rather than as a guaranteed or recurring baseline requirement.

Vendor Question #15: Existing Sampling Protocols and QAPP - Section III, SOW Work Plan, PA #1 and PA #2, Pages 2–3 The SOW requires the contractor to develop sampling procedures while also complying with CDPHE-provided sampling protocols and the Quality Assurance Project Plan (QAPP). Please provide the existing CDPHE sampling protocols and QAPP and clarify whether the contractor is expected to develop entirely new procedures or adapt existing CDPHE-approved procedures for the specified sample types.

CDPHE Answer #15: The contractor should reference any previous PFAS related QAPP/SAP that they have developed to meet the project expectations and contractor qualifications. The contractor will be expected to refine any existing QAPP/SAPs to meet the project needs which will be provided after an award is made.

Vendor Question #16: Sampling Equipment Responsibilities - Section II.D and Section III, SOW, PA #2, Pages 1–3 The SOW requires the contractor to provide sampling supplies but specifically excludes pumps, tubing, ice, and certain sampling equipment from the definition of sampling supplies. Please clarify which party is responsible for providing and paying for sampling pumps, tubing, field instrumentation, ice, and other equipment necessary to complete sampling activities.

CDPHE Answer #16: All other materials needed to conduct specialized sampling should be provided by the grant recipient or the program participant. CDPHE may authorize the purchase of specialized materials if necessary.

Vendor Question #17: Sample Collection by Grant Participants - Section III, SOW, PA #2, Page 3 Please provide the estimated percentage of samples anticipated to be collected directly by grant participants versus those requiring contractor personnel to perform on-site sample collection.

Additionally, please confirm whether the contractor is responsible for training grant participants or solely providing written sampling instructions and technical assistance.

CDPHE Answer #17: Please refer to question #4. The program anticipates that the majority of grant participants will only require written sampling instructions, with occasional hands-on field assistance needed for select entities.

Vendor Question #18: Access to Sampling Locations - Section III, SOW Work Plan, PA #2 and PA #4, Pages 2–4 Please confirm that CDPHE or the participating entity will be responsible for securing property access, obtaining necessary permissions, and coordinating with facility representatives prior to contractor mobilization.

CDPHE Answer #18: The contractor is responsible for securing site access and coordination.

Vendor Question #19: Laboratory Selection and Contracting - Section III, SOW Work Plan, PA #3, Pages 3–4 Please clarify whether CDPHE will designate and contract directly with the analytical laboratory or whether the contractor is responsible for selecting, subcontracting, and paying the laboratory for all required PFAS analyses.

CDPHE Answer #19:Please refer to question #3 above.

Vendor Question #20: Laboratory Analytical Costs - Section III, SOW Work Plan, PA #3, Pages 3–4 Please confirm whether CDPHE will pay laboratory invoices directly or whether analytical laboratory charges must flow through the contractor’s invoice. If through the contractor, please clarify the required backup documentation and treatment of lab surcharges.

CDPHE Answer #20: Please see question #3 above. The paid invoices provided by the subcontracted lab will be required for backup documentation.

Vendor Question #21: Analytical Methods for Soil and Private Wells - Section III, SOW, PA #3 Standards and Requirements, Page 4 The SOW identifies EPA Method 537.1 for treated drinking water, Modified Method 1633 for groundwater and surface water, and EPA Method 1633 for wastewater, biosolids, and biota. Please clarify the required analytical methods for soil and residential private well samples and whether any additional analytical methods or modifications will be required.

CDPHE Answer #21: Please refer to question #2 above.

Vendor Question 22: Laboratory Turnaround Requirements - Section III, SOW, PA #3, Page 3 Please identify the standard laboratory turnaround time required for routine samples and the anticipated turnaround time for expedited or emergency samples. Additionally, please confirm whether expedited laboratory fees will be reimbursed separately or must be included in the contractor’s proposed pricing.

CDPHE Answer #22: Standard commercial laboratory turnaround times are acceptable for all routine sampling events; vendors should specify their subcontracted laboratory's standard and expedited turnaround times in their proposal. CDPHE will indicate when an emergency rush is required for specific samples. All expedited laboratory fees must be accounted for within the contractor’s proposed pricing and will come out of the existing contract budget rather than separate supplemental reimbursement.

Vendor Question #23: Sample Shipping and Chain of Custody - Section III, SOW, PA #3, Page 3 Please clarify whether the contractor is responsible for all shipping, courier services, sample receipt, and chain-of-custody management for samples collected by both contractor personnel and grant participants. Please also confirm whether shipping costs and any additional costs associated with improperly packaged or rejected samples will be reimbursable.

CDPHE Answer #23: Yes, the contractor is responsible for all shipping, courier services, sample receipt coordination, and chain-of-custody management for samples collected by both contractor personnel and grant participants. The contractor must cover all analytical, shipping, sampling material, and incidental costs within their contracted pricing structure. Costs associated with re-shipping or re-analyzing sample kits improperly packaged, labeled, or rejected due to grant participant error are reimbursable under the established contract budget.

Vendor Question #24: Analytical Reporting Templates - Section III, SOW, PA #5, Pages 4–5 Please provide the required CDPHE analytical reporting templates, including electronic data deliverable formats, required fields, and any database upload requirements. Please also clarify whether the contractor is responsible for interpreting analytical results or solely compiling and distributing laboratory-generated data.

CDPHE Answer #24: Please refer to question #5. The contractor will be responsible for compiling and distributing results and only interpreting collected data in their annual report.

Vendor Question #25: GPS and Location Data Requirements - Section III, SOW, PA #5, Page 5 The SOW requires sample location GPS coordinates accurate within 15 meters. Please confirm whether GPS coordinates obtained through standard mobile devices are acceptable or whether specialized GPS equipment is required. Additionally, please clarify who is responsible for obtaining location data when samples are collected directly by grant participants.

CDPHE Answer #25: Standard mobile devices are acceptable when collecting GPS information. When samples are collected the grant participant they are responsible for GPS information collection

Vendor Question #26: Online Grant Participant Inquiry Form - Section III, SOW, PA #2 and Section IV, Pages 3 and 6 Please clarify whether the required online-compatible grant participant inquiry form is intended to be a simple electronic form or a hosted, interactive web-based application. Please also confirm whether the contractor is required to host, maintain, and provide ongoing technical support for the form throughout the contract term.

CDPHE Answer #26: The online inquiry form is intended to be a simple electronic form. The contractor is responsible for updating the form and maintaining the link.

Vendor Question #27: Annual and Final Reporting Requirements -Section IV, SOW, Deliverable Schedule, Page 6 Please provide the required format, content, and level of detail for annual and final project reports.

Additionally, please clarify whether the annual report due August 15 is intended to cover the preceding state fiscal year ending June 30.

CDPHE Answer #27: CDPHE will collaborate with the contractor each year to determine the format of the annual report. The program expects the following to be included each year on the report: number of samples, sample matrices, and results. Each annual report should include data collected between July 1st and June 30th.

Vendor Question #28: Emergency Sampling Response Requirements - Section III, SOW, PA #6, Page 5 Please clarify whether the one-week emergency mobilization requirement means seven calendar days or five business days, whether weekends/holidays may be required, and whether premium labor and expedited laboratory charges may be separately invoiced.

CDPHE Answer #28: The one week emergency requirement is referring to seven calendar days. CDPHE does not expect work to be completed during weekends or holidays. CDPHE will indicate when an emergency rush is required for specific samples. All expedited laboratory fees must be accounted for within the contractor’s proposed pricing and will come out of the existing contract budget rather than separate supplemental reimbursement.

Vendor Question #29: Public Outreach and Notification Responsibilities - Section III, SOW, PA #4, Page Please clarify the extent of the contractor’s responsibilities for outreach to private well owners and notification of at-risk populations. Specifically, please confirm whether CDPHE will prepare and approve all public health notifications and exposure-reduction recommendations, with the contractor providing administrative and logistical assistance only.

CDPHE Answer #29: CDPHE will assist in drafting reporting language that addresses health concerns and exposure reduction. The contractor will be responsible for the delivery of this information along with sample results.

Vendor Question #30: Contract Pricing Structure - Section III and Section VII, Pages 2–10 Please clarify which cost categories CDPHE expects to be separately priced, including sample collection, analytical testing, reporting, mobilization, supplies, and administrative support, and whether all categories must be included in the budget narrative. (The payment mechanism is addressed separately in RFI-25.)

CDPHE Answer #30: Please refer to question #9 above.

Vendor Question #31: Reimbursement of Travel and Mobilization Expenses – RFP Section VII.A, Pages 7– Please clarify which travel expense categories (mileage, lodging, meals, vehicle charges, and shipping) are allowable as separate reimbursements, and identify applicable reimbursement caps or documentation requirements.

CDPHE Answer #31: The offeror may separate travel line items into specific categories. Due to the dynamic nature of this contract there are no identifiable caps for specific categories. Invoice documentation for travel should include standard supplemental documentation (e.g., receipts and hours logged).

Vendor Question #32: Contract Duration and Renewal Pricing - Section VII.D, Page 10 Please confirm the permitted total contract duration and whether the extension provisions in Exhibit C apply to the initial term specified in the RFP. (Renewal-year rate adjustment mechanics are addressed separately in RFI-41.)

CDPHE Answer #32: The anticipated initial term of the contract is April 1, 2027 to March 31, 2028.

CDPHE may renew the agreement for up to four (4) additional one (1) year periods, not to exceed five

(5) years total. The extension provisions in Exhibit C apply to the initial term.

Vendor Question #33: Reporting Deadline and Contract Document Corrections - Section IV, Page 6, and Section VII.B, Page 9 The Deliverable Schedule references analytical data being received by “HDR” rather than the contractor. Additionally, the Deliverable Acceptance Process contains an incomplete notification period identified as “[insert number(##)].” Please confirm that the reference to HDR should be replaced with “Contractor” and identify the intended notification period for deficient deliverables.

CDPHE Answer 33: The RFP documentation has been updated to reflect new changes. Modified Exhibit C Draft Statement of Work.

Vendor Question #34: Fixed-Price Contract versus Unit-Rate Payment - RFP Sections V.C (p. 6), VI.B.4

(p. 8) The RFP describes a fixed-price contract while requesting hourly and unit rates. Please confirm whether payment will be based on actual quantities at fixed unit rates, fixed task-order prices, or a single lump-sum amount regardless of quantities.

CDPHE Answer #34: A firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractor's cost experience in performing the contract. CDPHE prefers unit pricing based on regions and per sample and sample event basis and cost per hour based on services provided.

Vendor Question #35: Annual Budget Allocation and Guaranteed Work - RFP Section IV.B (pp. 4–5) Please clarify whether the annual budget allocations are expenditure ceilings or projected spending and whether CDPHE guarantees any minimum annual dollar value or volume of work.

CDPHE Answer #35: The annual budget allocation is an expected cap for each project year. This does guarantee a minimum volume of work.

Vendor Question #36: Compensation for Additional Services – RFP Section V.C (p. 6) Please clarify the authorization and compensation process for additional consultations, data requests, and unforeseen services outside an approved sampling assignment, including whether written task authorization is required.

CDPHE Answer #36: CDPHE will indicate through written instruction when an emergency rush is required for specific samples. All expedited laboratory fees must be accounted for within the contractor’s proposed pricing and will come out of the existing contract budget rather than separate supplemental reimbursement.

Vendor Question #37: Regional Rate Differentials - RFP Section VI.B.4 (p. 8) Please confirm whether bidders may propose distinct hourly labor rates and travel-zone pricing for different Colorado regions, separate from the mobilization and reimbursable expense categories addressed elsewhere.

CDPHE Answer #37: Yes, Offerors may propose regional pricing.

Vendor Question #38: Minimum Sample Processing Capacity - RFP Section V.B.7 (p. 6) Does the minimum capacity to process 1,000 samples apply per year, over the initial contract term, or within another defined period? Please specify whether field and laboratory QC samples count toward this threshold.

CDPHE Answer #38: The Offeror must have the capacity to process 1,000 samples (combined field and QC samples) over an annual period.

Vendor Question #39: Subcontractor Analytical Qualifications - RFP Sections V.B (p. 6), VI.B.2 (p. 7) Please confirm whether the prime offeror may satisfy analytical-method experience and sample-processing capacity requirements entirely through a qualified subcontracted laboratory.

CDPHE Answer #39: Please refer to question #1 above.

Vendor Question #40: Conflicting Analytical Methods - RFP Section V.B.5 (p. 6); Exhibit C, PA #3 (p. 4) The RFP lists Modified Method 537 for groundwater and surface water, while Exhibit C specifies Modified Method 1633. Which method controls for proposal compliance and pricing?

CDPHE Answer #40: Please refer to question #2 above.

Vendor Question #41: Three-Year PFAS Experience Requirement - RFP Section V.B.3 (p. 6) Must the prime contractor independently demonstrate three years of PFAS sampling and QA/QC planning experience, or may experience be demonstrated collectively with proposed subcontractors?

CDPHE Answer #41: Please refer to question #1 above.

Vendor Question #42: Prior CDPHE Program Experience - RFP Section V.B.3 (p. 6) Is prior direct participation in CDPHE’s PFAS grant program mandatory, or will comparable PFAS grant support, QAPP, and regulatory data-submission experience satisfy the stated familiarity requirement?

CDPHE Answer #42: Applicants are not required to have direct participation in CDPHE’s PFAS grant program. However, Section V.B.3 (page 6) does call for a minimum of 3 years of experience with PFAS sample collection, QAPP planning, and to be familiar with the PFAS grant program structure and data submittal templates. The additional required documentation for submittals is outlined in Section VI.B.2.a-d (page 7).

Vendor Question #43: Regional Proposal Responsiveness - RFP Sections V.B.2 (p. 6), VI.B.3–4 (pp. 7–8) Please confirm whether an offer limited to identified Colorado regions is fully responsive and eligible for award despite the stated statewide collection capability requirement.

CDPHE Answer #43: The offeror must have the ability to sample across all regions in Colorado.

Vendor Question #44: Single versus Multiple Awards - RFP Section VII.A (p. 8) Does CDPHE anticipate one statewide award or multiple awards by region or specialty? If multiple awards are possible, how will assignments be allocated among contractors?

CDPHE Answer 44: An award will be made to a single Offeror. CDPHE will allow vendors to use subcontractors to perform the scope of services.

Vendor Question #45: Emergency Coverage Outside Proposed Region - RFP Section IV.C.7 (p. 5) For a contractor proposing regional coverage, must emergency sampling be available outside its proposed service region, or is the emergency obligation limited to the awarded region?

CDPHE Answer #45:The offeror must be able to provide similar services to all regions in Colorado.

Vendor Question #46: Evaluation Factor Weighting - RFP Section VII.C (p. 9) Please provide the point values or relative weighting, if established, for experience/qualifications, work plan, budget, and references.

CDPHE Answer #46: Total possible points is 110.

Section I. Experience and Qualifications Summary 40 points Section II. Work Plan 40 points Section III. Budget 20 points Section IV. References 10 points

Vendor Question #47: Common Pricing Evaluation Scenario - RFP Sections VI.B.4 (p. 8), VII.C.4 (p. 9) Will CDPHE provide a common hypothetical mix of sample quantities, locations, and service hours for evaluating competing prices? If not, how will unlike rate schedules be normalized for comparison?

CDPHE Answer #47: Please review question #4 above.

Vendor Question #48: Standard Pricing Worksheet - RFP Section VI.B.4 (p. 8) Will CDPHE issue a required pricing worksheet or may offerors submit their own itemized budget schedule? Please identify any required pricing format or unit conventions.

CDPHE Answer #48: Please refer to question #9 above.

Vendor Question #49: Accessibility of Technical Deliverables - RFP Section V.A (p. 6); IX.B.2 (pp. 11– 12) Do WCAG Level AA and Section 508 requirements apply to laboratory PDFs, GIS maps, spreadsheets, and other technical deliverables? Will CDPHE supply compliant reporting templates?

CDPHE Answer #49: No, CDPHE will compile technical data internally and ensure accessibility standards are met before presenting the information to the public.

Vendor Question #50: Renewal Rate Adjustment Mechanism - RFP Section IV.A (p. 4); Exhibit C, Section VII.D (p. 10) The initial term is specified as April 1, 2027–March 31, 2028. Given the Exhibit C provision for extensions at the same rates, please confirm whether renewal-year adjustments or escalation provisions may be proposed and, if so, how they must be documented.

CDPHE Answer #50: Rate adjustment can be proposed and may be considered as an amendment to the contract when necessary.

Vendor Question #51: Contract Exhibit Identification - RFP Sections VIII.B (p. 10), IX.B.10 (p. 13) Section VIII identifies Exhibit B as the contract template, while Section IX refers to a draft contract in Exhibit D. Please identify the controlling contract exhibit and confirm whether contract redlines are required with the proposal or only if changes are requested.

CDPHE Answer #51: Exhibit B is the Colorado Personal Services Contract Template. Redlines are not required to be submitted with the submission of the proposal but we do encourage vendors to have someone review the contract prior to submission. The contract template is owned and managed by the Office of the State Controller and most redlines will have to be approved by that office, not someone at CDPHE.

Vendor Question #52: For this RFP our lab would be great for analyzing samples. However, we don’t perform actual sampling services which kind of excludes us from submittal. Is there any chance you guys can get personnel to sample if we can provide instructions for the sampling? If that is acceptable how would you want us to word this in our submittal?

CDPHE Answer #52: The Offeror must be able to provide sample services as a part of this contract.

Vendor Question #53: RFP, Section V, Subsection B – The RFP references experience using Modified EPA Method 537 for PFAS analysis of groundwater and surface water samples. Given that EPA Method 1633A is the current EPA multi-matrix method specifically developed for PFAS analysis in environmental waters and is widely recognized as the preferred method for groundwater and surface water applications, will experience and analytical capability using EPA Method 1633A be considered an acceptable equivalent for meeting this requirement?

CDPHE Answer #53: Please review question #2 above.

Vendor Question #54: RFP, Section V, Subsection B – Is there a breakdown of how many samples, per matrix are expected to be taken per year or rough estimate?

CDPHE Answer #54: Please refer to questions #4 above.

Vendor Question #55: SOW, Primary Activity #1 – The SOW includes biota PFAS sampling requirements.

Can the State provide additional details regarding the specific biota anticipated for sampling (e.g., fish tissue, macroinvertebrates, aquatic plants, wildlife tissue, etc.) and the expected sample sizes that will be taken?

CDPHE Answer #55: Please refer to question #4 above.

Vendor Question #56: SOW, Primary Activity #3 – The SOW indicates the contractor shall have groundwater and surface water samples analyzed using Modified Method 1633. The laboratories regularly utilize Final Method 1633A for analysis of PFAS. Will this be acceptable in place in of Modified Method 1633 mentioned in this requirement?

CDPHE Answer #56: Please refer to question #2 above.

Vendor Question #57: Although Section VII.A of the RFP states that award will be made to a single Offeror, it also reserves the right to award multiple vendors, and the proposal may offer statewide or regional service. Does CDPHE anticipate considering regional or scope-based awards? If multiple awards are made, how will work and the available budget be allocated?

CDPHE Answer #57: Please refer to question #1 above. An award will be made to a single Offeror.

CDPHE will allow vendors to use subcontractors to perform the scope of services.

Vendor Question #58: Section V.C of the RFP document states that the resulting contract will be “fixed price,” while Section VI.B.4 requests unit/hourly rates for sample analysis, sample collection, data reporting, mileage, supplies, support services, and administrative costs, and Exhibit C permits quantities to be increased or decreased based on established rates. Could you please clarify whether Offerors should propose a fixed total price, a not-to-exceed amount supported by fixed unit rates, or another pricing structure?

CDPHE Answer #58: Please refer to question #9 above.

Vendor Question #59: Also, could CDPHE please also provide example numbers of units that could help Offerors produce comparable bids to one another, such as anticipated quantities by sample matrix and analytical method, estimated contractor-collected versus participant-collected sample volumes, anticipated annual field mobilizations, etc.?

CDPHE Answer #59: Please refer to question #4 above.

Vendor Question #60: Will specialized sampling equipment be required as part of the scope? I.e. auto-samplers or remote monitoring devices?

CDPHE Answer #60: Please refer to question#16 above.

Vendor Question #61: Is the previous incumbent of this contract precluded from this RFQ, or do they have the ability to apply and win again?

CDPHE Answer #61: This RFP is open to everyone, including the incumbent.

Vendor Question #62: Are there formatting requirements (e.g., page count, page size limits, font or margin requirements) for Offerors’ proposals?

CDPHE Answer #62: No, there are no formatting requirements.

Vendor Question #63: Is there a requirement for naming and providing resumes for key staff?

CDPHE Answer #63: No, there is no requirement for naming and providing resumes of key staff. We do encourage vendors to provide the experience and qualifications of personnel when composing their responses for the Experience and Qualifications Summary and Work Plan.

Vendor Question #64: Does the Offeror need to provide project descriptions to demonstrate past experience?

CDPHE Answer #64: Yes, please provide background on how the Offeror meets minimum requirements.

Vendor Question #65: Under Section 6.B.3, the RFP states including a Work Plan. Please clarify if that’s a narrative description of project approach, or if CDPHE is looking for a written Work Plan to include as an attachment.

CDPHE Answer #65: A narrative description can be included to fulfill this requirement.

Vendor Question #66: In Exhibit C, Paragraph IV, the table states the Contractor shall provide analytical data reports to CDPHE and grant participants no later than 20 business days after HDR receives analytical data from the lab. Please clarify HDR’s role on this program.

CDPHE Answer #66: Please refer to question #33 above.

Vendor Question #67: Should third-party data validation be conducted once analytical data reports are received from the lab (i.e., should Contractors plan to complete data validation)?

CDPHE Answer #67: Yes, contractors should expect to complete data validation.

Vendor Question #68: Is this program funded through the grant program or is it funded directly through

CDPHE?

CDPHE Answer #68: The grant program and the awarded contract will be funded through the Senate Bill 20-18 Cash Fund.

Vendor Question #69: Does the hourly rate for sample collection include mobilization/demobilization and travel time?

CDPHE Answer #69: The Offeror may determine if the mobilization/demobilization and travel time are included in the hourly rate or if they are separated into their own line-item. Please refer to question #9 above.

Vendor Question #70: The RFP lists Modified Method 537 for groundwater and surface water, while Exhibit C lists Modified Method 1633. Please confirm which method applies.

CDPHE Answer #70: Please refer to question #2 above.

Vendor Question #71: Exhibit C adds soil and biota sampling, which the RFP does not list. Please confirm whether soil and biota are in scope, and if so, which analytical method the CDPHE expects for each.

CDPHE Answer #71: Please refer to question #2 and question #4 above.

Vendor Question #72: Please list the required PFAS analytes and reporting limits for each method, or confirm whether these will be set with CDPHE after award.

CDPHE Answer #72: Please refer to question #2 above.

Vendor Question #73: Must analyzing laboratories hold any specific certification or accreditation (e.g., Colorado drinking water certification?)

CDPHE Answer #73: Please refer to question #3 above.

Vendor Question #74: Please give historical or anticipated annual sample counts by sample type and the expected split between Contractor-collected and participant-collected samples.

CDPHE Answer #74: Please refer to question #4 above.

Vendor Question #75: Will rate adjustments (e.g., for inflation) be considered at renewal, given that Exhibit C says extensions continue “at the same rates”?

CDPHE Answer #75: Please refer to question #50 above.

Vendor Question #76: Will experience with comparable state or federal PFAS sampling programs and data submittal templates satisfy the requirement to be “familiar with the PFAS grant program structure and data submittal templates?”

CDPHE Answer #76: Please refer to question #42 above.

Vendor Question #77: Will the QAPP be provided for cost estimating purposes for the development of the Work Plan?

CDPHE Answer #77: Please refer to question #15 above.

Vendor Question #78: Is there a page limit for the submittal?

CDPHE Answer #78: Please refer to question #62 above.

Vendor Question #79: Does the State prefer a font and size for our submittal?

CDPHE Answer #79: Please refer to question #62 above.

Vendor Question #80: The RFP mentions a goal of 3% for SDVOSB for all contracts. With the specialized nature of this scope of work, would CDPHE waive this requirement?

CDPHE Answer #80: It is a CDPHE goal and not a requirement of this RFP. Vendors with SDVOSB certification are encouraged to include this information in their proposal.

Vendor Question #81:Section V.C. of the RFP describes the contract as resulting in a "fixed price" contract, while Section VI.B.4 instructs Offerors to submit hourly rates and mileage rates alongside sample analysis and administrative costs. Could CDPHE validate whether pricing should be structured as a firm-fixed-price lump sum, a time-and-materials rate schedule, or fixed unit rates against an estimated quantity?

CDPHE Answer #81: Please refer to Question #9 above.

Vendor Question #82: Section VIII.B.2. of the RFP lists "Exhibit B: Colorado Personal Services Contract Template", whereas Section IX.B.10.a. notes that "A draft Contract is included in Exhibit D to this solicitation". Could CDPHE verify the correct exhibit designation for the draft contract to confirm where redlines should be applied?

CDPHE Answer #82: Exhibit B is the Colorado Personal Services Contract Template. Redlines are not required to be submitted with the submission of the proposal. We do encourage vendors to have someone review the contract prior to submission. The contract template is owned and managed by the Office of the State Controller and most redlines will have to be approved by that office, not someone at CDPHE.

Vendor Question #83: Section III. of Exhibit C Draft Statement of Work, PA#1 and PA#2 list “soil samples” to be collected. PA#3 Standards and Requirements #3 states "The Contractor shall have wastewater, biosolids, biota samples analyzed using EPA Method 1633." Please confirm what analytical method should be used for soil samples.

CDPHE Answer #83: Please refer to question #2 above.

Vendor Question #84: Section VII.B.8. of Exhibit C Draft Statement of Work states “the State will notify the Contractor of the failure or deficiency within [insert number(##)] calendar days of the date the State becomes aware of the failure or deficiency”. Please confirm how many calendar days should be listed under the Notice requirement.

CDPHE Answer #84: Please refer to question #33 above.

Vendor Question #85:Will CDPHE designate an analytical laboratory, or will the contractor be responsible for selecting a qualified laboratory?

CDPHE Answer #85: Please refer to question #3 above.

Vendor Question #86: Given that the scope includes sampling public water systems and wastewater facilities, will analytical results be used for regulatory compliance reporting?

CDPHE Answer #86: Yes, potentially.

Vendor Question #87: If so, are subcontracted laboratories required to maintain Colorado-specific certifications for drinking water and wastewater PFAS analysis, and will CDPHE recognize appropriately accredited or certified out-of-state laboratories?

CDPHE Answer #87: Yes. Please refer to question #3 above.

Vendor Question #88: PA#2 of the Statement of Work states that there will be a CDPHE-provided sampling protocol and QAPP. Can CDPHE please confirm that the contractor need only prepare a sampling and analysis plan and not a Quality Assurance Project Plan (QAPP)?

CDPHE Answer #88: Please refer to question #15 above.

Vendor Question #89: PA#2 of the Statement of Work states that the contractor shall have a procedure in place for answering inquiries from PFAS sampling grant participants regarding PFAS testing. Can CDPHE expand on the support requested for this area?

a. Does it entail answering emails and calls from participants already reached out to for sampling?

Or is it more broad for all participants?

b. Will the contractor be expected to staff a hotline or dedicated email inbox to answer participant inquiries?

CDPHE Answer #89: The contractor is expected to make initial contact to grant recipients and program participants from a contact list CDPHE provides. The contractor should maintain contact until results have been delivered and questions are addressed.

Vendor Question #90: PA#3 of the Statement of Work states that the contractor will ship samples “to the specified lab.” Will CDPHE specify the lab? Or is the contractor to identify and subcontract the lab(s)? If the latter, does the exact lab(s) need to be specified in the response to the RFP or can the contractor identify the lab(s) after award (with approval from CDPHE)?

CDPHE Answer #90: Please refer to question #3 above.

Vendor Question #91: Can CDPHE provide more details on what respondents should cost for PA#4? Such as the extent of outreach to private well owners (if the contractor is to identify well owners and their contact information, number of owners for outreach)?

CDPHE Answer #91: Please refer to question #89 above.

Vendor Question #92: Should respondents assume 1,000 samples across all PA#s for the costing? Does CDPHE desire a certain number of samples for each expected method (537.1, modified 537, and 1633), or should respondents assume a mix?

CDPHE Answer #92: Please refer to question #4 and #38 above.

Vendor Question #93: Is all sampling support expected to come from in-state personnel, or can the contractor use out-of-state staff?

CDPHE Answer #93: Sampling support should come from in-state.

Vendor Question #94: The RFP states on page 6 that the RFP will result in a “fixed price” contract.

Please confirm if this is true.

CDPHE Answer #94: A firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractor's cost experience in performing the contract. CDPHE prefers unit pricing based on regions and per sample and sample event basis and cost per hour based on services provided.

Please refer to Question #58 above.

Vendor Question #95: Please clarify whether contractor rates will remain fixed for the full potential contract term, including all option years, or whether rate escalations may be proposed and negotiated prior to the exercise of each option year.

CDPHE Answer #95: Please refer to question #9 above.

Vendor Question #96: Given the broad scope of work and the variety of skill levels required to perform the services efficiently and cost-effectively, may Contractors propose their own labor categories and corresponding rates in developing the budget for sampling and support services?

CDPHE Answer #96: Yes

Vendor Question #97: PA#6 Given that emergency PFAS sampling events are unpredictable in frequency, scope, and level of effort, please clarify how Offerors should price these services within a fixed-price proposal. Should Offerors assume a specific number of emergency response events?

CDPHE Answer #97: Please refer to question #9 above.

Vendor Question #98: Section V.B.3 - The requirement that Offerors “be familiar with the PFAS grant program structure and data submittal templates” appears to favor firms that have previously supported CDPHE’s PFAS Grant Program, because other qualified Offerors may not have had access to CDPHE-specific data submittal templates. To promote full and open competition, would CDPHE be willing to either (1) provide the applicable templates and program documentation to all prospective Offerors as part of the RFP, or (2) revise the requirement to permit Offerors to demonstrate experience with comparable PFAS data-management and reporting requirements and the ability to adopt CDPHE’s specific requirements following award?

CDPHE Answer #98: Please refer to question #5 and 42 above.

Vendor Question #99: The SOW does not require preparation of a QAPP. Does WQCD have an existing QAPP outlining QA/QC requirements and protocols? Are any QAPP amendments anticipated for this projects and individual SAPs expected to be prepared for each grant recipients receiving assistance from the state directed contractor.

CDPHE Answer #99: Please refer to question #15 above. The contractor may use one SAP to serve as the base for all grant recipient projects. The SAP will need to outline standards for each matrix listed in the SOW.

Vendor Question #100: Will the selected vendor be providing support to all grant recipients or only recipients of standard sampling grants?

CDPHE Answer #100: The contractor will only be providing support to standard sampling grant recipients and special projects proposed by CDPHE.

Vendor Question #101: RFP Regarding the Offeror Requirement (V.B.3) to be “familiar with the PFAS grant program structure and data submittal templates,” would the Department confirm that demonstrated experience supporting PFAS grant programs (including program structure, participant coordination, sampling logistics, data management, and use of standardized data submittal/reporting templates) in other states or at the federal level would satisfy this requirement, provided the offeror can show a clear understanding of the applicable Colorado program elements and can efficiently adapt to CDPHE’s specific templates and processes? Clarifying this point would help ensure that the evaluation criteria remain accessible to a broad pool of qualified firms with relevant PFAS grant experience and support a competitive process.

CDPHE Answer #101: Please refer to question #42 above.

Vendor Question #102: RFP Section IV. Project Elements: The RFP contemplates a not to exceed five-year period of performance by giving CDPHE the option to renew up to four additional one-year periods. Since a fixed price contract is also contemplated, can the State please confirm whether all Offeror pricing is intended to remain fixed for all option periods, or whether annual rate adjustments (e.g., CPI-based, mutually negotiated adjustments, or as provided in the proposal) will be permitted for option years exercised?

CDPHE Answer #102: Please refer to question #50 above.

Vendor Question #103: RFP Section 5.B.v of the Contract Template allows the State to increase quantities of services and corresponding contract funding. Can the State please clarify whether there are any limitations on the magnitude of quantity increases through this provision? If the State materially increases the scope, quantity, or level of effort beyond that contemplated by the awarded contract, would the State allow a change in rate(s), as applicable, through a mutually negotiated contract amendment?

CDPHE Answer #103: Please refer to question # 50 above.

Vendor Question #104: RFP Section V. C (Budget) states that this RFP will result in a fixed price contract. Can CDPHE please explain the structure of the fixed price contract as the current scope does not clarify quantities nor level of effort for “support services as requested”. For example, does CDPHE intend to assign sampling numbers for each type of sampling described within the SOW and using a contractors proposed sampling unit cost award a fixed price contract or is the contractor to assume a sample quantity and level of effort for additional support services within our work plan.

CDPHE Answer #104: Please refer to question #9 above. CDPHE will collaborate with the contractor and provide sampling lists for each sample matrix as projects are selected.

Vendor Question #105: RFP Section VII.C Are all evaluation factors equal? If not, can the weight of each evaluation factor be provided?

CDPHE Answer #105: Please refer to Question #46 above.

Vendor Question #106: RFP Section III.B. 5 and SOW PA#3 – Discrepancies between these two sections exist as to which analytical method should be used for analyzing groundwater and surface water samples. Please confirm that Method 1633 is the correct method (vs. Method 537.1) and since the method has been finalized the “modified” qualifier is no longer relevant.

CDPHE Answer #106: Please refer to question #2 above.

Vendor Question #107: RFP Section V.B.7. – Is the sample process capacity of a minimum of 1000 samples applicable for each year of the contract or throughout the base and option years?

CDPHE Answer #107: Please refer to question #38 above.

Vendor Question #108: Given that this solicitation represents a continuation of CDPHE's existing statewide PFAS sampling program, are there specific changes, improvements, or expanded capabilities CDPHE is seeking through this procurement compared with the previous contract? Is CDPHE seeking to diversify or expand the consultant and laboratory resources supporting the program, or does CDPHE anticipate maintaining a generally similar delivery model under the new contract?

CDPHE Answer #108: CDPHE anticipates maintaining the program's current processes, with limited scope expansions for special projects involving soil and biota sampling.

Vendor Question #109: Given the statewide and potentially site-specific nature of the work, please clarify how CDPHE intends to address potential conflicts of interest that may arise during performance.

This is the start of the file's text. The full file is on GovTribe.