Addendum 1 Questions and Answers.Final.pdf

PDF 114 KB Posted

Attached to
CREW Willow Mulching
Solicitation number
ITB-11977
Issued by
Collier County, Florida

About this file

This document is Addendum No. 1 for the Florida Fish and Wildlife Conservation Commission (FWC) Solicitation No. FWC 24/25-76, titled "Crew Willow Mulching". The addendum provides clarifications and answers to potential bidders' questions regarding equipment specifications for a vegetation mulching project. All responses to the solicitation must be received by 3:00 PM (ET) on Thursday, April 17, 2025, with strict guidelines on equipment usage. The addendum specifically addresses three key questions about equipment, including confirmation that swamp mats can be used in the marsh, a requirement that only mulching heads (not bush hog attachments) are permitted, and a definitive statement that no skid steers will be allowed to operate in the marsh.

The addendum emphasizes technical requirements for the project, notably that all equipment must have under 6 lbs PSI ground pressure. Bidders are informed that pontoon tracks are not mandatory, but ground pressure remains a critical factor. The document clearly restricts equipment options, rejecting alternative cutting attachments like heavy-duty bush hogs and prohibiting skid steers from marsh operations. These detailed specifications suggest the FWC is seeking precise environmental management techniques that minimize ground disturbance while effectively managing invasive vegetation in sensitive marsh ecosystems.

View the file

Other files

File Type Posted
FWC.24.25.76.ITB.Final.pdf PDF
FWC.24.25.76.ITB.Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Fish and Wildlife Conservation Commission

Commissioners

Rodney Barreto

Chairman

Coral Gables

Steven Hudson

Vice Chairman

Fort Lauderdale

Preston Farrior

Tampa

Gary Lester

Oxford

Albert Maury

Coral Gables

Gary Nicklaus

Jupiter

Sonya Rood

St. Augustine

Office of the

Executive Director

Roger A. Young

Executive Director

Charles “Rett” Boyd

Assistant Executive Director

George Warthen

Chief Conservation Officer

Jessica Crawford

Chief of Staff

850-487-3796

850-921-5786 FAX

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street

Tallahassee, Florida

32399-1600

Voice: 850-488-4676

Hearing/speech-impaired:

800-955-8771 (T)

800-955-8770 (V)

MyFWC.com

DATE: APRIL 10, 2025

ADDENDUM NO.: 1

BID NO.: FWC 24/25-76

BID TITLE: CREW WILLOW MULCHING

UPDATE: QUESTIONS & ANSWERS

The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s

(FWC) Solicitation No. FWC 24/25-76, “Crew Willow Mulching”.

All responses to the subject solicitation must be received no later than 3:00

PM (ET) on Thursday, April 17, 2025.

A response received after the exact time specified will not be considered.

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in

Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875

Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.

Sincerely, Randy Golightly, FWC Procurement Manager

FWC SOLICITATION ADDENDUM 2

BEGIN ADDENDUM

QUESTION #1

Just want to confirm that swamp mats can be used instead of pontoon tracks?

ANSWER #1

Swamp mats can be used in the marsh but are not required. After careful consideration, pontoon tracks are also not a requirement. All equipment must be under 6 lbs PSI ground pressure .

QUESTION #2

The bid packet requires a mulching head. Would you allow a heavy duty bush hog attachment on the long reach excavator will cut up to 8-inch diameter, due to the head speed and that its 8ft wide it will be far quicker and cover more acres per day.

ANSWER #2

After careful consideration, heavy duty bush hog cutting attachments will not be allowed. Only mulching heads will be allowed.

QUESTION #3

We have a 309 excavator with a fecon mulcher head: its ground pressure is 5.5-6 LBS

PSI. We also have 2 skid steers with 3.4-6 LBS PSI. Would these skid steers be allowed to be used as support for the excavator in areas where conditions are appropriate? The skid steers have a production rate 10X of the excavator. This could reflect on our per acre pricing.

ANSWER #3

No skid steers will be allowed to operate in the marsh.

END ADDENDUM