Addendum 1 QSP Hot Water System Flushing PD.pdf
PDF 472 KB Posted
- Attached to
- Hot Water System Flushin
- Solicitation number
- BD-19-1237-DTH00-DT001-54124
- Issued by
- Massachusetts
About this file
This document is an Addendum 1 to a Request for Proposal (RFP) issued by the State of Massachusetts for a Hot Water System Flushing project. The project requires the successful contractor to supply all materials, equipment, and labor to drain down the entire system of approximately 1,200 gallons, safely dispose of the drained solution, flush the entire system, refill the system with a pre-mixed 30% propylene glycol (PG) solution, and ensure proper connections and operation of the system. The contractor must also test and start up the hot water loop.
The addendum provides additional details and clarification regarding the project requirements. It does not contain any information about pricing terms, set-asides, incumbents, funding requirements, or other salient financial details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 3 Hot Water System Flushing PD.pdf | ||
| Addendum 2 Hot Water Flushing PD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .