Addendum 1 QSP Hot Water System Flushing PD.pdf

PDF 472 KB Posted

Attached to
Hot Water System Flushin
Solicitation number
BD-19-1237-DTH00-DT001-54124
Issued by
Massachusetts

About this file

This document is an Addendum 1 to a Request for Proposal (RFP) issued by the State of Massachusetts for a Hot Water System Flushing project. The project requires the successful contractor to supply all materials, equipment, and labor to drain down the entire system of approximately 1,200 gallons, safely dispose of the drained solution, flush the entire system, refill the system with a pre-mixed 30% propylene glycol (PG) solution, and ensure proper connections and operation of the system. The contractor must also test and start up the hot water loop.

The addendum provides additional details and clarification regarding the project requirements. It does not contain any information about pricing terms, set-asides, incumbents, funding requirements, or other salient financial details.

View the file

Other files

File Type Posted
Addendum 3 Hot Water System Flushing PD.pdf PDF
Addendum 2 Hot Water Flushing PD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .