This is an Addendum 1 Question and Answer document for Dunn County, Wisconsin's Invitation for Bid #2021-05 for Snowmobile Bridges. The project involves the installation of steel truss bridges across multiple waterways, with specific bridges identified as 05E, 05A, and 05C. Bridges 05E and 05A require access over cropland, while Bridge 05C may have cattle or logging present. The County has secured landowner agreements for bridge access and will assist with landowner communications; however, the successful bidder remains responsible for obtaining any additional access agreements as needed. Vehicle load specifications are to be determined based on Bridge Guidelines documentation, with preference for AASHTO H-Truck configuration at 25,000 lbs. according to DNR engineer recommendations. All questions and responses were scheduled to be posted to the Dunn County website by March 19th and emailed to interested parties.

Key technical requirements include restrictions on piling placement, with horizontal profiles prohibited from extending riverward beyond the ordinary high water mark (OHWM), though vertical piling above the OHWM is permitted. For Project #2021-05E, a Hydraulics and Hydrology (H&H) study will be completed in 2021 to determine project feasibility, with the successful bidder to be invoiced for this study and related design expenses should the project not proceed. Permitting is the contractor's responsibility, though Dunn County will provide assistance gathering required information. The DNR permit process involves submission through Wisconsin Department of Natural Resources, which will forward applications to the U.S. Army Corps of Engineers for determination of additional permit requirements. Shoreland and Floodplain Zoning questions should be directed to Bob Colson, Dunn County Planning/Zoning Administrator, at 715-231-6522 or rcolson@co.dunn.wi.us.

View the file

Other files

File Type Posted
Daley IFB 05A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X:\Purchasing\2021\2021-05\[Addendum #1 Q&A.xlsx]Sheet1

RFP #2021 - 05 Snowmobile Bridges

The landowners have signed agreements for the bridges. Dunn County should be contacted prior to access and will assist with communications with the landower. Bridge 05E and 05A will require access over cropland. Bridge 05C may have cattle or logging present.

The vehicle load shall be determined based on the Bridge Guidelines document

No, the bid is requesting steel truss bridges.

The horizontal profile of the bridge may not include a piling riverward (on the stream side) of the elevation of the OHWM, and must be on the landward side of the OHWM. The depth of the piling is not specified. If the piling is placed using the above guidance but extends vertically to the elevation of the OHWM that will be allowed.

The successful bidder will be required to invoice for the H&H study and any other expenses incurred, then Dunn County will pay on that invoice.

The WI DNR Permit information can be found at https://dnr.wisconsin.gov/topic/Waterways/water_levels_crossings/bridges.html. The DNR will forward the permit to Army Corp of Engineers and if Army Corp of Engineers requires a permit they will notify you. Questions for Shoreland & Floodplain Zoning should be directed to Bob Colson, Planning/Zoning Administrator. A list of some possible contractors/engineers that provide evaluation of floodplains can be sent upon request.

I noticed I needed to get shoreland & Flood plain zoning, is that for each bridge? Is their a certain company you guys usually go with or would recommend.

Are there land access agreements in place to access the sites or will the successful bidder be required to obtain landowner access agreements for all projects? Is access an issue on 05C?

In the General Specifications, Phase 3 – Construction No. 2 – iii states “ No support pilings are allowed below the OHWM. Vertical piling above the OHWM are allowed.” Does this relate to the location of pile cutoff being outside of the ordinary high water mark (OHWM) or does this mean something different (i.e. piling cannot be located in area of high watermark)?

For Project#2021-05E, it is stated that a H&H study will be completed in 2021 to determine if the project will move forward. How will the successful bidder be compensated for their work on the H & H and other design work if the results from the H & H show the project cannot proceed?

Could you clarify the requirements for the 25,000 lbs. vehicle load? Currently, the DNR Guidelines states that the design vehicle loadings “shall be based on ‘typical’ equipment train weight (using individual weight, width, and wheel or track spacing loading”. In conversations with the DNR engineers, the preference is to use the

AASHTO H-Truck configuration for the loads.

I see the specifications for these bridges mentions steel truss. Are timber based bridges allowed also provided they meet requirements set forth in the DNR bridge manual?

I noticed phase 2 -permitting ( permits) where would I go to attain the forms I would need for the bridges? US Army Corps of Engineers ? Wi Department of Natural

Resources is this the same as the WI DNR PERMIT?

Permits are the responsibility of the contractor, however Dunn County will assist with gathering the information required for the DNR permit (landowner contact, etc). The WI DNR Permit information can be found at https://dnr.wisconsin.gov/topic/Waterways/water_levels_crossings/bridges.html. The DNR will forward the permit to Army Corp of Engineers and if Army Corp of Engineers requires a permit for the bridge they will notify you. Questions for Shoreland &

Floodplain Zoning should be directed to Bob Colson, Dunn County Planning/Zoning Administrator (phone: 715-231-6522, email: rcolson@co.dunn.wi.us).

Responses to questions will be sent out to the person who answered the question by email March 19th. All questions and responses will be posted to the Dunn

County website March 19th.