This document is an Addendum to the Supervisory Control and Data Acquisition (SCADA) Request for Quote (RFQ) #C5612456 issued by the California Department of Corrections and Rehabilitation (CDCR). The RFQ is for Computer System Technical and Maintenance Services at the CDCR's Reverse Osmosis Potable Water Plant and Wastewater Treatment Plant located at the Deuel Vocational Institution in Tracy, California. The Addendum provides a Question and Answer (Q&A) document in response to potential bidder questions regarding the computer system specifications, including processor type and speed, form factor, port connectivity, power requirements, memory, storage, video card, operating system, and peripherals. The existing computers are considered obsolete, and the new systems only need to meet the minimum requirements to run the specified SCADA software.
The contract opportunity is located in the state of California, specifically in San Joaquin County and Torrance City. The Addendum reminds bidders that they must include a copy of the Addendum with their bid response, and that all other requirements of the RFQ and terms and conditions will remain the same.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ_C5612456.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supervisory Control and Data Acquisition (SCADA) Request for Quote #C5612456 Computer System Technical and Maintenance Services California Department of Corrections and Rehabilitation (CDCR)
ADDENDUM #1
Contract Analyst: Lisa Marquez Email: Lisa.Marquez@cdcr.ca.gov
CDCR/ IT Contract Procurement Unit (ITCPU)
DATE: 9/17/2024
The purpose of Addendum #1 is to inform potential bidders of changes made to the RFQ C5612456. This RFQ has been changed to the following listed below.
This Addendum changes the following:
1. A Question and Answer (Q&A) document has been provided in Addendum #1.
Bidders are reminded that it is their responsibility to review the entire addendum and consider these changes when preparing their bids.
BIDDERS MUST INCLUDE A COPY OF THIS ADDENDUM #1 WITH THEIR BID
RESPONSE.
ALL OTHER REQUIREMENTS OF THE RFQ, TERMS AND CONDITIONS WILL
REMAIN THE SAME
ADDENDUM #1 – Q&A
The following Questions and Answers (Q&A) are in response to potential bidder questions submitted to the CDCR Contract Analyst at Enterprise Information Services (EIS). All Q&A will be collected, answered, and posted as an Addendum to the above-mentioned Solicitation by the due date for Q&A as listed in the Request for Quote (RFQ).
Individual questions submitted by email or phone will only be answered via an Addendum and not given directly to specific bidders upon request.
Item # Question #’s Answers #’s
1.
Description of the Issue:
In reviewing the RFQ, we found that there were no specifications provided for the computers, though the software requirements were detailed. Specifically, on Page 19, Section C (Equipment List), the RFQ states that "Please note there are two computers at each plant running this software. Each plant has a central SCADA computer system." However, no detailed specs for the computers were included.
Remedy Sought:
To ensure the proper configuration of these computers, we kindly request the following information regarding the required specifications:
Processor type and speed Size of the Form Factor Any special port connectivity required eg.
USB/COM/etc.
External power adapters or standard PC with a power supply.
The controlling computers, (2 per plant) only need to meet the minimum requirements to run the WonderWare (AVEVA) InTouch Run Time 60K V10.1; Development Studio UnlimitedV10.1A; and SCADA Alarm V6.0.The existing machines are considered obsolete to today’s availability. Each machine is connected by ethernet to the PLC system. Each Control PC has it’s own 120V 1500VA UPS. 1TB SSD, non removable) storage is recommended. Industrial Grade is not required. Existing form factor is full size tower. Each machine runs Windows with 2 screens, 1 keyboard and 1 mouse.
ADDENDUM #1 – Q&A
Memory requirements Hard drive specifications (mechanical or removable if needed) Video card (if applicable) Fanless or otherwise PC Industrial-grade PC or regular desktop PC Operating system (Windows or Linux) Any additional peripherals (mouse, keyboard, monitor, etc.)