About this file
This Addendum 1 and Pre-Bid Meeting Minutes document pertains to a nutrient reduction wetland construction project (Flo971628B, Bid No. 26-07) issued by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality in Floyd County. The project scope encompasses approximately 10,800 cubic yards of earthwork, 1,202 square feet of steel sheetpile installation, 1,977 linear feet of tile drainage, a water control structure with inlet riser and drawdown pipe, 437 tons of riprap, 44.5 tons of granular foundation material, 87 cubic yards of concrete grout, erosion control measures (175 linear feet of straw wattle and 430 linear feet of silt fence), and 7.1 acres of seeding (0.7 acres structural and 6.4 acres buffer). A pre-bid meeting was held with attendance documented in the materials. Sealed bids were due August 26, 2026 at 3:00 PM through the Iowa Management of Procurement and Contracts System (IMPACS). Construction must be completed by June 15, 2027, with buffer seeding by June 30, 2027 and structure seeding by September 15, 2027. Addendum No. 1, issued August 21, 2026, modified the original bid documents posted July 31, 2026, with revisions to the proposed construction access location, antiseep collar location, and sheetpile detail, along with an updated Proposal and Schedule of Prices form and revised construction plans.
Bids are submitted on a unit-price basis using the prescribed Schedule of Prices Worksheet. Bidders must provide a proposal guarantee equal to 10% of the base bid and, if awarded, furnish a satisfactory performance bond of no less than 100% of the contract award within 14 days of notice of award. Liquidated damages are assessed at $175 per day for all work except seeding and $125 per day for seeding activities. The estimated construction cost range is $200,000 to $300,000. All construction must comply with Floyd County requirements and the 2023 Natural Resources Conservation Service Practice 656 (Constructed Wetland) standards. Contractors must comply with ASTM standards for materials, contact Iowa One Call at least two business days prior to excavation, adhere to OSHA safety standards, and be registered with the Iowa Department of Inspections, Appeals & Licensing. Materials are exempt from Iowa sales and use tax. The site is located in Section 28, Township 97 North, Range 16 West, Floyd County, Iowa, and will treat overland flow from approximately 174 acres of agricultural land discharging to the Cedar River.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Soil Conservation and Water Quality
Cover Sheet
To: All plan holders From: Tracy Bruun, Division
Pages: 34 Phone: 515-344-6279
Re: Flo971628B Nutrient Reduction Wetland (Bid 26-07) Date: August 21, 2026
Comments: Page
• Cover Sheet 1
• Addendum No. 1 with Attachments 1 and 2 2-28
• Pre-Bid Meeting Minutes 29-33
• Pre-Bid meeting attendance list/Updated plan holders list 34
• Electronic files for grading can be obtained by e-mail by contacting Spencer Pech with ISG Inc at 563- 920-5758 or spencer.pech@isginc.com.
- END OF COVER PAGE -
August 21, 2026
Division of Soil Conservation and Water Quality 1305 E Walnut Street Des Moines, IA 50319
TO: Prospective Bidders
Subject: Addendum No. 1 to Bid Documents FLO971628B Nutrient Reductionl Wetland Project – Bid No. 26-7 Floyd County, Iowa
This addendum forms a part of the bidding contract documents and modifies the original bidding documents posted July 31, 2026. An updated bidding form, Document CC.– Proposal and Schedule of Prices is attached with the addendum acknowledged. This updated bidding form must be used for 26-7 and all bidders must acknowledge this addendum on Page CC-2. FAILURE TO DO SO WILL SUBJECT BIDDER TO DISQUALIFICATON.
Description:
DOCUMENT CC– PROPOSAL AND SCHEDULE OF PRICES, 26-7 (See Attachment No.1)
Please use the updated Document CC, to acknowledge Addendum No. 1 (See Attachment No. 1):
Plans (See Attachment No. 2) The location of the proposed construction access has been modified, the location of the antiseep collar has changed and the sheetpile detail has been updated to provide more clarity. Attached are the revised set of Plans.
Sincerely, Sara Smith, P.E.
Water Resources Bureau
Attachment No. 1 – Updated Document CC Attachment No. 2 – Revised set of Plans
End of Addendum No. 1
FLO971628BNutrient Reduction Wetland Project DOCUMENT CC – Attachment 1 Bid No. 26-7 PROPOSAL AND SCHEDULE OF PRICES
Time and Date for Bid Submissions: 3:00:00 PM, 08/26/2026
BIDDER LOGIN –
https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
Time and Date of Bid Opening: 3:00 PM, August 26, 2026
Bid Opening TEAMS: +1 469-998-7627,,352050218#
Project Description and Location: Flo971628B Nutrient Reduction Wetland Project Section 28, Township 97 North, Range 16 West Floyd County, Iowa
PROPOSAL AND SCHEDULE OF PRICES
Proposal of (PRINT Name of Bidder: COMPANY & CONTACT)
Located at (FULL Address)
(Telephone Number)
Amount of
Proposal Guarantee
Description of Work Specified Completion Date Liquidated Damages
10% of Base Bid
All Work Except Seeding
June 15, 2027
$175.00 Per Day
Seeding - Buffer Seeding – Structure
06/30/2027 09/15/2027
$125.00 Per Day
Seeding must be done within the respective seeding period
The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish satisfactory Performance Bond in an amount not less than one hundred percent (100%) of the contract award within fourteen (14) days from the date when Notice-of-Award is received, and to provide all supervision, labor, materials, and equipment required to complete the project designated above, for the prices hereinafter set forth, in strict compliance with the Contract Documents prepared by the Division.
Further, the parties agree and acknowledge as follows:
The amount of loss or damages likely to be incurred by Division are uncertain and said loss is incapable or very difficult to quantify and estimate;
The amount specified for liquidated damages herein bear a reasonable relationship to, and are not plainly or grossly disproportionate to, the probable loss likely to be incurred by Division in connection with any delay on part of the Contractor;
The amount of liquidated damages fixed herein bears a reasonable relationship to Division’s anticipated losses and/or actual losses;
The amount of liquidated damages herein fairly approximates Division’s loss at the time of making of this Agreement;
The amount of liquidated damages fixed herein are fair and reasonable and it approximates to the extent possible the actual loss to Division as a result of any delay on the part of Contractor; and
Division and Contractor are sophisticated parties and negotiated this Agreement at arm’s length.
Now therefore, in consideration of the mutual obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:
Contractor will commence the work after the Preconstruction Conference and by the Construction Start Date approved by Division in the Construction Progress Schedule.
Contractor will complete the work within the specified time period identified in the contract, or as amended, or be responsible for liquidated damages per day as set forth in the above table.
The liquidated damages may be withheld from payments made to the Contractor by the Division upon written notice that liquidated damages have begun to accrue, and such damages are in addition to other remedies available as provided for in this contract and applicable law.
A Proposal Guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Division, if the undersigned fails or refuses to execute the contract and furnish satisfactory Performance Bond, if awarded the contract.
By _______________________________________________ (Signed)
(PRINT NAME)
(Title) (Date)
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
1 08/21/26
THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTARIZED, OR THIS BID WILL BE REJECTED
AFFIDAVIT
The signatory, being duly sworn, does depose and say that the undersigned is an authorized representative of:
(Name of Firm)
Located at ____________________________________________________________________________________ hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said Bidder has thoroughly examined the Contract Documents, carefully prepared the Proposal and Schedule of Prices form, and has checked the same in detail before submitting; and that said Bidder, or the agents, officers, or employees thereof, have not, either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
(Signed)
(PRINT name)
Subscribed and sworn to before me this _________ day of ________________________________, 20____
(Signed, Notary)
My Commission Expires _______________, 20______
Must include notary stamp
SCHEDULE OF PRICES
Flo971628B Project Contract No. 26-07 Section 28, Township 97 North, Range 16 West, Floyd County, Iowa
Name of Bidder:
IMPACS
LI #
ISG
LI #
SUB-
ITEM
DESCRIPTION SPECIFIC-
ATION NO.
EST
QTY
UNIT Unit Price Unit Price
1.1 1 - Mobilization & Demobilization CS-008 1 LS
1.2 2 - Site Stripping & Preparation IA-CS-001 1 LS
3 - Crop Damage IA-CS-001 0 AC
1.3 4 - Silt Fence IA-CS-005 430 LF
1.4 5 - Straw Wattle IA-CS-005 175 LF
1.5 6 - Buffer Seeding IA-CS-006 6.4 AC
1.6 7 - Structure Seeding IA-CS-006 0.7* AC
1.7 8 - Drain Tile Investigation IA-CS-009 5 HR
1.8 9 - Drain Tile Removal IA-CS-009 200 LF
1.9 10 - Steel Sheet Piling IA-CS-013 1202 SF
1.10 11 - Excavation (General) IA-CS-021 3535 CY
1.11 12 - Excavation (Core Trench) IA-CS-021 320 CY
1.12 13 - Earthfill (Submerged Berms) IA-CS-023 203 CY
1.13 14 - Earthfill (General Dam & Core) IA-CS-023 2299 CY
1.14 15 - Earthfill (General Stockpiling & Wasting)
IA-CS-023 807 CY
1.15 16 - Topsoil Placement IA-CS-026 3619 CY
17 - Corrugated Polyethylene Tubing (Non-perforated):
1.16 A 8-inch IA-CS-046 1672 LF
18 - Corrugated Polyethylene Tubing (Perforated):
1.17 A 4-inch (Toe-Drain) IA-CS-046 256 LF
19 - Corrugated profile Wall (Dual Wall) Polyethylene Pipe
1.18 A 12-inch IA-CS-046 49 LF
20 - Drain Tile Connections
1.19 A 6-inch IA-CS-046 5 EA
1.20 B 4-inch IA-CS-046 22 EA
1.21 21 - Stoplog Storage Structure IA-CS-046 1 EA
1.22 22 - Water Control Structure Assembly IA-CS-051 1 EA
1.23 23 - 12-inch Tile Outlet IA-CS-051 4 EA
1.24 24 - Riprap, Class E IA-CS-061 437 TON
1.25 25 - Granular Foundation Material IA-CS-061 44.5 TON
1.26 26 - Road Access Driveway IA-CS-061 1 EA
1.27 27 - Concrete Grout IA-CS-062 87 CY
*IMPACS will not accept an amount less than 1. Enter a unit price for 1 unit, and the bid tabulation will be adjusted based on the engineer's estimated quantity.
TOTAL BASE BID………………………………………………………………………………………$________________
Worksheet purposes only. Bids will only be accepted through the on-line Iowa Management of Procurement & Contracts System (IMPACS).
To register and learn about IMPACS, go to:https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
END OF DOCUMENT CC
Attachment No. 2
Revised set of Plans
30398-TITLE
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
ID
AL
S
FL
O
B-
FL
O
YD
C
O U
N
TY
IA
\3
P R
O D
U C
TI
O
N F
IL
ES
\3
C
IV
IL
D
\P R
O D
U C
TI
O
N D
W G
S\
8-
TI
TL
E.
D
W G
SA
VE
D
B Y:
IA
N
.M O
R
AN
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
NUTRIENT REDUCTION WQI WETLAND
FLOYD COUNTY, IOWA
PROJECT INDEX:
PROJECT
ADDRESS / LOCATION:
OCEAN AVE
FLOYD, IA 50435
SECTION 28, T97N, R16W
CEDAR TWP
FLOYD COUNTY, IOWA PROJECT MANAGER: SPENCER PECH
EMAIL: SPENCER.PECH@ISGINC.COM
IDALS FLO971628B
ISG PROJECT # 23-30398
PROJECT LOCATION
B.M. ELEVATION=1087.60
TIE IN EAST SIDE OF POWERPOLE
NORTHING: 9809811.97
EASTING: 12499354.21
MANAGING OFFICE:
TOPOGRAPHIC SURVEY
THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS
OF DATA COLLECTED IN MARCH, 2024 BY ISG.
PROJECT GENERAL NOTES
LEGEND
GIS DISCLAIMER:
INFORMATION FOR THE BOUNDARY / LOT LINES, AND UNDERGROUND UTILITIES SHOWN WAS DERIVED FROM DIGITAL DATABASES AND IS FOR INFORMATIONAL PURPOSES ONLY. DATA MAY NOT HAVE BEEN
PREPARED FOR, OR BE SUITABLE FOR: LEGAL, ENGINEERING, OR SURVEYING PURPOSES.
LOCATION MAP
EXISTING
CITY LIMITS
ACCESS CONTROL
SECTION LINE
QUARTER SECTION LINE
RIGHT OF WAY LINE
PROPERTY / LOTLINE
EASEMENT LINE
CULVERT
WATER EDGEW
WET WETLAND BOUNDARY
WATER
FENCE LINE
UT
TILE
CONTOUR (MAJOR)
I
UNDERGROUND TELEPHONE
OVERHEAD ELECTRICOE
UNDERGROUND ELECTRICUE
UNDERGROUND TVUTV
GASG
FBO UNDERGROUND FIBER OPTIC
CONTOUR (MINOR)
DECIDUOUS TREE
CONIFEROUS TREE
TREE LINE
DROP INTAKE
HYDRANT
POWER POLE
PROPOSED
TILE
WATERI I
OVERHEAD ELECTRICOE
UNDERGROUND ELECTRICUE
UNDERGROUND TVUTV
GASG
CONTOUR (MINOR)
DROP INTAKE
EASEMENT
OPEN DITCH REPAIR>>
TILE (PIPE WIDTH)
PROPOSED OPEN DITCH
OVERHEAD UTILITYOHL
UNDERGROUND UTILITY UTL
EXISTING OPEN DITCH>>
WATERSHED BOUNDARY
CONTOUR (MAJOR)
CULVERT (CMP)
SLOUGH REPAIR
SPOIL PLACEMENT
CULVERT (RCP)
TREE CLEARING
REMOVE TREE
BUFFER
>> PRIVATE TILE
CULVERT (HDPE)
PRIVATE TILE>>>
N
S
W E
PROJECT DATUM
HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE
NORTH AMERICAN DATUM OF 1983 (NAD83), ZONE 2, ON THE IOWA
REGIONAL COORDINATE SYSTEM, IN U.S. SURVEY FEET.
ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988 (NAVD 88).
RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND
VERTICAL COORDINATES FOR THIS PROJECT.
SPECIFICATIONS REFERENCE
ALL CONSTRUCTION SHALL COMPLY WITH FLOYD COUNTY'S
REQUIREMENTS AND WITH THE 2023 EDITION OF THE NATURAL
RESOURCES CONSERVATION SERVICE PRACTICE 656
(CONSTRUCTED WETLAND), UNLESS DIRECTED OTHERWISE.
1. ALL WORK SHALL CONFORM TO THE CONTRACT
DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO,
THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT
MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY
CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL
DISCIPLINES AND ALL ADDENDA, MODIFICATIONS, AND
CLARIFICATIONS ISSUED BY ARCHITECT/ENGINEER.
2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL
SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN
COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT
AND COMPLETE COORDINATION OF ALL WORK.
3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED
DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY
DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR
CONDITIONS REQUIRING INFORMATION OR CLARIFICATION
BEFORE PROCEEDING WITH THE WORK.
5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE
PROFILES AND TYPE OF DETAILING REQUIRED
THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE
SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE
SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT
CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER
BEFORE PROCEEDING WITH THE WORK.
6. ALL MANUFACTURED ARTICLES, MATERIALS, AND
EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED,
ERECTED, CLEANED, AND CONDITIONED ACCORDING TO
MANUFACTURERS' INSTRUCTIONS. IN CASE OF
DISCREPANCIES BETWEEN MANUFACTURERS'
INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE
WORK.
7. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED
FROM EACH OTHER TO AVOID GALVANIC CORROSION.
8. THE LOCATION AND TYPE OF ALL EXISTING UTILITIES
SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION
ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST
OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO
WARRANTY OR GUARANTEE IS IMPLIED. THE
CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS, AND
ELEVATIONS OF ALL EXISTING UTILITIES PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY
NOTIFY ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM PLAN.
9. THE CONTRACTOR IS TO CONTACT "IOWA ONE CALL" FOR
UTILITY LOCATIONS A MINIMUM OF 2 BUSINESS DAYS
PRIOR TO ANY EXCAVATION / CONSTRUCTION
(1-800-292-8989).
23-30398
C0-10 TITLE
---- ---- C0-10
C0-10
CONSTRUCTION PLANS
FLOYD COUNTY IOWA
335 CEDAR STREET
SUITE 200
WATERLOO, IA 50701
PHONE: 319.234.1515
WATERLOO OFFICE
TITLE
OBO
SDP/JJJ
SDP
SHEET INDEX
NUTRIENT
REDUCTION WQI
WETLAND
IDALS
FLO971628B
C0-10 TITLE
C0-20 CONSTRUCTION NOTES
C0-21 ESTIMATE REFERENCE
C0-22 DETAILS
C0-23 DETAILS
C0-24 DETAILS
C0-25 DETAILS
C0-26 DETAILS
C0-27 SHEET PILE STRUCTURE
C2-10 EXISTING SITE & REMOVAL PLAN
C3-10 SITE PLAN
C3-30 SOUTH TILE INTERCEPT PROFILE
C3-31 SOUTH TILE INTERCEPT PROFILE
C3-32 NORTH TILE INTERCEPT PROFILE
C3-33 NORTH TILE INTERCEPT PROFILE
C3-34 ALTERNATIVE OUTLET PROFILE
C4-10 OVERALL GRADING PLAN
C4-21 FOREBAY DETAILED GRADING
C4-22 BERM PROFILE
C4-23 POOL CROSS SECTION
C5-10 SITE RESTORATION PLAN
T97N
R1 6W
Printed or typed name
(signature) (date)
License number
SEAL
WIO A
LI
CE
NS
ED
PROFESS IONAL ENGINEER
I hereby certify that this engineering document was prepared by me or under direct personal supervision and that I am a duly licensed Professional Engineer under the laws of the State of Iowa.
My license renewal date is December 31, Pages or sheets covered by this seal:
SPENCER D.
PECH
28161
SPENCER D. PECH
ALL SHEETS
28161
TO THE BEST OF MY PROFESSIONAL KNOWLEDGE, JUDGEMENT,
BELIEF, THE PLANS MEET APPLICABLE NRCS STANDARDS.
ENGINEER'S SIGNATURE DATE
I HAVE REVIEWED AND AGREE WITH THE CONTENTS OF THE
PLAN AND SPECIFICATIONS AS PREPARED.
LANDOWNER SIGNATURE DATE
CONTRACTOR IS RESPONSIBLE FOR CALLING IOWA ONE CALL
ONE CALL TICKET NO.
IF A CULTURAL RESOURCE IS IDENTIFIED DURING
CONSTRUCTION, WORK WILL STOP IMMEDIATELY AND THE
LOCAL NRCS FIELD OFFICE WILL BE NOTIFIED.
I CERTIFY THAT THIS PRACTICE HAS BEEN CONSTRUCTED IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.
CONTRACTORS SIGNATURE DATE
ENGINEER'S REP. SIGNATURE DATE
IA NRCS JOB CLASS IV
3-26-25
03-26-25
1. RIPRAP IS TO BE CLASS E REVETMENT STONE AS DEFINED BY SECTION 4130 OF THE CURRENT IDOT STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION AND SCREENED OVER AN 8" GRIZZLY SEPARATOR. TAKE CARE TO NOT DAMAGE EXPOSED PVC PIPING WHEN PLACING RIPRAP, WHERE APPLICABLE.
2. STRIPPING - ALL EXCAVATIONS AND FILL AREAS ARE TO BE STRIPPED OF TWELVE (12) INCHES OF TOPSOIL (UNLESS OTHERWISE DIRECTED BY PLAN NOTE) TO REMOVE VEGETATION.
3. POOL GRADING AREAS INVOLVE EXCAVATION OF THE DESIGNATED AREAS SHOWN TO THE ELEVATION ON THE PLAN. WASTE SPOIL IN DESIGNATED AREAS OR AS DIRECTED BY ENGINEER.
AREAS RECEIVING WASTE SOILS SHALL BE SHAPED TO DRAIN TOWARD POOL AREA. POOL GRADING SPOIL MUST BE LOCATED AT DESIGNATED LOCATION AS SHOWN ON SHEET C4-10.
4. TOPSOIL - ALL EXPOSED BORROW AREA AND POOL GRADING AREA SURFACES SHALL BE TOPSOILED TO A MINIMUM DEPTH OF EIGHT (8) INCHES.
5. THE BERM SURFACE SHALL BE TOPSOILED TO A MINIMUM DEPTH OF EIGHT (8) INCHES.
6. EXCESS TOPSOIL TO BE WASTED IN AN AREA OUTSIDE OF THE POOL DESIGNATED BY THE ENGINEER.
7. ALL AREAS UNDER STRUCTURE FILL SHALL BE SCARIFIED TO A DEPTH OF SIX (6) INCHES AND BE RECOMPACTED IN ACCORDANCE WITH STD. SPEC. IA-23, SECTION 6, METHOD 2.
8. EARTHFILL - CONTRACTOR TO ENSURE ADEQUATE MOISTURE AND DENSITY THROUGHOUT CONSTRUCTION. COMPACTION IS TO BE PERFORMED IN ACCORDANCE WITH SPEC. IA-23
EARTHFILL.
9. FILL SHALL BE PLACED IN LOOSE LIFTS NO THICKER THAN NINE (9) INCHES. ENGINEER MAY DIRECT THINNER LIFTS BASED ON AVAILABLE COMPACTION EQUIPMENT.
10. UTILITIES - CONTRACTOR IS RESPONSIBLE FOR CALLING IOWA ONE CALL: 1-800-292-8989 AND PROTECTION OF ALL UTILITIES.
11. EXISTING TILE - CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING EXISTING TILE LOCATIONS AND ELEVATIONS, PRIOR TO INSTALLING NEW TILE.
12. SAFETY - ALL WORK SHALL BE DONE ACCORDING TO OSHA STANDARDS FOR PROTECTION OF LIFE. NOTHING INDICATED ON THE DRAWINGS SHALL RELIEVE THE CONTRACTOR FROM
COMPLYING WITH ANY APPROPRIATE SAFETY REGULATION.
13. ENCOUNTERED TILE - ALL TILE LINES UNDER FOOT PRINT OF STRUCTURE AND POOL ARE TO BE LOCATED AND REMOVED AND REROUTED AS SHOWN ON PLANS.
14. CONTRACTOR SHALL IMMEDIATELY REPORT TO ENGINEER ALL PREVIOUSLY UNKNOWN TILE LINES ENCOUNTERED DURING THE WORK AND LEAVE THE TILE LINES UNCOVERED FOR
EVALUATION BY ENGINEER.
15. CONTROL - CONTRACTOR IS TO PROTECT ALL CONTROL POINT AND WORK LIMIT PINS SET PRIOR TO CONSTRUCTION.
16. SLOPES - BORROW SITES AND POOL GRADING AREAS SHALL BE GRADED WITH A MINIMUM CUT/FILL SLOPE OF 3H:1V.
17. SOILS - CONTRACTOR SHALL OBTAIN FILL FOR STRUCTURE FROM AREAS DESIGNATED ON PLANS.
18. WATER - CONTRACTOR IS RESPONSIBLE FOR MAINTAINING DRAINAGE THROUGHOUT CONSTRUCTION TO ENSURE FAVORABLE WORKING CONDITIONS, INCLUDING DEWATERING AS
NECESSARY.
19. CONTRACTOR IS RESPONSIBLE FOR PROVIDING WATER TO ENSURE SOILS MEET MINIMUM MOISTURE REQUIREMENTS.
20. EQUIPMENT STAGING - CONTRACTOR TO DESIGNATE EQUIPMENT STAGING AREA AT PRECONSTRUCTION MEETING.
21. ACCESS SHALL BE COORDINATED WITH THE LANDOWNER PRIOR TO MOBILIZATION.
22. CONCRETE WASHOUT: A DESIGNATED CONCRETE WASHOUT LOCATION SHALL BE PROVIDED. WASHOUT AREA SHALL NOT BE IN THE WETLAND AREA.
23. SUPPLEMENTAL DETAILS:
23.1. SUDAS 9040.119 - SILT FENCE
23.2. SUDAS 9040.105 - WATTLE
23.3. SUDAS 9040.120 - STABILIZED CONSTRUCTION EXIT
WETLAND CONSTRUCTION NOTES
PROJECT GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS,
WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER -
CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH
INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND
SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL
ADDENDA, MODIFICATIONS, AND CLARIFICATIONS ISSUED BY
ARCHITECT/ENGINEER.
2. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL
SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN
COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT
AND COMPLETE COORDINATION OF ALL WORK.
3. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED
DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY
DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION
OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK.
4. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR
CONDITIONS REQUIRING INFORMATION OR CLARIFICATION
BEFORE PROCEEDING WITH THE WORK.
5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE
PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT
THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER
TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS,
OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE
WORK.
6. ALL MANUFACTURED ARTICLES, MATERIALS, AND EQUIPMENT
SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED,
CLEANED, AND CONDITIONED ACCORDING TO
MANUFACTURERS' INSTRUCTIONS. IN CASE OF
DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS
AND THE CONTRACT DOCUMENTS, NOTIFY
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE
WORK.
7. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED
FROM EACH OTHER TO AVOID GALVANIC CORROSION.
8. THE LOCATION AND TYPE OF ALL EXISTING UTILITIES SHOWN
ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND
ARE ACCURATE AND COMPLETE TO THE BEST OF THE
KNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR
GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY
THE SIZES, LOCATIONS, AND ELEVATIONS OF ALL EXISTING
UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR
VARIATIONS FROM PLAN.
9. THE CONTRACTOR IS REQUIRED TO CONTACT "IOWA ONE
CALL" FOR UTILITY LOCATIONS A MINIMUM OF 2 BUSINESS
DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION
(1-800-292-8989).
10. IF A CULTURAL RESOURCE IS IDENTIFIED DURING
CONSTRUCTION, STOP IMMEDIATELY AND NOTIFY THE LOCAL
NATURAL RESOURCES CONSERVATION SERVICE OFFICE.
11. ALL CONSTRUCTION ACTIVITIES SHALL BE IN COMPLIANCE
WITH NRCS NATIONAL AND STATE UTILITY SAFETY POLICY
(NEM PART 503-SAFETY, SUBPART A - ENGINEERING
ACTIVITIES AFFECTING UTILITIES 503.00 THROUGH 503.06)
12. CONSTRUCTION CONTRACT BETWEEN CONTRACTOR AND
IDALS, PLANS, SPECIFICATIONS, PROJECT MANUAL, AND
ADDENDA. ANY MODIFICATIONS MUST BE APPROVED BY
IDALS.
13. NRCS DOES NOT GUARANTEE THAT THE POND WILL FILL
AND/OR REMAIN FILLED WITH WATER TO THE PRINCIPAL
SPILLWAY CREST ELEVATION.
14. PROPOSED DESIGN MEETS PRACTICE STANDARD DESIGN
CRITERIA AND COMPLIES WITH APPLICABLE LAWS AND
REGULATIONS SET FORTH IN 210-NEM-505.
CONSERVATION PRACTICE STANDARDS
PRIMARY
656: CONSTRUCTED WETLAND
SUPPORTING
327: CONSERVATION COVER
342: CRITICAL AREA PLANTING
356: DIKE OR LEVEE
378: POND
410: GRADE STABILIZATION STRUCTURE
587: STRUCTURE FOR WATER CONTROL
606: SUBSURFACE DRAIN
620: UNDERGROUND OUTLET
Bid Item Sub Item Description Spec. Ref Shop Drawing Required Inspection or Survey
1 - Mobilization & Demobilization CS-008
2 - Site Stripping & Preparation IA-CS-001 Inspection: verify topsoil strip depth Review: by survey or contractor equipment (laser level, machine control)
3 - Crop Damage IA-CS-001 Inspection: area damaged Review: engineer's survey of damaged area
4 - Silt Fence IA-CS-005 X Inspection: verify proper installation and total linear feet of material Review:
visual
5 - Straw Wattle IA-CS-005 X Inspection: verify proper installation and total linear feet of material Review:
visual
6 - Buffer Seeding IA-CS-006 X Inspection: seed bed preperation Review: visual
7 - Structure Seeding IA-CS-006 X Inspection: seed bed preperation Review: visual
8 - Drain Tile Investigation IA-CS-009 Inspection: encountered drain tile not shown on plans Review: visual inspection + survey as conditions dictate
9 - Drain Tile Removal IA-CS-009
10 - Steel Sheet Piling IA-CS-013 X Inspection: confirmation of sheet length prior to driving, visual inspection of driving, and survey of final elevations Review: visual and survey
11 - Excavation (General) IA-CS-021 Inspection: soils suitability for earthen berm and core trench Review: visual, non-destructive field testing (ribboning)12 - Excavation (Core Trench) IA-CS-021
13 - Earthfill (Submerged Berms) IA-CS-023 Inspection: Compaction of earthern berm and core trench, ensure proper method is utilized Review: visual, field testing as required (proof roll, denting)14 - Earthfill (General Dam & Core) IA-CS-023
15 - Earthfill (General Stockpiling & Wasting) IA-CS-023 Inspection: Final grading Review: visual + survey as conditions dictate
16 - Topsoil Placement IA-CS-026 Inspection: subgrade to verify topsoiling depth Review: by survey or contractor equipment (laser level, machine control)
17 - Corrugated Polyethlylene Tubing (Non-perforated):
IA-CS-046 X
Inspection: Initial blinding, use of ASTM Class 2 backfill Review: visual, engineer supplied pipe crawler (if conditions dictate), survey of flow line elevations upon notice from contractorA 8-inch
18 - Corrugated Polyethlylene Tubing (Perforated):
IA-CS-046 X
Inspection: Initial blinding, use of ASTM Class 2 backfill Review: visual, engineer supplied pipe crawler (if conditions dictate), survey of flow line elevations upon notice from contractorA 4-inch (Toe-Drain)
19 - Corrugated profile Wall (Dual Wall) Polyethlyene Pipe
IA-CS-046 X
Inspection: Initial blinding, use of ASTM Class 2 backfill Review: visual, engineer supplied pipe crawler (if conditions dictate), survey of flow line elevations upon notice from contractorA 12-inch
20 - Drain Tile Connections
IA-CS-046 Inspection: soil tight joint Review: visualA 6-inch
B 4-inch
21 - Stoplog Storage Structure IA-CS-046 X
22 - Water Control Structure Assembly IA-CS-051 X Inspection: sub-grade prep and concrete base, verification of flowlines Review: visual and survey
23 - 12-inch Tile Outlet IA-CS-051 X Inspection: soil tight joint Review: visual
24 - Riprap, Class E IA-CS-061 X Inspection: Subgrade preperation with base (less around riser), final installation Review: visual, survey or contractor equipment (laser level, machine control) as conditions dictate
25 - Granular Foundation Material IA-CS-061 X Inspection: sub-grade conditions that require foundation Review: visual
26 - Road Access Driveway IA-CS-061 X Inspection: final grading and surfacing placement Review: visual and survey as conditions dictate
27 - Concrete Grout IA-CS-062 X Inspection: pouring/installation of grout Review: visual
Note: Provide Engineer with 48 hours notice prior to anticipated inspection date
ITEMS OF WORK TABLE
INSPECTION TABLE
30398-C0-DETAILS
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
ID
AL
S
FL
O
B-
FL
O
YD
C
O U
N
TY
IA
\3
P R
O D
U C
TI
O
N F
IL
ES
\3
C
IV
IL
D
\P R
O D
U C
TI
O
N D
W G
S\
8-
C 0-
D
ET
AI
LS
.D W
G S
AV
ED
B Y:
O W
EN
.O
EL
TJ
EN
BR
U N
S
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C0-20
C0-20 CONSTRUCTION NOTES
23-30398
C0-20
CONSTRUCTION
NOTES
IOWAFLOYD COUNTY
SDP
SDP/JJJ
OBO
NUTRIENT
REDUCTION WQI
WETLAND
IDALS
FLO971628B
ITEM NO. ITEM CODE DESCRIPTION
1 CS-008 MOBILIZATION AND DEMOBILIZATION
INCLUDES PREPARATORY WORK AND OPERATIONS INCLUDING, BUT NOT LIMITED TO, THOSE
NECESSARY FOR THE MOVEMENT OF PERSONNEL, EQUIPMENT, SUPPLIES, AND INCIDENTALS TO THE PROJECT SITE; SIGN INSTALLATION; FOR THE ESTABLISHMENT OF ALL CONTRACTOR FACILITIES
NECESSARY FOR WORK ON THE PROJECT; AND FOR ALL OTHER WORK AND OPERATIONS WHICH
MUST BE PERFORMED, OR COST INCURRED BEFORE BEGINNING WORK ON THE VARIOUS ITEMS ON THE PROJECT SITE INCLUDING BONDS AND INSURANCE. MOBILIZATION PAYMENT WILL BE PRORATED
BASED ON PERCENT OF COMPLETED WORK. SEE SPECIFICATIONS CS-008 FOR DETAILS.
2 IA-CS-001 SITE STRIPPING & PREPARATION
ITEM IS FOR CLEARING AND GRUBBING OF TREES, LOGS, STUMPS, ROOTS, HEDGE, BRUSH, FENCE, SIGNS, VEGETATION, AND ANY OTHER DEBRIS LOCATED IN THE PROJECT AREA. ITEM ALSO INCLUDES STRIPPING OF TOPSOIL TO THE DEPTH INDICATED IN THE PLANS AND STOCKPILING TOPSOIL IN DESIGNATED AREAS. (EST 4,000 CY) QUANTITIES SHALL BE CONSIDERED FINAL. SOME GRUBBED MATERIAL MAY BE PILED EAST OF THE WETLAND SITE WITH PERMISSION FROM THE LANDOWNER, ALL REMAINING MATERIAL SHALL BE BURNED OR DISPOSED OF OFFSITE. CONTRACTOR IS
RESPONSIBLE FOR BURNING AND BURYING IN ACCORDANCE WITH ALL LOCAL AND STATE
REGULATIONS.
3 IA-CS-001 Crop Damage
INCLUDES CROP DAMAGE THAT RESULTS FROM CONSTRUCTION ACTIVITES. IT IS RECOMMENDED
THE CONTRACTOR REMOVE CORN RESIDUE RATHER THAN KNOCK IT DOWN. THE EXACT LOCATION
OF CROP DAMAGE WILL BE DETERMINED DURING CONSTRUCTION AND MEASURED TO THE NEAREST
0.1 ACRE
4 IA-CS-005 SILT FENCE
INCLUDES FURNISHING AND INSTALLING SILT FENCE PER SUDAS SPECIFICATIONS. SILT FENCE IS
SHOWN ON THE SITE RESTORATION PLAN SHEET. SILT FENCE LOCATIONS AND SIZES ARE
APPROXIMATE. EXACT LOCATION AND LENGTH OF SILT FENCE NEEDED WILL BE DETERMINED
DURING CONSTRUCTION. IF ACCUMULATED SEDIMENT REACHES A LEVEL ONE-HALF THE HEIGHT OF
THE FENCE, REVMOCE THE ACCUMULATED SEDIMENT. THE SILT FENCE SHALL BE CAREFULLY
INSPECTED AND ANY MAINTENANCE NEEDED SHALL BE INCLUDED IN BID ITEM.
5 IA-CS-005 STRAW WATTLE
TO BE USED AROUND WETLAND AND SPOIL PLACEMENT SITES AND AS NEEDED FOR EROSION
CONTROL. INCLUDES PLACEMENT, MAINTENANCE, REMOVAL, AND OFFSITE DISPOSAL OF SEDIMENT, AND REMOVAL OF DEVICE. REFER TO THE SITE RESTORATION PLAN SHEET. EXACT LOCATION AND
LENGTH OF WATTLES NEEDED WILL BE DETERMINED DURING CONSTRUCTION.
6 IA-CS-006 BUFFER SEEDING
INCLUDES ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO PREPARE SEED BED, SEED,
FERTILIZE AND MULCH AND ESTABLISH GROWTH IN DISTURBED AREAS. USE BUFFER SEEDING MIX IN IA CS-006 SPECIFICATION SEED BED PREPARATION SHALL BE REVIEWED AND ACCEPTED BY ENGINEER PRIOR TO SEEDING. ALL ROCKS AND CLODS LARGER THAN GOLF BALL SIZE SHALL BE REMOVED FROM THE SEED BED. WEED CONTROL IS RESPONSIBILITY OF CONTRACTOR. INCLUDES SUPPLEMENTAL
WATERING AS REQUIRED AND RESEEDING AREAS OF NON-GERMINATION.
7 IA-CS-006 STRUCTURE & CHANNEL SEEDING
INCLUDES ALL MATERIALS, EQUIPMENT AND LABOR REQUIRED TO PREPARE SEED BED, SEED,
FERTILIZE AND MULCH AND ESTABLISH GROWTH IN DISTURBED AREAS. USE STRUCTURE AND
WATERWAY/CHANNEL SEEDING MIX IN IA CS-006 SPECIFICATION. SEED BED PREPARATION SHALL BE REVIEWED AND ACCEPTED BY ENGINEER PRIOR TO SEEDING. ALL ROCKS AND CLODS LARGER THAN GOLF BALL SIZE SHALL BE REMOVED FROM THE SEED BED. WEED CONTROL IS RESPONSIBILITY OF
CONTRACTOR. INCLUDES SUPPLEMENTAL WATERING AS REQUIRED AND RESEEDING AREAS OF
NON-GERMINATION.
8 IA-CS-009 DRAIN TILE INVESTIGATION
ALL EXPLORATORY INVESTIGATION IS TO BE COMPLETED BY THE CONTRACTOR PRIOR TO ANY TILE WORK, UNLESS SPECIFICALLY DIRECTED BY THE ENGINEER TO PROCEED DIFFERENTLY. CONTRACTOR IS TO GIVE ENGINEER (712-732-7745) 48 HOURS NOTICE PRIOR TO PERFORMING ANY EXPLORATORY INVESTIGATION WORK. CONTRACTOR IS ENCOURAGED TO PERFORM EXPLORATORY EXCAVATION OF
EXISTING UTILITIES AS SOON AS POSSIBLE TO ALLOW PROPER LEAD TIME FOR CONFLICT
RESOLUTION, IF NECESSARY.
9 IA-CS-009 DRAIN TILE REMOVAL
INCLUDES EXCAVATION; REMOVAL AND DISPOSAL OF EXISTING TILE; AND PLACING, COMPACTING, AND GRADING OF BACKFILL. CONTRACTOR IS TO REMOVE TILE ONLY IN AREAS SPECIFIED IN THE
PLANS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. MUCH OF THE REMOVAL IS TO OCCUR
WITHIN OR NEAR THE PROPOSED POOL AREA AND CAN BE COMPLETED WHILE GRADING THE POOL.
ALL REMOVED TILE SHALL BECOME PROPERTY OF THE CONTRACTOR. INSTALLING CAPS ON THE TILE
TO REMAIN IN PLACE IS INCIDENTAL TO THIS BID ITEM.
10 IA-CS-013 STEEL SHEET PILING
INCLUDES FURNISHING AND DRIVING THE SPECIFIED SHEET PILING AT THE LOCATION SHOWN ON THE DRAWINGS. PILING SHALL BE DRIVEN IN A MANNER SO AS TO ENSURE PERFECT INTERLOCKING THROUGHOUT THE ENTIRE LENGTH OF EACH PILE. PILING SHALL BE DRIVEN TO THE FULL DEPTH
SHOWN ON THE DRAWINGS UNLESS OTHERWISE APPROVED BY THE ENGINEER. THE CONTRACTOR
SHALL CUT THE PILING OFF AT THE SPECIFIED ELEVATIONS. PILING LENGTH SHALL BE SUFFICIENT TO
PERMIT REMOVAL OF ALL MATERIALS DAMAGED BY DRIVING.
11 IA-CS-021 EXCAVATION (GENERAL)
REFER TO GRADING PLANS FOR DETAILS AND SHEET C4-10 FOR THE EARTHWORK SUMMARY.
QUANTITIES SHALL BE CONSIDERED FINAL AND NO ADDITIONAL PAYMENT WILL BE ALLOWED.
INCLUDES REMOVAL AND GRADING TO FINAL SUBGRADE ELEVATIONS, AS WELL AS SCARIFICATION
AND COMPACTION OF THE EXPOSED CUT SURFACES.
12 IA-CS-021 EXCAVATION (CORE TRENCH)
REFER TO ITEM NUMBER 11
13 IA-CS-023 EARTHFILL (SUBMERGED BERM - METHOD 1)
REFER TO GRADING PLANS FOR DETAILS. INCLUDES PLACEMENT AND GRADING OF SUBMERGED
BERMS WITHIN THE WETLAND AREA TO FINAL PLAN ELEVATIONS, METHOD 1 COMPACTION WILL BE REQUIRED IN THIS AREA. ADDITIONAL MATERIAL IS TO BE WASTED IN THE SPOILS PLACEMENT AREA
TO THE EAST OF THE WETLAND.
14 IA-CS-023 EARTHFILL (GENERAL DAM - METHOD 2)
REFER TO GRADING PLANS FOR DETAILS. INCLUDES PLACEMENT AND GRADING TO FINAL SUBGRADE ELEVATIONS. METHOD 2 COMPACTION IS REQUIRED, REFER TO SPECIFICATIONS FOR DETAILS.
MATERIAL EXCAVATED FOR THE CORE TRENCH MAY BE REUSED AS FILL, IF MATERIAL IS SUITABLE.
ALL OTHER BORROW MATERIAL IS EXPECTED TO COME FROM THE POOL GRADING AND FOREBAY
AREAS.
15 IA-CS-023 EARTHFILL (GENERAL STOCKPILING)
REFER TO GRADING PLANS FOR DETAILS. INCLUDES PLACEMENT AND GRADING OF EXCESS MATERIAL IN THE SPOILS PLACEMENT AREA TOT HE EAST OF THE WETLAND, METHOD 1 COMPACTION WILL BE
REQUIRED IN THIS AREA.
16 IA-CS-026 TOPSOIL PLACEMENT
THE PROJECT AREA SHALL BE DRESSED WITH A MINIMUM OF 8" OF TOPSOIL IN AREAS DESIGNATED ON THE PLANS. ANY EXCESS TOPSOIL SHALL BE SPREAD IN THE DESIGNATED AREA EAST OF THE
WETLAND, UNLESS OTHERWISE DIRECTED BY ENGINEER OR LANDOWNER.
17 IA-CS-046 CORRUGATED POLYETHYLENE TUBING (NON-PERFORATED)
INCLUDES TRENCH EXCAVATION AND INSTALLATION OF PIPE ACCORDING TO PLANS AND
SPECIFICATIONS. ITEM INCLUDES LINEAR MEASUREMENT THROUGH ALIGNMENT TURNS,
PREFABRICATED ELBOWS, AND TEE SECTIONS. FABRICATION AND INSTALLATION OF FITTINGS AND ANTI-SEEP COLLARS IS INCIDENTAL TO THIS ITEM. MATERIAL SHALL BE STANDARD POLYETHYLENE TUBING AS SPECIFIED IN IA-CS-046. PIPE IS TO BE LAID IN ACCORDANCE WITH SPOON OR FLAT
BOTTOM TRENCH (SEE DETAILS). ITEM INCLUDES ALL GRANULAR BEDDING AND ENCASEMENT
MATERIAL TO MEET INSTALLATION REQUIREMENTS. AN UNSTABLE TRENCH BOTTOM SHALL BE
STABILIZED WITH GRANULAR FOUNDATION MATERIAL UPON APPROVAL FROM THE ENGINEER.
GRANULAR FOUNDATION MATERIAL, IF APPROVED BY ENGINEER, WILL BE PAID UNDER A SEPERATE BID ITEM. ITEM ALSO INCLUDES ALL SHORING/BRACING REQUIRED FOR SURROUNDING UTILITIES AND STRUCTURES TO PROPERLY INSTALL PIPE. CONTRACTOR SHALL FIELD VERIFY UTILITY LOCATIONS
AND ELEVATIONS. SUBSIDIARY TO THIS BID ITEM IS THE SEPARATION OF SOILS DURING
INSTALLATION. ALL EFFORTS SHALL BE MADE DURING CONSTRUCTION TO SEPARATE SOIL TYPES.
BACKFILL SHALL BE COMPACTED PRIOR TO PLACEMENT OF TOPSOIL. TOPSOIL SHALL BE PLACED TO A
MINIMUM OF 18", OR UNIFORM TO THE TOPSOIL DEPTH OF THE SURROUNDING AREA.
18 IA-CS-046 CORRUGATED POLYETHYLENE TUBING (PERFORATED)
REFER TO ITEM NUMBER 17
19 IA-CS-046 CORRUGATED PROFILE WALL (DUAL WALL) POLYETHYLENE PIPE
INCLUDES TRENCH EXCAVATION AND INSTALLATION OF PIPE ACCORDING TO PLANS AND
SPECIFICATIONS. ITEM INCLUDES LINEAR MEASUREMENT THROUGH ALIGNMENT TURNS,
PREFABRICATED ELBOWS, AND TEE SECTIONS. FABRICATION AND INSTALLATION OF FITTINGS AND ANTI-SEEP COLLARS IS INCIDENTAL TO THIS ITEM. MATERIAL SHALL BE HIGH DENSITY POLYETHYLENE WITH GASKETED JOINTS AS SPECIFIED IN IA-CS-046. PIPE IS TO BE LAID IN ACCORDANCE WITH SPOON OR FLAT BOTTOM TRENCH (SEE DETAILS). ITEM INCLUDES ALL GRANULAR BEDDING AND
ENCASEMENT MATERIAL TO MEET INSTALLATION REQUIREMENTS. AN UNSTABLE TRENCH BOTTOM
SHALL BE STABILIZED WITH GRANULAR FOUNDATION MATERIAL UPON APPROVAL FROM THE
ENGINEER. GRANULAR FOUNDATION MATERIAL, IF APPROVED BY ENGINEER, WILL BE PAID UNDER A SEPERATE BID ITEM. ITEM ALSO INCLUDES ALL SHORING/BRACING REQUIRED FOR SURROUNDING UTILITIES AND STRUCTURES TO PROPERLY INSTALL PIPE. CONTRACTOR SHALL FIELD VERIFY UTILITY LOCATIONS AND ELEVATIONS. SUBSIDIARY TO THIS BID ITEM IS THE SEPARATION OF SOILS DURING INSTALLATION. ALL EFFORTS SHALL BE MADE DURING CONSTRUCTION TO SEPARATE SOIL TYPES.
BACKFILL SHALL BE COMPACTED PRIOR TO PLACEMENT OF TOPSOIL. TOPSOIL SHALL BE PLACED TO A
MINIMUM OF 18", OR UNIFORM TO THE TOPSOIL DEPTH OF THE SURROUNDING AREA.
20 IA-CS-045 MISC. DRAIN TILE REPAIRS AND CONNECTIONS
ITEM IS TO BE USED FOR CONNECTING ANY TILE PREVIOUSLY CONNECTED TO THE EXISTING TILE, CONNECTING BASIN DRAINS, AND EMERGENCY REPAIR OF UNKNOWN TILE ACCIDENTALLY DAMAGED
DURING CONSTRUCTION. ITEM INCLUDES ANY FITTINGS, GRANULAR MATERIAL, CONCRETE, OR
OTHER MATERIALS REQUIRED TO REPAIR AND/OR CONNECT THE TILE TO THE PROPOSED PIPE, AND UP TO 20 LF OF TUBING TO MAKE CONNECTIONS. ITEM ALSO INCLUDES THE KEEPING AND DELIVERY
OF A LOG OF CONNECTIONS MADE, AND APPROPRIATE CRUSH AND BURY OR REMOVAL AND
DISPOSAL OF EXISTING TILE MATERIAL.
21 IA-CS-046 STOPLOG STORAGE STRUCTURE
ITEM INCLUDES PIPE AND END CAP AS SHOWN IN THE PLANS. ITEM ALSO INCLUDES ALL
EXCAVATION, COMPACTED ROCK, BEDDING AND BACKFILL.
22 IA-CS-051 WATER CONTROL STRUCTURE ASSEMBLY
ITEM INCLUDES FURNISHING AND INSTALLATION OF THE CMP RISER INLET STRUCTURE, CMP WATER
CONTROL STRUCTURE WITH STOPLOG CHANNEL, STOPLOGS, CONCRETE BASE, DRAWDOWN PIPE,
AND 12” CMP PIPE AS SHOWN ON THE PLANS. ITEM ALSO INCLUDES ALL EXCAVATION, PLACING, COMPACTING BACKFILL MATERIAL, AND PIPE CONNECTIONS AND ANTI-SEEP COLLARS REQUIRED FOR THE WATER CONTROL STRUCTURE ASSEMBLY, LABOR, AND OTHER MATERIALS NECESSARY FOR THE
INSTALLATION OF THE WATER CONTROL STRUCTURE ASSEMBLY.
23 IA-CS-051 TILE OUTLET
ITEM INCLUDES FURNISHING AND INSTALLATION OF THE 20 LF CMP TILE OUTLET, CONCRETE COLLAR, AND ANIMAL GUARD. TILE OUTLET PIPE SHOULD HAVE A MINIMUM GRADE OF 1%. THE OUTLET
INVERT SHOULD BE A MINIMUM OF 1-FOOT ABOVE THE NORMAL POOL ELEVATION IN WHICH IT IS
DRAINING INTO.
24 IA-CS-061 RIPRAP
MATERIAL SHALL COMPLY WITH GRADATION OF IOWA DOT SPECIFICATION 4130.02, CLASS E.
PAYMENT WILL BE FOR ACTUAL TONS PLACED BASED ON SCALE TICKETS.
25 IA-CS-061 GRANULAR FOUNDATION MATERIAL
INCLUDES FURNISHING, STOCKPILING, AND INSTALLING THE SPECIFIED MATERIAL. MATERIAL SHALL
MEET ASTM D2321 CLASS 1 (CRUSHED ROCK, ANGULAR). MATERIAL MUST BE CRUSHED AND
ANGULAR, ROUNDED PEBBLES, STONES OR "RIVER ROCK" WILL NOT BE ACCEPTED. ITEM WILL ONLY
BE PAID FOR RIPRAP/EROSION FILTER STONE AND HDPE DUAL-WALL PIPE BEDDING, UPON
APPROVAL OF ENGINEER. GRANULAR FOUNDATION MATERIAL USED FOR OTHER BID ITEMS, SUCH AS STRUCTURE FOUNDATION OR TILE CONNECTIONS, IS CONSIDERED INCIDENTAL TO THAT SPECIFIC BID
ITEM AND WILL NOT BE PAID UNDER THIS ITEM.
26 IA-CS-061 ROAD ACCESS DRIVEWAY
INCLUDES THE CONSTRUCTION OF A PERMANENT STABLILIZED DRIVEWAY AND CULVERT AS SHOWN
ON PLANS AND IN ACCORDANCE WITH FLOYD COUNTY SECONDARY ROADS. ITEM INCLUDES
APPROXIMATLEY 14 TONS OF GRANULAR MATERIAL TO STABILIZE DRIVEWAY.
27 IA-CS-062 CONCRETE GROUT
INCLUDES FURNISHING AND PLACING OF CONCRETE GROUT ON THE PORTIONS OF RIPRAP AS
INDICATED IN THE PLANS. GROUT SHALL BE CONSOLIDATED INTO THE VOIDS WITH THE USE OF A CONCRETE VIBRATOR. THE GROUT APPLICATION SHALL BE ADJUSTED TO ENSURE THAT VOIDS ARE
PROPERLY FILLED THROUGH THE ENTIRE RIPRAP DEPTH AND SHALL NOT CREATE A SMOOTH
SURFACE. UNUSED OR WASTED GROUT WILL BE ESTIMATED AND DEDUCTED FROM PAYMENT
VOLUME BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE.
30398-C0-DETAILS
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
ID
AL
S
FL
O
B-
FL
O
YD
C
O U
N
TY
IA
\3
P R
O D
U C
TI
O
N F
IL
ES
\3
C
IV
IL
D
\P R
O D
U C
TI
O
N D
W G
S\
8-
C 0-
D
ET
AI
LS
.D W
G S
AV
ED
B Y:
O W
EN
.O
EL
TJ
EN
BR
U N
S
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C0-21
C0-21 ESTIMATE REFERENCE
23-30398
C0-21
ESTIMATE
REFERENCE
SDP/JJJ
OBO
NUTRIENT
REDUCTION WQI
WETLAND
HDPE SPOON TRENCH
NTS
PIPE IDUNDISTURBED SOIL
BACKFILL WITH TRENCH MATERIAL
(24" LIFTS)
SPOON EXTENTS
PLACE GRANULAR ENCASEMENT
MATERIAL (MECHANICALLY
COMPACT TO 6" ABOVE PIPE
IN 6" LIFTS)
6"
NOTES:
1. GRANULAR ENCASEMENT AND BACKFILL SHALL BE INCIDENTAL TO CONSTRUCTION.
2. SPOON DIMENSIONS SHALL COMPLY WITH PIPE MANUFACTURER'S SPECIFICATIONS.
3. ALL PIPE WITH A FILL HEIGHT GREATER THAN 15-FEET SHALL BE FULLY ENCASED IN
ASTM CLASS I MATERIAL.
FIL
L H
EI
GH
T (V
AR
IE
S)
HDPE FLAT BOTTOM TRENCH
WITH GRANULAR FOUNDATION
NTS
NOTES:
1. GRANULAR BEDDING, GRANULAR ENCASEMENT, AND BACKFILL SHALL BE
INCIDENTAL TO CONSTRUCTION.
2. GRANULAR FOUNDATION BELOW THE PIPE SHALL BE PAID FOR BY THE CUBIC YARD,
ONLY WHERE APPROVED BY THE FIELD ENGINEER.
3. ALL PIPE WITH A FILL HEIGHT GREATER THAN 15-FEET SHALL BE FULLY ENCASED IN
ASTM CLASS I MATERIAL.
4. THE SHOE WIDTH SHALL BE THE SAME AS THE COMPACTING MECHANISMS WIDTH
OR THE PIPE MANUFACTURER'S SPECIFICATIONS, WHICHEVER IS GREATER.
PIPE ID
UNDISTURBED SOIL
SHOE SHOE
MI
N
6" 6"
PLACE GRANULAR ENCASEMENT
MATERIAL (MECHANICALLY
COMPACT TO 6" ABOVE PIPE
IN 6" LIFTS)
BACKFILL WITH TRENCH MATERIAL
(24" LIFTS)
6" PLACE GRANULAR BEDDING
MATERIAL
PLACE GRANULAR
FOUNDATION MATERIAL
FIL
L H
EI
GH
T (V
AR
IE
S)
PLACE GRANULAR HAUNCH
MATERIAL (MECHANICALLY
COMPACT)
HDPE FLAT BOTTOM TRENCH
NTS
NOTE:
1. GRANULAR BEDDING, GRANULAR ENCASEMENT, AND BACKFILL SHALL BE
INCIDENTAL TO CONSTRUCTION.
2. ALL PIPE WITH A FILL HEIGHT GREATER THAN 15-FEET SHALL BE FULLY ENCASED IN
ASTM CLASS I MATERIAL.
3. THE SHOE WIDTH SHALL BE THE SAME AS THE COMPACTING MECHANISMS WIDTH
OR THE PIPE MANUFACTURER'S SPECIFICATIONS, WHICHEVER IS GREATER.
PIPE IDUNDISTURBED SOIL
BACKFILL WITH TRENCH MATERIAL
(24" LIFTS)
SHOE SHOE
6" 6"
PLACE GRANULAR ENCASEMENT
MATERIAL (MECHANICALLY
COMPACT TO 6" ABOVE PIPE
IN 6" LIFTS)
PLACE GRANULAR BEDDING
MATERIAL
FIL
L H
EI
GH
T (V
AR
IE
S)
PLACE GRANULAR HAUNCH
MATERIAL (MECHANICALLY
COMPACT)
TYPICAL CONNECTION DETAILS
NTS
HDPE EXTERNAL COUPLER
HDPE BEND (VARIES)
CONCRETE COLLAR (TYP)
CONNECTION
CONNECTION
APPROVED WTGF BULKHEAD
BULKHEAD3
BULKHEAD
PE INTERNAL COUPLER
PE CAP
HDPE CAP
CONCRETE PLUG
CONCRETE AND GRANULAR
FOUNDATION MATERIAL (TYP)
APPROVED WTGF
GRANULAR FOUNDATION
MATERIAL (TYP)
TILE TAPE
KEY NOTES:
APPROVED WATERTIGHT GASKETED FITTING (WTGF) SHALL ONLY BE USED WHEN THE PIPE TO BE CONNECTED IS 1/2 (OR SMALLER) THE DIAMETER OF THE PIPE TO BE TAPPED. A MOLDED TEE SHALL BE USED IN ALL OTHER SITUATIONS. APPROVED WTGF SHALL NOT BE INSTALLED COMPLETELY VERTICAL
OR INTO THE BOTTOM HALF OF THE PIPE TO BE TAPPED.
CONNECTION OF HDPE TO CLAY, CONCRETE, OR PE TILE.
CONNECTION OF PE TO CLAY, CONCRETE, OR PE TILE.
CONNECTION OF PE OR HDPE TO PIPE TO BE TAPPED.
BULKHEAD OF EXISTING CLAY OR CONCRETE TILE.
BULKHEAD OF EXISTING PE TILE.
BULKHEAD OF EXISTING HDPE TILE.
CONCRETE BULKHEAD SHALL EXTEND INTO THE PIPE A MINIMUM LENGTH EQUIVALENT TO ONE
DIAMETER OF THE PIPE.
GASKET
TILE TAPE
GEOTEXTILE FABRIC
(TYPE IV)
GEOTEXTILE FABRIC
(TYPE IV)
GEOTEXTILE FABRIC
(TYPE IV)
GEOTEXTILE FABRIC
(TYPE IV)
GEOTEXTILE FABRIC
(TYPE IV)
NOTES:
1. ALL TILE, FITTINGS, GEOTEXTILE FABRIC, FOUNDATION ROCK, TILE TAPE, CONCRETE, AND EXCAVATION
SHALL BE INCIDENTAL TO RESPECTIVE BID ITEM UNLESS OTHERWISE NOTED.
2. NOT ALL SITUATIONS OR APPROVED EQUALS ARE DEMONSTRATED IN DETAIL. ENGINEER SHALL APPROVE
OF EQUALS.
CONNECT TO EXISTING TILE
NTS
PIPE OD
FIL
L H
EI
GH
T (V
AR
IE
S)
SURROUND FITTINGS WITH GRANULAR
FOUNDATION (INCIDENTAL)
CONNECT TO
PROPOSED TILE
INSTALL TILE
(LENGTH VARIES)
BACKFILL WITH TRENCH MATERIAL
COMPACT IN 24" LIFTS
CONNECT TO EXISTING TILE
NOTES:
REFER TO THE TABLE FOR MATERIAL. SIZE VARIES. THE TILE SHALL BE THE SAME AS OR THE NEXT
AVAILABLE SIZE, UNLESS OTHERWISE SPECIFIED OR APPROVED BY THE ENGINEER.
HDPE SHALL BE USED IF THE EXISTING TILE IS HDPE, REGARDLESS OF THE FILL HEIGHT.
HDPE SHALL BE USED WITHIN 5' FROM THE PROPOSED PIPE AND THEN PE MAY BE USED.
REFER TO TYPICAL CONNECTION DETAILS.
CONNECTION TO PROPOSED TILE SHALL BE LIMITED TO 15 TO 75 DEGREES FROM SPRING LINE.
ALL TILE, FITTINGS, GEOTEXTILE FABRIC, FOUNDATION ROCK, TILE TAPE, CONCRETE, AND EXCAVATION
SHALL BE INCIDENTAL.
BULKHEAD EXISTING
TILE
EXISTING TILE TYPE FILL HEIGHT CONNECTION
MATERIAL
EXISTING PUBLIC TILES ALL HDPE
EXISTING PRIVATE TILES >15 FEET HDPE
EXISTING PRIVATE TILES ≤15 FEET
30398-C0-DETAILS
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
ID
AL
S
FL
O
B-
FL
O
YD
C
O U
N
TY
IA
\3
P R
O D
U C
TI
O
N F
IL
ES
\3
C
IV
IL
D
\P R
O D
U C
TI
O
N D
W G
S\
8-
C 0-
D
ET
AI
LS
.D W
G S
AV
ED
B Y:
O W
EN
.O
EL
TJ
EN
BR
U N
S
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C0-22
C0-22 DETAILS
23-30398
C0-22
DETAILS
SDP/JJJ
OBO
NUTRIENT
REDUCTION WQI
WETLAND
12'
12'
APPROX. 3' (SEE BERM & PROFILE GRADING)
OVERBUILD BERM ELEVATION: 1090.50'
SETTLED BERM ELEVATION: 1090.00'
4:1
4:1
1:1 MIN, TYP.
POOL ELEVATION:
1086.00
EXTEND 5' PAST TOE
EXISTING GROUND (TYP)
EXTEND 5' PAST TOE
TOE DRAIN DETAIL
18" MIN.
" M
IN
3"
FL ELEV
NTS
CO
MP
AC
TE
D
EA
RT
H
BA
CK
FIL
L
6' FROM DOWNSTREAM TOE
DOWNSTREAM
TOE OF DIKE
POROUS BACKFILL
±3'
4" PERFORATED (OR OTHERWISE
INDICATED ON PLANS) CORRUGATED
POLYETHYLENE DRAINAGE TUBING
2% TYP.
EARTHFILL, GENERAL DAM
METHOD 2 COMPACTION
TYPICAL EMBANKMENT SECTION
TILE OUTLET
NTS
1'
4' (± 2')
CMP
1% MINIMUMHDPE DRAIN TILE
2' MAX
EX. GROUND (TYP)
PLACE CMP OVER TILE A MINIMUM OF 6".
ENCASE JOINT IN 4" x 12" CONCRETE COLLAR.
THIS IS INCIDENTAL TO CMP PIPE WORK
ALTERNATIVELY, CONNECT TILE TO CMP WITH
DISSIMILAR PIPE COUPLER (MARMAC OR
APPROVED EQUIVALENT) NORMAL POOL ELEVATION: 1086'
NEW CMP DIAMETER
SHALL BE SMALLEST STANDARD SIZE THAT WILL FIT OVER
TILE; MINIMUM DIAMETER OF 12"
6" MIN INSTALL ANIMAL GUARD TO
OUTLETS 18" AND SMALLER.
INCIDENTAL TO TILE EXTENSION.
20' CMP
0.66' TOPSOIL SURFACING
STRIP 1' TOPSOIL WITHIN
ENTIRE PROJECT AREA SCARIFY AND COMPACT CUT SURFACES
CORE TRENCH: REFER TO IA CS-023 FOR EARTHFILL REQUIREMENTS
1.5 ' R
IPR
AP
30398-C0-DETAILS
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
ID
AL
S
FL
O
B-
FL
O
YD
C
O U
N
TY
IA
\3
P R
O D
U C
TI
O
N F
IL
ES
\3
C
IV
IL
D
\P R
O D
U C
TI
O
N D
W G
S\
8-
C 0-
D
ET
AI
LS
.D W
G S
AV
ED
B Y:
O W
EN
.O
EL
TJ
EN
BR
U N
S
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C0-23
C0-23 DETAILS
23-30398
C0-23
SDP/JJJ
OBO
NUTRIENT
REDUCTION WQI
WETLAND
PLAN VIEW
GRADE STABILIZATION
NTS
EXISTING GROUND
SHEET PILE WIER
1.5' RIPRAP
BERM TOP
VARIES
SECTION A-A
PROFILE VIEW
PLAN VIEW
STILLING BASIN RIPRAP
EXISTING GROUND
3:1 MAX.
2' MIN.
1.5
' RIPRAP
3:1 MAX.
3:1
MAX.
2'
2' 2'
1.5
' RIPRAP
EXISTING GROUND
3:1 MAX.
3:1 MAX.
2'2'
2'
DISTANCE VARIES
DI
ST
AN
CE
V
AR
IE
S
TOETOP
6" F
ILT
ER STO
NE
6" F
ILT
ER STONE
AA 3:1
M
AX
B B
SECTION B-B
PROFILE VIEW
NTS
SECTION A-A
PROFILE VIEW
NTS
2' 2'
CLASS E RIPRAP
1.5" FILTER STONE
6"
FI
LT
ER
S
TO
NE
6" GRAVEL
6" G
RA
VE
L
GRAVEL
2.5:1 MAX
2.5 :1
MA
X
EXISTING GROUND
EXISTING GROUND
EXISTING GRAVEL LINE EXISTING FIELD LINE
TIE INTO EXISTING
ROAD ELEVATION TIE INTO EXISTING
FIELD ELEVATION
1081.41
1079.951079.89
1084.79
1084.83 1082.45 1081.011081.23
5'
COMPACTED FILL MATERIAL
A A
BB
SECTION A-A
PROFILE VIEW
NTS
SECTION B-B
PROFILE VIEW
NTS
PLAN VIEW
DRIVEWAY
NTS
PLACE 12" CMP CULVERT AT DITCH LOW POINT
NWL: 1086.0'
RIPRAP ELEV.: 1085.8'
ELEV.: 1078.5'
3:1 SIDESLOPE
ELEV. VARIES
6' PROPOSED GROUND
BOTTOM OF SHEET PILE
1.5" FILTER STONE
2:1
3:1
2:1
3:1
3:1
-2.0%
12'
SHEET PILE WEIR
PLACE CLASS E RIPRAP WITH GROUT THROUGHOUT STILLING
BASIN OUT TO GRADING EXTENTS
A
A
6'
TRENCH DAM
NTS
2'
NOTES:
1. BETONITE SHALL BE EITHER IN
GRANULAR OR CHIP FORM, WITH A
MAXIMUM NOMINAL SIZE OF 3
8"
MIXED WITH NO MORE THAN 80%
SAND (C33).
2. THE TRENCH DAM (ANTI-SEEP COLLAR)
SHALL EXTEND AT LEAST 6 INCHES
BEYOND THE STANDARD PIPE
TRENCH.
3. PLACEMENT OF THE COLLAR SHALL NOT
BE WITHIN 2 FEET OF A PIPE JOINT.
4. MINMUM DISTANCE FROM EDGE OF PIPE
IS 3x PIPE DIAMETER OR 6" BEYOND
TRENCH EXTENTS, WHICHEVER IS
GREATER, TYP
BENTONITE/SAND MIX (25:75)
SEE NOTE 4 SEE NOTE 4PIPE I.D.
CARRIER PIPE
2'
MI
N 2'
30398-C0-DETAILS
DATE
REVISION SCHEDULE
DESCRIPTION BY
SHEET
TITLE
PROJECT
WITHOUT PRIOR WRITTEN CONSENT.
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
PROJECT NO.
FILE NAME
DESIGNED BY
ORIGINAL ISSUE DATE
DRAWN BY
CLIENT PROJECT NO.
REVIEWED BY
D W
G L
O C
AT
IO
N
S:
\P
R O
JE
C
TS
\3
P R
O J\
0-
9\
ID
AL
S
FL
O
B-
FL
O
YD
C
O U
N
TY
IA
\3
P R
O D
U C
TI
O
N F
IL
ES
\3
C
IV
IL
D
\P R
O D
U C
TI
O
N D
W G
S\
8-
C 0-
D
ET
AI
LS
.D W
G S
AV
ED
B Y:
J
ES
SE
.C
R U
TC
H
ER
SHEET NOT VALID UNLESS THIS TEXT IS COLOR.
---- ---- C0-24
C0-24 DETAILS
23-30398
C0-24
SDP/JJJ
OBO
NUTRIENT
REDUCTION WQI
WETLAND
IDALS
CORRECTED ELEVATIONS FOR DRIVEWAY8-14-2026 JAC
1. STRUCTURE SHOP DRAWINGS ARE REQUIRED FOR ENGINEER'S REVIEW AND
APPROVAL BEFORE FABRICATION OF WATER CONTROL STRUCTURE.
2. STRUCTURE IS TO BE CONSTRUCTED OF ALUMINIZED CORRUGATED METAL
PIPE.
3. STOP LOG CHANNEL IS TO BE ANCHORED TO THE WALLS AND FLOOR PRIOR
TO PLACING CONCRETE INVERT.
4. A CONCRETE INVERT IS TO BE INSTALLED AFTER STOP LOG CHANNEL IS
INSTALLED. THE BOTTOM STOP LOG IS TO BE CAST INTO THE INVERT WITH
THREE HALF INCH Ø "J BOLTS" FASTENED TO THE BOTTOM STOP LOG. NO
LIFTING HOLES ARE REQUIRED FOR THIS BOTTOM LOG.
5. PLACE/POUR BASE OF STRUCTURE ON FIRM UNDISTURBED EARTH
FOUNDATION APPROVED BY ENGINEER.
6. A-LOK (OR EQUIVALENT) WATERTIGHT SEALS ARE REQUIRED FOR PIPE
CONNECTIONS TO THE WATER CONTROL STRUCTURE.
7. MANHOLE STEPS ARE TO BE INSTALLED FOR MAINTENANCE ACCESS TO THE
STOP LOGS.
8. STOP LOG ASSEMBLY SHALL BE WATER TIGHT AND CONFORM TO WHIPPS, INC.
OR AN APPROVED EQUAL. ALL STRUCTURE JOINTS TO BE WATER TIGHT TO
LIMIT ANY WATER MIGRATING THROUGH JOINTS AND AROUND THE STOP LOG
CHANNEL.
9. ALL CMP FOR CONTROL STRUCTURE, RISER, AND ASSOCIATED PIPE SHALL BE
14 GA MINIMUM.
WATER CONTROL STRUCTURE NOTES:
48"
8" 9.5
4"
FLOW
WATER CONTROL STRUCTURE ELEVATION
12" Ø CMP
FL ELEV. 1079.34
FL ELEV. 1079.17
ELEV. 1078.84
6"
TOP STOP LOG CHANNEL
ELEV. 1088.34
TOP STOP LOG
(NWL)
ELEV. 1086.00
TOP OF EARTH ACCESS
BERM: 1090.00'
COVER AND STOP LOG STORAGE DETAILS
30" END CAP WITH 2-6"
GALVANIZED HANDLES
BOLTED TO TOP
RIM OF STRUCTURE TO BE
12" ABOVE GROUND.
MOUND SOIL TO SHED
WATER
6 LF 30" DIA. DUAL WALL HDPE BURIED
FOR STOP LOG STORAGE TUBE
PLACE 6" COMPACTED ROCK
TO SUPPORT TUBE AND PROVIDE DRAINAGE.
NTS
1. PROVIDE COMPATIBLE GRATE WITH LOCKING MECHANISM AND LIFTING
HANDLE (AGRIDRAIN GR24P OR APPROVED EQUIVALENT).
2. BOTH PADLOCKS FOR ACCESS DOOR AND STOPLOG STORAGE TUBE SHALL
BE KEYED ALIKE. FOUR KEYS ARE TO BE SUPPLIED UPON PROJECT
COMPLETION.
3. STOP LOG STORAGE IS TO BE PLACED CENTERED ON THE TOP OF BERM
OFFSET SO AN NOT TO INTERFERE WITH ANTI-SEEP COLLARS OR WATER
CONTROL STRUCTURE PIPING.
4. STOP LOGS NOT USED ARE TO BE PLACED IN THE STOP LOG STORAGE.
COVER/STOP LOG STORAGE NOTES:
STOP LOG CHANNEL NOTES:
1. ALL STEEL SHALL BE FY=36 KSI.
2. STOP LOG CHANNEL SHALL BE FURNISHED AS ONE CONTINUOUS PIECE W/
CONTINUOUS WELDS
3. ALL STEEL STOP LOG CHANNEL COMPONENTS ARE TO BE ALUMINIZED
AFTER WELDING AND DRILLING IS COMPLETE
4. CONTRACTOR IS TO APPLY SEALANT VERY GENEROUSLY TO BACKSIDE OF
STOP LOG CHANNEL TO ENSURE WATERTIGHT SEAL. SEALANT SHALL BE
SIKA 30 YEAR INDUSTRIAL CAULK IN LIMESTONE GREY OR APPROVED
EQUIVALENT.
PROVIDE SLOTS FOR REMOVAL TOOL
- TWO PER STOP LOG…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .