Addendum 1 & Pre-bid.pdf
PDF 14 MB Posted
- Attached to
- 26-02 Cal883229BN & BS (Calhoun)
- Solicitation number
- 26-02 Cal883229BN & BS (Calhoun)
- Issued by
- Carroll County, Iowa
About this file
This document comprises an Addendum No. 1 and supporting bid documents for a state and local contract opportunity issued by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality. The project involves the design and construction of two pumped nutrient reduction wetlands in Calhoun County, Iowa (Project 26-2, CAL883229BN & CAL883229BS). The scope of work includes selective clearing, excavation, grading, installation of solar-powered lift stations with dual and single pump configurations, force mains, tile drainage systems, inlet risers, water control structures, drawdown pipes, riprap placement, and seeding at two separate sites. The North site (CAL883229BN) encompasses approximately 31,200 cubic yards of earthwork and 16.6 acres of seeding, while the South site (CAL883229BS) involves approximately 10,300 cubic yards of earthwork and 1.0 acre of seeding. All construction work except seeding must be completed by December 31, 2026, with structure seeding required by May 15, 2027, and buffer seeding by June 30, 2027. Sealed bids must be submitted electronically through the Iowa Management of Procurement and Contracts System (IMPACS) by 3:00 PM on May 20, 2026, with bid opening occurring simultaneously. A pre-bid conference was conducted on April 24, 2026. Addendum No. 1, issued May 6, 2026, updates the proposal and schedule of prices form (Document CC) and revises the engineering plans dated April 28, 2026, adding single cantilever slide gates and chain link fence bid items for each lift station and noting drainage district designations.
The estimated construction cost ranges from $375,000 to $475,000 for the North site and $175,000 to $275,000 for the South site. Bidders must submit a proposal guarantee (bid bond) equal to 10 percent of the base bid amount and, upon award, furnish a Performance and Payment Bond equal to 100 percent of the contract price within fourteen days of the Notice-of-Award. Monthly progress payments will be processed at 97 percent of completed work value, subject to 3 percent retention. Liquidated damages are assessed at $175.00 per day for all work except seeding and $125.00 per day for seeding-related delays. Construction materials are exempt from Iowa sales and use tax, with the Division providing tax exemption certificates. The contract documents, sealed by Professional Engineers Daniel Jensen (License No. 25063) and Kevin Bruxvoort (License No. 19927), specify compliance with NRCS standards, NFPA 70, ASTM standards, ANSI standards, and UL certifications. The successful contractor must be registered with the Iowa Department of Inspections, Appeals & Licensing and must commence construction within 14 days of the preconstruction meeting. Electronic grading files are available from the engineer of record, Dan Jensen of Shive-Hattery (djensen@shive-hattery.com). No incumbent vendor or current contractor has been identified for this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Schedule of Prices - REVISED.pdf | ||
| General Requirements.pdf | ||
| Plans.pdf | ||
| H & H Report.pdf | ||
| Bid Bond.pdf | ||
| Specifications.pdf | ||
| Plans - REVISED.pdf | ||
| Schedule of Prices.pdf | ||
| Proposal & Affidavit.pdf | ||
| Notice to Bidders.pdf | ||
| Appendix I.pdf | ||
| Proposal & Affidavit - REVISED.pdf | ||
| QA QC Plan.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Division of Soil Conservation and Water Quality
Cover Sheet
To: All plan holders From: Tracy Blocker, Division
Pages: Phone: 515-344-6279
Re: Cal883229BN-North & BS-South Nutrient Reduction Wetland (Bid 26-2) Date: May 12, 2026
Comments: Page
• Cover Sheet 1
• Addendum No. 1 with Attachments 1 and 2 2-35
• Pre-Bid Meeting Minutes 36-39
• Pre-Bid meeting attendance list 40
• Updated plan holders list 41
• Electronic files for grading can be obtained by e-mail by contacting Dan Jensen with Shive-Hattery at 515.233.8104 or djensen@shive-hattery.com.
- END OF COVER PAGE -
May 6, 2026
Division of Soil Conservation and Water Quality 1305 E Walnut Street Des Moines, IA 50319
TO: Prospective Bidders
Subject: Addendum No. 1 to Bid Documents CAL883229BN & CAL883229BS Nutrient Reductionl Wetland Project – Bid No. 26-2 Calhoun County, Iowa
This addendum forms a part of the bidding contract documents and modifies the original bidding documents posted on April 16, 2026. An updated bidding form, Document CC.– Proposal and Schedule of Prices is attached with the addendum acknowledged. This updated bidding form must be used for 26-2 and all bidders must acknowledge this addendum on Page CC-2. FAILURE TO DO SO WILL SUBJECT BIDDER TO DISQUALIFICATON.
Description:
DOCUMENT CC– PROPOSAL AND SCHEDULE OF PRICES, 26-2 (See Attachment No.1)
Please use the updated Document CC, to acknowledge Addendum No. 1 (See Attachment No. 1):
Plans (See Attachment No. 2): See revised set of Plans dated 04-28-2026 Plans are noting the Drainage District that each wetland would be constructed at.
The project quantities have been updated to include a single cantilever slide gate for each site.
Bid items for chain link fence have been added to each of the lift stations.
See revised set of Plans dated 04-28-2026.
Sincerely, Sara Smith, P.E.
Water Resources Bureau
SS
Attachment No. 1 – Updated Document CC Attachment No. 2 – Updated Plans dated 04-28-2026.
End of Addendum No. 1
CAL883229BN & CAL883229BS Nutrient Reduction Wetland Project DOCUMENT CC – Attachment 1 Bid No. 26-2 PROPOSAL AND SCHEDULE OF PRICES
Time and Date for Bid Submissions: 3:00:00 PM, 05/20/2026
BIDDER LOGIN
https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
Time and Date of Bid Opening: 3:00 PM, May 20, 2026 Bid Opening TEAMS: +1 469-998-7627, 771541789#
Project Description and Location: CAL883229BN & CAL883229BS Nutrient Reduction Wetlands Project Section 29, Township 88 North, Range 32 West Calhoun County, Iowa
PROPOSAL AND SCHEDULE OF PRICES
Proposal of ___________________________________________________________________________________________ (PRINT Name of Bidder: COMPANY & CONTACT)
Located at ( ) (FULL Mailing Address) (Telephone Number)
Amount of
Proposal Guarantee
Description of Work Specified Completion Date Liquidated Damages
10% of Base Bid
All Work Except Seeding
December 31, 2026
$175.00 Per Day
Seeding - Structure
Seeding - Buffer
May 15, 2027 June 30, 2027
$125.00 Per Day
The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish satisfactory Performance Bond in an amount not less than one hundred percent (100%) of the contract award within fourteen (14) days from the date when Notice-of-Award is received, and to provide all supervision, labor, materials, and equipment required to complete the project designated above, for the prices hereinafter set forth, in strict compliance with the Contract Documents prepared by the Division.
Further, the parties agree and acknowledge as follows:
The amount of loss or damages likely to be incurred by Division are uncertain and said loss is incapable or very difficult to quantify and estimate;
The amount specified for liquidated damages herein bear a reasonable relationship to, and are not plainly or grossly disproportionate to, the probable loss likely to be incurred by Division in connection with any delay on part of the Contractor;
The amount of liquidated damages fixed herein bears a reasonable relationship to Division’s anticipated losses and/or actual losses;
The amount of liquidated damages herein fairly approximates Division’s loss at the time of making of this Agreement;
The amount of liquidated damages fixed herein are fair and reasonable and it approximates to the extent possible the actual loss to Division as a result of any delay on the part of Contractor; and
Division and Contractor are sophisticated parties and negotiated this Agreement at arm’s length.
Now therefore, in consideration of the mutual obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:
Contractor will commence the work after the Preconstruction Conference and by the Construction Start Date approved by Division in the Construction Progress Schedule.
Contractor will complete the work within the specified time period identified in the contract, or as amended, or be responsible for liquidated damages per day as set forth in the above table.
The liquidated damages may be withheld from payments made to the Contractor by the Division upon written notice that liquidated damages have begun to accrue, and such damages are in addition to other remedies available as provided for in this contract and applicable law.
A Proposal Guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Division, if the undersigned fails or refuses to execute the contract and furnish satisfactory Performance Bond, if awarded the contract.
By _______________________________________________ (Signed)
( PRINT NAME)
(Title) (Date)
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________
THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTARIZED, OR THIS BID WILL BE REJECTED
AFFIDAVIT
The signatory, being duly sworn, does depose and say that the undersigned is an authorized representative of:
(Name of Firm)
Located at __________________________________________________________________________________ hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said Bidder has thoroughly examined the Contract Documents, carefully prepared the Proposal and Schedule of Prices form, and has checked the same in detail before submitting; and that said Bidder, or the agents, officers, or employees thereof, have not, either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.
(Signed)
(PRINT name)
Subscribed and sworn to before me this _________ day of ________________________________, 20____
(Signed, Notary)
My Commission Expires _______________, 20______
Must include notary stamp
SCHEDULE OF PRICES
CAL883229BN
Contract No. 26-2 Section 29, Township 88 North, Range 32 West, Calhoun County, Iowa
Name of Bidder:_____________________________________________________________________________
Item No.
Work or Material Spec No.
Est Qty
Unit Unit Price
Total
1 Site Stripping and Preparation CS-IA-001 1 LS
2 Crop Damage CS-IA-001 - - - -
3 Structure & Channel Seeding CS-IA-006 1.5 AC
4 Buffer Seeding CS-IA-006 15.1 AC
5 Mobilization & Demobilization CS-008 1 LS
6 Drain Tile Investigation & Removal CS-IA-009 2,270 LF
7 Excavation (General - P) CS-IA-021 6,176 CY
8 Earthfill (General - P) CS-IA-023 6,176 CY
9 Earthfill (General Dam - P) CS-IA-023 0 CY - -
10 Earthfill (Dam Core - P) CS-IA-023 0 CY - -
11 Earthfill (18"-Clay Liner Wetland Bottom, 2 lifts of 9" - P) CS-IA-023 9,841 CY
Earthfill (Scarify and Recompact 9" layer of wetland bottom- P)
CS-IA-023 4,494 CY
13 Topsoil Placement (6" layer - P) CS-IA-026 4,535 CY
14 Topsoil Placement (12" layer - P) CS-IA-026 0 CY - -
15 PVC Forcemain, 8" Schedule 80 CS-IA-045 92 LF
16 Perforated Polyethylene Pipe with porous backfill, 4" dam. CS-IA-046 279 LF
17 Non-perforated Polyethylene Pipe, 6" diam. CS-IA-046 187 LF
18 SDR 26 PVC, 24" diam. CS-IA-046 367 LF
19 Riser Inlet Structure, 24" CS-IA-051 1 EA
20 CMP Water Control Structure, 48" CS-IA-051 1 EA
21 Aluminized CMP, 18" diam, 14 GA CS-IA-051 177 LF
22 CMP Outlet Pipes, 8" x 20' CS-IA-051 2 EA
23 Riprap, Class E CS-IA-061 150 TN
24 Clean Stone, 1" CS-IA-061 150 TN
25 Clean Stone, 2" CS-IA-061 30 TN
26 Pollution Control, Silt Fence CS-IA-005 472 LF
27 Pollution Control, Type 2B RECP CS-IA-005 560 LF
28 Solar, Batter, Electrical & Control Division 26 2 EA
29 Pump Station Div 26 & 33 2 EA
30 Single Cantiliver Slide Gate Plan C304 1 LS
31 Chain link security fence Plan C304 215 LF
IMPACS will have only 30 bid items listed under group one.
SUB-TOTAL BASE BID….……………………………………………………………………………$________________
Cal883229BN-NORTH
Cal883229BS-SOUTH Contract No. 26-2 Section 29, Township 88 North, Range 32 West, Calhoun County, Iowa
Name of Bidder:
Item No.
Work or Material Spec No.
Est Qty
Unit Unit Price
Total
1 Site Stripping and Preparation CS-IA-001 1 LS
2 Crop Damage CS-IA-001 - - - -
3 Structure & Channel Seeding CS-IA-006 0.4 AC
4 Buffer Seeding CS-IA-006 0.6 AC
5 Mobilization & Demobilization CS-008 1 LS
6 Drain Tile Investigation & Removal CS-IA-009 65 LF
7 Excavation (General - P) CS-IA-021 1,056 CY
8 Earthfill (General - P) CS-IA-023 585 CY
9 Earthfill (General Dam - P) CS-IA-023 579 CY
10 Earthfill (Dam Core - P) CS-IA-023 191 CY
11 Earthfill (18"-Clay Liner Wetland Bottom, 2 lifts of 9" - P) CS-IA-023 2,046 CY
Earthfill (Scarify and Recompact 9" layer of wetland bottom- P)
CS-IA-023 4,607 CY
13 Topsoil Placement (6" layer - P) CS-IA-026 787 CY
14 Topsoil Placement (12" layer - P) CS-IA-026 433 CY
15 PVC Forcemain, 8" Schedule 80 CS-IA-045 27 LF
Perforated Polyethylene Pipe with porous backfill, 4" dam.
CS-IA-046 0 LF - -
17 Non-perforated Polyethylene Pipe, 6" diam. CS-IA-046 0 LF - -
18 SDR 26 PVC, 24" diam. CS-IA-046 210 LF
19 Riser Inlet Structure, 24" CS-IA-051 1 EA
20 CMP Water Control Structure, 48" CS-IA-051 1 EA
21 Aluminized CMP, 18" diam, 14 GA CS-IA-051 114 LF
22 CMP Outlet Pipes, 8" x 20' CS-IA-051 0 EA - -
23 Riprap, Class E CS-IA-061 150 TN
24 Clean Stone, 1" CS-IA-061 70 TN
25 Clean Stone, 2" CS-IA-061 30 TN
26 Pollution Control, Silt Fence CS-IA-005 304 LF
27 Pollution Control, Type 2B RECP CS-IA-005 395 LF
28 Solar, Batter, Electrical & Control Division 26 1 EA
29 Pump Station Div 26 & 33 1 EA
30 Single Cantiliver Slide Gate Plan C304 1 LS
31 Chain link security fence Plan C304 168 LF IMPACS will have only 30 bid items listed under group two.
SUB-TOTAL BASE BID….……………………………………………………………………………$________________
Cal883229BN-SOUTH
TOTAL BASE BID………… Cal883229BN-NORTH and Cal883229BS-SOUTH…………………$________________
Worksheet purposes only. Bids will only be accepted through the on-line Iowa Management of Procurement & Contracts System (IMPACS).
To register and learn about IMPACS, go to:
https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa
END OF DOCUMENT CC
Attachment No. 2
(Please see updated Plans Dated 04-28-2026)
STATE OF IOWA
ROCKWELL CITY, IOWA
ENGINEER
SHIVE-HATTERY, INC
ATTN: DAN JENSEN
4125 WESTOWN PARKWAY, SUITE 100
WEST DES MOINES, IOWA 50266
PH: (515) 223-8104
FX: (515) 223-0622
SITE ADDRESS:
2579 PRESTON AVE
ROCKWELL CITY, IA, 50579
CONTACT INFORMATION:
IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP
SARA SMITH
502 E 9TH ST
DES MOINES, IA, 50319
OFFICE PH: (515) 242-6130
SARA.SMITH@IOWAAGRICULTURE.GOV
CAL883229B PUMPED WETLANDS
IDALS
PROJECT
LOCATION
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C000
BI
D
DO
CU
M
EN
TS
/2 8/
C
AL
B
PU
M
PE
D
W
ET
LA
N
D S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
- C
O
VE
R
SH
EE
T.
dw g
4/
/2
:4 4:
A
M
PROJECT DRAWING COORDINATE SYSTEM:
HORIZONTAL: NAD83 IOWA STATE PLANE
NORTH ZONE (1401)
VERTICAL: NAVD88
UNITS: U.S. SURVEY FEET
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL 'C' SHEETS
DANIEL JENSEN
25063
CIVIL ENGINEER
NRCS NEM PART 505 CERTIFICATION
THE SIGNING PROFESSIONALS HEREBY
CERTIFY THAT, TO THE BEST OF THEIR
PROFESSIONAL KNOWLEDGE,
JUDGEMENT, AND BELIEF, THESE PLANS
MEET APPLICABLE NRCS STANDARDS.
I O
W A D E P A R T M E NT O F
AGR
I C U L T UR E & L A N D S T EWA R D
SH
IP
PROJECT
LOCATION
CALHOUN COUNTY
NORTH CONSTRUCTION
ENTRANCE
LANDOWNERS
JOEL WUEBKER
2588 QUINTON AVE
ROCKWELL CITY, IA 50579
PH: (712) 297-0609
LOHRVILLE
ROCKWELL CITY
POMEROY
MANSON
FARNHAMVILLE
LAKE CITY
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
PR
ES
TO
N
A
VE
D.D.9 CAL
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL 'E' SHEETS
KEVIN J. BRUXVOORT
19927
ELECTRICAL ENGINEER
NORTH WETLAND
PROJECT EASEMENT
LANDOWNER: JOEL WUEBKER
CALHOUN COUNTY CONSERVATION
CURTIS VANDERHEIDEN
1228 HIGH ST
ROCKWELL CITY, IA, 50579
OFFICE PH: (712) 297-7131
CONSERVATION@CALHOHNCOUNTY.IOWA.GOV
SOUTH WETLAND
PROJECT EASEMENT
LANDOWNER: CALHOUN
COUNTY CONSERVATION
Sheet List Table Sheet Number Sheet Title
C000 COVER SHEET
C001 PROJECT QUANTITIES
C002 PROJECT NOTES
CD01 EXISTING CONDITIONS AND REMOVALS
C101 NORTH WETLAND GRADING PLAN
C102 NORTH WETLAND CUT-FILL PLAN
C103 NORTH WETLAND DRAWDOWN PLAN AND PROFILE
C104 NORTH WETLAND PUMP STATION 1 PLAN AND PROFILE
C105 NORTH WETLAND PUMP STATION 2 PLAN AND PROFILE
C106 NORTH SEEDING PLAN
C201 SOUTH WETLAND GRADING PLAN
C202 SOUTH WETLAND CUT-FILL PLAN
C203 SOUTH EMBANKMENT PLAN AND PROFILE
C204 SOUTH WETLAND DRAWDOWN PLAN AND PROFILE
C205 SOUTH WETLAND PUMP STATION PLAN AND PROFILE
C206 SOUTH SEEDING PLAN
C301 CONSTRUCTION DETAILS
C302 CONSTRUCTION DETAILS
C303 CONSTRUCTION DETAILS
C304 CONSTRUCTION DETAILS
C305 NORTH WETLAND DUPLEX PUMP DETAILS
C306 SOUTH WETLAND SIMPLEX PUMP DETAILS
E101 NORTH WETLAND PUMP STATION
E102 SOUTH WETLAND PUMP STATION
NORTH WETLAND
PROJECT EASEMENT
LANDOWNER: CALHOUN COUNTY
CONSERVATION
THE ENGINEERING JOB CLASS IS IV
SOUTH CONSTRUCTION
ENTRANCE
D.
D.
CA
L
D.D.65 CAL
DRAINAGE DISTRICT
BRIAN BLOME
ROCKWELL CITY, IA, 50579
BBLOMME@BVCOUNTYIOWA.COM
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL 'C' SHEETS
DANIEL JENSEN
25063
CIVIL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:
My License Renewal Date is: DECEMBER 31, Printed or typed name:
License Number:
Signature: Date
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED
BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF IOWA.
ALL 'E' SHEETS
KEVIN J. BRUXVOORT
19927
ELECTRICAL ENGINEER
04-03-2026
04-03-2026
04-28-2026
04-28-2026
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C001
PR
O
JE
CT
Q
UA
NT
IT
IE
S
G
HK
DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
C
AL
B
PU
M
PE
D
W
ET
LA
N
D S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
Q
UA
NT
IT
IE
S.
dw g 4/
/2
:4
4:
A M
ESTIMATED QUANTITIES:
GENERAL NOTES:
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE
CONNECTIONS PLOTTED ON THIS DRAWING ARE APPROXIMATE ONLY AND
WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY,
INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND
SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT
SHOWN ON THIS DRAWING. THE VERIFICATION OF EXISTENCE OF, AND THE
DETERMINATION OF THE EXACT LOCATION OF, UTILITY MAINS,
STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY
OF THE CONSTRUCTION CONTRACTOR(S).
2. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES
VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48
HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
3. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S
EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
4. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT
PRIOR AUTHORIZATION FROM THE OWNER'S REPRESENTATIVE.
5. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY
CONSTRUCTION. MONUMENTS SHALL BE SET BY A LAND SURVEYOR
REGISTERED TO PRACTICE IN THE STATE OF IOWA.
6. ALL DEBRIS AND TRASH ENCOUNTERED DURING CONSTRUCTION WITHIN
THE PROJECT LIMITS, OR DIRECTED BY THE ENGINEER, SHALL BE
PROPERLY DISPOSED OF.
7. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION DE-WATERING
THAT IS REQUIRED AT NO ADDITIONAL COST TO THE DIVISION.
8. REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES (TILE, UTILITIES,
FENCES, ETC.) DESIGNATED TO REMAIN, AT NO ADDITIONAL EXPENSE TO
THE OWNER. ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING
STAGING AREAS AND HAUL ROUTES, ARE TO BE REWORKED TO THEIR
EXISTING CONDITIONS AND SEEDED AT NO ADDITIONAL COST TO THE
DIVISION IF OUTSIDE OF PROJECT LIMITS AND NOT APPROVED BY
ENGINEER.
9. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE
CONTRACT WILL BE CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK,
WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE
MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE,
FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL
BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER, AS REQUIRED
BY THE OWNER AT THE CONTRACTOR'S EXPENSE.
10. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNERS
REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS
OR ANY EXTRA WORK DONE WITHOUT AUTHORITY WILL NOT BE PAID FOR.
11. A SHRINKAGE FACTOR OF 20% WAS ESTIMATED FOR THIS PROJECT. THE
CONTRACTOR SHALL MAKE CHANGES IN EARTHWORK AS NEEDED TO
ADJUST FOR INACCURACIES INHERENT WITH ESTIMATING THE SHRINKAGE
FACTOR. THESE CHANGES SHALL ONLY BE MADE AFTER CONSULTATION
AND APPROVAL BY THE ENGINEER AND DIVISION.
12. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.
13. THE CONTRACTOR SHALL KEEP ALL ROADS OPEN TO THROUGH TRAFFIC
AT ALL TIMES.
14. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE COORDINATED
WITH THE GOVERNING AUTHORITY AND SHALL BE DONE IN ACCORDANCE
WITH THEIR STANDARDS.
15. SUBMIT MANUFACTURER'S CERTIFICATION AND MATERIAL DATA FOR ALL
MATERIALS DELIVERED TO THE PROJECT SITE AS REQUESTED BY THE
OWNERS REPRESENTATIVE.
16. CONSTRUCTION SURVEY STAKING WILL BE PAID FOR BY THE OWNER AND
PROVIDED BY THE ENGINEER. CONTROL POINTS WILL BE SET FOR USE
WITH GPS CONTROLLED GRADING, IF DESIRED. CONTRACTOR SHALL
PRESERVE STAKES TO THE EXTENT FEASIBLE. ANY RE-STAKING COSTS
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
17. NEITHER SHIVE-HATTERY NOR IDALS GUARANTEE THIS PRACTICE WILL
HOLD A PERMANENT POOL OF WATER.
CULTURAL RESOURCES NOTE:
1. IF A CULTURAL RESOURCE IS IDENTIFIED
DURING CONSTRUCTION, STOP IMMEDIATELY
AND NOTIFY LOCAL NATURAL RESOURCES
CONSERVATION SERVICE OFFICE.
NORTH WETLAND DESIGN DATA:
PROJECT ID CAL883229B (NORTH) -----
LANDOWNER(S) JOEL WUEBKER & CALHOHN COUNTY CONSERVATION -----
PRELIMINARY OR FINAL DESIGN FINAL -----
DRAINAGE AREA 34,496 (DRAINAGE DITCH) 32.6 (OVERLAND FLOW) ACRES
WETLAND POOL AREA 7.35 ACRES
DEEP WATER AREA (>3 FT DEEP) 0.05 ACRES
NORMAL POOL ELEVATION 1186.00 FEET
AVERAGE POOL DEPTH 0.85 FEET
MAXIMUM POOL DEPTH 2.2 FEET
POOL STORAGE 6.17 ACRE-FEET
BERM ELEVATION N/A FEET
BERM STORAGE N/A ACRE-FEET
LENGTH OF BERM N/A FEET
AUXILIARY SPILLWAY ELEVATION N/A FEET
AUXILIARY SPILLWAY WIDTH N/A FEET
WEIR WIDTH N/A FEET
DROP HEIGHT N/A FEET
TIME OF CONCENTRATION 0.179 HOURS
WEIGHTED RUNOFF CURVE NUMBER 85 -----
5-YEAR STORM DESIGN FLOW 112.04 CFS
5-YEAR FLOOD SURF. ELEVATION 1186.81 FEET
25-YEAR STORM DESIGN FLOW 191.27 CFS
25-YEAR FLOOD SURF. ELEVATION 1186.97 FEET
100-YEAR STORM DESIGN FLOW 280.62 CFS
100-YEAR FLOOD SURF. ELEVATION 1187.09 FEET
TOTAL EASEMENT AREA 24.04 ACRES
PUMP INFORMATION
TOTAL DYNAMIC HEAD 14.5 FEET
DESIGN MAXIMUM DISCHARGE 3.2 CFS (Two Pumps) CFS
DESIGN DAILY FLOW VOLUME 600,000 - 700,00 GAL/DAY
# ITEM DESCRIPTION NORTH SITE
QUANTITY
SOUTH SITE
QUANTITY TOTAL QUANTITY UNITS
1 SITE STRIPPING & PREPARATION 1 1 1 LS
2 CROP DAMAGE 0 0 0 AC
3 STRUCTURE & CHANNEL SEEDING 1.5 0.4 1.9 AC
4 BUFFER SEEDING 15.1 0.6 15.7 AC
5 MOBILIZATION AND DEMOBILIZATION 1 1 1 LS
6 DRAIN TILE INVESTIGATION AND REMOVAL 2270 65 2335 LF
7 EXCAVATION (GENERAL (P)) 6176 1056 7232 CY
8 EARTHFILL (GENERAL (P)) 6176 585 6761 CY
9 EARTHFILL (GENERAL DAM (P)) 0 579 579 CY
10 EARTHFILL (DAM CORE (P)) 0 191 191 CY
11 EARTHFILL (18" CLAY LINER, WETLAND BOTTOM, TWO 9" LIFTS (P)): 9841 2046 11887 CY
12 EARTHFILL (SCARIFY AND RECOMPACT 9" LAYER OF WETLAND BOTTOM (P)): 4494 4607 9101 CY
13 TOPSOIL PLACEMENT, 6 INCH 4535 787 5322 CY
14 TOPSOIL PLACEMENT, 12 INCH 0 433 433 CY
15 8" PVC PIPE, SCHEDULE 80, FORECMAIN 92 27 119 LF
16 4" PERFORATED POLYETHYLENE PIPE WITH POROUS BACKFILL, SINGLE WALL 279 0 279 LF
17 6" NON-PERFORTATED POLYETHYLENE PIPE, SINGLE WALL 187 0 187 LF
18 24" SDR 26 PVC 367 210 577 LF
19 24" RISER INLET STRUCTURE 1 1 2 EA
20 48" CMP WATER CONTROL STRUCTURE 1 1 2 EA
21 18" ALUMINIZED CMP WETLAND DRAWDOWN PIPE, 14GA 177 114 291 LF
22 8" CMP TILE OUTLETS (20 LF EACH) 2 0 2 EA
23 RIP RAP, CLASS E 150 150 300 TON
24 1" CLEAN STONE 150 70 220 TON
25 2" CLEAN STONE 30 30 60 TON
26 POLLUTION CONTROL, SILT FENCE 472 304 776 LF
27 POLLUTION CONTROL, TYPE 2B RECP 560 395 955 SY
28 SOLAR, BATTERY, ELECTRICAL AND CONTROLS (COMPLETE SYSTEM) 2 1 3 LS
29 PUMP STATION (PUMP, CONTROLS, ELECTRICAL, STRUCTURE, APPURENTANCES (COMPLETE SYSTEM)) 2 1 3 LS
30 SINGLE CANTILEVER SLIDE GATE 1 1 2 LS
31 CHAIN LINK SECURITY FENCE 215 168 383 LF
SOUTH WETLAND DESIGN DATA:
PROJECT ID CAL883229B (SOUTH) -----
LANDOWNER(S) CALHOUN COUNTY CONSERVATION -----
PRELIMINARY OR FINAL DESIGN FINAL -----
DRAINAGE AREA 10,560 (DRAINAGE DTICH) 9.8 (OVERLAND FLOW) ACRES
WETLAND POOL AREA 4.65 ACRES
DEEP WATER AREA (>3 FT DEEP) 0.09 ACRES
NORMAL POOL ELEVATION 1186.00 FEET
AVERAGE POOL DEPTH 0.63 FEET
MAXIMUM POOL DEPTH 3.0 FEET
POOL STORAGE 2.71 ACRE-FEET
BERM ELEVATION 1187 FEET
BERM STORAGE 8.78 ACRE-FEET
LENGTH OF BERM 305 FEET
AUXILIARY SPILLWAY ELEVATION N/A FEET
AUXILIARY SPILLWAY WIDTH N/A FEET
WEIR WIDTH N/A FEET
DROP HEIGHT N/A FEET
TIME OF CONCENTRATION 0.083 HOURS
WEIGHTED RUNOFF CURVE NUMBER 85 -----
2-YEAR STORM DESIGN FLOW 31.32 CFS
2-YEAR FLOOD SURF. ELEVATION 1186.33 FEET
25-YEAR STORM DESIGN FLOW 72.07 CFS
25-YEAR FLOOD SURF. ELEVATION 1186.56 FEET
100-YEAR STORM DESIGN FLOW 105.13 CFS
100-YEAR FLOOD SURF. ELEVATION 1186.71 FEET
TOTAL EASEMENT AREA 8.83 ACRES
PUMP INFORMATION
TOTAL DYNAMIC HEAD 12.8 FEET
DESIGN MAXIMUM DISCHARGE 1.7 CFS (One Pump) CFS
DESIGN DAILY FLOW VOLUME 300,000 - 360,000 GAL/DAY
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
T M E N T O F
A G R I C U L T UR E
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C002
PR
O
JE
CT
N O
TE
S
G
HK
DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
C
AL
B
PU
M
PE
D
W
ET
LA
N
D S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
Q
UA
NT
IT
IE
S.
dw g 4/
/2
:4
4:
A M
GENERAL NOTES:
1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE
CONNECTIONS PLOTTED ON THIS DRAWING ARE APPROXIMATE ONLY AND
WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY,
INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND
SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT
SHOWN ON THIS DRAWING. THE VERIFICATION OF EXISTENCE OF, AND THE
DETERMINATION OF THE EXACT LOCATION OF, UTILITY MAINS,
STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY
OF THE CONSTRUCTION CONTRACTOR(S).
2. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES
VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48
HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.
3. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S
EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.
4. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT
PRIOR AUTHORIZATION FROM THE OWNER'S REPRESENTATIVE.
5. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY
CONSTRUCTION. MONUMENTS SHALL BE SET BY A LAND SURVEYOR
REGISTERED TO PRACTICE IN THE STATE OF IOWA.
6. ALL DEBRIS AND TRASH ENCOUNTERED DURING CONSTRUCTION WITHIN
THE PROJECT LIMITS, OR DIRECTED BY THE ENGINEER, SHALL BE
PROPERLY DISPOSED OF.
7. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION DE-WATERING
THAT IS REQUIRED AT NO ADDITIONAL COST TO THE DIVISION.
8. REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES (TILE, UTILITIES,
FENCES, ETC.) DESIGNATED TO REMAIN, AT NO ADDITIONAL EXPENSE TO
THE OWNER. ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING
STAGING AREAS AND HAUL ROUTES, ARE TO BE REWORKED TO THEIR
EXISTING CONDITIONS AND SEEDED AT NO ADDITIONAL COST TO THE
DIVISION IF OUTSIDE OF PROJECT LIMITS AND NOT APPROVED BY
ENGINEER.
9. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE
CONTRACT WILL BE CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK,
WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE
MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE,
FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL
BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER, AS REQUIRED
BY THE OWNER AT THE CONTRACTOR'S EXPENSE.
10. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNERS
REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS
OR ANY EXTRA WORK DONE WITHOUT AUTHORITY WILL NOT BE PAID FOR.
11. A SHRINKAGE FACTOR OF 20% WAS ESTIMATED FOR THIS PROJECT. THE
CONTRACTOR SHALL MAKE CHANGES IN EARTHWORK AS NEEDED TO
ADJUST FOR INACCURACIES INHERENT WITH ESTIMATING THE SHRINKAGE
FACTOR. THESE CHANGES SHALL ONLY BE MADE AFTER CONSULTATION
AND APPROVAL BY THE ENGINEER AND DIVISION.
12. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.
13. THE CONTRACTOR SHALL KEEP ALL ROADS OPEN TO THROUGH TRAFFIC
AT ALL TIMES.
14. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE COORDINATED
WITH THE GOVERNING AUTHORITY AND SHALL BE DONE IN ACCORDANCE
WITH THEIR STANDARDS.
15. SUBMIT MANUFACTURER'S CERTIFICATION AND MATERIAL DATA FOR ALL
MATERIALS DELIVERED TO THE PROJECT SITE AS REQUESTED BY THE
OWNERS REPRESENTATIVE.
16. CONSTRUCTION SURVEY STAKING WILL BE PAID FOR BY THE OWNER AND
PROVIDED BY THE ENGINEER. CONTROL POINTS WILL BE SET FOR USE
WITH GPS CONTROLLED GRADING, IF DESIRED. CONTRACTOR SHALL
PRESERVE STAKES TO THE EXTENT FEASIBLE. ANY RE-STAKING COSTS
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
17. NEITHER SHIVE-HATTERY NOR IDALS GUARANTEE THIS PRACTICE WILL
HOLD A PERMANENT POOL OF WATER.
CULTURAL RESOURCES NOTE:
1. IF A CULTURAL RESOURCE IS IDENTIFIED
DURING CONSTRUCTION, STOP IMMEDIATELY
AND NOTIFY LOCAL NATURAL RESOURCES
CONSERVATION SERVICE OFFICE.
ESTIMATE REFERENCE NOTES:
ITEM # SPEC # DESCRIPTION
1 IA CS-001 SITE STRIPPING & PREPARATION : THIS ITEM WILL CONSIST OF WORK TO REMOVE AND DISPOSE OF EXISTING MATERIAL OR WASTE ONE SITE AND TO TO REMOVE VEGETATION ON AREAS TO BE EXCAVATED OR FILLED. TOTAL DEPTH OF VEGETATIVE STRIPPING AND TOPSOIL STRIPPING SHALL EQUAL A COMBINED DEPTH OF 12". THE TOPSOIL REPLACEMENT QUANTITY SHALL BE PAID SEPARATELY. THIS ITEM WILL ALSO INCLUDE ANY TREE AND BRUSH REMOVAL ALONG WITH ANY FENCES.
2 IA CS-001 CROP DAMAGE: THIS ITEM CONSISTS OF CROP DAMAGE THAT RESULTS FROM CONSTRUCTION ACTIVITIES. IT IS RECOMMENDED CONTRACTOR REMOVE CORN RESIDUE RATHER THAN KNOCK IT DOWN. PAYMENT FOR CROP DAMAGE WILL BE MADE TO THE NEAREST 0.1 ACRE AS MEASURED BY THE ENGINEER OR THEIR REPRESENTATIVE.
THE UNIT RATE FOR CROP DAMAGE WILL BE DETERMINED BY THE DIVISION NEAR THE COMPLETION OF CONSTRUCTION AND ADDED TO THE CONTRACT WITH A CHANGE ORDER. PAYMENT WILL BE MADE TO CONTRACTOR WHO WILL PAY LANDOWNER.
3 IA CS-006 STRUCTURE & CHANNEL SEEDING: THIS ITEM INCLUDES SEEDING AND RELATED ACTIVITIES FOR STUCTURE SEEDING AREAS AS SHOWN ON THE PLANS. INCLUDES SEEDBED PREP, SEEDING, STRAW MULCH, AND FERTILIZER.
4 IA CS-006 BUFFER SEEDING: THIS ITEM INCLUDES SEEDING AND RETAED ACTVITIES FOR BUFFER SEEDING AREAS AS SHOWN ON THE PLANS. NO MULCH OR FERTILIZER SHALL BE APPLIED.
5 CS-008 MOBILIZATION AND DEMOBILIZATION: THIS ITEM SHALL BE CONSIDERED FULL COMPENSATION TO MOBILIZE AND DEMOBILIZE THE CONTRACTOR'S FORCES AND EQUIPMENT FOR THE PROJECT. ALL OTHER WORK NECESSARY TO COMPLETE THE PROJECT AS REPRESENTED HEREIN BUT NOT INCLUDED IN THE ITEMS LISTED BELOW SHALL BE INCIDENTAL TO THIS ITEM. THIS ITEM SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT AND IOWA ONE CALL NOTIFICATIONS TO INSTALL SIGN PROVIDED BY IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP IN AND OWNER APPROVED LOCATION.
6 IA CS-009 DRAIN TILE INVESTIGATION AND REMOVAL: THIS ITEM INCLUDES THE EXPLORATORY EXCAVATIONS REQUIRED TO LOCATE AND REMOVE TILES SHOWN ON THE PLANS. THIS IS FULL COMPENSATION FOR EXCAVATION, BACKFILLING, AND REMOVAL OF THE TILE TRENCHES. CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR ALL TILE
LOCATED AND REMOVED.
7 IA CS-021 EXCAVATION (GENERAL (P)): THIS ITEM INCLUDES THE EXCAVATION OF MATERIAL REQUIRED TO FORM THE WETLAND POOL, EXCAVATION OF THE CORE TRENCH BELOW THE EXISTING GROUND LEVEL, AS DETAILED, AND EXCAVATION FOR BORROW MATERIAL FOR PUMP EQUIPMENT PADS. COHESIVE MATERIAL FOUND DURING GENERAL GRADING MUST BE RESERVED FOR WETLAND CLAY LINER CONSTRUCTION, CORE TRENCH FILL, AND THE DAM CORE. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR THIS EARTHFILL WITHIN THE WETLAND AND MUST BE WASTED IN THE AREAS SHOWN ON THE PLANS OR MAY BE USED FOR THE EQUIPMENT PADS IF REQUIRED.
8 IA CS-023
EARTHFILL (GENERAL (P)): THIS ITEM INCLUDES THE SOIL MATERIAL REQUIRED TO CONSTRUCT THE SUBMERGED BERMS, ADDITIONAL FILL TO BE PLACED OVER TILE COVER BERMS, FILL FOR PUMP EQUIPMENT PADS, AND WASTE SOIL. COHESIVE MATERIAL FOUND DURING GENERAL GRADING MUST BE RESERVE FOR CLAY LINER CONSTRUCTION, CORE TRENCH FILL, AND THE DAM CORE. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR THIS EARTHFILL WITHIN THE WETLAND AND MUST BE WASTED IN THE AREAS SHOWN ON THE PLANS. THE REQUIRED FILL INCLUDES A 20% SHRINKAGE FACTOR. COMPACTION SHALL BE NRCS METHOD 1. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.
9 IA CS-023
EARTHFILL (GENERAL DAM (P)): THIS ITEM INCLUDES THE EARTHFILL PLACEMENT AND COMPACTION NECESSARY TO CONSTRUCTION THE PORTION OF THE EMBANKMENT THAT IS NOT THE EMBANKMENT CORE. COHESIVE MATERIAL FOUND DURING GENERAL GRADING AND COMPACTED LINER CAN BE USED FOR THIS AREA. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR FILL IN THESE AREAS. THE REQUIRED FILL INCLUDES A 20% SHRINKAGE FACTOR. COMPACTION SHALL BE METHOD 1 OR METHOD 2. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN
QUANTITY.
10 IA CS-023 EARTHFILL (DAM CORE (P)): THIS ITEM INCLUDES THE EARTHFILL PLACEMENT AND COMPACTION NECESSARY TO CONSTRUCT THE EMBANKMENT CORE WITHIN THE EMBANKMENT. SELECT COHESIVE MATERIAL TAKEN FROM DESIGNATED BORROW AREA SHOULD BE USED FOR THIS AREA. SAND AND GRAVEL SHALL NOT BE USED FOR THIS AREA. THE REQUIRED FILL INCLUDES A 20% SHRINKAGE FACTOR. COMPACTION SHALL BE NRCS METHOD 2. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.
11 IA CS-023
EARTHFILL (18" RE-COMPACTED CLAY LINER, WETLAND BOTTOM (P)): THIS ITEM INCLUDES CONSTRUCTION OF A COMPACTED CLAY LINER WITHIN THE WETLAND POOL IN AREAS WHERE EXCAVATION OCCURS. SEQUENCING SHALL INCLUDE OVEREXCAVATION AND STOCKPILE OF 9" OF SOIL, SCARIFICATION TO A DEPTH OF 9 INCHES, AND RECOMPACTION (LIFT 1). AN ADDITIONAL 9 INCH CLAY LIFT WILL BE REPLACED ABOVE LIFT ONE AND COMPACTED, FORMING A TOTAL OF 18 INCHES OF CLAY LINER PRIOR TO RESPREADIN TOPSOIL. PROPOSED CONTOURS SHOWN ARE TO FINSHED SURFACE, POST TOPSOIL RESPREAD. MOISTURE CONDITIONING MAY BE REQUIRED AND COMPACTION SHALL BE NRCS METHOD 2. RESERVE SELECT CLAY SOILS FOR CONSTRUCTION OF THE CLAY LINER AND NOTIFY THE ENGINEER IS SANDY SOILS ARE LOCATED. CONTRACTOR SHALL REMOVE ROCKS LARGER THAN 6 INCHES. NOTIFY ENGINEER IMMEDIATELY IF SANDY SOILS ARE ENCOUNTERED. ITEM WILL BE PAID BASED ON
PLAN QUANTITY.
12 IA CS-023 EARTHFILL (SCARIFY AND RECOMPACT 9" LAYER OF WETLAND BOTTOM (P)): THIS ITEM INCLUDES SCARIFICATION AND LOOSENING OF A 9 INCH SURFACE LAYER OF SOIL IN UNDISTURBED AREAS OF THE WETLAND POOL BOTTOM , MOISTURE CONDITIONING, AND COMPACTION OF THE WETLAND BOTTOM TO FORM A SEAL. CONTRACTOR SHALL REMOVE ROCKS LARGER THAN 6 INCHES. NOTIFY ENGINEER IMMEDIATELY IF SANDY SOILS ARE ENCOUNTERED. ITEM WILL BE PAID BASED ON PLAN QUANTITY.
13 IA CS-026 TOPSOIL PLACEMENT. 6 INCH: THIS ITEM INCLUDES THE RESPREAD OF TOPSOIL STOCKPILED DURING SITE STIRPPING. RESPREAD 6" TOPSOIL IN ALL DISTURBED AREAS INCLDUNG EXCAVATION, BORROW, AND EARTHFILL FOOTPRINTS. ITEM WILL BE PAID BASED ON PLAN QUANTITY.
14 IA CS-026 TOPSOIL PLACEMENT, 12 INCH: THIS ITEM INCLUDES THE RESPREAD OF TOPSOIL STOCKPILED DURING SITE STIRPPING. RESPREAD 12" TOPSOIL ON THE EMBANKMENT FOOTPRINT ON THE SOUTH WETLAND SITE. ITEM WILL BE PAID BASED ON PLAN QUANTITY.
15 IA CS-045 8" SCHEDULE 80 PVC PIPE: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, FITTINGS, AND BACKFILL OF THE BURIED 8" SCHEDULE 80 PVC PIPE AS SHOWN ON THE PLANS. PIPING WITHIN THE PUMP STATION IS NOT INCLUDED WITH THIS BID ITEM AND SHALL BE INCIDENTAL TO BID ITEM 30.
16 IA CS-046 4" PERFORATED POLYETHYLENE PIPE WITH POROUS BACKFILL, SINGLE WALL : THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 4" PERFORATED HDPE DRAIN TILE WITH POROUS BACKFILL.
17 IA CS-046 6" PERFORATED POLYETHYLENE PIPE, NON PERFORATED, SINGLE WALL: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 6" NON-PERFORATED HDPE DRAIN TILE.
18 IA CS-046 24" SDR 26 PVC PIPE: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 24" SDR 26 PVC PIPE WITH GASKETED BELL AND SPIGOT JOINTS FROM THE DRAINAGE DITCH TO THE PUMP STATION STUCTURES. PIPE SHALL BE BEDDED IN CLASS 1 AGGREGATE. CONCRETE COLLR CONNECTIONS AT THE
PUMP STUCTURE ARE REQUIRED.
19 IA CS-051 24" RISER INLET STRUCTURE: THIS ITEM INCLUDES COSTS FOR THE MATERIAL AND INSTALLATION OF 24" CMP RISER INLET STRUCTURE PIPE, TRASH RACK, AND BASE A DETAILED.
20 IA CS-051 48" CMP WATER CONTROL STRUCTURE : THIS ITEM INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS FOR THE PLACEMENT OF THE 48" CMP WATER CONTROL STRUCTURE, FOOTING, STEEL, FABRICATION, PIPE CONNECTIONS, STOP LOGS, STOP LOG STORAGE STRUCTURE, AND LOCKABLE LID.
21 IA CS-051 18" CMP DRAWDOWN WETLAND OUTLET PIPE: THIS ITEM INCLUDES ALL LABOR, EQUIPMENT, MATERIALS REQUIRED FOR THE EXCAVATION, AND THE PLACEMENT OF THE CORRUGATE METAL PIPE, INCLUDING ANTI-SEEPAGAE COLLARS.
22 IA CS-051 8" CMP TILE OUTLETS (20 LF EACH): THIS ITEM INCLUDES THE COSTS FOR MATERIAL, EXCAVATION, PLACEMENT, JOINTING, BEDDING, RODENT GUARDS, AND BACKFILLING OF THE 20 LF 8" CMP END SECTION FOR THE PROPOSED FIELD TILE OUTLET TO THE WETLAND. 8" CMP OUTLET SECTIONS ARE FOR 6 INCH TILES.
23 IA CS-061 RIP RAP: THIS ITEM INCLUDES THE EXCAVATION AND PLACEMENT OF CLASS 'E' REVETMENT OVER GEOTEXTILE FABRIC AT THE LOCATIONS SHOWN ON THE PLANS. GEOTEXTILE FABRIC IS INCIDENTAL TO THIS ITEM. QUANTITY DETERMINATION IS BASED ON A UNIT WEIGHT OF 105 POUNDS PER CUBIC FOOT. PROVIDE WEIGHT TICKETS TO
OWNER'S REPRESENTATIVE.
24 IA CS-061 1" CLEAN STONE: THIS ITEMS INCLUDES PROCUREMENT, PLACEMENT AND SPREADING OF 1 INCH CLEAN STONE OVER GEOTEXTILE FABRIC AT THE PUMP PADS. QUANTITY DETERMINATION IS BASED ON A UNIT WEIGHT OF 130 POUNDS PER CUBIC FOOT.
25 IA CS-061 2" CLEAN STONE: THIS ITEMS INCLUDES PROCUREMENT, PLACEMENT AND SPREADING OF 2 INCH CLEAN STONE AT THE STABILIZED CONSTRUCTION ENTRANCE.
26 CS-008 POLLUTION CONTROL, SILT FENCE: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF SILT FENCE AS SHOWN ON THE PLANS AND AS DETAILED.
27 IA CS-005 POLLUTION CONTROL, TYPE 2B RECP: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF TYPE 2B RECP TURF REINFORCING MAT IN ACOORDANCE WITH SUDAS 9040. INSTALLATION SHALL BE PER THE MANUFACTURER’S RECOMMENDATIONS.
28 DIVISION
SOLAR, BATTERY, ELECTRICAL AND CONTROLS (COMPLETE SYSTEM); THIS ITEM INCLUDES PROCUREMENT, INSTALLATION, START UP AND WARRANTYY OF ALL COMPONENTS FOR THE PHOTOVOLTAIC AND BATTERY SYSTEM AS SHOWN IN THE PLANS AND AS DESCRIBED IN THE SPECIFICATIONS INCLUDING CONNECTION TO THE PUMP
SYSTEM AND CONTROLS.
29 DIVISION
33 & 26
PUMP STATION (PUMP, CONTROLS, ELECTRICAL, STRUCTURE, APPURENTANCES (COMPLETE SYSTEM)) : THIS ITEM INCLUDES PROCUREMENT, INSTALLATION, START UP AND WARRANTY ALL COMPONENTS FOR THE PUMPING SYSTEMS AS SHOWN IN THE PLANS AND AS DESCRIBED IN THE SPECIFICATIONS INCLUDING THE CONCRETE STUCTURE, CONNECTIONS, CONTROLS, FLOATS, ELECTRICAL, VARIABLE FREQUENCY DRIVE, PUMPS, INTERIOR PIPING, WATER METER, AND REMOTE MONITORING SYSTEM. REFER TO DRAWINGS AND SPECIFICATIONS.
30 IA CS-092
SINGLE CANTILEVER SLIDE GATE: THIS TIEMS INCLUDES THE INSALLATION AND MATERIALS NEEDED TO INSTALL MANUAL CHAIN‑LINK CANTILEVER SLIDE GATE WITH 12‑FOOT CLEAR OPENING, COMPLETE AND OPERATIONAL, AT LOCATIONS SHOWN. GATE SHALL BE INSTALLED LEVEL, ALIGNED, AND ADJUSTED TO PROVIDE SMOOTH OPERATION WITHOUT GROUND CONTACT. COORDINATE GATE CLEARANCES, POST LOCATIONS, AND FULL TRAVEL LENGTH WITH FENCE LAYOUT. GATE AUTOMATION IS NOT INCLUDED UNLESS SPECIFICALLY NOTED ON THE PLANS. INSTALLATION AND MATERIALS SHALL COMPLY WITH MANUFACTURER RECOMMENDATIONS, SUDAS, AND
OTHER APPLICABLE IOWA STANDARDS.
31 IA CS-092 CHAIN LINK SECURITY FENCE: THIS ITEMS INCLUDES THE INSTALLATION AND MATERIALS NEEDED TO INSTALL 6‑FOOT TALL GALVANIZED CHAIN‑LINK SECURITY FENCE WITH BARBED WIRE TOP AT LOCATIONS SHOW IN PLANS. INSTALLATION AND MATERIALS SHALL COMPLY WITH MANUFACTURER RECOMMENDATIONS, SUDAS, AND OTHER APPLICABLE IOWA STANDARDS. FENCE ALIGNMENT, POST SPACING, AND TERMINATION SHALL BE COORDINATED WITH GATES AND EXISTING IMPROVEMENTS. RESTORE DISTURBED AREAS TO ORIGINAL OR BETTER CONDITION UPON COMPLETION.
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
T M E N T O F
A G R I C U L T UR E
L A
ND
S
TEWARDSHIP
C
ALH
O U
N C
O U
N
TY
C
ALH
O U
N C
O U
N
TY
D
&J LAN
D
TR
U
ST
C
ALH
O U
N C
O U
N
TY
W U
EBKER
, JO
EL & M
O
N
IC
A
D
&J LAN
D
TR
U
ST
D
&J LAN
D
TR
U
ST
11801180
PROJECT GRADING LIMITS AND TILE INSTALLATION LIMITS
STRIP AND STOCKPILE 12 INCHES OF TOPSOIL IN EMBANKMENT
FOOTPRINT AND ALONG PROPOSED DIVERSION TILE LENGTH
OUTSIDE THE PROPOSED EASEMENT. STRIP 6 INCHES OF
TOPSOIL IN ALL OTHER DISTURBED AREAS. RESPREAD TOPSOIL
PRIOR TO SEED BED PREPARATION AND SEEDING.
NO CONTRACTOR
TRAFFIC OUTSIDE OF
EASEMENT UNLESS
APPROVED BY OWNER
EXISTING STREAM
CENTERLINE
100-YEAR FEMA
FLOODPLAIN
LOCATE AND REMOVE
900' OF EXISTING TILE
LOCATE, CRUSH, AND BURY ALL TILE
WITHIN PROPOSED WETLAND POOL.
LOCATED AND REMOVE
TILE OUTLETS TO CREEK
LOCATE EXISTING FIELD TILE FOR
CONNECTIONS TO PROPOSED TILE TO
BE DAYLIGHTED TO THE POOL (TYP).
3 LOCATIONS ANTICIPATED.
PROTECT ALL TILE TO REMAIN IN PLACE.
CONTRACTOR RESPONSIBLE FOR REPAIR OF
ANY DAMAGE CAUSED BY CONSTRUCTION AT
NO ADDITIONAL COST TO THE DIVISION.
EXISTING 12" CMP
LOCATE AND REMOVE
1,020' OF EXISTING TILE
LOCATE AND REMOVE
218' OF EXISTING TILE
EASEMENT BOUNDARY
EASEMENT BOUNDARY (TYP)
REMOVE & DISPOSE
EXISTING 12" CMP OUTLET
REMOVE & DISPOSE
EXISTING 12" CMP OUTLET
APPROXIMATE PROPERTY
BOUNDARY (TYP.)
EMBANKMENT DAM
GRADING LIMITS
STRIP 12 INCHES
FEMA FLOODWAY
REMOVE AND DISPOSE
EXISTING 18" CMP OUTLET
CONSTRUCTION ACCESS ROUTE SHALL BE
WITHIN EASEMENT, COORDINATE WITH THE
OWNER. DISK COMPACTED AREAS AS
REQUIRED PRIOR TO SEED BED PREPARATION.
STABILIZED CONSTRUCTION
ENTRANCE, 30 TONS 2" CLEAN STONE
PRESTON AVE
LAKE CREEK
STABILIZED CONSTRUCTION
ENTRANCE, 30 TONS 2" CLEAN STONE
EXCAVATION LIMITS
STRIP 12 INCHES
N O
R
TH
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
T M E N T O F
A G R I C U L T UR E
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d:
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: CD01
EX
IS
TI
NG
CO
ND
IT
IO
NS
A
ND
RE
M O
VA
LS
G
HK
DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
C
AL
B
PU
M
PE
D
W
ET
LA
N
D S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C D0
- E
XI
ST
IN
G
C O
ND
IT
IO
NS
A
ND
R
EM
O
VA
LS
.d wg 4/
/2
:4
4:
A M
PROPERTY LINE (APPROX)
EXISTING CONTOUR - MAJOR
EXISTING CONTOUR - MINOR
LEGEND SURVEY NOTES:
1. LIMITED TOPOGRAPHIC SURVEY COMPLETED BY SHIVE-HATTERY ON
FEBRUARY 22, 2024.
2. SUPPLEMENTAL EXISTING SURFACE INFORMATION SHOWN WAS
BASED ON LIGHT DETECTION AND RANGING (LIDAR) INFORMATION
FROM IOWA DNR (2020).
3. CONTRACTOR SHALL VERIFY BASE SURFACE PRIOR TO
CONSTRUCTION AND COORDINATE WITH ENGINEER.
COORDINATE SYSTEM AND DATUM:
HORIZONTAL DATUM - NAD83, IOWA STATE PLANE, NORTH ZONE
VERTICAL DATUM - NAVD88
TILE INFORMATION
EXISTING TILE INFORMATION IS APPROXIMATE AND WAS PROVIDED BY
THE LANDOWNER.
EXISTING DRAIN TILE
EXISTING TILE REMOVAL
SOIL BORING SB
EASEMENT BOUNDARY
100-YEAR FLOODPLAIN
SOILS NOTES:
1. STRIP EXISTING VEGETATION AND TOPSOIL WITHIN ALL DISTURBED
AREAS. STRIPPING DEPTH SHALL BE 12 INCHES. STOCKPILE CLEAN
TOPSOIL FREE OF VEGETATION FOR RESPREAD.
2. LIMITED SOIL PROBING WAS COMPLETED BY SHIVE-HATTERY ON
OCTOBER 26, 2023. PROBING WAS DONE TO A DEPTH OF
APPROXIMATELY 42 INCHES IN PROPOSED POOL AREAS.
3. SOILS CONSIST OF A SURFACE LAYER OF DARK ORGANIC TOPSOIL
FOLLOWED BY A LEAN CLAY LAYER. SOME SILT AND SAND SEAMS WERE
PRESENT AS IS TYPICAL IN FLOODPLAN AREAS. THE CLAY LAYER WAS
OBSERVED DOWN TO DEPTHS OF ABOUT 42 INCHES. SOILS AT DEEPER
DEPTHS ARE UNKNOWN. EXCAVATION IS LIMITS TO 3 FEET IN POOL
AREAS AND SELECT SOILS SHALL BE RESERVED FOR CLAY LINER
CONSTRUCTION. SOIL CONDITIONS MAY VARY.
4. NOTIFY ENGINEER IMMEDIATELY IF SAND IS ENCOUNTERED IN LARGE
QUANTITIES. GRADING MAY REQUIRE MODIFICATION IN THE FIELD
BASED ON SOIL CONDITIONS. COORDINATE WITH THE ENGINEER.
500-YEAR FLOODPLAIN
FLOODWAY
0+00
1+00 2+00
2+50
0+
1+
2+
11801180
9:1
:1
43:1
4:1
4:1
0:
3:1
3:
85 11
:1
INSTALL 30 LF OF
6" HDPE @ 3.28%
START IE = 1189.0
END IE = 1188.0
INSTALL 74 LF OF
6" HDPE @ 0.47%
START IE = 1188.0
END IE = 1187.7
INSTALL 90 LF OF
6" HDPE @ 1.12%
START IE = 1189.0
END IE = 1188.0
IE = 1188.0
24" CMP RISER
RIM = 1185.50
NORTH WETLAND DRAWDOWN PIPE
146 LF 18" CMP @ 0.69%
48" CMP WATER CONTROL STRUCTURE
RIM = 1188.60
NORTH WETLAND OUTLET PIPE
31 LF 18" CMP @ 0.00%
PRESTON AVE
LAKE CREEK
X
X
X
X
X X
X
X X
INSTALL 34 LF OF
6" HDPE @ 0.47%
START IE = 1187.7
END IE = 1187.5
IE = 1187.5
TWO PUMP STATION SUMPS, SOLAR PANELS,
BATTERY AND CONTROLS. WATER METER TO
BE INSTALLED ON EACH DISCHARGE PIPE
- SEE DETAIL ON C305
GRAVITY INTAKE PIPE FROM
STREAM TO SUMP. TWIN 24"
SDR 26 PVC TO EACH VAULT
BURIED WATER FORCEMAIN
8 INCH SCHEDULE 80 PVC.
PROPOSED NORMAL WATER LEVEL
ELEVATION = 1186.0
AREA = 7.35 ACRES
AVERAGE DEPTH = 0.85 FT
MAX DEPTH = 2.2 FT
FEMA ZONE A
100-YEAR FLOODPLAIN
APPROXIMATE PROPERTY
BOUNDARY (TYP.)
WETLAND EXCAVATION LIMITS
AREA = 4.1 ACRES
EQUIPMENT PAD
TOP ELEV = 1191.50
EXCESS SOIL PLACEMENT LIMITS
AREA = 1.3 ACRES
EXCAVATED CHANNEL
GRADE TO DRAIN TOWARDS OUTLET
TILE COVER BERM
TOP WIDTH = 12 FEET
SIDE SLOPES = 4:1
TILE COVER BERM
TOP WIDTH = 12 FEET
SIDE SLOPES = 4:1
SEE SHEETS C201 AND C202 FOR
SOUTH WETLAND GRADING PLANS
DELINEATED
FLOODWAY
TILE OUTLET SWALE TO WETLAND POOL
PLACE 35 TONS CLASS 'E' RIPRAP 1.5' THICK
INSTALL 279 LF 4"
PERFORATED DRAIN TILE
WITH POROUS BACKFILL.
0.5% MIN SLOPE.
TILE OUTLET SWALE TO WETLAND POOL
PLACE 25 TONS CLASS 'E' RIPRAP 1.5' THICK
EASEMENT BOUNDARY (TYP.)
20 TONS CLASS 'E' RIPRAP
20 TONS CLASS 'E' RIPRAP
20 TONS CLASS 'E' RIPRAP
30 TONS CLASS 'E' RIPRAP
INSTALL SINGLE
CANTILEVER SLIDE GATE
- SEE DETAIL
INSTALL 215 LF OF CHAIN
LINK SECURITY FENCE
- SEE DETAIL
APPROXIMATE FENCE
POST LOCATION (TYP.)
- SEE DETAIL
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T U R E
L A
ND
S
TEWARDSHIP
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C101
N O
R
TH
W
ET
LA
N
D G
R
AD
IN
G
P
LA
N G
HK DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
50 --- ---C
AL
B
PU
M
PE
D W
ET
LA
N D
S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
G
RA
DI
NG
P
LA
N.
dw g
4/
/2
:5 1:
A
M
N O
R
TH
LEGEND
LINE TYPEDESCRIPTION
TOP OF DAM ELEVATION
GRADING LIMITS
MAJOR CONTOUR (PROPOSED)
MINOR CONTOUR (PROPOSED)
APPROX. PROPERTY BOUNDARY
MAJOR CONTOUR (EXISTING)
MINOR CONTOUR (EXISTING)
NORMAL WATER LEVEL
EASEMENT BOUNDARY
PROPOSED TILE
100-YEAR FLOODPLAIN
X X XSECURITY FENCE
11801180
DELINEATED FLOODWAY
FEMA ZONE A
100-YEAR FLOODPLAIN
X
X
X
X X
X X
X
X X
X
SCARIFY AND RECOMPACT 9"
OF ALL NON-EXCAVATED
AREAS WITHIN POOL LIMITS
WASTE SOIL AREA
18" RECOMPACTED CLAY
LINER WITHIN EXCAVATION
LIMITS OF POOL
SCARIFY AND RECOMPACT 9"
OF ALL NON-EXCAVATED
AREAS WITHIN POOL LIMITS
NORTH EQUIPMENT PAD
TILE COVERS
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
T M E N T O F
A G R I C U L T UR E
L A
ND
S
TEWARDSHIP
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K
PR
O
JE
C
T N
U M
BE
R
Pr in te d: C102
N O
R
TH
W
ET
LA
N
D C
U T-
FI
LL
P
LA
N G
HK DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
50 --- ---C
AL
B
PU
M
PE
D W
ET
LA
N D
S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
G
RA
DI
NG
P
LA
N.
dw g
4/
/2
:5 1:
A
M
N O
R
TH
EARTHWORK TABLE
CLASSIFICATION CUT TOTAL FILL + 20% SHRINK
EXCAVATION, WETLAND 6,176 0
EARTHFILL, EQUIPMENT PAD 0 1,110
EARTHFILL, WASTE SOIL 0 4,046
EARTHFILL, TILE BERMS 0 1,020
TOTAL EARTHWORK 6,176 6,176
ELEVATIONS TABLE
CUT/FILL MINIMUM ELEVATION (FT.) MAXIMUM ELEVATION (FT.) COLOR
CUT -3.0 -2.5
CUT -2.5 -2.0
CUT -2.0 -1.5
CUT -1.5 -1.0
CUT -1.0 -0.5
CUT -0.5 0.0
FILL 0.0 0.5
FILL 0.5 1.0
FILL 1.0 1.5
FILL 1.5 2.0
FILL 2.0 2.5
FILL 2.5 3.0
FILL 3.0 3.5
FILL 3.5 4.0
FILL 4.0 4.5
FILL 4.5 5.0
FILL 5.0 5.5
0+00.00 1+00.00 2+00.00 2+50.00
NORTH WETLAND OUTLET PIPE
18" CMP 31 LF @ 0.00%
48" CMP WATER CONTROL STRUCTURE
RIM = 1188.60
IE = 1181.0
IE = 1181.0
24" CMP RISER
RIM = 1185.50
NORTH WETLAND DRAWDOWN PIPE
18" CMP 146 LF @ 0.69%
IE = 1181.0
IE = 1182.0
NWL = 1186.00
EXISTING GROUND
20 TONS CLASS 'E' RIP RAP MOUNDED
AROUND INTAKE RISER. PLACE WITH CARE
TO ENSURE INTEGRITY OF RISER
6' X 6' CMP
ANTI-SEEP COLLAR
- SEE DETAIL
20 TONS CLASS E RIP RAP
2' THICK OVER GEOTEXTILE
MATCH EXISTING STREAM AND BANK GRADES
7' X 7' CONCRETE BASE
TOP = 1180.67
BOTTOM = 1180.00
6' X 6' CMP
ANTI-SEEP COLLAR
- SEE DETAIL
0+00
1+00
2+00
2+50
146 LF OF 18" CMP @ 0.69%
48" CMP WATER CONTROL STRUCTURE
RIM = 1188.60
31 LF OF 18" CMP @ 0.00%
24" CMP RISER
RIM = 1185.50
STOP LOG STORAGE STRUCTURE
31 LF OF 18" CMP @ 0.00%
20 TONS CLASS E RIP RAP
2' THICK OVER GEOTEXTILE
MATCH EXISTING STREAM
AND BANK GRADES
20 TONS CLASS 'E' RIP RAP
MOUNDED AROUND INTAKE RISER
HORIZONTAL SCALE:
VERTICAL SCALE:
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T U R E
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C103
NO
RT
H W
ET
LA
ND
DR
AW
DO
W N
PL
AN
AN
D
PR
O
FI
LE
G
HK
DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
C
AL
B
PU
M
PE
D
W
ET
LA
N
D S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
.d wg 4/
/2
:5
2:
A M
NORTH
0+00
1+00
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
4:1
4:1
:1
UNISTRUT RACKING FOR
PUMP AND SOLAR CONTROLS
- SEE DETAIL
SOLAR PANELS
- SEE DETAILS
105 TONS 1" CLEAN
STONE, 6" THICK
OVER GEOTEXTILE
ACCESS RAMP
WIDTH = 12 FEET
560 SY TPE 2B RECP
20 TONS CLASS
'E' RIPRAP
NORTH WETLAND PUMP STATION #1
9' X 9' CONCRETE BOX STRUCTURE
RIM = 1191.50
SUMP = 1173.00
NORTH BURIED WATER FORCEMAIN 1A
8" SCH 80 PVC 26 LF @ 0.00%
12.00'
NORTH WETLAND GRAVITY INTAKE PIPE 1A.2
24" SDR 26 PVC 4 LF @ 0.00%
NORTH WETLAND GRAVITY INTAKE PIPE 1B.2
24" SDR 26 PVC 4 LF @ 0.00%
NORTH WETLAND GRAVITY INTAKE PIPE 1A.1
24" SDR 26 PVC 94 LF @ -1.02%
NORTH WETLAND GRAVITY INTAKE PIPE 1B.1
24" SDR 26 PVC 91 LF @ 1.03%
NORTH BURIED WATER FORCEMAIN 1B
8" SCH 80 PVC 9 LF @ 0.00%
30 TONS CLASS E RIP RAP 2'
THICK OVER GEOTEXTILE
MATCH EXISTING STREAM
AND BANK GRADES
DUPLEX PUMP STATION
- SEE DETAIL ON C305
INSTALL SINGLE
CANTILEVER SLIDE GATE
- SEE DETAIL
INSTALL 215 LF OF CHAIN
LINK SECURITY FENCE
- SEE DETAIL
APPROXIMATE FENCE
POST LOCATION (TYP.)
- SEE DETAIL
0+00.00 1+00.00 2+00.00
NWL = 1186.00
EXISTING GROUND
LIGHT ALARM
DUCKBILL CHECK VALVE
PUMP STATION
- SEE DETAIL ON C305
20 TONS CLASS 'E' RIPRAP 2'
THICK OVER GEOTEXTILE FABRIC
SUMP = 1173.00
CONCRETE BASE AND
STONE SUBBASE
- SEE DETAIL
PROPOSED GROUND
IE = 1187.0
IE = 1187.0
IE = 1178.9
IE = 1178.0
8" SH 80 PVC FORCEMAIN
24" SDR 26 PVC
30 TONS CLASS 'E' RIPRAP 2'
THICK OVER GEOTEXTILE FABRIC
A B C D E F
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
A B C D E F
IOWA D
EP
A R
TM
E NT O F
A G R I C U L T U R E
L A
ND
S
TEWARDSHIP
D R
AW
N
AP
PR
O
VE
D
IS
SU
ED
F
O R
D
AT
E:
FI
EL
D B
O O
K:
PR
O
JE
C
T N
O
C
LI
EN
T
N O
Pr in te d: C104
NO
RT
H W
ET
LA
ND
PU
M P
ST
AT
IO
N
PL
AN
A
ND
P
RO
FI
LE
G
HK
DJ
J
BI
D
DO
CU
M
EN
TS
/2
8/
C
AL
B
PU
M
PE
D
W
ET
LA
N
D S
ID
AL
S
RO
CK
W
EL
L
CI
TY
, I
O W
A
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
O
UT
LE
T
CH
AN
NE
L
PL
AN
A
ND
P
RO
FI
LE
.d wg 4/
/2
:5
2:
A M
NO
RTH
HORIZONTAL SCALE:
VERTICAL SCALE:
0+00
1+00
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
4:1
4:1
:1
NORTH WETLAND PUMP STATION #2
9' X 9' CONCRETE BOX STRUCTURE
RIM = 1191.50
SUMP = 1173.00
UNISTRUT RACKING FOR
PUMP AND SOLAR CONTROLS
- SEE DETAIL
SOLAR PANELS
- SEE DETAILS
105 TONS 1" CLEAN
STONE, 6" THICK
OVER GEOTEXTILE
ACCESS RAMP
WIDTH = 12 FEET
560 SY TPE 2B RECP
20 TONS CLASS
'E' RIPRAP
12.00'
NORTH WETLAND GRAVITY INTAKE PIPE 2B.2
24" SDR 26 PVC 4 LF @ 0.00%
NORTH WETLAND GRAVITY INTAKE PIPE 2A.2
24" SDR 26 PVC 4 LF @ 0.00%
NORTH WETLAND GRAVITY INTAKE PIPE 2A.1
24" SDR 26 PVC 84 LF @ -1.19%
NORTH WETLAND GRAVITY INTAKE PIPE 2B.1
24" SDR 26 PVC 82 LF @ -1.22%
NORTH BURIED WATER FORCEMAIN 2B
8" SCH 80 PVC 20 LF @ -0.00%
NORTH BURIED WATER FORCEMAIN 2A
8" SCH 80 PVC 33 LF @ 0.00%
NORTH BURIED WATER FORCEMAIN 2C
8" SCH 80 PVC 3 LF @ 0.00%
30 TONS CLASS E RIP RAP 2'
THICK OVER GEOTEXTILE
MATCH EXISTING STREAM
AND BANK GRADES
DUPLEX PUMP STATION
- SEE DETAIL ON C305
INSTALL SINGLE
CANTILEVER SLIDE GATE
- SEE DETAIL
INSTALL 215 LF OF CHAIN
LINK SECURITY FENCE
- SEE DETAIL
APPROXIMATE FENCE
POST LOCATION (TYP.)
- SEE DETAIL
0+00.00 1+00.00 2+00.00 2+25.13
IE = 1187.0 NWL = 1186.00
EXISTING GROUND
LIGHT ALARM
PUMP STATION
- SEE DETAIL ON C305
20 TONS CLASS 'E'…
This is the start of the file's text. The full file is on GovTribe.