Addendum 1 & Pre-bid.pdf

PDF 14 MB Posted

Attached to
26-02 Cal883229BN & BS (Calhoun)
Solicitation number
26-02 Cal883229BN & BS (Calhoun)
Issued by
Carroll County, Iowa

About this file

This document comprises an Addendum No. 1 and supporting bid documents for a state and local contract opportunity issued by the Iowa Department of Agriculture and Land Stewardship, Division of Soil Conservation and Water Quality. The project involves the design and construction of two pumped nutrient reduction wetlands in Calhoun County, Iowa (Project 26-2, CAL883229BN & CAL883229BS). The scope of work includes selective clearing, excavation, grading, installation of solar-powered lift stations with dual and single pump configurations, force mains, tile drainage systems, inlet risers, water control structures, drawdown pipes, riprap placement, and seeding at two separate sites. The North site (CAL883229BN) encompasses approximately 31,200 cubic yards of earthwork and 16.6 acres of seeding, while the South site (CAL883229BS) involves approximately 10,300 cubic yards of earthwork and 1.0 acre of seeding. All construction work except seeding must be completed by December 31, 2026, with structure seeding required by May 15, 2027, and buffer seeding by June 30, 2027. Sealed bids must be submitted electronically through the Iowa Management of Procurement and Contracts System (IMPACS) by 3:00 PM on May 20, 2026, with bid opening occurring simultaneously. A pre-bid conference was conducted on April 24, 2026. Addendum No. 1, issued May 6, 2026, updates the proposal and schedule of prices form (Document CC) and revises the engineering plans dated April 28, 2026, adding single cantilever slide gates and chain link fence bid items for each lift station and noting drainage district designations.

The estimated construction cost ranges from $375,000 to $475,000 for the North site and $175,000 to $275,000 for the South site. Bidders must submit a proposal guarantee (bid bond) equal to 10 percent of the base bid amount and, upon award, furnish a Performance and Payment Bond equal to 100 percent of the contract price within fourteen days of the Notice-of-Award. Monthly progress payments will be processed at 97 percent of completed work value, subject to 3 percent retention. Liquidated damages are assessed at $175.00 per day for all work except seeding and $125.00 per day for seeding-related delays. Construction materials are exempt from Iowa sales and use tax, with the Division providing tax exemption certificates. The contract documents, sealed by Professional Engineers Daniel Jensen (License No. 25063) and Kevin Bruxvoort (License No. 19927), specify compliance with NRCS standards, NFPA 70, ASTM standards, ANSI standards, and UL certifications. The successful contractor must be registered with the Iowa Department of Inspections, Appeals & Licensing and must commence construction within 14 days of the preconstruction meeting. Electronic grading files are available from the engineer of record, Dan Jensen of Shive-Hattery (djensen@shive-hattery.com). No incumbent vendor or current contractor has been identified for this project.

View the file

Other files

File Type Posted
Schedule of Prices - REVISED.pdf PDF
General Requirements.pdf PDF
Plans.pdf PDF
H & H Report.pdf PDF
Bid Bond.pdf PDF
Specifications.pdf PDF
Plans - REVISED.pdf PDF
Schedule of Prices.pdf PDF
Proposal & Affidavit.pdf PDF
Notice to Bidders.pdf PDF
Appendix I.pdf PDF
Proposal & Affidavit - REVISED.pdf PDF
QA QC Plan.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Soil Conservation and Water Quality

Cover Sheet

To: All plan holders From: Tracy Blocker, Division

Pages: Phone: 515-344-6279

Re: Cal883229BN-North & BS-South Nutrient Reduction Wetland (Bid 26-2) Date: May 12, 2026

Comments: Page

• Cover Sheet 1

• Addendum No. 1 with Attachments 1 and 2 2-35

• Pre-Bid Meeting Minutes 36-39

• Pre-Bid meeting attendance list 40

• Updated plan holders list 41

• Electronic files for grading can be obtained by e-mail by contacting Dan Jensen with Shive-Hattery at 515.233.8104 or djensen@shive-hattery.com.

- END OF COVER PAGE -

May 6, 2026

Division of Soil Conservation and Water Quality 1305 E Walnut Street Des Moines, IA 50319

TO: Prospective Bidders

Subject: Addendum No. 1 to Bid Documents CAL883229BN & CAL883229BS Nutrient Reductionl Wetland Project – Bid No. 26-2 Calhoun County, Iowa

This addendum forms a part of the bidding contract documents and modifies the original bidding documents posted on April 16, 2026. An updated bidding form, Document CC.– Proposal and Schedule of Prices is attached with the addendum acknowledged. This updated bidding form must be used for 26-2 and all bidders must acknowledge this addendum on Page CC-2. FAILURE TO DO SO WILL SUBJECT BIDDER TO DISQUALIFICATON.

Description:

DOCUMENT CC– PROPOSAL AND SCHEDULE OF PRICES, 26-2 (See Attachment No.1)

Please use the updated Document CC, to acknowledge Addendum No. 1 (See Attachment No. 1):

Plans (See Attachment No. 2): See revised set of Plans dated 04-28-2026 Plans are noting the Drainage District that each wetland would be constructed at.

The project quantities have been updated to include a single cantilever slide gate for each site.

Bid items for chain link fence have been added to each of the lift stations.

See revised set of Plans dated 04-28-2026.

Sincerely, Sara Smith, P.E.

Water Resources Bureau

SS

Attachment No. 1 – Updated Document CC Attachment No. 2 – Updated Plans dated 04-28-2026.

End of Addendum No. 1

CAL883229BN & CAL883229BS Nutrient Reduction Wetland Project DOCUMENT CC – Attachment 1 Bid No. 26-2 PROPOSAL AND SCHEDULE OF PRICES

Time and Date for Bid Submissions: 3:00:00 PM, 05/20/2026

BIDDER LOGIN

https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa

Time and Date of Bid Opening: 3:00 PM, May 20, 2026 Bid Opening TEAMS: +1 469-998-7627, 771541789#

Project Description and Location: CAL883229BN & CAL883229BS Nutrient Reduction Wetlands Project Section 29, Township 88 North, Range 32 West Calhoun County, Iowa

PROPOSAL AND SCHEDULE OF PRICES

Proposal of ___________________________________________________________________________________________ (PRINT Name of Bidder: COMPANY & CONTACT)

Located at ( ) (FULL Mailing Address) (Telephone Number)

Amount of

Proposal Guarantee

Description of Work Specified Completion Date Liquidated Damages

10% of Base Bid

All Work Except Seeding

December 31, 2026

$175.00 Per Day

Seeding - Structure

Seeding - Buffer

May 15, 2027 June 30, 2027

$125.00 Per Day

The undersigned hereby agrees, if awarded the contract, to execute the proposed contract and to furnish satisfactory Performance Bond in an amount not less than one hundred percent (100%) of the contract award within fourteen (14) days from the date when Notice-of-Award is received, and to provide all supervision, labor, materials, and equipment required to complete the project designated above, for the prices hereinafter set forth, in strict compliance with the Contract Documents prepared by the Division.

Further, the parties agree and acknowledge as follows:

The amount of loss or damages likely to be incurred by Division are uncertain and said loss is incapable or very difficult to quantify and estimate;

The amount specified for liquidated damages herein bear a reasonable relationship to, and are not plainly or grossly disproportionate to, the probable loss likely to be incurred by Division in connection with any delay on part of the Contractor;

The amount of liquidated damages fixed herein bears a reasonable relationship to Division’s anticipated losses and/or actual losses;

The amount of liquidated damages herein fairly approximates Division’s loss at the time of making of this Agreement;

The amount of liquidated damages fixed herein are fair and reasonable and it approximates to the extent possible the actual loss to Division as a result of any delay on the part of Contractor; and

Division and Contractor are sophisticated parties and negotiated this Agreement at arm’s length.

Now therefore, in consideration of the mutual obligations set forth herein, the receipt and sufficiency of which is hereby acknowledged, the parties agree as follows:

Contractor will commence the work after the Preconstruction Conference and by the Construction Start Date approved by Division in the Construction Progress Schedule.

Contractor will complete the work within the specified time period identified in the contract, or as amended, or be responsible for liquidated damages per day as set forth in the above table.

The liquidated damages may be withheld from payments made to the Contractor by the Division upon written notice that liquidated damages have begun to accrue, and such damages are in addition to other remedies available as provided for in this contract and applicable law.

A Proposal Guarantee in the amount stipulated herein is included with this proposal, to be forfeited to the Division, if the undersigned fails or refuses to execute the contract and furnish satisfactory Performance Bond, if awarded the contract.

By _______________________________________________ (Signed)

( PRINT NAME)

(Title) (Date)

In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________

In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________

In executing this proposal, Bidder acknowledges receipt of Addendum Number _____ dated ____________________

THE FOLLOWING AFFIDAVIT MUST BE COMPLETED AND NOTARIZED, OR THIS BID WILL BE REJECTED

AFFIDAVIT

The signatory, being duly sworn, does depose and say that the undersigned is an authorized representative of:

(Name of Firm)

Located at __________________________________________________________________________________ hereinafter referred to as “Bidder” and does hereby affirm to have personal knowledge that said Bidder has thoroughly examined the Contract Documents, carefully prepared the Proposal and Schedule of Prices form, and has checked the same in detail before submitting; and that said Bidder, or the agents, officers, or employees thereof, have not, either directly or indirectly, entered into any agreement, participated in any collusion or fraud, or otherwise taken any action in restraint of free competitive bidding in connection with this bid.

(Signed)

(PRINT name)

Subscribed and sworn to before me this _________ day of ________________________________, 20____

(Signed, Notary)

My Commission Expires _______________, 20______

Must include notary stamp

SCHEDULE OF PRICES

CAL883229BN

Contract No. 26-2 Section 29, Township 88 North, Range 32 West, Calhoun County, Iowa

Name of Bidder:_____________________________________________________________________________

Item No.

Work or Material Spec No.

Est Qty

Unit Unit Price

Total

1 Site Stripping and Preparation CS-IA-001 1 LS

2 Crop Damage CS-IA-001 - - - -

3 Structure & Channel Seeding CS-IA-006 1.5 AC

4 Buffer Seeding CS-IA-006 15.1 AC

5 Mobilization & Demobilization CS-008 1 LS

6 Drain Tile Investigation & Removal CS-IA-009 2,270 LF

7 Excavation (General - P) CS-IA-021 6,176 CY

8 Earthfill (General - P) CS-IA-023 6,176 CY

9 Earthfill (General Dam - P) CS-IA-023 0 CY - -

10 Earthfill (Dam Core - P) CS-IA-023 0 CY - -

11 Earthfill (18"-Clay Liner Wetland Bottom, 2 lifts of 9" - P) CS-IA-023 9,841 CY

Earthfill (Scarify and Recompact 9" layer of wetland bottom- P)

CS-IA-023 4,494 CY

13 Topsoil Placement (6" layer - P) CS-IA-026 4,535 CY

14 Topsoil Placement (12" layer - P) CS-IA-026 0 CY - -

15 PVC Forcemain, 8" Schedule 80 CS-IA-045 92 LF

16 Perforated Polyethylene Pipe with porous backfill, 4" dam. CS-IA-046 279 LF

17 Non-perforated Polyethylene Pipe, 6" diam. CS-IA-046 187 LF

18 SDR 26 PVC, 24" diam. CS-IA-046 367 LF

19 Riser Inlet Structure, 24" CS-IA-051 1 EA

20 CMP Water Control Structure, 48" CS-IA-051 1 EA

21 Aluminized CMP, 18" diam, 14 GA CS-IA-051 177 LF

22 CMP Outlet Pipes, 8" x 20' CS-IA-051 2 EA

23 Riprap, Class E CS-IA-061 150 TN

24 Clean Stone, 1" CS-IA-061 150 TN

25 Clean Stone, 2" CS-IA-061 30 TN

26 Pollution Control, Silt Fence CS-IA-005 472 LF

27 Pollution Control, Type 2B RECP CS-IA-005 560 LF

28 Solar, Batter, Electrical & Control Division 26 2 EA

29 Pump Station Div 26 & 33 2 EA

30 Single Cantiliver Slide Gate Plan C304 1 LS

31 Chain link security fence Plan C304 215 LF

IMPACS will have only 30 bid items listed under group one.

SUB-TOTAL BASE BID….……………………………………………………………………………$________________

Cal883229BN-NORTH

Cal883229BS-SOUTH Contract No. 26-2 Section 29, Township 88 North, Range 32 West, Calhoun County, Iowa

Name of Bidder:

Item No.

Work or Material Spec No.

Est Qty

Unit Unit Price

Total

1 Site Stripping and Preparation CS-IA-001 1 LS

2 Crop Damage CS-IA-001 - - - -

3 Structure & Channel Seeding CS-IA-006 0.4 AC

4 Buffer Seeding CS-IA-006 0.6 AC

5 Mobilization & Demobilization CS-008 1 LS

6 Drain Tile Investigation & Removal CS-IA-009 65 LF

7 Excavation (General - P) CS-IA-021 1,056 CY

8 Earthfill (General - P) CS-IA-023 585 CY

9 Earthfill (General Dam - P) CS-IA-023 579 CY

10 Earthfill (Dam Core - P) CS-IA-023 191 CY

11 Earthfill (18"-Clay Liner Wetland Bottom, 2 lifts of 9" - P) CS-IA-023 2,046 CY

Earthfill (Scarify and Recompact 9" layer of wetland bottom- P)

CS-IA-023 4,607 CY

13 Topsoil Placement (6" layer - P) CS-IA-026 787 CY

14 Topsoil Placement (12" layer - P) CS-IA-026 433 CY

15 PVC Forcemain, 8" Schedule 80 CS-IA-045 27 LF

Perforated Polyethylene Pipe with porous backfill, 4" dam.

CS-IA-046 0 LF - -

17 Non-perforated Polyethylene Pipe, 6" diam. CS-IA-046 0 LF - -

18 SDR 26 PVC, 24" diam. CS-IA-046 210 LF

19 Riser Inlet Structure, 24" CS-IA-051 1 EA

20 CMP Water Control Structure, 48" CS-IA-051 1 EA

21 Aluminized CMP, 18" diam, 14 GA CS-IA-051 114 LF

22 CMP Outlet Pipes, 8" x 20' CS-IA-051 0 EA - -

23 Riprap, Class E CS-IA-061 150 TN

24 Clean Stone, 1" CS-IA-061 70 TN

25 Clean Stone, 2" CS-IA-061 30 TN

26 Pollution Control, Silt Fence CS-IA-005 304 LF

27 Pollution Control, Type 2B RECP CS-IA-005 395 LF

28 Solar, Batter, Electrical & Control Division 26 1 EA

29 Pump Station Div 26 & 33 1 EA

30 Single Cantiliver Slide Gate Plan C304 1 LS

31 Chain link security fence Plan C304 168 LF IMPACS will have only 30 bid items listed under group two.

SUB-TOTAL BASE BID….……………………………………………………………………………$________________

Cal883229BN-SOUTH

TOTAL BASE BID………… Cal883229BN-NORTH and Cal883229BS-SOUTH…………………$________________

Worksheet purposes only. Bids will only be accepted through the on-line Iowa Management of Procurement & Contracts System (IMPACS).

To register and learn about IMPACS, go to:

https://solutions.sciquest.com/apps/Router/SupplierLogin?CustOrg=DASIowa

END OF DOCUMENT CC

Attachment No. 2

(Please see updated Plans Dated 04-28-2026)

STATE OF IOWA

ROCKWELL CITY, IOWA

ENGINEER

SHIVE-HATTERY, INC

ATTN: DAN JENSEN

4125 WESTOWN PARKWAY, SUITE 100

WEST DES MOINES, IOWA 50266

PH: (515) 223-8104

FX: (515) 223-0622

SITE ADDRESS:

2579 PRESTON AVE

ROCKWELL CITY, IA, 50579

CONTACT INFORMATION:

IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP

SARA SMITH

502 E 9TH ST

DES MOINES, IA, 50319

OFFICE PH: (515) 242-6130

SARA.SMITH@IOWAAGRICULTURE.GOV

CAL883229B PUMPED WETLANDS

IDALS

PROJECT

LOCATION

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d: C000

BI

D

DO

CU

M

EN

TS

/2 8/

C

AL

B

PU

M

PE

D

W

ET

LA

N

D S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

- C

O

VE

R

SH

EE

T.

dw g

4/

/2

:4 4:

A

M

PROJECT DRAWING COORDINATE SYSTEM:

HORIZONTAL: NAD83 IOWA STATE PLANE

NORTH ZONE (1401)

VERTICAL: NAVD88

UNITS: U.S. SURVEY FEET

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

My License Renewal Date is: DECEMBER 31, Printed or typed name:

License Number:

Signature: Date

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED

BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL

SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF IOWA.

ALL 'C' SHEETS

DANIEL JENSEN

25063

CIVIL ENGINEER

NRCS NEM PART 505 CERTIFICATION

THE SIGNING PROFESSIONALS HEREBY

CERTIFY THAT, TO THE BEST OF THEIR

PROFESSIONAL KNOWLEDGE,

JUDGEMENT, AND BELIEF, THESE PLANS

MEET APPLICABLE NRCS STANDARDS.

I O

W A D E P A R T M E NT O F

AGR

I C U L T UR E & L A N D S T EWA R D

SH

IP

PROJECT

LOCATION

CALHOUN COUNTY

NORTH CONSTRUCTION

ENTRANCE

LANDOWNERS

JOEL WUEBKER

2588 QUINTON AVE

ROCKWELL CITY, IA 50579

PH: (712) 297-0609

LOHRVILLE

ROCKWELL CITY

POMEROY

MANSON

FARNHAMVILLE

LAKE CITY

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

PR

ES

TO

N

A

VE

D.D.9 CAL

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

My License Renewal Date is: DECEMBER 31, Printed or typed name:

License Number:

Signature: Date

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED

BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL

SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF IOWA.

ALL 'E' SHEETS

KEVIN J. BRUXVOORT

19927

ELECTRICAL ENGINEER

NORTH WETLAND

PROJECT EASEMENT

LANDOWNER: JOEL WUEBKER

CALHOUN COUNTY CONSERVATION

CURTIS VANDERHEIDEN

1228 HIGH ST

ROCKWELL CITY, IA, 50579

OFFICE PH: (712) 297-7131

CONSERVATION@CALHOHNCOUNTY.IOWA.GOV

SOUTH WETLAND

PROJECT EASEMENT

LANDOWNER: CALHOUN

COUNTY CONSERVATION

Sheet List Table Sheet Number Sheet Title

C000 COVER SHEET

C001 PROJECT QUANTITIES

C002 PROJECT NOTES

CD01 EXISTING CONDITIONS AND REMOVALS

C101 NORTH WETLAND GRADING PLAN

C102 NORTH WETLAND CUT-FILL PLAN

C103 NORTH WETLAND DRAWDOWN PLAN AND PROFILE

C104 NORTH WETLAND PUMP STATION 1 PLAN AND PROFILE

C105 NORTH WETLAND PUMP STATION 2 PLAN AND PROFILE

C106 NORTH SEEDING PLAN

C201 SOUTH WETLAND GRADING PLAN

C202 SOUTH WETLAND CUT-FILL PLAN

C203 SOUTH EMBANKMENT PLAN AND PROFILE

C204 SOUTH WETLAND DRAWDOWN PLAN AND PROFILE

C205 SOUTH WETLAND PUMP STATION PLAN AND PROFILE

C206 SOUTH SEEDING PLAN

C301 CONSTRUCTION DETAILS

C302 CONSTRUCTION DETAILS

C303 CONSTRUCTION DETAILS

C304 CONSTRUCTION DETAILS

C305 NORTH WETLAND DUPLEX PUMP DETAILS

C306 SOUTH WETLAND SIMPLEX PUMP DETAILS

E101 NORTH WETLAND PUMP STATION

E102 SOUTH WETLAND PUMP STATION

NORTH WETLAND

PROJECT EASEMENT

LANDOWNER: CALHOUN COUNTY

CONSERVATION

THE ENGINEERING JOB CLASS IS IV

SOUTH CONSTRUCTION

ENTRANCE

D.

D.

CA

L

D.D.65 CAL

DRAINAGE DISTRICT

BRIAN BLOME

ROCKWELL CITY, IA, 50579

BBLOMME@BVCOUNTYIOWA.COM

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

My License Renewal Date is: DECEMBER 31, Printed or typed name:

License Number:

Signature: Date

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED

BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL

SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF IOWA.

ALL 'C' SHEETS

DANIEL JENSEN

25063

CIVIL ENGINEER

PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL:

My License Renewal Date is: DECEMBER 31, Printed or typed name:

License Number:

Signature: Date

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT DESCRIBED

BELOW WAS PREPARED BY ME OR UNDER MY DIRECT PERSONAL

SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF IOWA.

ALL 'E' SHEETS

KEVIN J. BRUXVOORT

19927

ELECTRICAL ENGINEER

04-03-2026

04-03-2026

04-28-2026

04-28-2026

D R

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d: C001

PR

O

JE

CT

Q

UA

NT

IT

IE

S

G

HK

DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

C

AL

B

PU

M

PE

D

W

ET

LA

N

D S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

Q

UA

NT

IT

IE

S.

dw g 4/

/2

:4

4:

A M

ESTIMATED QUANTITIES:

GENERAL NOTES:

1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE

CONNECTIONS PLOTTED ON THIS DRAWING ARE APPROXIMATE ONLY AND

WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY,

INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND

SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT

SHOWN ON THIS DRAWING. THE VERIFICATION OF EXISTENCE OF, AND THE

DETERMINATION OF THE EXACT LOCATION OF, UTILITY MAINS,

STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY

OF THE CONSTRUCTION CONTRACTOR(S).

2. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES

VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48

HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.

3. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S

EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.

4. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT

PRIOR AUTHORIZATION FROM THE OWNER'S REPRESENTATIVE.

5. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY

CONSTRUCTION. MONUMENTS SHALL BE SET BY A LAND SURVEYOR

REGISTERED TO PRACTICE IN THE STATE OF IOWA.

6. ALL DEBRIS AND TRASH ENCOUNTERED DURING CONSTRUCTION WITHIN

THE PROJECT LIMITS, OR DIRECTED BY THE ENGINEER, SHALL BE

PROPERLY DISPOSED OF.

7. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION DE-WATERING

THAT IS REQUIRED AT NO ADDITIONAL COST TO THE DIVISION.

8. REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES (TILE, UTILITIES,

FENCES, ETC.) DESIGNATED TO REMAIN, AT NO ADDITIONAL EXPENSE TO

THE OWNER. ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING

STAGING AREAS AND HAUL ROUTES, ARE TO BE REWORKED TO THEIR

EXISTING CONDITIONS AND SEEDED AT NO ADDITIONAL COST TO THE

DIVISION IF OUTSIDE OF PROJECT LIMITS AND NOT APPROVED BY

ENGINEER.

9. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE

CONTRACT WILL BE CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK,

WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE

MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE,

FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL

BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER, AS REQUIRED

BY THE OWNER AT THE CONTRACTOR'S EXPENSE.

10. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNERS

REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS

OR ANY EXTRA WORK DONE WITHOUT AUTHORITY WILL NOT BE PAID FOR.

11. A SHRINKAGE FACTOR OF 20% WAS ESTIMATED FOR THIS PROJECT. THE

CONTRACTOR SHALL MAKE CHANGES IN EARTHWORK AS NEEDED TO

ADJUST FOR INACCURACIES INHERENT WITH ESTIMATING THE SHRINKAGE

FACTOR. THESE CHANGES SHALL ONLY BE MADE AFTER CONSULTATION

AND APPROVAL BY THE ENGINEER AND DIVISION.

12. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.

13. THE CONTRACTOR SHALL KEEP ALL ROADS OPEN TO THROUGH TRAFFIC

AT ALL TIMES.

14. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE COORDINATED

WITH THE GOVERNING AUTHORITY AND SHALL BE DONE IN ACCORDANCE

WITH THEIR STANDARDS.

15. SUBMIT MANUFACTURER'S CERTIFICATION AND MATERIAL DATA FOR ALL

MATERIALS DELIVERED TO THE PROJECT SITE AS REQUESTED BY THE

OWNERS REPRESENTATIVE.

16. CONSTRUCTION SURVEY STAKING WILL BE PAID FOR BY THE OWNER AND

PROVIDED BY THE ENGINEER. CONTROL POINTS WILL BE SET FOR USE

WITH GPS CONTROLLED GRADING, IF DESIRED. CONTRACTOR SHALL

PRESERVE STAKES TO THE EXTENT FEASIBLE. ANY RE-STAKING COSTS

WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

17. NEITHER SHIVE-HATTERY NOR IDALS GUARANTEE THIS PRACTICE WILL

HOLD A PERMANENT POOL OF WATER.

CULTURAL RESOURCES NOTE:

1. IF A CULTURAL RESOURCE IS IDENTIFIED

DURING CONSTRUCTION, STOP IMMEDIATELY

AND NOTIFY LOCAL NATURAL RESOURCES

CONSERVATION SERVICE OFFICE.

NORTH WETLAND DESIGN DATA:

PROJECT ID CAL883229B (NORTH) -----

LANDOWNER(S) JOEL WUEBKER & CALHOHN COUNTY CONSERVATION -----

PRELIMINARY OR FINAL DESIGN FINAL -----

DRAINAGE AREA 34,496 (DRAINAGE DITCH) 32.6 (OVERLAND FLOW) ACRES

WETLAND POOL AREA 7.35 ACRES

DEEP WATER AREA (>3 FT DEEP) 0.05 ACRES

NORMAL POOL ELEVATION 1186.00 FEET

AVERAGE POOL DEPTH 0.85 FEET

MAXIMUM POOL DEPTH 2.2 FEET

POOL STORAGE 6.17 ACRE-FEET

BERM ELEVATION N/A FEET

BERM STORAGE N/A ACRE-FEET

LENGTH OF BERM N/A FEET

AUXILIARY SPILLWAY ELEVATION N/A FEET

AUXILIARY SPILLWAY WIDTH N/A FEET

WEIR WIDTH N/A FEET

DROP HEIGHT N/A FEET

TIME OF CONCENTRATION 0.179 HOURS

WEIGHTED RUNOFF CURVE NUMBER 85 -----

5-YEAR STORM DESIGN FLOW 112.04 CFS

5-YEAR FLOOD SURF. ELEVATION 1186.81 FEET

25-YEAR STORM DESIGN FLOW 191.27 CFS

25-YEAR FLOOD SURF. ELEVATION 1186.97 FEET

100-YEAR STORM DESIGN FLOW 280.62 CFS

100-YEAR FLOOD SURF. ELEVATION 1187.09 FEET

TOTAL EASEMENT AREA 24.04 ACRES

PUMP INFORMATION

TOTAL DYNAMIC HEAD 14.5 FEET

DESIGN MAXIMUM DISCHARGE 3.2 CFS (Two Pumps) CFS

DESIGN DAILY FLOW VOLUME 600,000 - 700,00 GAL/DAY

# ITEM DESCRIPTION NORTH SITE

QUANTITY

SOUTH SITE

QUANTITY TOTAL QUANTITY UNITS

1 SITE STRIPPING & PREPARATION 1 1 1 LS

2 CROP DAMAGE 0 0 0 AC

3 STRUCTURE & CHANNEL SEEDING 1.5 0.4 1.9 AC

4 BUFFER SEEDING 15.1 0.6 15.7 AC

5 MOBILIZATION AND DEMOBILIZATION 1 1 1 LS

6 DRAIN TILE INVESTIGATION AND REMOVAL 2270 65 2335 LF

7 EXCAVATION (GENERAL (P)) 6176 1056 7232 CY

8 EARTHFILL (GENERAL (P)) 6176 585 6761 CY

9 EARTHFILL (GENERAL DAM (P)) 0 579 579 CY

10 EARTHFILL (DAM CORE (P)) 0 191 191 CY

11 EARTHFILL (18" CLAY LINER, WETLAND BOTTOM, TWO 9" LIFTS (P)): 9841 2046 11887 CY

12 EARTHFILL (SCARIFY AND RECOMPACT 9" LAYER OF WETLAND BOTTOM (P)): 4494 4607 9101 CY

13 TOPSOIL PLACEMENT, 6 INCH 4535 787 5322 CY

14 TOPSOIL PLACEMENT, 12 INCH 0 433 433 CY

15 8" PVC PIPE, SCHEDULE 80, FORECMAIN 92 27 119 LF

16 4" PERFORATED POLYETHYLENE PIPE WITH POROUS BACKFILL, SINGLE WALL 279 0 279 LF

17 6" NON-PERFORTATED POLYETHYLENE PIPE, SINGLE WALL 187 0 187 LF

18 24" SDR 26 PVC 367 210 577 LF

19 24" RISER INLET STRUCTURE 1 1 2 EA

20 48" CMP WATER CONTROL STRUCTURE 1 1 2 EA

21 18" ALUMINIZED CMP WETLAND DRAWDOWN PIPE, 14GA 177 114 291 LF

22 8" CMP TILE OUTLETS (20 LF EACH) 2 0 2 EA

23 RIP RAP, CLASS E 150 150 300 TON

24 1" CLEAN STONE 150 70 220 TON

25 2" CLEAN STONE 30 30 60 TON

26 POLLUTION CONTROL, SILT FENCE 472 304 776 LF

27 POLLUTION CONTROL, TYPE 2B RECP 560 395 955 SY

28 SOLAR, BATTERY, ELECTRICAL AND CONTROLS (COMPLETE SYSTEM) 2 1 3 LS

29 PUMP STATION (PUMP, CONTROLS, ELECTRICAL, STRUCTURE, APPURENTANCES (COMPLETE SYSTEM)) 2 1 3 LS

30 SINGLE CANTILEVER SLIDE GATE 1 1 2 LS

31 CHAIN LINK SECURITY FENCE 215 168 383 LF

SOUTH WETLAND DESIGN DATA:

PROJECT ID CAL883229B (SOUTH) -----

LANDOWNER(S) CALHOUN COUNTY CONSERVATION -----

PRELIMINARY OR FINAL DESIGN FINAL -----

DRAINAGE AREA 10,560 (DRAINAGE DTICH) 9.8 (OVERLAND FLOW) ACRES

WETLAND POOL AREA 4.65 ACRES

DEEP WATER AREA (>3 FT DEEP) 0.09 ACRES

NORMAL POOL ELEVATION 1186.00 FEET

AVERAGE POOL DEPTH 0.63 FEET

MAXIMUM POOL DEPTH 3.0 FEET

POOL STORAGE 2.71 ACRE-FEET

BERM ELEVATION 1187 FEET

BERM STORAGE 8.78 ACRE-FEET

LENGTH OF BERM 305 FEET

AUXILIARY SPILLWAY ELEVATION N/A FEET

AUXILIARY SPILLWAY WIDTH N/A FEET

WEIR WIDTH N/A FEET

DROP HEIGHT N/A FEET

TIME OF CONCENTRATION 0.083 HOURS

WEIGHTED RUNOFF CURVE NUMBER 85 -----

2-YEAR STORM DESIGN FLOW 31.32 CFS

2-YEAR FLOOD SURF. ELEVATION 1186.33 FEET

25-YEAR STORM DESIGN FLOW 72.07 CFS

25-YEAR FLOOD SURF. ELEVATION 1186.56 FEET

100-YEAR STORM DESIGN FLOW 105.13 CFS

100-YEAR FLOOD SURF. ELEVATION 1186.71 FEET

TOTAL EASEMENT AREA 8.83 ACRES

PUMP INFORMATION

TOTAL DYNAMIC HEAD 12.8 FEET

DESIGN MAXIMUM DISCHARGE 1.7 CFS (One Pump) CFS

DESIGN DAILY FLOW VOLUME 300,000 - 360,000 GAL/DAY

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

T M E N T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

D R

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d: C002

PR

O

JE

CT

N O

TE

S

G

HK

DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

C

AL

B

PU

M

PE

D

W

ET

LA

N

D S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

Q

UA

NT

IT

IE

S.

dw g 4/

/2

:4

4:

A M

GENERAL NOTES:

1. THE LOCATIONS OF UTILITY MAINS, STRUCTURES AND SERVICE

CONNECTIONS PLOTTED ON THIS DRAWING ARE APPROXIMATE ONLY AND

WERE OBTAINED FROM RECORDS MADE AVAILABLE TO SHIVE-HATTERY,

INC. THERE MAY BE OTHER EXISTING UTILITY MAINS, STRUCTURES AND

SERVICE CONNECTIONS NOT KNOWN TO SHIVE-HATTERY, INC. AND NOT

SHOWN ON THIS DRAWING. THE VERIFICATION OF EXISTENCE OF, AND THE

DETERMINATION OF THE EXACT LOCATION OF, UTILITY MAINS,

STRUCTURES AND SERVICE CONNECTIONS SHALL BE THE RESPONSIBILITY

OF THE CONSTRUCTION CONTRACTOR(S).

2. IOWA CODE 480, UNDERGROUND FACILITIES INFORMATION, REQUIRES

VERBAL NOTICE TO IOWA ONE-CALL 1-800-292-8989, NOT LESS THAN 48

HOURS BEFORE EXCAVATING, EXCLUDING WEEKENDS AND HOLIDAYS.

3. THE MEANS OF THE WORK AND THE SAFETY OF THE CONTRACTOR'S

EMPLOYEES ARE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR.

4. NO WORK SHALL BE PERFORMED BEYOND THE PROJECT LIMITS WITHOUT

PRIOR AUTHORIZATION FROM THE OWNER'S REPRESENTATIVE.

5. REPLACE ANY PROPERTY MONUMENTS REMOVED OR DESTROYED BY

CONSTRUCTION. MONUMENTS SHALL BE SET BY A LAND SURVEYOR

REGISTERED TO PRACTICE IN THE STATE OF IOWA.

6. ALL DEBRIS AND TRASH ENCOUNTERED DURING CONSTRUCTION WITHIN

THE PROJECT LIMITS, OR DIRECTED BY THE ENGINEER, SHALL BE

PROPERLY DISPOSED OF.

7. CONTRACTOR IS RESPONSIBLE FOR ALL CONSTRUCTION DE-WATERING

THAT IS REQUIRED AT NO ADDITIONAL COST TO THE DIVISION.

8. REPAIR OR REPLACE DAMAGE TO EXISTING FACILITIES (TILE, UTILITIES,

FENCES, ETC.) DESIGNATED TO REMAIN, AT NO ADDITIONAL EXPENSE TO

THE OWNER. ALL AREAS DISTURBED BY CONSTRUCTION, INCLUDING

STAGING AREAS AND HAUL ROUTES, ARE TO BE REWORKED TO THEIR

EXISTING CONDITIONS AND SEEDED AT NO ADDITIONAL COST TO THE

DIVISION IF OUTSIDE OF PROJECT LIMITS AND NOT APPROVED BY

ENGINEER.

9. WORK WHICH DOES NOT CONFORM TO THE REQUIREMENTS OF THE

CONTRACT WILL BE CONSIDERED UNACCEPTABLE. UNACCEPTABLE WORK,

WHETHER THE RESULT OF POOR WORKMANSHIP, USE OF DEFECTIVE

MATERIALS, DAMAGE THROUGH CARELESSNESS OR ANY OTHER CAUSE,

FOUND TO EXIST PRIOR TO THE FINAL ACCEPTANCE OF THE WORK, SHALL

BE REMOVED AND REPLACED IN AN ACCEPTABLE MANNER, AS REQUIRED

BY THE OWNER AT THE CONTRACTOR'S EXPENSE.

10. WORK DONE CONTRARY TO THE INSTRUCTIONS OF THE OWNERS

REPRESENTATIVE, WORK DONE BEYOND THE LINES SHOWN ON THE PLANS

OR ANY EXTRA WORK DONE WITHOUT AUTHORITY WILL NOT BE PAID FOR.

11. A SHRINKAGE FACTOR OF 20% WAS ESTIMATED FOR THIS PROJECT. THE

CONTRACTOR SHALL MAKE CHANGES IN EARTHWORK AS NEEDED TO

ADJUST FOR INACCURACIES INHERENT WITH ESTIMATING THE SHRINKAGE

FACTOR. THESE CHANGES SHALL ONLY BE MADE AFTER CONSULTATION

AND APPROVAL BY THE ENGINEER AND DIVISION.

12. CONTOURS AND SPOT ELEVATIONS SHOWN ARE TO FINISHED GRADE.

13. THE CONTRACTOR SHALL KEEP ALL ROADS OPEN TO THROUGH TRAFFIC

AT ALL TIMES.

14. ALL WORK WITHIN THE PUBLIC RIGHT OF WAY SHALL BE COORDINATED

WITH THE GOVERNING AUTHORITY AND SHALL BE DONE IN ACCORDANCE

WITH THEIR STANDARDS.

15. SUBMIT MANUFACTURER'S CERTIFICATION AND MATERIAL DATA FOR ALL

MATERIALS DELIVERED TO THE PROJECT SITE AS REQUESTED BY THE

OWNERS REPRESENTATIVE.

16. CONSTRUCTION SURVEY STAKING WILL BE PAID FOR BY THE OWNER AND

PROVIDED BY THE ENGINEER. CONTROL POINTS WILL BE SET FOR USE

WITH GPS CONTROLLED GRADING, IF DESIRED. CONTRACTOR SHALL

PRESERVE STAKES TO THE EXTENT FEASIBLE. ANY RE-STAKING COSTS

WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

17. NEITHER SHIVE-HATTERY NOR IDALS GUARANTEE THIS PRACTICE WILL

HOLD A PERMANENT POOL OF WATER.

CULTURAL RESOURCES NOTE:

1. IF A CULTURAL RESOURCE IS IDENTIFIED

DURING CONSTRUCTION, STOP IMMEDIATELY

AND NOTIFY LOCAL NATURAL RESOURCES

CONSERVATION SERVICE OFFICE.

ESTIMATE REFERENCE NOTES:

ITEM # SPEC # DESCRIPTION

1 IA CS-001 SITE STRIPPING & PREPARATION : THIS ITEM WILL CONSIST OF WORK TO REMOVE AND DISPOSE OF EXISTING MATERIAL OR WASTE ONE SITE AND TO TO REMOVE VEGETATION ON AREAS TO BE EXCAVATED OR FILLED. TOTAL DEPTH OF VEGETATIVE STRIPPING AND TOPSOIL STRIPPING SHALL EQUAL A COMBINED DEPTH OF 12". THE TOPSOIL REPLACEMENT QUANTITY SHALL BE PAID SEPARATELY. THIS ITEM WILL ALSO INCLUDE ANY TREE AND BRUSH REMOVAL ALONG WITH ANY FENCES.

2 IA CS-001 CROP DAMAGE: THIS ITEM CONSISTS OF CROP DAMAGE THAT RESULTS FROM CONSTRUCTION ACTIVITIES. IT IS RECOMMENDED CONTRACTOR REMOVE CORN RESIDUE RATHER THAN KNOCK IT DOWN. PAYMENT FOR CROP DAMAGE WILL BE MADE TO THE NEAREST 0.1 ACRE AS MEASURED BY THE ENGINEER OR THEIR REPRESENTATIVE.

THE UNIT RATE FOR CROP DAMAGE WILL BE DETERMINED BY THE DIVISION NEAR THE COMPLETION OF CONSTRUCTION AND ADDED TO THE CONTRACT WITH A CHANGE ORDER. PAYMENT WILL BE MADE TO CONTRACTOR WHO WILL PAY LANDOWNER.

3 IA CS-006 STRUCTURE & CHANNEL SEEDING: THIS ITEM INCLUDES SEEDING AND RELATED ACTIVITIES FOR STUCTURE SEEDING AREAS AS SHOWN ON THE PLANS. INCLUDES SEEDBED PREP, SEEDING, STRAW MULCH, AND FERTILIZER.

4 IA CS-006 BUFFER SEEDING: THIS ITEM INCLUDES SEEDING AND RETAED ACTVITIES FOR BUFFER SEEDING AREAS AS SHOWN ON THE PLANS. NO MULCH OR FERTILIZER SHALL BE APPLIED.

5 CS-008 MOBILIZATION AND DEMOBILIZATION: THIS ITEM SHALL BE CONSIDERED FULL COMPENSATION TO MOBILIZE AND DEMOBILIZE THE CONTRACTOR'S FORCES AND EQUIPMENT FOR THE PROJECT. ALL OTHER WORK NECESSARY TO COMPLETE THE PROJECT AS REPRESENTED HEREIN BUT NOT INCLUDED IN THE ITEMS LISTED BELOW SHALL BE INCIDENTAL TO THIS ITEM. THIS ITEM SHALL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT AND IOWA ONE CALL NOTIFICATIONS TO INSTALL SIGN PROVIDED BY IOWA DEPARTMENT OF AGRICULTURE AND LAND STEWARDSHIP IN AND OWNER APPROVED LOCATION.

6 IA CS-009 DRAIN TILE INVESTIGATION AND REMOVAL: THIS ITEM INCLUDES THE EXPLORATORY EXCAVATIONS REQUIRED TO LOCATE AND REMOVE TILES SHOWN ON THE PLANS. THIS IS FULL COMPENSATION FOR EXCAVATION, BACKFILLING, AND REMOVAL OF THE TILE TRENCHES. CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR ALL TILE

LOCATED AND REMOVED.

7 IA CS-021 EXCAVATION (GENERAL (P)): THIS ITEM INCLUDES THE EXCAVATION OF MATERIAL REQUIRED TO FORM THE WETLAND POOL, EXCAVATION OF THE CORE TRENCH BELOW THE EXISTING GROUND LEVEL, AS DETAILED, AND EXCAVATION FOR BORROW MATERIAL FOR PUMP EQUIPMENT PADS. COHESIVE MATERIAL FOUND DURING GENERAL GRADING MUST BE RESERVED FOR WETLAND CLAY LINER CONSTRUCTION, CORE TRENCH FILL, AND THE DAM CORE. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR THIS EARTHFILL WITHIN THE WETLAND AND MUST BE WASTED IN THE AREAS SHOWN ON THE PLANS OR MAY BE USED FOR THE EQUIPMENT PADS IF REQUIRED.

8 IA CS-023

EARTHFILL (GENERAL (P)): THIS ITEM INCLUDES THE SOIL MATERIAL REQUIRED TO CONSTRUCT THE SUBMERGED BERMS, ADDITIONAL FILL TO BE PLACED OVER TILE COVER BERMS, FILL FOR PUMP EQUIPMENT PADS, AND WASTE SOIL. COHESIVE MATERIAL FOUND DURING GENERAL GRADING MUST BE RESERVE FOR CLAY LINER CONSTRUCTION, CORE TRENCH FILL, AND THE DAM CORE. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR THIS EARTHFILL WITHIN THE WETLAND AND MUST BE WASTED IN THE AREAS SHOWN ON THE PLANS. THE REQUIRED FILL INCLUDES A 20% SHRINKAGE FACTOR. COMPACTION SHALL BE NRCS METHOD 1. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.

9 IA CS-023

EARTHFILL (GENERAL DAM (P)): THIS ITEM INCLUDES THE EARTHFILL PLACEMENT AND COMPACTION NECESSARY TO CONSTRUCTION THE PORTION OF THE EMBANKMENT THAT IS NOT THE EMBANKMENT CORE. COHESIVE MATERIAL FOUND DURING GENERAL GRADING AND COMPACTED LINER CAN BE USED FOR THIS AREA. SAND AND GRAVEL FOUND ON SITE SHALL NOT BE USED FOR FILL IN THESE AREAS. THE REQUIRED FILL INCLUDES A 20% SHRINKAGE FACTOR. COMPACTION SHALL BE METHOD 1 OR METHOD 2. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN

QUANTITY.

10 IA CS-023 EARTHFILL (DAM CORE (P)): THIS ITEM INCLUDES THE EARTHFILL PLACEMENT AND COMPACTION NECESSARY TO CONSTRUCT THE EMBANKMENT CORE WITHIN THE EMBANKMENT. SELECT COHESIVE MATERIAL TAKEN FROM DESIGNATED BORROW AREA SHOULD BE USED FOR THIS AREA. SAND AND GRAVEL SHALL NOT BE USED FOR THIS AREA. THE REQUIRED FILL INCLUDES A 20% SHRINKAGE FACTOR. COMPACTION SHALL BE NRCS METHOD 2. MEASUREMENT AND PAYMENT FOR PLACEMENT AND COMPACTION OF ALL FILL MATERIAL IS INCLUDED IN THIS ITEM AND WILL BE PAID BASED ON PLAN QUANTITY.

11 IA CS-023

EARTHFILL (18" RE-COMPACTED CLAY LINER, WETLAND BOTTOM (P)): THIS ITEM INCLUDES CONSTRUCTION OF A COMPACTED CLAY LINER WITHIN THE WETLAND POOL IN AREAS WHERE EXCAVATION OCCURS. SEQUENCING SHALL INCLUDE OVEREXCAVATION AND STOCKPILE OF 9" OF SOIL, SCARIFICATION TO A DEPTH OF 9 INCHES, AND RECOMPACTION (LIFT 1). AN ADDITIONAL 9 INCH CLAY LIFT WILL BE REPLACED ABOVE LIFT ONE AND COMPACTED, FORMING A TOTAL OF 18 INCHES OF CLAY LINER PRIOR TO RESPREADIN TOPSOIL. PROPOSED CONTOURS SHOWN ARE TO FINSHED SURFACE, POST TOPSOIL RESPREAD. MOISTURE CONDITIONING MAY BE REQUIRED AND COMPACTION SHALL BE NRCS METHOD 2. RESERVE SELECT CLAY SOILS FOR CONSTRUCTION OF THE CLAY LINER AND NOTIFY THE ENGINEER IS SANDY SOILS ARE LOCATED. CONTRACTOR SHALL REMOVE ROCKS LARGER THAN 6 INCHES. NOTIFY ENGINEER IMMEDIATELY IF SANDY SOILS ARE ENCOUNTERED. ITEM WILL BE PAID BASED ON

PLAN QUANTITY.

12 IA CS-023 EARTHFILL (SCARIFY AND RECOMPACT 9" LAYER OF WETLAND BOTTOM (P)): THIS ITEM INCLUDES SCARIFICATION AND LOOSENING OF A 9 INCH SURFACE LAYER OF SOIL IN UNDISTURBED AREAS OF THE WETLAND POOL BOTTOM , MOISTURE CONDITIONING, AND COMPACTION OF THE WETLAND BOTTOM TO FORM A SEAL. CONTRACTOR SHALL REMOVE ROCKS LARGER THAN 6 INCHES. NOTIFY ENGINEER IMMEDIATELY IF SANDY SOILS ARE ENCOUNTERED. ITEM WILL BE PAID BASED ON PLAN QUANTITY.

13 IA CS-026 TOPSOIL PLACEMENT. 6 INCH: THIS ITEM INCLUDES THE RESPREAD OF TOPSOIL STOCKPILED DURING SITE STIRPPING. RESPREAD 6" TOPSOIL IN ALL DISTURBED AREAS INCLDUNG EXCAVATION, BORROW, AND EARTHFILL FOOTPRINTS. ITEM WILL BE PAID BASED ON PLAN QUANTITY.

14 IA CS-026 TOPSOIL PLACEMENT, 12 INCH: THIS ITEM INCLUDES THE RESPREAD OF TOPSOIL STOCKPILED DURING SITE STIRPPING. RESPREAD 12" TOPSOIL ON THE EMBANKMENT FOOTPRINT ON THE SOUTH WETLAND SITE. ITEM WILL BE PAID BASED ON PLAN QUANTITY.

15 IA CS-045 8" SCHEDULE 80 PVC PIPE: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, FITTINGS, AND BACKFILL OF THE BURIED 8" SCHEDULE 80 PVC PIPE AS SHOWN ON THE PLANS. PIPING WITHIN THE PUMP STATION IS NOT INCLUDED WITH THIS BID ITEM AND SHALL BE INCIDENTAL TO BID ITEM 30.

16 IA CS-046 4" PERFORATED POLYETHYLENE PIPE WITH POROUS BACKFILL, SINGLE WALL : THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 4" PERFORATED HDPE DRAIN TILE WITH POROUS BACKFILL.

17 IA CS-046 6" PERFORATED POLYETHYLENE PIPE, NON PERFORATED, SINGLE WALL: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 6" NON-PERFORATED HDPE DRAIN TILE.

18 IA CS-046 24" SDR 26 PVC PIPE: THIS ITEM INCLUDES THE MATERIAL, EXCAVATION, PLACEMENT, JOINTING, AND BACKFILL OF THE 24" SDR 26 PVC PIPE WITH GASKETED BELL AND SPIGOT JOINTS FROM THE DRAINAGE DITCH TO THE PUMP STATION STUCTURES. PIPE SHALL BE BEDDED IN CLASS 1 AGGREGATE. CONCRETE COLLR CONNECTIONS AT THE

PUMP STUCTURE ARE REQUIRED.

19 IA CS-051 24" RISER INLET STRUCTURE: THIS ITEM INCLUDES COSTS FOR THE MATERIAL AND INSTALLATION OF 24" CMP RISER INLET STRUCTURE PIPE, TRASH RACK, AND BASE A DETAILED.

20 IA CS-051 48" CMP WATER CONTROL STRUCTURE : THIS ITEM INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS FOR THE PLACEMENT OF THE 48" CMP WATER CONTROL STRUCTURE, FOOTING, STEEL, FABRICATION, PIPE CONNECTIONS, STOP LOGS, STOP LOG STORAGE STRUCTURE, AND LOCKABLE LID.

21 IA CS-051 18" CMP DRAWDOWN WETLAND OUTLET PIPE: THIS ITEM INCLUDES ALL LABOR, EQUIPMENT, MATERIALS REQUIRED FOR THE EXCAVATION, AND THE PLACEMENT OF THE CORRUGATE METAL PIPE, INCLUDING ANTI-SEEPAGAE COLLARS.

22 IA CS-051 8" CMP TILE OUTLETS (20 LF EACH): THIS ITEM INCLUDES THE COSTS FOR MATERIAL, EXCAVATION, PLACEMENT, JOINTING, BEDDING, RODENT GUARDS, AND BACKFILLING OF THE 20 LF 8" CMP END SECTION FOR THE PROPOSED FIELD TILE OUTLET TO THE WETLAND. 8" CMP OUTLET SECTIONS ARE FOR 6 INCH TILES.

23 IA CS-061 RIP RAP: THIS ITEM INCLUDES THE EXCAVATION AND PLACEMENT OF CLASS 'E' REVETMENT OVER GEOTEXTILE FABRIC AT THE LOCATIONS SHOWN ON THE PLANS. GEOTEXTILE FABRIC IS INCIDENTAL TO THIS ITEM. QUANTITY DETERMINATION IS BASED ON A UNIT WEIGHT OF 105 POUNDS PER CUBIC FOOT. PROVIDE WEIGHT TICKETS TO

OWNER'S REPRESENTATIVE.

24 IA CS-061 1" CLEAN STONE: THIS ITEMS INCLUDES PROCUREMENT, PLACEMENT AND SPREADING OF 1 INCH CLEAN STONE OVER GEOTEXTILE FABRIC AT THE PUMP PADS. QUANTITY DETERMINATION IS BASED ON A UNIT WEIGHT OF 130 POUNDS PER CUBIC FOOT.

25 IA CS-061 2" CLEAN STONE: THIS ITEMS INCLUDES PROCUREMENT, PLACEMENT AND SPREADING OF 2 INCH CLEAN STONE AT THE STABILIZED CONSTRUCTION ENTRANCE.

26 CS-008 POLLUTION CONTROL, SILT FENCE: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF SILT FENCE AS SHOWN ON THE PLANS AND AS DETAILED.

27 IA CS-005 POLLUTION CONTROL, TYPE 2B RECP: THIS ITEM INCLUDES PROCUREMENT AND INSTALLATION OF TYPE 2B RECP TURF REINFORCING MAT IN ACOORDANCE WITH SUDAS 9040. INSTALLATION SHALL BE PER THE MANUFACTURER’S RECOMMENDATIONS.

28 DIVISION

SOLAR, BATTERY, ELECTRICAL AND CONTROLS (COMPLETE SYSTEM); THIS ITEM INCLUDES PROCUREMENT, INSTALLATION, START UP AND WARRANTYY OF ALL COMPONENTS FOR THE PHOTOVOLTAIC AND BATTERY SYSTEM AS SHOWN IN THE PLANS AND AS DESCRIBED IN THE SPECIFICATIONS INCLUDING CONNECTION TO THE PUMP

SYSTEM AND CONTROLS.

29 DIVISION

33 & 26

PUMP STATION (PUMP, CONTROLS, ELECTRICAL, STRUCTURE, APPURENTANCES (COMPLETE SYSTEM)) : THIS ITEM INCLUDES PROCUREMENT, INSTALLATION, START UP AND WARRANTY ALL COMPONENTS FOR THE PUMPING SYSTEMS AS SHOWN IN THE PLANS AND AS DESCRIBED IN THE SPECIFICATIONS INCLUDING THE CONCRETE STUCTURE, CONNECTIONS, CONTROLS, FLOATS, ELECTRICAL, VARIABLE FREQUENCY DRIVE, PUMPS, INTERIOR PIPING, WATER METER, AND REMOTE MONITORING SYSTEM. REFER TO DRAWINGS AND SPECIFICATIONS.

30 IA CS-092

SINGLE CANTILEVER SLIDE GATE: THIS TIEMS INCLUDES THE INSALLATION AND MATERIALS NEEDED TO INSTALL MANUAL CHAIN‑LINK CANTILEVER SLIDE GATE WITH 12‑FOOT CLEAR OPENING, COMPLETE AND OPERATIONAL, AT LOCATIONS SHOWN. GATE SHALL BE INSTALLED LEVEL, ALIGNED, AND ADJUSTED TO PROVIDE SMOOTH OPERATION WITHOUT GROUND CONTACT. COORDINATE GATE CLEARANCES, POST LOCATIONS, AND FULL TRAVEL LENGTH WITH FENCE LAYOUT. GATE AUTOMATION IS NOT INCLUDED UNLESS SPECIFICALLY NOTED ON THE PLANS. INSTALLATION AND MATERIALS SHALL COMPLY WITH MANUFACTURER RECOMMENDATIONS, SUDAS, AND

OTHER APPLICABLE IOWA STANDARDS.

31 IA CS-092 CHAIN LINK SECURITY FENCE: THIS ITEMS INCLUDES THE INSTALLATION AND MATERIALS NEEDED TO INSTALL 6‑FOOT TALL GALVANIZED CHAIN‑LINK SECURITY FENCE WITH BARBED WIRE TOP AT LOCATIONS SHOW IN PLANS. INSTALLATION AND MATERIALS SHALL COMPLY WITH MANUFACTURER RECOMMENDATIONS, SUDAS, AND OTHER APPLICABLE IOWA STANDARDS. FENCE ALIGNMENT, POST SPACING, AND TERMINATION SHALL BE COORDINATED WITH GATES AND EXISTING IMPROVEMENTS. RESTORE DISTURBED AREAS TO ORIGINAL OR BETTER CONDITION UPON COMPLETION.

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

T M E N T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

C

ALH

O U

N C

O U

N

TY

C

ALH

O U

N C

O U

N

TY

D

&J LAN

D

TR

U

ST

C

ALH

O U

N C

O U

N

TY

W U

EBKER

, JO

EL & M

O

N

IC

A

D

&J LAN

D

TR

U

ST

D

&J LAN

D

TR

U

ST

11801180

PROJECT GRADING LIMITS AND TILE INSTALLATION LIMITS

STRIP AND STOCKPILE 12 INCHES OF TOPSOIL IN EMBANKMENT

FOOTPRINT AND ALONG PROPOSED DIVERSION TILE LENGTH

OUTSIDE THE PROPOSED EASEMENT. STRIP 6 INCHES OF

TOPSOIL IN ALL OTHER DISTURBED AREAS. RESPREAD TOPSOIL

PRIOR TO SEED BED PREPARATION AND SEEDING.

NO CONTRACTOR

TRAFFIC OUTSIDE OF

EASEMENT UNLESS

APPROVED BY OWNER

EXISTING STREAM

CENTERLINE

100-YEAR FEMA

FLOODPLAIN

LOCATE AND REMOVE

900' OF EXISTING TILE

LOCATE, CRUSH, AND BURY ALL TILE

WITHIN PROPOSED WETLAND POOL.

LOCATED AND REMOVE

TILE OUTLETS TO CREEK

LOCATE EXISTING FIELD TILE FOR

CONNECTIONS TO PROPOSED TILE TO

BE DAYLIGHTED TO THE POOL (TYP).

3 LOCATIONS ANTICIPATED.

PROTECT ALL TILE TO REMAIN IN PLACE.

CONTRACTOR RESPONSIBLE FOR REPAIR OF

ANY DAMAGE CAUSED BY CONSTRUCTION AT

NO ADDITIONAL COST TO THE DIVISION.

EXISTING 12" CMP

LOCATE AND REMOVE

1,020' OF EXISTING TILE

LOCATE AND REMOVE

218' OF EXISTING TILE

EASEMENT BOUNDARY

EASEMENT BOUNDARY (TYP)

REMOVE & DISPOSE

EXISTING 12" CMP OUTLET

REMOVE & DISPOSE

EXISTING 12" CMP OUTLET

APPROXIMATE PROPERTY

BOUNDARY (TYP.)

EMBANKMENT DAM

GRADING LIMITS

STRIP 12 INCHES

FEMA FLOODWAY

REMOVE AND DISPOSE

EXISTING 18" CMP OUTLET

CONSTRUCTION ACCESS ROUTE SHALL BE

WITHIN EASEMENT, COORDINATE WITH THE

OWNER. DISK COMPACTED AREAS AS

REQUIRED PRIOR TO SEED BED PREPARATION.

STABILIZED CONSTRUCTION

ENTRANCE, 30 TONS 2" CLEAN STONE

PRESTON AVE

LAKE CREEK

STABILIZED CONSTRUCTION

ENTRANCE, 30 TONS 2" CLEAN STONE

EXCAVATION LIMITS

STRIP 12 INCHES

N O

R

TH

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

T M E N T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

D R

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d:

D R

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d: CD01

EX

IS

TI

NG

CO

ND

IT

IO

NS

A

ND

RE

M O

VA

LS

G

HK

DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

C

AL

B

PU

M

PE

D

W

ET

LA

N

D S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C D0

- E

XI

ST

IN

G

C O

ND

IT

IO

NS

A

ND

R

EM

O

VA

LS

.d wg 4/

/2

:4

4:

A M

PROPERTY LINE (APPROX)

EXISTING CONTOUR - MAJOR

EXISTING CONTOUR - MINOR

LEGEND SURVEY NOTES:

1. LIMITED TOPOGRAPHIC SURVEY COMPLETED BY SHIVE-HATTERY ON

FEBRUARY 22, 2024.

2. SUPPLEMENTAL EXISTING SURFACE INFORMATION SHOWN WAS

BASED ON LIGHT DETECTION AND RANGING (LIDAR) INFORMATION

FROM IOWA DNR (2020).

3. CONTRACTOR SHALL VERIFY BASE SURFACE PRIOR TO

CONSTRUCTION AND COORDINATE WITH ENGINEER.

COORDINATE SYSTEM AND DATUM:

HORIZONTAL DATUM - NAD83, IOWA STATE PLANE, NORTH ZONE

VERTICAL DATUM - NAVD88

TILE INFORMATION

EXISTING TILE INFORMATION IS APPROXIMATE AND WAS PROVIDED BY

THE LANDOWNER.

EXISTING DRAIN TILE

EXISTING TILE REMOVAL

SOIL BORING SB

EASEMENT BOUNDARY

100-YEAR FLOODPLAIN

SOILS NOTES:

1. STRIP EXISTING VEGETATION AND TOPSOIL WITHIN ALL DISTURBED

AREAS. STRIPPING DEPTH SHALL BE 12 INCHES. STOCKPILE CLEAN

TOPSOIL FREE OF VEGETATION FOR RESPREAD.

2. LIMITED SOIL PROBING WAS COMPLETED BY SHIVE-HATTERY ON

OCTOBER 26, 2023. PROBING WAS DONE TO A DEPTH OF

APPROXIMATELY 42 INCHES IN PROPOSED POOL AREAS.

3. SOILS CONSIST OF A SURFACE LAYER OF DARK ORGANIC TOPSOIL

FOLLOWED BY A LEAN CLAY LAYER. SOME SILT AND SAND SEAMS WERE

PRESENT AS IS TYPICAL IN FLOODPLAN AREAS. THE CLAY LAYER WAS

OBSERVED DOWN TO DEPTHS OF ABOUT 42 INCHES. SOILS AT DEEPER

DEPTHS ARE UNKNOWN. EXCAVATION IS LIMITS TO 3 FEET IN POOL

AREAS AND SELECT SOILS SHALL BE RESERVED FOR CLAY LINER

CONSTRUCTION. SOIL CONDITIONS MAY VARY.

4. NOTIFY ENGINEER IMMEDIATELY IF SAND IS ENCOUNTERED IN LARGE

QUANTITIES. GRADING MAY REQUIRE MODIFICATION IN THE FIELD

BASED ON SOIL CONDITIONS. COORDINATE WITH THE ENGINEER.

500-YEAR FLOODPLAIN

FLOODWAY

0+00

1+00 2+00

2+50

0+

1+

2+

11801180

9:1

:1

43:1

4:1

4:1

0:

3:1

3:

85 11

:1

INSTALL 30 LF OF

6" HDPE @ 3.28%

START IE = 1189.0

END IE = 1188.0

INSTALL 74 LF OF

6" HDPE @ 0.47%

START IE = 1188.0

END IE = 1187.7

INSTALL 90 LF OF

6" HDPE @ 1.12%

START IE = 1189.0

END IE = 1188.0

IE = 1188.0

24" CMP RISER

RIM = 1185.50

NORTH WETLAND DRAWDOWN PIPE

146 LF 18" CMP @ 0.69%

48" CMP WATER CONTROL STRUCTURE

RIM = 1188.60

NORTH WETLAND OUTLET PIPE

31 LF 18" CMP @ 0.00%

PRESTON AVE

LAKE CREEK

X

X

X

X

X X

X

X X

INSTALL 34 LF OF

6" HDPE @ 0.47%

START IE = 1187.7

END IE = 1187.5

IE = 1187.5

TWO PUMP STATION SUMPS, SOLAR PANELS,

BATTERY AND CONTROLS. WATER METER TO

BE INSTALLED ON EACH DISCHARGE PIPE

- SEE DETAIL ON C305

GRAVITY INTAKE PIPE FROM

STREAM TO SUMP. TWIN 24"

SDR 26 PVC TO EACH VAULT

BURIED WATER FORCEMAIN

8 INCH SCHEDULE 80 PVC.

PROPOSED NORMAL WATER LEVEL

ELEVATION = 1186.0

AREA = 7.35 ACRES

AVERAGE DEPTH = 0.85 FT

MAX DEPTH = 2.2 FT

FEMA ZONE A

100-YEAR FLOODPLAIN

APPROXIMATE PROPERTY

BOUNDARY (TYP.)

WETLAND EXCAVATION LIMITS

AREA = 4.1 ACRES

EQUIPMENT PAD

TOP ELEV = 1191.50

EXCESS SOIL PLACEMENT LIMITS

AREA = 1.3 ACRES

EXCAVATED CHANNEL

GRADE TO DRAIN TOWARDS OUTLET

TILE COVER BERM

TOP WIDTH = 12 FEET

SIDE SLOPES = 4:1

TILE COVER BERM

TOP WIDTH = 12 FEET

SIDE SLOPES = 4:1

SEE SHEETS C201 AND C202 FOR

SOUTH WETLAND GRADING PLANS

DELINEATED

FLOODWAY

TILE OUTLET SWALE TO WETLAND POOL

PLACE 35 TONS CLASS 'E' RIPRAP 1.5' THICK

INSTALL 279 LF 4"

PERFORATED DRAIN TILE

WITH POROUS BACKFILL.

0.5% MIN SLOPE.

TILE OUTLET SWALE TO WETLAND POOL

PLACE 25 TONS CLASS 'E' RIPRAP 1.5' THICK

EASEMENT BOUNDARY (TYP.)

20 TONS CLASS 'E' RIPRAP

20 TONS CLASS 'E' RIPRAP

20 TONS CLASS 'E' RIPRAP

30 TONS CLASS 'E' RIPRAP

INSTALL SINGLE

CANTILEVER SLIDE GATE

- SEE DETAIL

INSTALL 215 LF OF CHAIN

LINK SECURITY FENCE

- SEE DETAIL

APPROXIMATE FENCE

POST LOCATION (TYP.)

- SEE DETAIL

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

TM

E NT O F

A G R I C U L T U R E

L A

ND

S

TEWARDSHIP

D R

AW

N

B Y

AP

PR

O

VE

D B

Y

IS

SU

ED

F

O R

IS

SU

E D

AT

E

FI

EL

D B

O O

K

PR

O

JE

C

T N

U M

BE

R

Pr in te d: C101

N O

R

TH

W

ET

LA

N

D G

R

AD

IN

G

P

LA

N G

HK DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

50 --- ---C

AL

B

PU

M

PE

D W

ET

LA

N D

S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

G

RA

DI

NG

P

LA

N.

dw g

4/

/2

:5 1:

A

M

N O

R

TH

LEGEND

LINE TYPEDESCRIPTION

TOP OF DAM ELEVATION

GRADING LIMITS

MAJOR CONTOUR (PROPOSED)

MINOR CONTOUR (PROPOSED)

APPROX. PROPERTY BOUNDARY

MAJOR CONTOUR (EXISTING)

MINOR CONTOUR (EXISTING)

NORMAL WATER LEVEL

EASEMENT BOUNDARY

PROPOSED TILE

100-YEAR FLOODPLAIN

X X XSECURITY FENCE

11801180

DELINEATED FLOODWAY

FEMA ZONE A

100-YEAR FLOODPLAIN

X

X

X

X X

X X

X

X X

X

SCARIFY AND RECOMPACT 9"

OF ALL NON-EXCAVATED

AREAS WITHIN POOL LIMITS

WASTE SOIL AREA

18" RECOMPACTED CLAY

LINER WITHIN EXCAVATION

LIMITS OF POOL

SCARIFY AND RECOMPACT 9"

OF ALL NON-EXCAVATED

AREAS WITHIN POOL LIMITS

NORTH EQUIPMENT PAD

TILE COVERS

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

T M E N T O F

A G R I C U L T UR E

L A

ND

S

TEWARDSHIP

D R

AW

N

B Y

AP

PR

O

VE

D B

Y

IS

SU

ED

F

O R

IS

SU

E D

AT

E

FI

EL

D B

O O

K

PR

O

JE

C

T N

U M

BE

R

Pr in te d: C102

N O

R

TH

W

ET

LA

N

D C

U T-

FI

LL

P

LA

N G

HK DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

50 --- ---C

AL

B

PU

M

PE

D W

ET

LA

N D

S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

G

RA

DI

NG

P

LA

N.

dw g

4/

/2

:5 1:

A

M

N O

R

TH

EARTHWORK TABLE

CLASSIFICATION CUT TOTAL FILL + 20% SHRINK

EXCAVATION, WETLAND 6,176 0

EARTHFILL, EQUIPMENT PAD 0 1,110

EARTHFILL, WASTE SOIL 0 4,046

EARTHFILL, TILE BERMS 0 1,020

TOTAL EARTHWORK 6,176 6,176

ELEVATIONS TABLE

CUT/FILL MINIMUM ELEVATION (FT.) MAXIMUM ELEVATION (FT.) COLOR

CUT -3.0 -2.5

CUT -2.5 -2.0

CUT -2.0 -1.5

CUT -1.5 -1.0

CUT -1.0 -0.5

CUT -0.5 0.0

FILL 0.0 0.5

FILL 0.5 1.0

FILL 1.0 1.5

FILL 1.5 2.0

FILL 2.0 2.5

FILL 2.5 3.0

FILL 3.0 3.5

FILL 3.5 4.0

FILL 4.0 4.5

FILL 4.5 5.0

FILL 5.0 5.5

0+00.00 1+00.00 2+00.00 2+50.00

NORTH WETLAND OUTLET PIPE

18" CMP 31 LF @ 0.00%

48" CMP WATER CONTROL STRUCTURE

RIM = 1188.60

IE = 1181.0

IE = 1181.0

24" CMP RISER

RIM = 1185.50

NORTH WETLAND DRAWDOWN PIPE

18" CMP 146 LF @ 0.69%

IE = 1181.0

IE = 1182.0

NWL = 1186.00

EXISTING GROUND

20 TONS CLASS 'E' RIP RAP MOUNDED

AROUND INTAKE RISER. PLACE WITH CARE

TO ENSURE INTEGRITY OF RISER

6' X 6' CMP

ANTI-SEEP COLLAR

- SEE DETAIL

20 TONS CLASS E RIP RAP

2' THICK OVER GEOTEXTILE

MATCH EXISTING STREAM AND BANK GRADES

7' X 7' CONCRETE BASE

TOP = 1180.67

BOTTOM = 1180.00

6' X 6' CMP

ANTI-SEEP COLLAR

- SEE DETAIL

0+00

1+00

2+00

2+50

146 LF OF 18" CMP @ 0.69%

48" CMP WATER CONTROL STRUCTURE

RIM = 1188.60

31 LF OF 18" CMP @ 0.00%

24" CMP RISER

RIM = 1185.50

STOP LOG STORAGE STRUCTURE

31 LF OF 18" CMP @ 0.00%

20 TONS CLASS E RIP RAP

2' THICK OVER GEOTEXTILE

MATCH EXISTING STREAM

AND BANK GRADES

20 TONS CLASS 'E' RIP RAP

MOUNDED AROUND INTAKE RISER

HORIZONTAL SCALE:

VERTICAL SCALE:

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

TM

E NT O F

A G R I C U L T U R E

L A

ND

S

TEWARDSHIP

D R

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d: C103

NO

RT

H W

ET

LA

ND

DR

AW

DO

W N

PL

AN

AN

D

PR

O

FI

LE

G

HK

DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

C

AL

B

PU

M

PE

D

W

ET

LA

N

D S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

O

UT

LE

T

CH

AN

NE

L

PL

AN

A

ND

P

RO

FI

LE

.d wg 4/

/2

:5

2:

A M

NORTH

0+00

1+00

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

4:1

4:1

:1

UNISTRUT RACKING FOR

PUMP AND SOLAR CONTROLS

- SEE DETAIL

SOLAR PANELS

- SEE DETAILS

105 TONS 1" CLEAN

STONE, 6" THICK

OVER GEOTEXTILE

ACCESS RAMP

WIDTH = 12 FEET

560 SY TPE 2B RECP

20 TONS CLASS

'E' RIPRAP

NORTH WETLAND PUMP STATION #1

9' X 9' CONCRETE BOX STRUCTURE

RIM = 1191.50

SUMP = 1173.00

NORTH BURIED WATER FORCEMAIN 1A

8" SCH 80 PVC 26 LF @ 0.00%

12.00'

NORTH WETLAND GRAVITY INTAKE PIPE 1A.2

24" SDR 26 PVC 4 LF @ 0.00%

NORTH WETLAND GRAVITY INTAKE PIPE 1B.2

24" SDR 26 PVC 4 LF @ 0.00%

NORTH WETLAND GRAVITY INTAKE PIPE 1A.1

24" SDR 26 PVC 94 LF @ -1.02%

NORTH WETLAND GRAVITY INTAKE PIPE 1B.1

24" SDR 26 PVC 91 LF @ 1.03%

NORTH BURIED WATER FORCEMAIN 1B

8" SCH 80 PVC 9 LF @ 0.00%

30 TONS CLASS E RIP RAP 2'

THICK OVER GEOTEXTILE

MATCH EXISTING STREAM

AND BANK GRADES

DUPLEX PUMP STATION

- SEE DETAIL ON C305

INSTALL SINGLE

CANTILEVER SLIDE GATE

- SEE DETAIL

INSTALL 215 LF OF CHAIN

LINK SECURITY FENCE

- SEE DETAIL

APPROXIMATE FENCE

POST LOCATION (TYP.)

- SEE DETAIL

0+00.00 1+00.00 2+00.00

NWL = 1186.00

EXISTING GROUND

LIGHT ALARM

DUCKBILL CHECK VALVE

PUMP STATION

- SEE DETAIL ON C305

20 TONS CLASS 'E' RIPRAP 2'

THICK OVER GEOTEXTILE FABRIC

SUMP = 1173.00

CONCRETE BASE AND

STONE SUBBASE

- SEE DETAIL

PROPOSED GROUND

IE = 1187.0

IE = 1187.0

IE = 1178.9

IE = 1178.0

8" SH 80 PVC FORCEMAIN

24" SDR 26 PVC

30 TONS CLASS 'E' RIPRAP 2'

THICK OVER GEOTEXTILE FABRIC

A B C D E F

W

ES

TO

W

N P

KW

Y, S U

IT

E

W

ES

T D

ES

M

O

IN

ES

, I

O W

A

5.

3.

S

H

IV

E- H

AT

TE

R Y.

C O

M

A B C D E F

IOWA D

EP

A R

TM

E NT O F

A G R I C U L T U R E

L A

ND

S

TEWARDSHIP

D R

AW

N

AP

PR

O

VE

D

IS

SU

ED

F

O R

D

AT

E:

FI

EL

D B

O O

K:

PR

O

JE

C

T N

O

C

LI

EN

T

N O

Pr in te d: C104

NO

RT

H W

ET

LA

ND

PU

M P

ST

AT

IO

N

PL

AN

A

ND

P

RO

FI

LE

G

HK

DJ

J

BI

D

DO

CU

M

EN

TS

/2

8/

C

AL

B

PU

M

PE

D

W

ET

LA

N

D S

ID

AL

S

RO

CK

W

EL

L

CI

TY

, I

O W

A

P:

\P ro je ct s\

DM

\2

0\ De liv er ab le s\ Dr aw in gs \1

_C ivi l\C

O

UT

LE

T

CH

AN

NE

L

PL

AN

A

ND

P

RO

FI

LE

.d wg 4/

/2

:5

2:

A M

NO

RTH

HORIZONTAL SCALE:

VERTICAL SCALE:

0+00

1+00

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

4:1

4:1

:1

NORTH WETLAND PUMP STATION #2

9' X 9' CONCRETE BOX STRUCTURE

RIM = 1191.50

SUMP = 1173.00

UNISTRUT RACKING FOR

PUMP AND SOLAR CONTROLS

- SEE DETAIL

SOLAR PANELS

- SEE DETAILS

105 TONS 1" CLEAN

STONE, 6" THICK

OVER GEOTEXTILE

ACCESS RAMP

WIDTH = 12 FEET

560 SY TPE 2B RECP

20 TONS CLASS

'E' RIPRAP

12.00'

NORTH WETLAND GRAVITY INTAKE PIPE 2B.2

24" SDR 26 PVC 4 LF @ 0.00%

NORTH WETLAND GRAVITY INTAKE PIPE 2A.2

24" SDR 26 PVC 4 LF @ 0.00%

NORTH WETLAND GRAVITY INTAKE PIPE 2A.1

24" SDR 26 PVC 84 LF @ -1.19%

NORTH WETLAND GRAVITY INTAKE PIPE 2B.1

24" SDR 26 PVC 82 LF @ -1.22%

NORTH BURIED WATER FORCEMAIN 2B

8" SCH 80 PVC 20 LF @ -0.00%

NORTH BURIED WATER FORCEMAIN 2A

8" SCH 80 PVC 33 LF @ 0.00%

NORTH BURIED WATER FORCEMAIN 2C

8" SCH 80 PVC 3 LF @ 0.00%

30 TONS CLASS E RIP RAP 2'

THICK OVER GEOTEXTILE

MATCH EXISTING STREAM

AND BANK GRADES

DUPLEX PUMP STATION

- SEE DETAIL ON C305

INSTALL SINGLE

CANTILEVER SLIDE GATE

- SEE DETAIL

INSTALL 215 LF OF CHAIN

LINK SECURITY FENCE

- SEE DETAIL

APPROXIMATE FENCE

POST LOCATION (TYP.)

- SEE DETAIL

0+00.00 1+00.00 2+00.00 2+25.13

IE = 1187.0 NWL = 1186.00

EXISTING GROUND

LIGHT ALARM

PUMP STATION

- SEE DETAIL ON C305

20 TONS CLASS 'E'…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .