Addendum__1_issued_10.15.25.pdf
PDF 121 KB Posted
- Solicitation number
- 0000036911
- Issued by
- Kern County, Kernville CDP, California
About this file
This is an addendum to a request for bid issued by the State of California Department of Parks and Recreation, Great Basin District, for repairs to a microgrid solar system at Red Rock Canyon State Park. The project is identified as Bid Number C25900003 with a bid date of November 12, 2025. The addendum, issued on October 15, 2025, clarifies licensing requirements and amends conditions in the original project manual. The document addresses a contractor inquiry regarding the specified contractor licenses required to perform the work.
The addendum clarifies that both C-46 (Solar) and C-10 (Electrical) contractor licenses are required to perform the microgrid solar system repair work, contrary to the contractor's assertion that a C-10 license alone would be sufficient. The state determined that due to the complexity of the project, dual licensure is mandatory. This addendum becomes part of the project documents and supersedes conflicting language in the original project manual, while all other conditions remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project_Manual_C25900003.pdf | ||
| Bid_Forms_C25900003.pdf | ||
| Drawings_C25900003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State of California • Natural Resources Agency Gavin Newsom, Governor
DEPARTMENT OF PARKS AND RECREATION Armando Quintero, Director Great Basin District 15101 Lancaster Rd.
Lancaster, CA 93536
ADDENDUM #1
Issued: October 15, 2025
REPAIRS TO MICROGRID SOLAR SYSTEM
Red Rock Canyon State Park
Bid Number: C25900003
Bid Date: November 12, 2025
The changes in this addendum shall be included in the Project and this addendum shall be part of the Project documents. All conditions not affected by this addendum shall remain unchanged.
1. Questions (Q) and Answers (A):
1) Q: On page 13 of the project manual, it states license required as C-10 and C-46. Under our license of C-10 license we are allowed to do all the work for this project. The form should read a C-10 or C-46? There is no water or steam work, which would require a C-46, all work is electrical which is covered under our C-10 license.
A: Due to the complexity of this microgrid solar system repair project, both C- 46 (Solar) and C-10 (Electrical) contractor licenses are required to perform this work.
END OF ADDENDUM #1