ADDENDUM _ 1.pdf
PDF 3 MB Posted
- Attached to
- Geological Exploration Drilling
- Solicitation number
- 10222937
- Issued by
- Imperial County, California
About this file
This document is Addendum 1 to Invitation for Bid (IFB) #10222937 issued by the California Department of Water Resources (DWR) on November 4, 2026, which modifies the original solicitation issued on October 23, 2026. The addendum replaces three bid sheets (Attachment I for base year work, Attachment II for Option Year 1, and Attachment III for Option Year 2) and updates Exhibit A, the Scope of Work, which includes maps and a work order template. DWR seeks geological exploration drilling and well drilling services on an as-needed basis in the Salton Sea watershed in Southern California to support vegetation enhancement projects at dust suppression areas. The contractor will perform work at a minimum of two and a maximum of six drilling sites, with each site containing one or more monitoring wells and production wells. The scope includes mud-rotary drilling, well construction, geophysical surveys, well development, pump and motor installation, and borehole destruction services. The contract is structured with base year work and two option years, with pricing provided through detailed unit-price bid items covering mobilization, drilling operations, well installation, testing, and ancillary services. The contractor must maintain a valid California C-57 Water Well Drilling License and possess an office or warehouse in California with full-time employees and drilling equipment. Work will commence within 15 calendar days of receiving a work order notice to proceed.
The bid sheets contain unit prices for 25 line items in Table A (drilling and well construction services) and 12 line items in Table B (well development services), with special equipment allowances capped at $500,000 for drilling work and $250,000 for well development. Payment terms include lump-sum amounts for mobilization and demobilization, unit pricing for footage and hourly services, cost-plus-markup (not to exceed 10 percent) for site security and special equipment, and cost reimbursement for miscellaneous materials and supplies. The contractor is responsible for safety compliance, accident prevention, environmental protection, site security, and proper disposal of drilling mud and cuttings. No guarantee of work is provided under this contract, and all computational errors will be resolved with unit prices prevailing over extended totals. The DWR Contract Manager serves as the authorized representative directing all field activities, and the contractor must provide qualified drillers with at least five years of experience and drilling crews consisting of one driller and at least two helpers, all of whom must complete required training in defensive driving, first aid and CPR, sexual harassment prevention, and environmental awareness. Progress payments will retain 10 percent until at least 30 days after satisfactory completion of work under each work order.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid NoticeGeological Exploration Drilling - Salton Sea Beach.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID
ADDENDUM # 1
SOLICITATION # 10222937
NOTICE TO PROSPECTIVE BIDDERS
November 4, 2026
To All Prospective Bidders:
Attached for your review is Invitation for Bid #10222937, Addendum 1 which includes changes to the original solicitation issued on October 23, 2026.
Changes have been made to include the following:
1. Attachment I, Bid Sheet (Page 19), Attachment II, Bid Sheet – Option Year 1 (Page 22), and Attachment III, Bid Sheet – Option Year 2 (Page 25), are hereby replaced with the attached Addendum 1, Attachment I, Bid Sheet, Addendum 1, Attachment II, Bid Sheet – Option Year 1, and Addendum 1, Attachment III, Bid Sheet – Option Year 2 and must be completed and submitted with your proposal or your bid will be rejected.
2. Exhibit A, Scope of Work, has been updated and changes have been highlighted.
3. Exhibit A, Attachment 1, Maps and Exhibit A, Attachment 2, Work Order are included and made part of this solicitation.
STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF WATER RESOURCES
715 P STREET, 7th FLOOR P.O. BOX 942836
SACRAMENTO, CA 94236-0001
IFB# 10222937
Addendum 1
ATTACHMENT I
BID SHEET
Table A Bid Item Description Unit Price Quantity Unit Subtotal
A1 Mob / Demob Mud-Rotary Rig to Imperial County6 $ 1 Each $
A2 Mob Mud-Rotary Rig directly to next borehole $ 7 Each $
A3 Obtain Well Permit (Imperial County) $ 8 Each $
A4 Install 20-in I.D. X 0.25 Mild Steel Conductor Casing (200-ft)
$ 1600 Foot $
A5 Install Cement Sanitary Seal (200-ft) $ 1600 Foot $
A6 Pilot Hole Drilling1 $ 4800 Foot $
A7
Borehole Geophysics (SP; 16-
in. short normal and 64-in.
long-normal resistivity; Natural Gamma-ray; Temperature;
Laterolog 3 (focused resistivity - guard); Acoustic (sonic) with variable density log (VDL) and sonic porosity;
Nuclear Magnetic Resonance (NMR); Borehole Deviation Survey; Caliper) to 600 feet bgs
$ 8 Each $
A8 Ream EXPLORATORY HOLE to 16-in diameter (surface to 800-ft depth)1
$ 4800 Foot $
A9 Install monitoring well - triple nested, 3" I.D. SCH 80 PVC Casing2
$ 3600 Foot $
A10
Install extraction well - 8" I.D.
SCH 80 PVC Casing with 2" SCH 80 PVC Sounding Tube
$ 4800 Foot $
A11 Annular backfill materials (bentonite, sand, cement)3 $ 7600 Foot $
A12
Above grade monument and 4 crash bollards at each location (8-in well casing or nested monitoring well)
$ 8 Each $
A13 Equipment (backhoe/skid steer) to spread cuttings away from drill rig for each borehole
$ 8 Each $
A14 Caliper Log $ 8 Each $ A15 Light Tower4 $ 50 Week $
A16 Water truck for water transport/dust suppression $ 50 Week $
A17 Mud-Rotary Rig Stand-by Time (Hourly) $ 40 Hour $
A18 Overtime Rate > 8 working hours On-Site $ 640 Hour $
A19 Borehole Destruction $ 2000 Foot $
A20 Towing Services (Contingent if drill rig or related equipment gets stuck)
$ 2 Each $
A21
Construction, use, and destruction of pits for containment of drilling materials at each site
$ 6 Each $
A22 Provide Site Security $ 50 Week $ A23 Special Equipment Allowance N/A Varies Up to $500,000
A24 Construction ramp and road from existing access road to well pad
$ 2 Each $
A25 Construct well pad $ 2 Each $
A Total $
Table B Bid Item Description Unit Price Quantity Unit Subtotal
B1 Mob/Demob Well Development Rig $ 8 Each $
B2 Well Development5 $ 1920 Hour $
B3
Supply and install/remove pump and conduct test in extraction wells (8-Hr Step- Drawdown; 24 Hr-Recovery)
$ 6 Each $
B4
Supply and install/remove pump and conduct test in extraction wells (72-Hr Constant Rate; 24 Hr- Recovery)
$ 6 Each $
B5
Fluid Settling Tank (Includes mobilization and demobilization to each well site)
$ 8 Month $
B6 Washout of Settling Tanks $ 8 Each $
IFB# 10222937
B7
Construction, use, and destruction of percolation ponds for containment of aquifer testing fluids
$ 6 Each $
B9 Installation and testing of newly installed pumps and motors to 600 feet bgs
$ 4200 Foot $
B10 Overtime Rate > 8 working hours On-Site $ 320 Hour $
B11 Provide Site Security $ 40 Week $ B12 Special Equipment Allowance N/A Varies Up to $250,000
Total B $
Grand Total (A + B) = $
Notes:
1. Overlapping segments of telescoped borehole will only be charged once for the initial footage advanced.
2. Centralizers to be installed on all casing at a minimum of 50-foot intervals.
3. Uncoated bentonite chips are not to be used as an annular material. Time-release pellets are acceptable.
4. Adequate lighting to be provided by drilling contractor to light work areas as needed.
5. Payment shall be per hour of well boring/well screen development. Not to include the installation or removal of pumps and/or development tooling.
NO GUARANTEE OF WORK UNDER THIS CONTRACT.
In the event of computational error, unit prices will prevail over extended totals. The State will check bid calculations and recalculate bid totals.
The Contractor’s signature, in ink, affixed hereon and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.
Company Name
Contractor’s License Number
Contractor’s License Expiration Date
Printed Name and Title of Bidder
Signature of Bidder Date
IFB# 10222937
ATTACHMENT II
BID SHEET – OPTION YEAR 1
Table A Bid Item Description Unit Price Quantity Unit Subtotal
A1 Mob / Demob Mud-Rotary Rig to Imperial County6 $ 1 Each $
A2 Mob Mud-Rotary Rig directly to next borehole $ 7 Each $
A3 Obtain Well Permit (Imperial County) $ 8 Each $
A4 Install 20-in I.D. X 0.25 Mild Steel Conductor Casing (200-ft)
$ 1600 Foot $
A5 Install Cement Sanitary Seal (200-ft) $ 1600 Foot $
A6 Pilot Hole Drilling1 $ 4800 Foot $
A7
Borehole Geophysics (SP; 16-
in. short normal and 64-in.
long-normal resistivity; Natural Gamma-ray; Temperature;
Laterolog 3 (focused resistivity - guard); Acoustic (sonic) with variable density log (VDL) and sonic porosity;
Nuclear Magnetic Resonance (NMR); Borehole Deviation Survey; Caliper) to 600 feet bgs
$ 8 Each $
A8 Ream EXPLORATORY HOLE to 16-in diameter (surface to 800-ft depth)1
$ 4800 Foot $
A9 Install monitoring well - triple nested, 3" I.D. SCH 80 PVC Casing2
$ 3600 Foot $
A10
Install extraction well - 8" I.D.
SCH 80 PVC Casing with 2" SCH 80 PVC Sounding Tube
$ 4800 Foot $
A11 Annular backfill materials (bentonite, sand, cement)3 $ 7600 Foot $
A12
Above grade monument and 4 crash bollards at each location (8-in well casing or nested monitoring well)
$ 8 Each $
A13 Equipment (backhoe/skid steer) to spread cuttings away from drill rig for each borehole
$ 8 Each $
IFB# 10222937
A16 Water truck for water transport/dust suppression $ 50 Week $
A17 Mud-Rotary Rig Stand-by Time (Hourly) $ 40 Hour $
A18 Overtime Rate > 8 working hours On-Site $ 640 Hour $
A19 Borehole Destruction $ 2000 Foot $
A20 Towing Services (Contingent if drill rig or related equipment gets stuck)
$ 2 Each $
A21
Construction, use, and destruction of pits for containment of drilling materials at each site
$ 6 Each $
A22 Provide Site Security $ 50 Week $ A23 Special Equipment Allowance N/A Varies Up to $500,000
A24 Construction ramp and road from existing access road to well pad
$ 2 Each $
A25 Construct well pad $ 2 Each $
A Total $
Table B Bid Item Description Unit Price Quantity Unit Subtotal
B1 Mob/Demob Well Development Rig $ 8 Each $
B2 Well Development5 $ 1920 Hour $
B3
Supply and install/remove pump and conduct test in extraction wells (8-Hr Step- Drawdown; 24 Hr-Recovery)
$ 6 Each $
B4
Supply and install/remove pump and conduct test in extraction wells (72-Hr Constant Rate; 24 Hr- Recovery)
$ 6 Each $
B5
Fluid Settling Tank (Includes mobilization and demobilization to each well site)
$ 8 Month $
B6 Washout of Settling Tanks $ 8 Each $
IFB# 10222937
destruction of percolation ponds for containment of aquifer testing fluids
$ 6 Each $
B9 Installation and testing of newly installed pumps and motors to 600 feet bgs
$ 4200 Foot $
B10 Overtime Rate > 8 working hours On-Site $ 320 Hour $
B11 Provide Site Security $ 40 Week $ B12 Special Equipment Allowance N/A Varies Up to $250,000
Total B $
Grand Total (A + B) = $
Notes:
1. Overlapping segments of telescoped borehole will only be charged once for the initial footage advanced.
2. Centralizers to be installed on all casing at a minimum of 50-foot intervals.
3. Uncoated bentonite chips are not to be used as an annular material. Time-release pellets are acceptable.
4. Adequate lighting to be provided by drilling contractor to light work areas as needed.
5. Payment shall be per hour of well boring/well screen development. Not to include the installation or removal of pumps and/or development tooling.
NO GUARANTEE OF WORK UNDER THIS CONTRACT.
In the event of computational error, unit prices will prevail over extended totals. The State will check bid calculations and recalculate bid totals.
The Contractor’s signature, in ink, affixed hereon and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.
Company Name
Contractor’s License Number
Contractor’s License Expiration Date
Printed Name and Title of Bidder
Signature of Bidder Date
IFB# 10222937
ATTACHMENT III
BID SHEET – OPTION YEAR 2
Table A Bid Item Description Unit Price Quantity Unit Subtotal
A1 Mob / Demob Mud-Rotary Rig to Imperial County6 $ 1 Each $
A2 Mob Mud-Rotary Rig directly to next borehole $ 7 Each $
A3 Obtain Well Permit (Imperial County) $ 8 Each $
A4 Install 20-in I.D. X 0.25 Mild Steel Conductor Casing (200-ft)
$ 1600 Foot $
A5 Install Cement Sanitary Seal (200-ft) $ 1600 Foot $
A6 Pilot Hole Drilling1 $ 4800 Foot $
A7
Borehole Geophysics (SP; 16-
in. short normal and 64-in.
long-normal resistivity; Natural Gamma-ray; Temperature;
Laterolog 3 (focused resistivity - guard); Acoustic (sonic) with variable density log (VDL) and sonic porosity;
Nuclear Magnetic Resonance (NMR); Borehole Deviation Survey; Caliper) to 600 feet bgs
$ 8 Each $
A8 Ream EXPLORATORY HOLE to 16-in diameter (surface to 800-ft depth)1
$ 4800 Foot $
A9 Install monitoring well - triple nested, 3" I.D. SCH 80 PVC Casing2
$ 3600 Foot $
A10
Install extraction well - 8" I.D.
SCH 80 PVC Casing with 2" SCH 80 PVC Sounding Tube
$ 4800 Foot $
A11 Annular backfill materials (bentonite, sand, cement)3 $ 7600 Foot $
A12
Above grade monument and 4 crash bollards at each location (8-in well casing or nested monitoring well)
$ 8 Each $
A13 Equipment (backhoe/skid steer) to spread cuttings away from drill rig for each borehole
$ 8 Each $
IFB# 10222937
A16 Water truck for water transport/dust suppression $ 50 Week $
A17 Mud-Rotary Rig Stand-by Time (Hourly) $ 40 Hour $
A18 Overtime Rate > 8 working hours On-Site $ 640 Hour $
A19 Borehole Destruction $ 2000 Foot $
A20 Towing Services (Contingent if drill rig or related equipment gets stuck)
$ 2 Each $
A21
Construction, use, and destruction of pits for containment of drilling materials at each site
$ 6 Each $
A22 Provide Site Security $ 50 Week $ A23 Special Equipment Allowance N/A Varies Up to $500,000
A24 Construction ramp and road from existing access road to well pad
$ 2 Each $
A25 Construct well pad $ 2 Each $
A Total $
Table B Bid Item Description Unit Price Quantity Unit Subtotal
B1 Mob/Demob Well Development Rig $ 8 Each $
B2 Well Development5 $ 1920 Hour $
B3
Supply and install/remove pump and conduct test in extraction wells (8-Hr Step- Drawdown; 24 Hr-Recovery)
$ 6 Each $
B4
Supply and install/remove pump and conduct test in extraction wells (72-Hr Constant Rate; 24 Hr- Recovery)
$ 6 Each $
B5
Fluid Settling Tank (Includes mobilization and demobilization to each well site)
$ 8 Month $
B6 Washout of Settling Tanks $ 8 Each $
IFB# 10222937
destruction of percolation ponds for containment of aquifer testing fluids
$ 6 Each $
B9 Installation and testing of newly installed pumps and motors to 600 feet bgs
$ 4200 Foot $
B10 Overtime Rate > 8 working hours On-Site $ 320 Hour $
B11 Provide Site Security $ 40 Week $ B12 Special Equipment Allowance N/A Varies Up to $250,000
Total B $
Grand Total (A + B) = $
Notes:
1. Overlapping segments of telescoped borehole will only be charged once for the initial footage advanced.
2. Centralizers to be installed on all casing at a minimum of 50-foot intervals.
3. Uncoated bentonite chips are not to be used as an annular material. Time-release pellets are acceptable.
4. Adequate lighting to be provided by drilling contractor to light work areas as needed.
5. Payment shall be per hour of well boring/well screen development. Not to include the installation or removal of pumps and/or development tooling.
NO GUARANTEE OF WORK UNDER THIS CONTRACT.
In the event of computational error, unit prices will prevail over extended totals. The State will check bid calculations and recalculate bid totals.
The Contractor’s signature, in ink, affixed hereon and dated will constitute a certification under the penalty of perjury under the laws of the State of California that the Contractor’s license number and expiration date are true and correct.
Company Name
Contractor’s License Number
Contractor’s License Expiration Date
Printed Name and Title of Bidder
Signature of Bidder Date
IFB# 10222937
EXHIBIT A
SCOPE OF WORK
1. Background – The Department of Water Resources (DWR) is exploring groundwater resources in the Salton Sea watershed to support vegetation enhancement projects at the dust suppression areas. Two USGS-mapped sections (Exhibit A, Attachment 1) are selected for geological exploration drilling to characterize water bearing zones and water quality and to install monitoring and extraction wells. Contractor will perform service at a minimum of two and a maximum six drilling sites based on DWR’s instruction. Each drilling site shall contain one or more monitoring wells and production wells. The Contractor must have an office/warehouse in the State of California with full-time employees and drilling equipment.
2. Services to Be Provided - Contractor agrees to provide to DWR geological exploration drilling and well drilling services on an as-needed basis as described herein.
3. Location of Services – Salton Sea watershed in Southern California. Please see Exhibit A, Attachment 1 for map of locations.
4. Work Orders - DWR will issue written Work Orders (Exhibit A, Attachment 2) to specify the sites to be serviced and the task items. All work items provided by Contractor will be performed on an as-need basis and always at the direction of DWR.
5. Contract Managers
The Contract Managers during the term of this agreement will be:
Department of Water Resources Contractor Name: Name:
Address: Address:
Phone: Phone:
Email: Email:
The Contract Managers can be changed by written notice to the other party.
6. Contract Provisions:
A. Applicable Laws and Regulations - The Contractor will perform the work in strict accordance with the terms of this contract and all applicable laws and regulations. In the case of conflict of the provisions with applicable laws or regulations, the laws or regulations will prevail, and the parties agree that all other provisions of this Agreement will remain enforceable.
B. Right of Way and Environmental Permits - DWR will provide right of way and environmental permits pertaining specifically to the field work sites. The Contractor will comply with all terms and conditions of any legal instrument granting the State, DWR, or the Contractor the right to enter upon property. The terms, conditions, and rights established by such instruments shall affect the time, method, or manner of performing the work, including, but not limited to, any one or a combination of the following:
1. Prevention and suppression of fires
2. Protection of endangered species and habitat
IFB #10222937
3. Work safety plan
4. Work order Letter
5. Noise suppression
6. Disposal of drilling mud and soil cuttings
7. Prevention of hydrocarbon contamination
C. County Well Permits - If requested, the Contractor will acquire County Well Permits.
Copies of permits will be provided to DWR prior to drilling under each Work Order.
D. Authority of the Contract Manager - The Contract Manager is the authorized representative of DWR and will be in charge at the work site and present at the field work site while field work is in progress. The Contract Manager, or the Contract Manager’s designated State representative, will direct the activities of the Contractor and approve all activities proposed by the Contractor. The Contact Manager or designated representative will determine all field activities and requirements, including, but not limited to, any one or a combination of the following:
1. Exact drillhole locations
2. Drillhole and reamed drillhole depths and diameters
3. Drilling and sampling methods, sequences, and intervals
4. Well construction, surface completion design, and construction details
5. Instrumentation installation requirements
6. Geophysical surveys to be conducted
7. Well development methods and procedures
8. Well and drillhole destruction methods
9. Grouting materials, methods, and techniques
E. Licenses – The Contractor is required to possess a valid C-57 Water Well Drilling
License with the California State Contractor's License Board. The license must be maintained throughout the contract period. Failure to maintain a valid license shall result in termination of the contract or other remedies allowed under this contract or applicable law.
In addition, California Water Code Section 13751 requires that anyone who constructs, alters, or destroys a water well, cathodic protection well, groundwater monitoring well, or geothermal heat exchange well must file with DWR a report of completion within 60 days of the completion of the work. Drillers must submit their well completion reports with the Online System of Well Completion Reports (OSWCR, pronounced "Oscar").
OSWCR is DWR’s online system for submitting Well Completion Reports and replaces the former DWR Form 188. The reports provide information on well location, construction, depth, planned use, subsurface geology, and other well characteristics. OSWCR users create an account based on their C-57 license that DWR will validate. Upon approval users will be able to submit Well Completion Reports. Well Completion Report services will be performed at no cost to DWR. Access to OSWCR can be found at the following link: https://water.ca.gov/programs/groundwater-management/wells/well-completion-reports
F. Contractor's Supervision of the Work
1. The Contractor will provide competent, efficient supervision of the work. All work will be performed in a skillful and orderly manner, and the Contractor along with the Contractor's supervisory personnel will enforce this requirement at all times.
IFB #10222937
Addendum 1 https://water.ca.gov/programs/groundwater-management/wells/well-completion-reports https://water.ca.gov/programs/groundwater-management/wells/well-completion-reports
2. The Contractor or the Contractor's representative will be present at the field work site while work is in progress. The Contractor's representative will have the authority to act for the Contractor at the field work site including the authority to sign off on daily Bid item quantities (as outlined in Item 6 Measurement and Payment below).
G. Special Requirements of the Contractor's Personnel
1. Driller Experience Requirements - The Contractor must employ and be able to provide under this contract at least two (2) Drillers who meet the minimum requirements stated herein. The Contractor must provide the resumes of the Drillers who will be performing the drilling documenting at least five (5) years of experience in applicable drilling projects, including experience with the type of drilling rigs and equipment to be used under this contract. Failure to maintain qualified drillers and acceptable resumes shall result in termination of the contract or other remedies allowed under this contract or applicable law.
2. Drilling Crew Requirements - The drilling crew for each drilling rig used by the Contractor in the performance of this contract will include one (1) driller and at least two (2) driller's helpers. The driller will be responsible for and oversee the drilling equipment and drilling operations at all times. The driller's helper(s) must have at least (6) six months of drilling-related experience and must be on the drill site when work is being performed by the driller.
3. Drilling Crew Training Requirements - DWR is committed to maintaining safe and professional work sites. Therefore, all Contractor personnel assigned to perform work under this contract, including drillers, driller helpers, and other Contractor representatives present at the work site, must have successfully completed training courses equivalent to the following within three (3) years prior to performing work under this contract:
a. Defensive Driver Training
b. First Aid and CPR
c. Sexual Harassment Prevention Training
Prior to awarding this contract, and throughout the duration of this contract, the Contractor must provide to DWR upon written request, proof of completion of the required classes for the drillers, driller’s helpers, and other representatives who will be at the work site.
Prior to the start of work, all drillers, driller’s helpers, and other representatives who will be at the work site are required to attend Worker Awareness training related to sensitive biological resources, archeological, Native American cultural resources, and paleontological resources, as well as Environmental Awareness training. Training will be coordinated and provided by DWR.
H. Removal of Personnel - The drilling crew is expected to work safely, efficiently, and act professionally at all times. If at any time any of the Contractor's personnel are judged by DWR to be significantly unsafe, unprofessional, untrained, or their training is out of date, or the Contractor's personnel are incapable of adequately performing the work, the Contractor will be notified of the problem and the Contractor will have two working days to replace said personnel or remedy the problem to the satisfaction of DWR. The Contract Manager may suspend or stop the work at a site immediately at no additional cost to DWR if the Contract Manager believes the Contractor's personnel are working unsafely. Upon resolution of the unsafe situation, DWR may direct the Contractor to commence work again.
IFB #10222937
I. Contractor Furnished Equipment
1. The Contractor will maintain safe and efficient equipment to meet the requirements of the work. The equipment will be in satisfactory operating condition and capable of safely and efficiently performing the work set forth herein. The equipment will be subject to inspection by the DWR prior to start of work under each work order and at all times at the site.
2. Equipment determined by DWR to be unsafe, unsatisfactory, inefficient, or any combination thereof, will be removed from the work site and replaced, within two working days, by adequate equipment at no additional cost to DWR. The Contract Manager may suspend or stop the work at a site immediately at no additional cost to DWR if the Contract Manager believes the Contractor's equipment is unsafe. Upon resolution of the unsafe situation, DWR may direct the Contractor to commence work again.
3. Specific equipment required to perform work during a work order under this contract will be described and listed in a letter to the Contractor, which will be furnished to the Contractor by DWR at least 15 calendar days prior to the start of the work order, unless a shorter notice is mutually agreed upon.
4. All equipment described and listed in a work order letter will be delivered to the work site on the first day of the work order and remain available for use throughout the duration of the callup. The Contract Manager may suspend or stop the work at a site immediately at no additional cost to DWR if the Contract Manager believes the Contractor has not delivered requested equipment or supplies to the site. Upon resolution of delivering equipment and supplies to the site, the Contract Manager may direct the Contractor to commence work again.
5. A printed copy of each work order letter will be provided to the Driller by the
Contractor prior to arriving at the job site, and that copy of the letter will remain available at the job site for the duration of the work order.
J. Subcontractors and Suppliers - The Contractor will be responsible under the contract for the acts and omissions of subcontractors, suppliers, and persons either directly or indirectly employed by them, insofar as their activities relate to the work required by this contract, as fully as the Contractor is for the acts and omissions of the Contractor's own employees. Nothing in the contract will create any contractual relation between any subcontractor or supplier and the DWR, or any obligation on the part of the DWR to pay or cause to be paid any money to any subcontractor or supplier.
K. Air Pollution - The Contractor will comply with all air pollution control rules, regulations, ordinances, and statutes which apply to any work performed pursuant to this contract, including those specified in Government Code Section 11017. All drilling and ancillary equipment must meet the State of California emission regulations.
L. Accident Prevention - The Contractor will be responsible for accident prevention and safety, and for the protection of persons and property. These responsibilities will include, at a minimum:
1. Proper health and safety training of Contractor's employees,
2. Installing adequate safety guards and protective devices for equipment and machinery, IFB #10222937
3. Providing and operating devices to give warning of any dangerous condition created or encountered as a result of the work,
4. Installing and maintaining temporary fences or covers or other suitable devices to protect persons, livestock, or wildlife from the hazards of equipment, open holes, and/or excavations created by the work, until all contract work is completed at each hole or excavation site, as determined by DWR, and
5. Supplying an up to date first aid kit with each drilling rig, suitable to handle accidents which may occur at a drilling job site.
M. Program for Prevention of Injury and Illness - The Contractor will comply with
California Safety Orders, Chapter 4, Division of Industrial Safety. The Contractor will prepare a written program in accordance with Title 8, Section 3395, specifically designed to prevent injury to all persons on the job site and to protect against undue exposure to health hazards that reasonably could be encountered in the performance of the work. The written program must be furnished to the Contract Manager within ten days after the Contractor receives the notice to proceed. The Contract Manager will review the program for safety of Department employees and the public within three (3) business days, and the Contractor will revise the program within three (3) business days to correct defects noted. The written program must be approved by DWR before work begins at the first work site. A copy of the approved program will be furnished to all persons performing work at any site where work will be performed under this contract.
N. Work Safety Plan - A written Work Safety Plan will be submitted by the Contractor prior to start of each work order. The plan will be site specific and cover such things as the closest location of emergency room services, fire department, and other needs based on the drilling activities and locale. Also, safety concerns specific to the site such as working on uneven surfaces, open water, or heat stress will be addressed. The Work Safety Plan will be submitted to the Contract Manager for review at least ten (10) working days prior to the first day of the work order. The Contract Manager will have five
(5) working days to review and approve the Work Safety Plan. Revisions, if any are requested, will be made by the Contractor before the work can begin. A printed copy of the written Work Safety Plan must be at the work site at all times in a visible and accessible location.
O. Heat Illness Prevention Plan - A written, site-specific heat illness prevention plan will be submitted by the Contractor to the Contract Manager for each site which complies with Title 8, Section 3395 California Code of Regulations. The site-specific heat-illness prevention plan will incorporate a work/rest schedule consistent with the NIOSH “Criteria for a Recommended Standard. Occupational Exposure to Heat and Hot Environments” (NIOSH, 2016). Rest time taken in accordance with the Heat Illness Prevention Plan will be treated as normal working time and not as drilling rig standby time. The heat illness prevention plan can be incorporated into the Work Safety Plan or provided to the Contract Manager along with the Work Safety Plan as a separate document. The Heat Illness Prevention Plan will be submitted to the Contract Manager for review at least ten
(10) working days prior to the first day of the work order. The Contract Manager will have five (5) working days to review and approve the Heat Illness Prevention Plan.
Revisions, if any are requested, will be made by the Contractor before the work can begin. A printed copy of the written Heat Illness Prevention Plan must be at the work site at all times in a visible and accessible location.
P. Fire Prevention Plan - Some project areas may be hot, dry, and windy, making them particularly susceptible to the starting and spreading of fires. The Contractor will provide a fire prevention plan in accordance with Title 8, section 3221. The Contractor will be responsible for preventing wildfire by taking all necessary precautions concerning the Contractor's actions, equipment, and vehicles. This responsibility includes, but is not
IFB #10222937
limited to, allowing smoking in fire-safe areas only; having spark arresters on drilling rig engines, pumps, and other equipment, and prohibiting vehicles with a catalytic converter from being driven or parked where dry vegetation may touch the catalytic converter. At least one fire extinguisher must be provided with each drilling rig, vehicle, or other Contractor-furnished mobile equipment. The fire extinguisher(s) must be in a visible and readily accessible location. A written Fire Prevention Plan will be submitted to the Contract Manager for review at least ten (10) working days prior to the first day of the work order. The Contract Manager will have five (5) working days to review and approve the Fire Prevention Plan. Revisions, if any are requested, will be made by the Contractor before the work can begin. A printed copy of the written Fire Prevention Plan must be at the work site at all times.
Q. Schedule of Work - For each work order the Contractor will commence work at the project site within 15 calendar days after being notified to proceed and thereafter will diligently prosecute the work to completion.
R. Work Hours -
1. Normal Work Hours - It is intended that the Contractor and the Contractor's employees work 40 hours each week. The Contractor and the Contractor's employees are expected to work eight (8) hours per day for five (5) days per week, Monday through Friday, at the job site, excluding State holidays. Normal working hours will begin no earlier than 7 a.m. and end no later than 5 p.m. During workdays which exceed six (6) hours at the work site, the Contractor and the Contractor's employees are required to take a lunch break/rest period of a minimum of one half hour. During the lunch break/rest period, no drilling or other related work will be performed. The lunch break/rest period should be scheduled so it is no closer than two (2) hours from the beginning of the workday, and no closer than two (2) hours from the end of the workday.
2. Shortened Work Week - During a week when the State is required to be closed for a one day State holiday, or for other reasons, the Contractor shall not be allowed to work at the work site on that day. In such weeks, the Contractor will be allowed to work four 10-hour days, or some other mutually agreeable schedule, to reach 40 hours of work at the job site.
3. Extended Work Hours - On some weeks the Contractor and the Contractor's employees may be asked to work more than eight (8) hours per day, more than 40 hours per week, holidays, weekends, or any combination thereof, in order to complete the work in a timely and efficient manner and to accommodate certain construction phases of the project that require longer continuous working hours.
Such hours will be at the discretion and must be approved in advance by the DWR Contract Manager.
S. Suspension of Work –
1. DWR may suspend the work for such period of time as it deems necessary due to unsuitable weather such as heavy rain, flooding, extremely muddy ground, lightning, wildfires, and high winds, or if other conditions, in its opinion, are considered unfavorable for safe, suitable prosecution of the work, or for such time as it deems necessary due to the failure of the Contractor to carry out orders given or to perform any provisions of the contract or a work order letter.
2. No payment will be made for such suspension of work. A suspension of work for any reason will not relieve the Contractor of the Contractor's responsibilities under this contract.
T. Early Termination of the Work
IFB #10222937
1. DWR may terminate the work being performed under any work order at any time for reasons including but not limited to changes in entry permits, environmental permits, weather, site conditions, and the availability of State funding. DWR may also terminate this contract at any time if deemed necessary by the DWR in accordance with the Termination Provision stated in Exhibit D. If a work order or the contract is terminated for the convenience of the DWR before the specified work is completed, the DWR will reimburse the Contractor for all work performed up to the time of termination and for reasonable costs incurred because of early termination in accordance with Exhibit D.
2. DWR may suspend contract payments or terminate the contract, or both, and the Contractor shall be subject to debarment, if the Contractor has made a false certification under Government Code Section 8355, relating to a drug-free workplace, or violates the certification by failing to carry out its requirements.
U. Work Site Security -
1. Contractor Responsibilities - The Contractor is responsible for securing the site and for any vandalism or theft on the job site that could result in damage boreholes, equipment, materials, or supplies. The Contractor is responsible for securing the work sites at all times, including nights, weekends, State holidays, and other non-work periods. The Contractor will use industry best practices to secure boreholes and protect people, animals, equipment, and property from injury or damage.
2. Borehole Protection - The Contractor will take all reasonable precautions and use industry best practices to protect boreholes, casing, drilling equipment, and associated materials from damage caused by natural events, including but not limited to flooding, stormwater runoff, erosion, high winds, and seismic activity. The Contractor will evaluate site conditions and implement appropriate protective measures, such as diversion berms, drainage controls, casing stabilization, equipment anchoring, temporary covers, and other methods necessary to minimize the risk of damage.
3. Work Sites on State Property - None of the work sites will be on State property.
4. Licensed Security Guards and Officers - The Contractor shall determine if there are work sites where the risk of vandalism and/or theft warrants the need for a security guard or officer. A security guard or officer may be needed at a work site during times when there are no drilling activities, and even possibly when work is being performed at the site. All security guards and officers in California are required to be licensed by the DWR. The Contractor will only use security guards and officers with a valid California license (guard card). Depending on the worksite conditions and/or location, security guards and officers shall be required to have certain safety and/or other training (to be specified in the work order letter).
5. Cost of Security - The cost of security services shall be reimbursed and is expected to be included in the bid under Bid Items A22 and B11. Security services will not be reimbursed through other bid items. There will be no additional charges to the Call-Up, to the contract, or to the DWR when a security officer is required and/or provided. In special cases where work site conditions and/or location require the security guards or officers to have certain safety and/or other training, the costs associated with that training can be paid under Bid Items A22 and B11.
7. TECHNICAL PROVISIONS
A. Description and location of work
1. The work consists of providing a minimum of one fully equipped drilling rig at a time, staffed with a driller and at least two (2) driller's helpers, on a work order basis to perform drilling and well construction services for projects located in the Salton Sea watershed in southern California. Drilling rigs mounted on two-wheel drive trucks are required to be available for use. Materials to be drilled are expected to range from soft clays to loose sands and gravels. Although unexpected, it is possible that boulders, and bedrock varying from weathered and weak, to fresh and very hard could be encountered. All borings are expected to encounter groundwater, with artesian conditions possible. Some borings shall have stable walls while others shall exhibit caving and/or flowing conditions.
2. A map (Exhibit A, Attachment 1) is provided showing the parcels where the wells are to be installed. The specific locations within each parcel will be provided in each work order.
3. In addition to drilling services, the Contractor will provide, when requested in writing by DWR, geophysical testing services, and other special equipment and services as directed by the Contract Manager.
B. Access - Access to some drilling sites will be by roads and trails that shall require the Contractor to have four-wheel drive equipment. At certain locations, a dozer or other heavy equipment shall be needed to prepare or improve access and to assist in moving the drilling rig and equipment to the drilling sites. Some locations shall have access roads that have recently been graded; however, additional improvements shall be required to get the drilling rig to the marked drilling location.
C. Field Equipment
1. Mud Rotary Drilling
a. The primary field equipment must consist of standard truck-mounted drilling rigs suitable for well installation.
b. All-terrain, track-mounted, skid-mounted, and other styles of drilling rigs may be substituted for individual work orders for no additional cost to the DWR only if mutually agreed upon by the Contractor and DWR.
c. The mud-rotary drilling equipment will be comparable to a Speedstar 50K-CH and, at a minimum, must be equipped with the following:
1. A mud pump,
2. A mud shaker table or equivalent, and
3. A water tank mounted on the drilling rig or on a trailer.
2. Well Development and Pump Installation
a. The primary field equipment must consist of a standard well development and pump installation rig
b. The well development rig will be comparable to a Pulstar 4x4 Pump Hoist and, at a minimum, must be equipped with the following:
1. An adequately sized generator for testing and operating the pump following installation
2. Well development equipment, including bailers, brushes, swabs, surge blocks, and other commonly used well development tools.
3. Equipment, including a temporary pump, for conducting step-drawdown tests and constant-rate aquifer tests at flow rates sufficient to stress the aquifer and produce drawdown determined by DWR.
D. Drilling Equipment - The drilling equipment for each drilling rig will include, at a minimum, the following:
1. Each rotary drilling rig will be equipped with the following operating accessory equipment:
IFB #10222937
a. Tricone rock bits, reaming bits, and drag (soil) bits of various sizes from three inches to fourteen and one-half inches in diameter.
b. Weight indicator
c. Approved equipment for measuring mud properties
d. A formation sampling trough or sample collection box. The trough will be constructed of aluminum or steel, and it should be adequately reinforced and supported so that it poses no hazard or threat to workers, inspectors, or other interested parties.
e. A water/Baker tank, either truck or trailer mounted, capable of providing the required volume of water for drilling, grouting of drillholes, completion, and well development.
f. Water lines, water pumps, pressure meters, portable tanks, and other related equipment for pumping water to remote drill sites.
g. Tremie pipe, grout valve, hoses, high-shear colloidal mixers, pumps, and other related equipment for mixing and backfilling drillholes with grout and other annular completion materials.
h. A sand separator, shaker table, and/or mud catcher.
i. Temporary casing of various diameters and lengths to stabilize drillholes.
j. Well construction materials and equipment.
E. Construction of Ramp, Road and Well Pad – To provide access to the parcels where drilling will take place, the Contractor will construct a ramp from the existing access road down to the parcel, followed by a road extending from the base of the ramp to the well pad location. The Contractor will construct a well pad.
1. A dirt ramp will be constructed to provide access for the drilling rig, support equipment, and all deliveries related to the well construction. The ramp must be at least 15-foot wide and of sufficiently shallow grade to allow unimpeded access for all vehicle traffic.
2. The contractor will construct a compacted dirt road from the bottom of the ramp to the well pad. The road must be maintained and repaired by the Contractor throughout the duration of the well construction work to facilitate continuous access.
3. The well pad must be sufficiently large to accommodate drilling activities, material staging, and vehicle turnaround for equipment returning to the ramp. The minimum size is 100-foot by 200-foot or larger.
F. Pilot Hole Drilling – The Contractor must adhere to the following requirements while drilling the Pilot Hole:
1. California Bulletin 74 Well Standards.
2. Drillhole deviation will not exceed 6-inches per 100-ft of drillhole drilled.
3. Contractor will take all diligent care to produce a plumb and straight drillhole. If at any single location the survey results indicate that the drillhole plumbness has exceeded the specified tolerance, the Contractor will be responsible for corrective measures to re-align the drillhole until a survey indicates alignment is within acceptable limits.
4. Contractor will obtain formation samples from the formation sampling trough or sample collection box during the course of pilot hole drilling at depth intervals specified by DWR.
G. Well Construction – At the conclusion of pilot drillhole reaming (16-inch diameter drillhole) to total specified depth and completion and approval of caliper log, well construction is expected to include the following:
IFB #10222937
1. Blank type Schedule 80 PVC Casing: Maintain minimum spacing of 2-inches between well casing, final drillhole wall, and any sounding tubes in the borehole.
2. Blank type Schedule 80 PVC Casing: Each monitoring well is expected to require a 10-ft sump with a PVC cap.
3. Screen type PVC Well Screen: Slot size of well screen is expected to be 0.020-inches or 0.030-inches and will be directed by DWR.
4. Casing and Screen Centralizers: Casing centering guides will be installed on all casing at a minimum of 50-ft intervals and within 10 feet of the top and bottom of each screened or perforated interval. Borehole deviation and depth may warrant more centralizers, as directed by DWR.
5. Artificial Filter Pack Material: Sand (or equivalent) placed by tremie pipe in the annulus between the well casing and the drillhole wall. The top of filter pack will be tagged frequently to verify the level of the material being placed in the annular space. At no time will the Contractor allow the filter pack material to fall more than 30-ft below the bottom of the tremie pipe.
6. The well screen will be swabbed during installation of the filter pack while circulation of fluids is maintained.
7. Placement of 20-ft Bentonite Transition Seal: Annular backfill materials (bentonite pellets: TR-60 to TR-90) placed by tremie pipe in the annulus between the well casing and the drillhole wall. The top of the annular transition seal will be tagged frequently to verify the level of the material being placed in the annular space. At no time will the Contractor allow the annular transition seal material to fall more than 30-ft below the bottom of the tremie pipe. Assume a total of 20-ft bentonite sealing material per well completion.
8. Placement of Annular Sand-Cement Seal: Annular sand-cement seal placed between the well casing and the drillhole from the top of the bentonite transition seal to the ground surface. The top of the annular sand-cement seal will be tagged frequently to verify the level of the material being placed in the annular space. At no time will the Contractor allow the annular sand-cement seal material to fall more than 30-ft below the bottom of the tremie pipe. The standard grout mix for the annular seal in this contract will be a sand-cement grout mixture consisting of (per cubic yard) 968 lbs. of Type II cement (ASTM C150-95 Standard Specification for Portland Cement) and 1,936 lbs. washed sand, to create a volume of one cubic yard of material. Approximately 60 gallons of water per cubic yard will be added, with a maximum of 63 gallons per cubic yard allowed, if necessary, to make the mixture more fluid for pumping. Care must be taken to avoid segregation of the grout mix by the addition of excessive quantities of water. The weight of the mixture will be approximately 128-lbs/cubic foot (cu ft). In no case will more than two hours elapse from the time of addition of water to the mixture at the ready-mix plant, to time of pumping the mixture down the hole.
9. The use of alternative sealing materials will be at the discretion of DWR.
10. Surface Completion: Above grade 22” diameter monument and four 5 1/2-inch diameter crash bollards at each well location. Each well monument will be installed within a 4-foot by 4-foot reinforced concrete pad.
H. Well Development Equipment- The Contract Manager shall request the Contractor to provide well development services. Equipment used in well development services does not have to be owned by the Contractor; it can be rented, leased, or subcontracted with the approval of DWR. All well development must be requested by the Contract Manager in writing. Well Development equipment and supplies shall include the following:
1. Surging with a surge block
a. Open ended single-swab surge block attached to the end of the drill pipe
b. Double swab surge block tool consisting of two rubber packers separated by no more than 20 feet of perforated intake tubing and capped at the down-
IFB #10222937
hole end.
2. Compressed air (airlifting)
3. Dual swabbing
4. Submersible pump (pumping and surging) capable of adequately stressing the aquifer as determined by DWR.
5. Bailer
6. Containment and settling of development water before discharge
7. 8-hour aquifer step test with 24-hour recovery monitoring
8. 72-hour aquifer constant rate test with 24-hour recovery monitoring
9. Baker tank (or equivalent) of sufficient volume for containment and settling of development fluids without disrupting development activities.
10. Sampling and analyzing purge water for stabilization criteria, including temperature, conductivity, dissolved oxygen, oxidation reduction potential, pH, and turbidity.
11. Equipment must be in good working order and calibrated within the previous 24-hours for all criteria
I. Well Development – If requested by DWR, the Contractor shall commence mechanical development no sooner than 24 hours and no later than 36 hours after the completion of the cement annular seal. All well development must be requested by the Contract Manager in writing. Well Development shall include the following:
1. The first phase will use an open-ended, single-swab surge block tool attached to the end of the drill pipe. The single-swab surge block tool will be moved up and down, three or four times in each section of screen, while simultaneously conducting air lifting. After working the tool to the bottom of the well, sediment in the bottom will be airlifted out. While tripping out with the single-swab tool the Contractor will spot apply AquaClear PFD; KlearWell 300 MudPurge; or equal, in the screen sections of the well in the concentrations specified by the manufacturer.
2. The second phase of mechanical development will use a double-swab surge block tool. The dual swab and airlifting tool will consist of two rubber packers separated by no more than 20 feet of perforated intake tubing and capped at the down-hole end.
Development will begin at the uppermost section of screen and progress downward.
At 20-foot intervals within the screen, development will consist of a cycle of simultaneous swabbing and airlifting, swabbing without airlifting, and simultaneous swabbing and airlifting again, until the discharge for each interval becomes clear.
Swabbing will consist of using the Kelly bar to move the tool assembly up and down, at least three to four times, within each 20-foot zone.
3. The Contractor will provide adequate air compressor volume and pressure capacity to maintain the proper airlifting efficiency during mechanical development.
4. Upon completion of mechanical development, the well shall be accurately sounded to determine the level of accumulated sediment in the well. If the sediment level is more than 2 feet deep the sediment will be removed by bailing prior to installation of the test pump.
5. Within 48 hours of completing mechanical well development, the Contractor will mobilize and install a test pump and begin well development by pumping methods.
6…
This is the start of the file's text. The full file is on GovTribe.