About this file
GoRaleigh Trench Drain Repairs - Bid Addendum Summary
This is Addendum No. 1 to the bidding documents for the GoRaleigh Trench Drain Repairs project issued by the City of Raleigh, North Carolina Transportation Department on August 10, 2026. The project encompasses the demolition, removal, and replacement of existing trench drains and catch basins; demolition and repair or replacement of concrete surfaces; replacement of PVC stormwater drain piping; re-striping of parking areas; addition of pedestrian crosswalk striping; and miscellaneous curb and concrete repairs at the GoRaleigh Operations and Maintenance Facility located at 4104 Poole Road, Raleigh, NC 27610. The pre-bid conference was held on August 4, 2026 at 11:00 a.m. (non-mandatory but attendance encouraged), with sealed bids due August 18, 2026 at 11:00 a.m. Addendum 1 incorporates changes to the Project Manual, Construction Documents, and provides updated Davis-Bacon wage determinations. The contract duration is 180 days with liquidated damages of $1,000 per day. Key allowance items include demolition and removal of concrete (2,700 square yards), heavy-duty concrete repairs (725 cubic yards at 4,000 psi), crushed stone base repairs (15 tons), epoxy-coated dowel rods (63,500 pounds), joint sealant (8,150 linear feet), curb and gutter repair (185 linear feet), epoxy crack injection (315 linear feet), undercut unsuitable subgrade (675 cubic yards), and concrete re-caulking (65,000 linear feet).
Bids shall be submitted as a lump-sum price for base bid scope items plus allowance items with unit prices. Bid Security equal to 5% of the bid amount is required, and Payment and Performance Bonds are mandatory. The project is subject to Federal Transit Administration (FTA) compliance requirements and Buy America program compliance per 49 CFR 661, with all products manufactured in accordance with these federal regulations. The contract is subject to Davis-Bacon Act prevailing wage requirements, with rates established by General Decision Number NC20260090 dated May 18, 2026 for Highway construction in Wake County and surrounding North Carolina counties. Executive Order 13706 regarding paid sick leave and Executive Order 13658 regarding minimum wage rates apply to this contract. If the lowest bid exceeds $500,000, City Council approval is required, which may add approximately one month to the Notice to Proceed date. The fueling station and wash station must remain operational throughout construction, requiring coordinated phasing and traffic control with the City of Raleigh to maintain continuous access.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-07-16 Bid#274 GoRaleigh Trench Drains_Advertisement For Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Addendum
Addendum No.: 1 Project Name: GoRaleigh Trench Drain Repairs
Date: August 10, 2026
Owner: City of Raleigh, Transportation Department
Engineer: McAdams
Project Location: 4104 Poole Road, Raleigh, NC 27610
This addendum forms a part of the Contract Documents and modifies the Bidding Documents dated July 22, 2026 with amendments noted below and attached to this form.
Acknowledge receipt of this Addendum in the space provided in the Bid form. Failure to do so may disqualify the bidder.
General Listing of Changes/Clarifications:
1. Requests for Information
a. Pre-Bid Meeting Minutes
b. Pre-Bid Meeting Attendance Sheet
2. Changes to the Project Manual
a. Advertisement for Bids
b. Bid Form
c. Bid Bond
d. Agreement Between Owner and Contractor for Construction
e. Notice to Proceed
f. Federal Required Highway Wage Determination
g. Allowance Item Clarification Notes
3. Changes to the Construction Documents
a. Cover Sheet
b. Demolition and Erosion Control Plan
c. Overall Site Plan
d. Grading and Drainage Plan (OVERALL)
e. Grading and Drainage Plan (Phase 1)
f. Grading and Drainage Plan (Phase 2)
g. Grading and Drainage Plan (Phase 4)
h. Grading and Drainage Plan (Phase 5)
i. Pavement and Marking Plan
Contractor Acknowledgment:
We acknowledge receipt of Addendum No. 1 and have incorporated its provisions into our bid.
Firm Name: __________________________________________
Authorized Signature: ________________________________
Printed Name & Title: ________________________________
Date: _______________________________________________
Pre-Bid Conference Meeting Minutes
Pre-Bid Conference Meeting Minutes Page 1 of 3
Project GoRaleigh Trench Drain Repairs Project Number
Owner City of Raleigh, North Carolina, Transportation Department
Construction Manager
Design Professional McAdams
Date 08/04/2026 Time 11:00 a.m. Location 4104 Poole Road, Raleigh, NC 27610
Attendance at Conference is ☐ Mandatory ☒ Not Mandatory
1.00 SIGN-IN/INTRODUCTIONS
1.01 Welcome - This is the pre-bid conference for the GoRaleigh Trench Drain Repairs Project.
1.02 Purpose and limitations on meeting content, requirement to sign in – Pre-bid is non-mandatory but all attendees are required to sign in.
1.03 Introductions
A. Cameron James – McAdams Project Manager/Design Consultant
B. Graham Scherle – McAdams Designer
C. City of Raleigh:
1. Sara Tromba – Project Manager (Transportation Department)
D. Bidder Introductions
1.04 Addenda, additional information, and documents.
A. The bid advertisement and addenda are available on the NC Electronic Vendor Portal (eVP) website:
https://evp.nc.gov/solicitations/details/?id=45215744-6784-f111-ab0f-001dd802e1e9. Complete contract documents (CDs + Project Manual) are available upon request by email the Engineer of Record, Cameron James at james@mcadamsco.com
B. Any questions must be submitted by Friday, August 7, 2026 by 12:00 p.m. Please make every effort to submit any questions before this deadline; bidders are not to rely on verbal responses; no verbal response is official or binding until and unless it is reduced to writing in an addendum.
C. Project Documents – there is one set of drawings and one project manual.
2.00 PROJECT INFORMATION
2.01 Review Special Contract Provisions
A. Type of contract – Contract is a traditional construction contract, and Competitive Sealed Bids are being used to select the Contractor.
B. Bid Process - due Tuesday August 18th, 2026 at 11:00 a.m. to City of Raleigh, Transportation Department at 4104 Poole Road, Raleigh, NC 27610. Conference room 123 reserved, located inside just off of the lobby.
C. Process for submitting Bids – please make note of all requirements in the bid documents, specifically reference the “Instructions to Bidders” and Bidder’s Checklist sections of the project manual to make sure you’ve included everything.
D. Required bonds – Bid, Payment, and Performance Bonds are required.
E. Bidder Safety Evaluation - Each bidder must provide a filled out “Bidder Safety Evaluation Questionnaire” with their bid
F. Construction schedule and liquidated damages, penalties, or fines that may be incurred – 180 days total.
Liquidated Damages are $1,000/day.
scherle Line scherle Line scherle Text Box Friday August 14, by 12:00 p.m.
scherle Text Box Tuesday August 25, by 11:00 p.m.
Pre-Bid Conference Meeting Minutes Page 2 of 3
G. FTA Compliance - Must comply with all applicable Federal Transit Administration (FTA) regulations, policies, procedures, and directives. Listed under Federal and State Requirements section of the project manual
H. Buy America compliance - All products provided on this project must be manufactured in compliance with the Buy America Program
I. Bid Format – Bids shall be submitted as lump sum price in accordance with the bid form. Total lump sum price shall be inclusive of allowance items listed on the bid form.
2.02 Project Overview
A. Technical overview – This project includes the demolition, removal, and replacement of existing trench drains and catch basins; demolition, removal and repair or replacement of concrete surfaces; replacement of PVC stormwater drain piping; restriping of parking areas; addition of pedestrian crosswalk striping; and miscellaneous curb and concrete repairs as needed.
B. Using the Site – Construction activities shall be planned and executed in phases so as not to interfere with the continued operation of the GoRaleigh Operations and Maintenance Facility. To ensure uninterrupted facility operations, each phase of work shall be fully completed prior to commencement of the subsequent phase.
C. Permits – none required
D. US Department of Labor Wage Determination update – updates made to Davis Beacon Act general determinations at the end of May. Will include the updated determination with the Bid Addenda.
E. Any other items from City of Raleigh?
1. If the lowest bid goes over $500,000, the project must be approved by city council. This may add a month to the NTP Date.
2. Fuel station and Wash station cannot be closed. The improvements around these stations will need to be phased to not interrupt operation. This phasing will need to be coordinated with City of Raleigh.
3.00 WRAP-UP
3.01 Questions from Bidders
A. Pre-Bid Question 1 – Are specific concrete repair areas noted on the plans? Where should we prioritize?
Response – This will be coordinated with the City of Raleigh.
B. Pre-Bid Question 2 – Is there a traffic control plan?
Response – Contractor shall submit a traffic control plan to the engineer and City of Raleigh for review prior to commencing work. Contractor shall maintain safe access throughout construction and shall not impede or reroute GoRaleigh bus operations without prior written authorization from the City. Traffic control shall be subsidiary to the lump sum traffic control item.
C. Pre-Bid Question 3 – Caulking estimate plan?
Response – This will be coordinated with the City of Raleigh.
D. Pre-Bid Question 4 – When is the likely NTP date?
Response – This depends on contract routing and total contract price. Procurement is expected to take 4-5 weeks and if the bid is over $500,000 then another month is needed for City Council approval.
E. Pre-Bid Question 5 – Could the contract time be extended?
Response – The contract time will now be extended from 60 days to 180 days.
F. Pre-Bid Question 6 – Are there any different requirements for handling the sludge around the fueling station?
Pre-Bid Conference Meeting Minutes Page 3 of 3
Response – No.
G. Pre-Bid Question 7 – Are alternates for the products specified in the plans allowed?
Response – Yes, alternatives may be submitted to the Owner and Engineer for consideration. However, bids shall be prepared in accordance with contract documents and the specific line items shown on the bid form.
3.02 Final Notes/Follow Up Actions – follow up addenda will be issued for sign in information, meeting minutes, and answers to these questions.
4.00 ADJOURN – MEETING ENDED AT APPROXIMATELY: 1:00 P.M.
scherle
Rectangle
City of Raleigh 00410-4 Bid Form
Basis of Bid
1.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
BASE BID
Description Unit Qty Bid Price All labor materials and equipment necessary for the installation of base bid scope items included in the provided bid documents. Major work items include:
LS $
Demolition and Erosion Control (Complete, per plans)
Storm Drainage System (Complete, per plans) Pavement Striping (Complete, per plans) Traffic Control and Detour Third Party Concrete Testing & Vibration Monitoring Owner’s Contingency (10% of Lump Sum Subtotal Excluding Mobilization): $
Mobilization (Max 5% of Lump Sum Subtotal Excluding Owner’s Contingency): $
(A) Lump Sum Total (Including Mobilization and
Owner’s Contingency):
Description Unit Qty Bid Price Allowance #1 (A1): Demolition and Removal of Concrete SY
2,700 $
Allowance #2 (A2): Heavy Duty Concrete (Approved Mix, 4,000 psi at 28 days) CY 725 $
Allowance #3 (A3): Crushed Stone Base Repairs TN 15 $
Allowance #4 (A4): Epoxy-Coated Dowel Rods LB 63,500 $
Allowance #5 (A5) Joint Sealant LF 8,150 $
Allowance #6 (A6): Curb and gutter repair. Includes the removal and replacement of curb and gutter.
LF 185 $
Allowance #7 (A7) Epoxy Crack Injection LF 315 $ Allowance #8 (A8) Undercut Unsuitable Subgrade CY 675 $ Allowance #9 (A9) Concrete Re-Caulking LF 65,000 $
(B) Allowance Items Total: $
Unit Prices Item No. Description Unit Unit Price A1 Demolition and Removal of Concrete SY $
A2 Heavy Duty Concrete (Approved Mix, 4,000 psi at 28 days)
CY $
A3 Crushed Stone Base Repairs TN $
A4 Epoxy-Coated Dowel Rods LB $
A5 Joint Sealant LF $
A6 Curb and gutter repair. Includes the removal and replacement of curb and gutter.
LF $
A7 Epoxy Crack Injection LF $ A8 Undercut Unsuitable Subgrade CY $ A9 Concrete Re-Caulking LF $
Cloud
City of Raleigh 00410-5 Bid Form
Unit prices quoted and accepted shall apply throughout the life of the contract, except as otherwise specifically noted. Unit prices shall be applied as appropriate, to compute the total value of changes in the base bid quantity of the work all in accordance with the contract documents.
Refer to the document entitled "Allowance Item Clarification Notes" included with Addendum No. 1 for additional scope descriptions, work inclusions, measurement and payment requirements, and general requirements associated with the allowance items identified herein.
Bidders shall incorporate all applicable requirements into their bids.
Total Base Bid = (A) Lump Sum Total + (B) Allowance Items Total: $______________________
Cloud
Line scherle Rectangle scherle scherle Text Box scherle Rectangle scherle
"General Decision Number: NC20260090 05/18/2026
State: North Carolina
Construction Types: Highway
Counties: North Carolina Counties of Brunswick, Cumberland, Currituck, Edgecombe, Franklin, Greene, Hoke, Johnston, Nash, New Hanover, Onslow, Pender, Pitt, Wake and Wayne
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
SUNC2014-005 11/17/2014
Rates Fringes
TRUCK DRIVER (GVWR OF 26,001 LBS OR GREATER)........$ 12.37 0.00
TRUCK DRIVER (GVWR OF 26,000 OR LESS)...............$ 11.12 0.00
POWER EQUIPMENT OPERATOR: MILLING MACHINE...........$ 15.36 0.00
POWER EQUIPMENT OPERATOR: MECHANIC..................$ 17.55 0.00
POWER EQUIPMENT OPERATOR (TACK TRUCK/DISTRIBUTOR
OPERATOR)...........................................$ 14.52 0.00
POWER EQUIPMENT OPERATOR (SLIP FORM MACHINE)........$ 16.50 0.00
POWER EQUIPMENT OPERATOR (SCRAPER ROUGH)............$ 11.35 0.00
POWER EQUIPMENT OPERATOR (SCRAPER FINISH)...........$ 12.71 0.00
POWER EQUIPMENT OPERATOR (ROLLER OTHER).............$ 11.36 0.00
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT FINISH)....$ 13.85 0.00
POWER EQUIPMENT OPERATOR (ROLLER ASPHALT BREAKDOWN).$ 12.45 0.00
POWER EQUIPMENT OPERATOR (PAVER CONCRETE)...........$ 18.20 0.00
POWER EQUIPMENT OPERATOR (PAVER ASPHALT)............$ 15.59 0.00
POWER EQUIPMENT OPERATOR (PAVEMENT MARKING
EQUIPMENT)..........................................$ 12.11 0.00
POWER EQUIPMENT OPERATOR (OILER/GREASER)............$ 13.55 0.00
POWER EQUIPMENT OPERATOR (OFF-ROAD HAULER/WATER
TANKER).............................................$ 11.36 0.00
POWER EQUIPMENT OPERATOR (MATERIAL TRANSFER VEHICLE
(SHUTTLE BUGGY))....................................$ 15.18 0.00
POWER EQUIPMENT OPERATOR (LOADER GREATER THAN 2
CUBIC YARDS)........................................$ 14.14 0.00
POWER EQUIPMENT OPERATOR (LOADER 2 CUBIC YARDS OR
LESS)...............................................$ 13.76 0.00
POWER EQUIPMENT OPERATOR (GRADER/BLADE ROUGH).......$ 14.62 0.00
POWER EQUIPMENT OPERATOR (GRADER/BLADE FINE)........$ 18.47 0.00
POWER EQUIPMENT OPERATOR (EXCAVATOR ROUGH)..........$ 14.00 0.00
POWER EQUIPMENT OPERATOR (EXCAVATOR FINE)...........$ 16.60 0.00
POWER EQUIPMENT OPERATOR (DRILL OPERATOR STRUCTURE).$ 21.14 0.00
POWER EQUIPMENT OPERATOR (DRILL OPERATOR ROCK)......$ 14.38 0.00
POWER EQUIPMENT OPERATOR (CRANE ROUGH/ALL TERRAIN)..$ 20.67 0.00
POWER EQUIPMENT OPERATOR (CRANE OTHER)..............$ 20.08 0.00
POWER EQUIPMENT OPERATOR (CRANE BOOM TRUCKS)........$ 20.54 0.00
POWER EQUIPMENT OPERATOR (CONCRETE GRINDER/GROOVER).$ 20.34 2.30
POWER EQUIPMENT OPERATOR (BULLDOZER ROUGH)..........$ 14.34 0.00
POWER EQUIPMENT OPERATOR (BULLDOZER FINE)...........$ 17.04 0.00
POWER EQUIPMENT OPERATOR (ASPHALT BROOM TRACTOR)....$ 11.85 0.00
PAINTER (BRIDGE)....................................$ 24.57 0.00
LABORER: PIPELAYER..................................$ 12.17 0.00
LABORER: COMMON OR GENERAL..........................$ 10.20 0.00
LABORER (TRAFFIC SIGNAL/LIGHTING INSTALLER).........$ 14.89 0.00
LABORER (GUARDRAIL/FENCE INSTALLER).................$ 12.87 0.00
LABORER (CEMENT MASON/CONCRETE FINISHER TENDER).....$ 12.54 0.00
LABORER (CARPENTER TENDER)..........................$ 12.88 0.00
LABORER (ASPHALT SCREED/JACKMAN)....................$ 14.33 0.00
LABORER (ASPHALT RAKER AND SPREADER)................$ 12.46 0.00
IRONWORKER..........................................$ 16.02 0.00
ELECTRICIAN (TELECOMMUNICATIONS TECHNICIAN).........$ 16.79 0.63
ELECTRICIAN (ELECTRICIAN)...........................$ 17.97 0.00
CEMENT MASON/CONCRETE FINISHER......................$ 14.48 0.00
CARPENTER...........................................$ 13.72 0.00
BLASTER.............................................$ 21.04 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
Allowance Item Clarification Notes General Allowance Requirements: Allowance quantities are estimates established solely for bid comparison and budget purposes. Allowance work shall be performed only when authorized by the Owner or Engineer. The Owner and Engineer reserve the right to revise allowance quantities, limits, classifications, and repair methodologies based on actual field conditions encountered during construction. Payment shall be based upon actual accepted quantities of work completed. Unit prices submitted shall include all labor, materials, equipment, overhead, profit, supervision, transportation, testing, disposal, incidentals, and other costs necessary to complete the work. These clarification notes are intended to provide additional description of the allowance items included in the Bid Form.
The descriptions are not intended to represent all conditions that may be encountered during construction nor eliminate the Contractor’s responsibility to field verify conditions and provide all labor, materials, equipment, and incidentals necessary to complete the Work.
Allowance No. 1 - Demolition and Removal of Concrete Allowance includes the demolition and removal of existing concrete elements as authorized by the Owner or Engineer, including concrete pavement, sidewalks, curb and gutter, pads, aprons, trench drain encasement concrete, and miscellaneous concrete surfaces encountered within the work area.
Work shall include, but not be limited to:
Sawcutting and neat edge preparation.
Breaking, removal, loading, hauling, and legal off-site disposal of concrete materials.
Protection of adjacent improvements to remain.
Removal of incidental embedded items where required to complete the demolition.
Coordination with subsequent concrete repair, trench drain replacement, or storm drainage work.
Measurement and Payment: Measured based on actual accepted quantity of concrete removed, using the unit of measure shown in the Bid Form. Payment shall include all labor, equipment, trucking, disposal fees, and incidentals necessary to complete the work. This allowance shall be coordinated with any separate demolition or LS work item to avoid duplicated payment for the same demolition activity.
Allowance No. 2 - Heavy Duty Concrete Allowance includes furnishing and installing heavy-duty concrete repairs or replacement concrete as directed by the Owner or Engineer. This item is intended for concrete pavement, pads, concrete repair areas, and miscellaneous heavy-duty concrete replacement within the project limits.
Work shall include, but not be limited to:
Subgrade preparation and fine grading.
Formwork, welded wire reinforcement, or other reinforcement where required by the plans or directed in the field.
Concrete placement, consolidation, finishing, curing, and protection.
Sawcutting, joint construction, and edge matching to adjacent concrete.
Surface restoration and cleanup.
Measurement and Payment: Measured based on actual accepted quantity installed, using the unit of measure shown in the Bid Form. Payment shall include all labor, materials, equipment, placement, finishing, curing, and incidentals required for a complete installation. This allowance shall be coordinated with the concrete repair detail and the required concrete strength, mix design, or testing requirements shown in the contract documents.
Allowance No. 3 - Crushed Stone Base Repair Allowance includes furnishing, placing, grading, and compacting crushed stone base material where existing base material is unsuitable, disturbed, removed, or otherwise requires replacement below concrete repair areas, trench drain improvements, and other work directed by the Owner or Engineer.
Work shall include, but not be limited to:
Placement of approved aggregate base material.
Moisture conditioning, grading, and compaction.
Proof rolling or field verification as directed.
Fine grading to support the proposed concrete or drainage improvement.
Measurement and Payment: Measured based on actual accepted quantity placed, using the unit of measure shown in the Bid Form. Payment shall include all labor, materials, equipment, aggregate, compaction, grading, and incidentals required to complete the work. This allowance should be used only where directed after existing base conditions are exposed during demolition or construction.
Allowance No. 4 - Epoxy Dowel Rods Allowance includes furnishing and installing epoxy-anchored dowel bars required to connect new concrete repair areas to existing concrete pavement, slabs, curb, gutter, drainage structures, or other adjoining concrete elements.
Work shall include, but not be limited to:
Layout and spacing of dowels as shown on the plans or directed in the field.
Drilling dowel holes into existing concrete.
Cleaning holes prior to adhesive installation.
Furnishing epoxy adhesive and dowel bars.
Installing and aligning dowels to maintain proper embedment and position.
Protection of installed dowels prior to concrete placement.
Measurement and Payment: Measured based on actual accepted quantity installed, using the unit of measure shown in the Bid Form. Payment shall include drilling, cleaning, epoxy adhesive, dowel bars, installation labor, equipment, and incidentals.
Allowance No. 5 - Joint Sealant Allowance includes joint sealant associated with concrete repair work, including sawcut or formed joints, butt joints, contraction joints, expansion joints, repaired slab edges, and other joints created, restored, or modified as part of concrete pavement repairs shown or directed under the concrete repair details.
Work shall include, but not be limited to:
Preparation and cleaning of joint faces associated with concrete repair work.
Installation of joint sealant compatible with exterior concrete pavement and vehicular use.
Tooling, finishing, curing/protection, and cleanup of sealant materials.
Measurement and Payment: Measured based on actual accepted linear footage of joint sealant installed as part of concrete repair work, using the unit of measure shown in the Bid Form. Payment shall include surface preparation, materials, installation, curing/protection, cleanup, labor, equipment, and incidentals required to complete the work. This item is separate from the Concrete Re-Caulking allowance item. Joint sealant is intended for concrete repair-related joints referenced by the concrete repair schedule and repair details, while Concrete Re-Caulking is intended for broader existing pavement joint recaulking work.
Allowance No. 6 - Curb and Gutter Repair Allowance includes removal and replacement of damaged or disturbed curb and gutter sections as authorized by the Owner or Engineer. This item is intended for spot repairs needed due to existing deterioration, construction impacts, or limits identified in the field.
Work shall include, but not be limited to:
Sawcutting at limits of repair.
Removal, loading, hauling, and legal disposal of existing curb and gutter.
Subgrade preparation and compaction.
Formwork where required.
Placement and finishing of new curb and gutter to match existing line, grade, and section.
Curing, protection, backfill, and adjacent surface restoration.
Measurement and Payment: Measured based on actual accepted linear footage installed. Payment shall include demolition, disposal, subgrade preparation, concrete placement, finishing, curing, restoration, labor, materials, equipment, and incidentals.
Allowance No. 7 - Epoxy Crack Injection Allowance includes epoxy injection repair of existing concrete cracks where replacement is not directed and where the Owner or Engineer determines that crack repair is appropriate.
Work shall include, but not be limited to:
Surface preparation and cleaning of cracks.
Routing or preparation as required for the selected injection method.
Installation of injection ports or surface seals where required.
Pressure injection of epoxy material.
Removal of temporary ports, surface seal materials, and excess epoxy.
Final surface finishing and cleanup.
Measurement and Payment: Measured based on actual accepted linear footage of crack injection completed.
Payment shall include preparation, epoxy materials, injection ports, equipment, labor, cleanup, and incidentals required for a complete repair. This allowance is intended for repair of concrete cracks where the surrounding concrete is otherwise suitable to remain. Cracks requiring full-depth replacement should be addressed under the applicable concrete repair items.
Allowance No. 8 - Undercut Unsuitable Subgrade Allowance includes excavation and replacement of unsuitable subgrade materials encountered below concrete repair areas, trench drain improvements, drainage structures, or other work areas where unsuitable conditions are confirmed after demolition or excavation.
Work shall include, but not be limited to:
Field verification of unsuitable material as directed by the Owner or Engineer.
Excavation and removal of unsuitable subgrade.
Loading, hauling, and legal off-site disposal of unsuitable material.
Furnishing and placing approved replacement material or aggregate as directed.
Moisture conditioning, grading, compacting, and proof rolling.
Testing or field verification where required.
Measurement and Payment: Measured based on actual accepted quantity of unsuitable material undercut and replaced, using the unit of measure shown in the Bid Form. Payment shall include excavation, disposal, replacement material, placement, compaction, testing coordination, labor, equipment, and incidentals. This allowance should be used only after unsuitable conditions are observed and approved in the field. It should not be used as a general contingency item.
Allowance No. 9 - Concrete Re-Caulking Allowance includes removal and replacement of existing pavement joint sealant at existing concrete pavement joints and concrete interfaces where directed by the Owner or Engineer. This item is intended for recaulking of existing joints outside of, or in addition to, joints created or restored as part of the concrete repair work.
Work shall include, but not be limited to:
Removal of existing deteriorated caulking, sealant, loose material, debris, or failed joint filler.
Cleaning and preparation of existing joint faces.
Installation of closed-cell backer rod where appropriate.
Installation of bond breaker tape where appropriate for sawcut control joints.
Installation of polyurethane traffic-grade sealant suitable for exterior vehicular concrete pavement applications.
Use of self-leveling or non-sag sealant as appropriate for joint orientation and manufacturer recommendations.
Tooling to a smooth finish and cleanup of excess materials.
Legal disposal of removed sealant, debris, and waste materials.
Measurement and Payment: Measured based on actual accepted linear footage of concrete recaulking installed. Payment shall include labor, materials, equipment, preparation, backer rod, bond breaker tape, sealant, tooling, cleanup, disposal, overhead, profit, and incidentals required to complete the work.
© 2025 Microsoft Corporation © 2025 TomTom © 2025 Zenrin
© 2025 Microsoft Corporation © 2025 TomTom © 2025 Zenrin
© 2025 Microsoft Corporation © 2025 Maxar ©CNES (2025) Distribution Airbus DS © 2025 TMAP MOBILITY Earthstar Geographics SIO
SHEET NUMBER
SHEET NAME
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
DOF
CMJ
06. 26. 2026
G O
R A
LE
IG
H O
PE
R
A
TI
O N
S A
N D
M A
IN
TE
N A
N C
E
FA
C
IL
IT
Y
TR
EN
C H
D R
A
IN
R
EP
A
IR
S
P
O O
LE
R
O
AD
R
AL
EI
G
H , N
C
C
IT
Y O
F R
A
LE
IG
H
, N O
R
TH
C A
R O
LI
N
A
PRIME CONSULTANT:
SUBCONSULTANT:
REV DESCRIPTION DATE
PROFESSIONAL SEAL
S C
H E
M A
TI
C
D E
S
IG
N
FULL SCALE SHEET SIZE= ARCH- D (24"x 36")
WARNING: THESE DRAWINGS THE PROPERTY OF THE PRIME CONSULTANT NOTED HEREWITHIN. ANY RE-USE OF THIS WORK WITHOUT WRITTEN CONSENT IS AN INFRINGEMENT OF THE ARCHITECT/ ENGINEER'S WORK. IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECT SUPERVISION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF AN ARCHITECT OR ENGINEER IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO THEIR ITEM THE SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
DESIGNED BY: DOF
The John R. McAdams Company, Inc.
www.mcadamsco.com
621 Hillsborough St phone 919. 823. 4300 fax 919. 361. 2269 license number: C-0293, C-187
Raleigh, NC 27603 Suite 500
4104 POOLE RD
RALEIGH, NC 27610
CONSTRUCTION DRAWINGS
BID NUMBER: 274-GoRaleighTrenchDrains-2026
DATE: JUNE, 2026
VICINITY MAP
N.T.S.
GORALEIGH POOLE RD. TRENCH
DRAIN REPLACEMENT
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
R
LOCATION MAP
N.T.S.
SITE
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
R
SHEET INDEX
SHEET NUMBER SHEET TITLE
C0.00 COVER SHEET
C0.01 GENERAL NOTES
C0.02 GENERAL NOTES
C1.00 EXISTING CONDITIONS
C1.01 DEMOLITION AND EROSION CONTROL PLAN
C1.02 OVERALL SITE PLAN
C3.01 GRADING AND DRAINAGE PLAN (OVERALL)
C3.02 GRADING AND DRAINAGE PLAN (Phase 5) C3.03 GRADING AND DRAINAGE PLAN (Phase 4) C3.04 GRADING AND DRAINAGE PLAN (Phase 3) C3.05 GRADING AND DRAINAGE PLAN (Phase 2) C3.06 GRADING AND DRAINAGE PLAN (Phase 1)
C3.07 PAVEMENT AND MARKING PLAN
C8.00 SCHEDULE OF CONCRETE REPAIRS
C8.01 CONCRETE DISTRESS DETAILS
C8.02 CONCRETE REPAIR DETAILS (1 OF 4)
C8.03 CONCRETE REPAIR DETAILS (2 OF 4)
C8.04 CONCRETE REPAIR DETAILS (3 OF 4)
C8.05 CONCRETE REPAIR DETAILS (4 OF 4)
C8.06 STORMWATER DETAILS (1 OF 2)
C8.07 STORMWATER DETAILS (2 OF 2)
C0.00
COVER SHEET
X:
\P ro je ct s\
W
SP
\W
SP
1\
-P ro du ct io n\
W at er R es ou rc es
\S to rm w at er
M an ag em en t\
Cu rr en t D ra w in gs
\X re f\ W
SP
1-
TB
-W
SP
.d w g, 0/
/2
4:
:3
PM
, D an ie l F rid ay
N.T.S.
BUY AMERICA PROGRAM REQUIREMENTS
ALL PRODUCTS PROVIDED ON THIS PROJECT MUST BE
MANUFACTURED IN COMPLIANCE WITH THE BUY AMERICA
PROGRAM FOR FEDERALLY FUNDED TRANSPORTATION
PROJECTS PER CODE OF FEDERAL REGULATIONS 49 CFR 661.
THESE REQUIREMENTS ARE DISTINCT AND DIFFERENT FROM
THOSE OF THE BUY AMERICAN ACT OF 1933.
ALL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE CURRENT CITY OF
RALEIGH AND NCDOT ENGINEERING DESIGN
AND CONSTRUCTION STANDARDS
BID ADDENDUM 1
C
74 LF TRENCH DRAIN TO BE REMOVED
87 LF TRENCH DRAIN TO BE REMOVED
CATCH BASIN TO BE REMOVED (TYP.)
SEE SHEET C8.05 FOR CONCRETE
DEMOLITION AND TRENCHING DETAILS.
37 LF TRENCH
DRAIN TO BE
REMOVED
74 LF TRENCH DRAIN
TO BE REMOVED
73 LF TRENCH
DRAIN TO BE
REMOVED
180 LF TRENCH DRAIN
TO BE REMOVED
135 LF TRENCH DRAIN
TO BE REMOVED
15 LF TRENCH DRAIN
TO BE REMOVED
TRENCH BOX AND CATCH
BASIN TO BE REMOVED
TRENCH BOX TO BE
REMOVED
TRENCH BOX TO BE
REMOVED
EXISTING PAVEMENT MARKINGS TO BE
REMOVED AND REPLACED IN
ACCORDANCE WITH NCDOT DETAILS IN
SECTION 1205 (TYP.)
CONTRACTOR TO COORDINATE
PROTECTION OF EXISTING
UTILITY (TYP.)
EXISTING DROP INLETS TO BE PROTECTED
(TYP.) SEE SHEET C8.01 FOR MORE
INFORMATION.
SITE LEGEND
TRENCH DRAIN TO BE REMOVED
CONCRETE DEMOLITION
INLET PROTECTION
SHEET NUMBER
SHEET NAME
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
DOF
CMJ
06. 26. 2026
G O
R A
LE
IG
H O
PE
R
A
TI
O N
S A
N D
M A
IN
TE
N A
N C
E
FA
C
IL
IT
Y
TR
EN
C H
D R
A
IN
R
EP
A
IR
S
P
O O
LE
R
O
AD
R
AL
EI
G
H , N
C
C
IT
Y O
F R
A
LE
IG
H
, N O
R
TH
C A
R O
LI
N
A
PRIME CONSULTANT:
SUBCONSULTANT:
REV DESCRIPTION DATE
PROFESSIONAL SEAL
S C
H E
M A
TI
C
D E
S
IG
N
FULL SCALE SHEET SIZE= ARCH- D (24"x 36")
WARNING: THESE DRAWINGS THE PROPERTY OF THE PRIME CONSULTANT NOTED HEREWITHIN. ANY RE-USE OF THIS WORK WITHOUT WRITTEN CONSENT IS AN INFRINGEMENT OF THE ARCHITECT/ ENGINEER'S WORK. IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECT SUPERVISION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF AN ARCHITECT OR ENGINEER IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO THEIR ITEM THE SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
DESIGNED BY: DOF
The John R. McAdams Company, Inc.
www.mcadamsco.com
621 Hillsborough St phone 919. 823. 4300 fax 919. 361. 2269 license number: C-0293, C-187
Raleigh, NC 27603 Suite 500
SEE SHEET C0.01 FOR ALL PROJECT, SITE,
GRADING, STORM DRAINAGE AND UTILITY
NOTES
ALL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE CURRENT CITY OF
RALEIGH AND NCDOT ENGINEERING DESIGN
AND CONSTRUCTION STANDARDS
GRAPHIC SCALE
0 25 50 100
1 inch = 50 ft.
C1.01
1" = 50'
DEMOLITION AND EROSION
CONTROL PLAN
X:
\P ro je ct s\
W
SP
\W
SP
1\
-P ro du ct io n\
W at er R es ou rc es
\S to rm w at er
M an ag em en t\
Cu rr en t D ra w in gs
\X re f\ W
SP
1-
TB
-W
SP
.d w g, 0/
/2
4:
:3
PM
, D an ie l F rid ay
CONCRETE REPAIRS TO BE COMPLETED AT
FULL EXTENTS OF GORALEIGH O&M
FACILITY. SEE SHEET C0.01 FOR
CONTRACTOR'S RESPONSIBILITY IN
DETERMINING REPAIR LOCATIONS.
GENERAL NOTES:
1. CONCRETE DEMOLITION PROPOSED FOR LOCATIONS OF UNSOUND
CONCRETE. CONTRACTOR TO UTILIZE SHEET C8.00 TO DETERMINE
LOCATIONS OF CONCRETE DEMOLITION AND REPAIR.
2. REFERENCE DETAIL 15 ON SHEET C8.04 FOR INFORMATION REGARDING
THE DEMOLITION AND REMOVAL OF TRENCH DRAINS. DEMOLITION OF
CONCRETE AROUND THE TRENCH DRAIN SHOULD EXTEND 1-FOOT BEYOND
DRAIN'S OUTER EDGES.
3. CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE ENGINEER
AND CITY OF RALEIGH FOR REVIEW PRIOR TO COMMENCING WORK.
CONTRACTOR SHALL MAINTAIN SAFE ACCESS THROUGHOUT
CONSTRUCTION AND SHALL NOT IMPEDE OR REROUTE GORALEIGH BUS
OPERATIONS WITHOUT PRIOR WRITTEN AUTHORIZATION FROM THE CITY.
TRAFFIC CONTROL SHALL BE SUBSIDIARY TO THE LUMP SUM TRAFFIC
CONTROL ITEM.
BUY AMERICA PROGRAM REQUIREMENTS
ALL PRODUCTS PROVIDED ON THIS PROJECT MUST BE
MANUFACTURED IN COMPLIANCE WITH THE BUY AMERICA
PROGRAM FOR FEDERALLY FUNDED TRANSPORTATION
PROJECTS PER CODE OF FEDERAL REGULATIONS 49 CFR 661.
THESE REQUIREMENTS ARE DISTINCT AND DIFFERENT FROM
THOSE OF THE BUY AMERICAN ACT OF 1933.
LAYOUT AND EXTENT OF
CONCRETE SLABS IS ASSUMED
PARKING LOT COMPOSED OF
HEAVY DUTY, 4000 PSI
CONCRETE SLABS MEASURING
18'L x 18'W (TYP.)
ALL EXISTING PAVEMENT
STRIPING TO BE REPLACED
FOLLOWING CONCRETE
REPAIRS. REFERENCE SHEET
C3.07.
PAVEMENT RE-CAULKING SHALL
BE PROVIDED AT EXISTING
CONCRETE PAVEMENT JOINTS
WHERE DIRECTED BY THE
OWNER OR ENGINEER. WORK
SHALL INCLUDE REMOVAL OF
EXISTING SEALANT OR LOOSE
MATERIAL, JOINT CLEANING AND
PREPARATION, INSTALLATION OF
CLOSED-CELL BACKER ROD OR
BOND BREAKER TAPE AS
APPROPRIATE, INSTALLATION OF
POLYURETHANE TRAFFIC-GRADE
SEALANT, TOOLING, AND CLEAN
UP. PAVEMENT RE-CAULKING
SHALL BE MEASURED AND PAID
BY LINEAR FOOT UNDER THE
PAVEMENT RE-CAULKING
ALLOWANCE ITEM.
EXISTING TRENCH DRAINS TO
BE REPLACED WITH ACO
POWERDRAIN S300K TRENCH
DRAINS. REFERENCE SHEET
C3.01.
APPROXIMATE BOUNDARY OF
ANTICIPATED CONCRETE
DEMOLITION, REPAIR, AND
RE-CAULKING AS LISTED IN THE
BID ALLOWANCE ITEMS.
ALLOWANCE WORK SHALL BE
PERFORMED ONLY WHEN
AUTHORIZED BY THE OWNER
AND ENGINEER. PAYMENT SHALL
BE BASED UPON ACTUAL
ACCEPTED QUANTITIES OF
WORK COMPLETED.
FUELING STATION AND WASH
STATION SHALL REMAIN
OPERATIONAL AT ALL TIMES.
CONTRACTOR SHALL
COORDINATE SEQUENCING
AND TRAFFIC CONTROL WITH
THE CITY OF RALEIGH TO
MAINTAIN SAFE AND
CONTINUOUS ACCESS DURING
CONSTRUCTION.
SITE LEGEND
PROPOSED ACO SK3-900 CATCH BASIN
PROPOSED NCDOT 840.35 CATCH BASIN
PROPOSED TRENCH DRAIN
PAVEMENT MARKING LINES
CROSSWALK
ASSUMED CONCRETE TILES (18' x 18')
EXTENTS OF CONCRETE REPAIR
SHEET NUMBER
SHEET NAME
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
DOF
CMJ
06. 26. 2026
G O
R A
LE
IG
H O
PE
R
A
TI
O N
S A
N D
M A
IN
TE
N A
N C
E
FA
C
IL
IT
Y
TR
EN
C H
D R
A
IN
R
EP
A
IR
S
P
O O
LE
R
O
AD
R
AL
EI
G
H , N
C
C
IT
Y O
F R
A
LE
IG
H
, N O
R
TH
C A
R O
LI
N
A
PRIME CONSULTANT:
SUBCONSULTANT:
REV DESCRIPTION DATE
PROFESSIONAL SEAL
S C
H E
M A
TI
C
D E
S
IG
N
FULL SCALE SHEET SIZE= ARCH- D (24"x 36")
WARNING: THESE DRAWINGS THE PROPERTY OF THE PRIME CONSULTANT NOTED HEREWITHIN. ANY RE-USE OF THIS WORK WITHOUT WRITTEN CONSENT IS AN INFRINGEMENT OF THE ARCHITECT/ ENGINEER'S WORK. IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECT SUPERVISION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF AN ARCHITECT OR ENGINEER IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO THEIR ITEM THE SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
DESIGNED BY: DOF
The John R. McAdams Company, Inc.
www.mcadamsco.com
621 Hillsborough St phone 919. 823. 4300 fax 919. 361. 2269 license number: C-0293, C-187
Raleigh, NC 27603 Suite 500
SEE SHEET C0.01 FOR ALL PROJECT, SITE,
GRADING, STORM DRAINAGE AND UTILITY
NOTES
ALL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE CURRENT CITY OF
RALEIGH AND NCDOT ENGINEERING DESIGN
AND CONSTRUCTION STANDARDS
C1.02
1" = 50'
OVERALL SITE PLAN
PAVEMENT MARKING NOTES
1. THE LOCATIONS OF EXISTING PAVEMENT MARKINGS WERE OBTAINED
FROM AS-BUILT DATA AND WERE NOT ACQUIRED FROM A CERTIFIED
BOUNDARY SURVEY AS PART OF THIS PROJECT. ALL EXISTING PAVEMENT
MARKINGS SHOULD BE FIELD VERIFIED.
2. THE LAYOUT OF EXISTING 18' x 18' CONCRETE SLABS IS ASSUMED AND WAS
NOT ACQUIRED FROM A CERTIFIED BOUNDARY SURVEY. THE LAYOUT OF
CONCRETE SLABS AS SHOWN IS TO BE UTILIZED EXCLUSIVELY FOR
VISUALIZATION PURPOSES. THE LOCATIONS AND EXTENTS OF ALL
CONCRETE SLABS ARE TO BE FIELD VERIFIED PRIOR TO CONSTRUCTION.
3. THE APPLICATION OF PAVEMENT MARKINGS ARE TO COMPLY WITH NCDOT
2024 STANDARD SPECIFICATIONS SECTION 1205.3F AND 1205.3G
4. REPLACEMENT OF PARKING LOT STRIPING PROPOSED AT ALL LOCATIONS
WITHIN THE MAINTENANCE FACILITY RIGHT OF WAY.
5. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC AND ARE TO BE
PLACED PER NCDOT STANDARDS (REFERENCE NCDOT DETAILS
(1205.01-1205.12)
6. PROPOSED LOCATION OF ALL THERMOPLASTIC MARKINGS ARE TO MATCH
WITH EXISTING ALIGNMENT.
GRAPHIC SCALE
0 25 50 100
1 inch = 50 ft.
BUY AMERICA PROGRAM REQUIREMENTS
ALL PRODUCTS PROVIDED ON THIS PROJECT MUST BE
MANUFACTURED IN COMPLIANCE WITH THE BUY AMERICA
PROGRAM FOR FEDERALLY FUNDED TRANSPORTATION
PROJECTS PER CODE OF FEDERAL REGULATIONS 49 CFR 661.
THESE REQUIREMENTS ARE DISTINCT AND DIFFERENT FROM
THOSE OF THE BUY AMERICAN ACT OF 1933.
ADDENDUM 1
74 LF ACO SK300
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (N) = 285.73
INV. (S) = 285.26
87 LF ACO SK300
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (W) = 285.81
INV. (E) = 285.46
PROPOSED GRATED CATCH BASIN PER
NCDOT 840.35 (TYP.)
SEE SHEET C1.01 FOR CONCRETE
DEMOLITION AND TRENCHING DETAILS.
37 LF ACO SK300
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (N) = 285.55
INV. (S) = 285.36
74 LF ACO SK300 POWERDRAIN
TRENCH DRAIN PROPOSED
INV. (N) =283.35
INV. (S) = 282.91
73 LF ACO SK300
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (N) = 283.33
INV. (S) = 282.66
180 LF ACO SK300 POWERDRAIN
TRENCH DRAIN PROPOSED
INV. (N) = 280.83
INV. (S) = 280.48
135 LF ACO SK300
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (N) = 281.20
INV. (S) = 281.00
15 LF ACO SK300 POWERDRAIN
TRENCH DRAIN PROPOSED
INV. (E) = 281
INV. (W) = 280.83
CB-109
CB-110
CB-105
CB-108
6" PVC CONNECTING ACO SK3-900
CATCH BASIN WITH PROPOSED
DROP INLET
INV. (NE) = 281.83
INV. (SW) = 280.44
6" PVC CONNECTING ACO
SK3-900 CATCH BASIN WITH
PROPOSED DROP INLET
INV. (NE) = 282.08
INV. (SW) = 279.8
CB 101
CB 102
CB-103
CB-104
CB-107CB-106
6" PVC CONNECTING ACO SK3-900
CATCH BASIN WITH PROPOSED
DROP INLET
INV. (N) = 278.86
INV. (S) = 277.29
CB-111
SITE LEGEND
PROPOSED ACO SK3-900 CATCH BASIN
PROPOSED NCDOT 840.35 CATCH BASIN
PROPOSED TRENCH DRAIN
SHEET NUMBER
SHEET NAME
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
DOF
CMJ
06. 26. 2026
G O
R A
LE
IG
H O
PE
R
A
TI
O N
S A
N D
M A
IN
TE
N A
N C
E
FA
C
IL
IT
Y
TR
EN
C H
D R
A
IN
R
EP
A
IR
S
P
O O
LE
R
O
AD
R
AL
EI
G
H , N
C
C
IT
Y O
F R
A
LE
IG
H
, N O
R
TH
C A
R O
LI
N
A
PRIME CONSULTANT:
SUBCONSULTANT:
REV DESCRIPTION DATE
PROFESSIONAL SEAL
S C
H E
M A
TI
C
D E
S
IG
N
FULL SCALE SHEET SIZE= ARCH- D (24"x 36")
WARNING: THESE DRAWINGS THE PROPERTY OF THE PRIME CONSULTANT NOTED HEREWITHIN. ANY RE-USE OF THIS WORK WITHOUT WRITTEN CONSENT IS AN INFRINGEMENT OF THE ARCHITECT/ ENGINEER'S WORK. IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECT SUPERVISION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF AN ARCHITECT OR ENGINEER IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO THEIR ITEM THE SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
DESIGNED BY: DOF
The John R. McAdams Company, Inc.
www.mcadamsco.com
621 Hillsborough St phone 919. 823. 4300 fax 919. 361. 2269 license number: C-0293, C-187
Raleigh, NC 27603 Suite 500
SEE SHEET C0.01 FOR ALL PROJECT, SITE,
GRADING, STORM DRAINAGE AND UTILITY
NOTES
ALL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH THE CURRENT CITY OF
RALEIGH AND NCDOT ENGINEERING DESIGN
AND CONSTRUCTION STANDARDS
STORMWATER NOTES.
1. CONTRACTOR TO COORDINATE WITH ACO SURFACE WATER MANAGEMENT
DIVISION ON THE LAYOUT OF THE PROPOSED ACO POWERDRAINS. A
COMBINATION OF SLOPED AND CONSTANT DEPTH SK300 TRENCH DRAINS
ARE TO BE USED TO ATTAIN THE INVERTS SHOWN IN THIS PLAN.
2. SEE SHEET C8.06 FOR DETAILS ON THE INSTALLATION OF SK300 TRENCH
DRAINS AND NCDOT 840.35 TRAFFIC BEARING CATCH BASINS.
3. TRENCHES ASSOCIATED WITH THE REMOVAL OF EXISTING TRENCH DRAINS
AND CATCH BASINS ARE TO BE REPAIRED AND FILLED IN ACCORDANCE
WITH DETAIL S-2 ON SHEET C8.07.
4. 6" PVC PIPES ARE TO BE USED TO CONNECT ALL SK3-900 CATCH BASINS
WITH THE SUBSEQUENT NCDOT 840.35 CATCH BASINS.
5. REFERENCE SHEET C1.01 FOR INFORMATION ON THE DEMOLITION AND
REMOVAL OF EXISTING TRENCH DRAINS.
6. PROPOSED INVERTS ARE BASED ON ASSUMED EXISTING CONDITIONS
COMPILED FROM CITY OF RALEIGH AS-BUILT DATA AND SURVEY
CONDUCTED BY WSP BETWEEN APRIL AND AUGUST, 2024.
GRAPHIC SCALE
0 20 40 80
1 inch = 40 ft.
C3.01
1" = 40'
GRADING AND DRAINAGE
PLAN (OVERALL)
X:
\P ro je ct s\
W
SP
\W
SP
1\
-P ro du ct io n\
W at er R es ou rc es
\S to rm w at er
M an ag em en t\
Cu rr en t D ra w in gs
\X re f\ W
SP
1-
TB
-W
SP
.d w g, 0/
/2
4:
:3
PM
, D an ie l F rid ay
BUY AMERICA PROGRAM REQUIREMENTS
ALL PRODUCTS PROVIDED ON THIS PROJECT MUST BE
MANUFACTURED IN COMPLIANCE WITH THE BUY AMERICA
PROGRAM FOR FEDERALLY FUNDED TRANSPORTATION
PROJECTS PER CODE OF FEDERAL REGULATIONS 49 CFR 661.
THESE REQUIREMENTS ARE DISTINCT AND DIFFERENT FROM
THOSE OF THE BUY AMERICAN ACT OF 1933.
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (N) = 285.73
INV. (S) = 285.26
87 LF ACO SK300
POWERDRAIN TRENCH
DRAIN PROPOSED
INV. (W) = 285.81
INV. (E) = 285.46
PROPOSED GRATED CATCH BASIN PER
NCDOT 840.35 (TYP.)
SEE SHEET C1.01 FOR CONCRETE
DEMOLITION AND TRENCHING DETAILS.
CB 102
CB-103
SITE LEGEND
PROPOSED ACO SK3-900 CATCH BASIN
PROPOSED NCDOT 840.35 CATCH BASIN
PROPOSED TRENCH DRAIN
SHEET NUMBER
SHEET NAME
DATE:
SCALE:
DRAWN BY:
CHECKED BY:
DOF
CMJ
06. 26. 2026
G O
R A
LE
IG
H O
PE
R
A
TI
O N
S A
N D
M A
IN
TE
N A
N C
E
FA
C
IL
IT
Y
TR
EN
C H
D R
A
IN
R
EP
A
IR
S
P
O O
LE
R
O
AD
R
AL
EI
G
H , N
C
C
IT
Y O
F R
A
LE
IG
H
, N O
R
TH
C A
R O
LI
N
A
PRIME CONSULTANT:
SUBCONSULTANT:
REV DESCRIPTION DATE
PROFESSIONAL SEAL
S C
H E
M A
TI
C
D E
S
IG
N
FULL SCALE SHEET SIZE= ARCH- D (24"x 36")
WARNING: THESE DRAWINGS THE PROPERTY OF THE PRIME CONSULTANT NOTED HEREWITHIN. ANY RE-USE OF THIS WORK WITHOUT WRITTEN CONSENT IS AN INFRINGEMENT OF THE ARCHITECT/ ENGINEER'S WORK. IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECT SUPERVISION OF A LICENSED ARCHITECT OR ENGINEER, TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE SEAL OF AN ARCHITECT OR ENGINEER IS ALTERED, THE ALTERING ARCHITECT OR ENGINEER SHALL AFFIX TO THEIR ITEM THE SEAL AND THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE AND THE DATE OF SUCH ALTERATION AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
DESIGNED BY: DOF
The John R. McAdams Company, Inc.
www.mcadamsco.com
621 Hillsborough St phone 919. 823.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .