This is Addendum 1 to Invitation to Bid (RFB-52-26) issued by the Commonwealth of Kentucky Department for Facilities and Support Services, Division of Engineering and Contract Administration, for Facilities Exterior Lighting Improvements at Kentucky State Police Post 5 in Campbellsburg, Kentucky. The addendum modifies the project specifications and drawing requirements for the exterior lighting improvements project. Key modifications include requirements for the contractor to remove all existing building-mounted and ground-mounted lights including flag lights; authorization of directional boring as an acceptable conduit installation method at a minimum depth of 24 inches with the contractor responsible for utility locates and any repairs; revision of one pole designation from "P20R" to "P20" due to the absence of a receptacle and presence of an RV plug on a concrete pier; specification that pole lighting circuits operate at 208-volt, two-pole configuration using existing conduit and wiring if reusable, or new materials if necessary to meet National Electrical Code standards; and restrictions on pull box placement prohibiting their installation in roadways or sidewalks, with any pull boxes in grassy areas required to be Quazite 18x24 heavy duty closed bottom Tier 15 units with "ELECTRICAL" covers, coordinated with the engineer and installed to meet State Electrical Inspector and NEC code requirements.
The addendum references Drawing SE1.01 (Site Electrical Plan) from E-Tech Consultants, PLLC consulting engineers and directs all bidders to refer to additional addendum materials to be distributed by Lynn Imaging for all additions, deletions, and changes to specifications and drawings. The addendum was issued September 8, 2025, with Project Number 520-CC1H-CB02-02 and RFB number RFB-785-2600000079. Janis Wilhoite, Statewide Procurement Analyst II, serves as the point of contact for the Division of Engineering and Contract Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000079_1_SO_FORM.PDF | ||
| Final_RFB_785_2600000079_2_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-52-26
FOR: Facilities Exterior Lighting Improvements Kentucky State Police- Post 5 Campbellsburg, Kentucky
DATE: September 8, 2025
RFB-785-2600000079
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-52-26 For: Facilities Exterior Lighting Improvements Kentucky State Police- Post 5 Campbellsburg, Kentucky
Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration
E-TECH CONSULTANTS, PLLC
Consulting Engineers
378 Park Avenue Lexington, KY 40502
PROJECT: RFB-52-26
Project #520-CC1H-CB02-02 KSP-Post 5-Facilities Exterior Lighting Improvements Campbellsburg, KY
ADDENDUM ITEMS
The following items shall be included in the Contract Documents for this Project.
ITEM NO. ONE (1)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Per General Sheet Note J, add the following: “The Contractor shall remove all existing building mounted and ground mounted lights, including the flag lights”.
Attachments: None Drawings: None
ITEM NO. TWO (2)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Add General Sheet Note K: “Directional Boring is an acceptable method of conduit installation. Depth of boring shall be 24” minimum. The Contractor is responsible for all utility locates, rock and utility repairs if encountered”.
ITEM NO. THREE (3)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Refer to Pole with the new RV Plug. “Revise this one Pole from “P20R” to “P20” since there is not a receptacle on this pole and has a RV plug on the concrete pier. Refer to details.”
ITEM NO. FOUR (4)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Refer to both Pole Light Circuits. “Pole lighting circuits to be 208volt, two pole using existing conduit/wiring, if reuseable. Contractor to field verify before bidding and provide new if not reusable to meet NEC code.”
E-TECH CONSULTANTS, PLLC
Consulting Engineers
378 Park Avenue Lexington, KY 40502
ITEM NO. FIVE (5)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Pull boxes are not acceptable in roadways or sidewalks. In the event that Contractor provides pull boxes in grassy areas, they shall be equal to Quazite, 18x24 heavy duty closed bottom Tier 15 with “ELECTRICAL” cover, location coordinated with Engineer and installed to meet State Electrical Inspector and the NEC code.”
END OF ADDENDUM
| KSP Post 5 Campbellsburg Facilities Exterior Lighting Improvements Addendum.pdf |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Per General Sheet Note J, add the following: “The Contractor shall remove all existing building mounted and ground mounted lights, including the flag lights”. |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Add General Sheet Note K: “Directional Boring is an acceptable method of conduit installation. Depth of boring shall be 24” minimum. The Contractor is responsible for all utility locates, rock and utility repairs if encountered”. |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Refer to Pole with the new RV Plug. “Revise this one Pole from “P20R” to “P20” since there is not a receptacle on this pole and has a RV plug on the concrete pier. Refer to details.” |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Refer to both Pole Light Circuits. “Pole lighting circuits to be 208volt, two pole using existing conduit/wiring, if reuseable. Contractor to field verify before bidding and provide new if not reusable to meet NEC code.” |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Pull boxes are not acceptable in roadways or sidewalks. In the event that Contractor provides pull boxes in grassy areas, they shall be equal to Quazite, 18x24 heavy duty closed bottom Tier 15 with “ELECTRICAL” cover, location coordinated with Engin... |