Addendum_1.pdf
PDF 58 KB Posted
- Solicitation number
- 07A5815
About this file
This document is an addendum issued by the California Department of Transportation (Caltrans) for an Invitation for Price Quotes (IFPQ) to provide new Electric Vehicle Supply Equipment (EVSE) and electric panel replacement services in Los Angeles County, California. The addendum extends the Optional Pre-bid Site Inspection date to May 13, 2024, and the Quote Submittal due date to May 20, 2024. The work includes removing one 200 ampere, 120/208V, single phase, three-wire electrical panel and replacing it with one 800 ampere, 208/120V, 3-phase, four-wire electrical panel, as well as installing four EVSE charging stations to comply with Executive Order N-70-20 Clean Transportation Act at the Caltrans District 7 location in Pacoima, CA.
This IFPQ is open to Certified Small Businesses (SB), Micro-Businesses (MB), Small Business-Public Works (SB-PW), or Disabled Veteran Business Enterprises (DVBE) only. No other pricing or contractual terms are provided in the addendum. The work is to be funded through state sources in support of California's clean transportation initiatives.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Package_07A5815.pdf | ||
| Addendum_2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, Governor
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th STREET, MS-65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
FAX (916) 227-6155
TTY 711
INTERNET http://www.dot.ca.gov/dpac
Making Conservation A California Way of Life.
May 6, 2024
Addendum No. 1
Invitation for Bid (IFPQ) 07A5815
New Electrical Vehicle Supply Equipment (EVSE) and Electric Panel Replacement, Los Angeles
County, CA
NOTICE TO ALL PROSPECTIVE BIDDERS:
Addendum No. 1 is issued for the above-referenced IFPQ. Price Quotes for this work shall be with the full understanding of this Addendum.
The following changes have been made:
The Optional Pre-bid Site Inspection has been updated to May 13, 2024, at 10:00 a.m. and the
Quote Submittal due date has been extended and is now May 20, 2024. Please refer to the revised IFPQ Timeline below:
Event Date
Time
(Pacific
Time)
IFPQ available to prospective bidders 04/29/24
Optional Site Inspection 05/13/24 10:00 a.m.
Written Question Submittal 05/13/24 5:00 p.m.
Final Date for Quote Submission 05/20/24 5:00 p.m.
Proposed Award Date (estimate) 05/27/24
ALL OTHER TERMS AND CONDITIONS SET FORTH IN THE IFPQ REMAIN IN FULL FORCE AND EFFECT.
Sincerely, John Leyva
Contract Analyst
File details come from the government source that posted it. Updated .