Addendum 1.pdf
PDF 218 KB Posted
- Solicitation number
- RFB-785-2600000080-2
- Issued by
- Harrison County, Kentucky
About this file
This document is an Addendum to an Invitation to Bid (RFB-54-26) issued by the Commonwealth of Kentucky's Department for Facilities and Support Services, Division of Engineering and Contract Administration for Facilities Exterior Lighting Improvements at Kentucky State Police Post 4 in Elizabethtown, Kentucky. The addendum, prepared by E-Tech Consultants, PLLC, provides five specific modifications to the original bid documents, focusing on the Site Electrical Plan (Drawing SE1.01). Key changes include instructions for removing existing building and ground-mounted lights, permitting directional boring for conduit installation with a minimum 24-inch depth, specifying pull box requirements, removing the existing site lighting Timer/Contactor, and clarifying light fixture installation details.
The addendum does not include specific pricing information or funding sources. It is primarily a technical clarification document that provides additional guidance to potential contractors bidding on the exterior lighting improvement project. The modifications aim to ensure clear expectations for the project's electrical work, utility considerations, and installation methods, with an emphasis on compliance with State Electrical Inspector and National Electrical Code (NEC) requirements. No attachments or drawings were included with this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2600000080_2_SO_FORM.PDF | ||
| Final_RFB_785_2600000080_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-54-26
FOR: Facilities Exterior Lighting Improvements Kentucky State Police- Post 4 Elizabethtown, Kentucky
DATE: September 8, 2025
RFB-785-2600000080
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to addendum to be distributed by Lynn Imaging for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-54-26 For: Facilities Exterior Lighting Improvements Kentucky State Police- Post 4 Elizabethtown, Kentucky
Janis Wilhoite, Statewide Procurement Analyst II Division of Engineering and Contract Administration
E-TECH CONSULTANTS, PLLC
Consulting Engineers
378 Park Avenue Lexington, KY 40502
PROJECT: RFB-54-26
Project #520-CC1H-ET05-02 KSP-Post 4-Facilities Exterior Lighting Improvements Elizabethtown, KY
ADDENDUM ITEMS
The following items shall be included in the Contract Documents for this Project.
ITEM NO. ONE (1)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Per General Sheet Note J, add the following: “The Contractor shall remove all existing building mounted and ground mounted lights, including the flag lights”.
Attachments: None Drawings: None
ITEM NO. TWO (2)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Add General Sheet Note K: “Directional Boring is an acceptable method of conduit installation. Depth of boring shall be 24” minimum. The Contractor is responsible for all utility locates, rock and utility repairs if encountered”.
ITEM NO. THREE (3)
DRAWING SE1.01 SITE ELECTRICAL PLAN
- Refer to Drawing o Pull boxes are not acceptable in roadways or sidewalks. In the event that Contractor provides pull boxes in grassy areas, they shall be equal to Quazite, 18x24 heavy duty closed bottom Tier 15 with “ELECTRICAL” cover, location coordinated with Engineer and installed to meet State Electrical Inspector and the NEC code.”
ITEM NO. FOUR (4)
- Refer to Drawing o Contractor to remove existing site lighting Timer/Contactor in
E-TECH CONSULTANTS, PLLC
Consulting Engineers
378 Park Avenue Lexington, KY 40502
Mechanical/Electrical Room #500A.
ITEM NO. FIVE (5)
- Refer to Drawing o The Three (3) shown Light Fixtures OLF8 on the plan east side of the main Post 4 KSP Building are incorrectly labeled. They are new installations and not replacments. Contractor to provide new fixture in new location with elevation and mounting similar to existing. Connect to new power to match sizes as indicated. Therefore revise three coded sheet tag notes 1 to be Sheet Note 2 respectively.
END OF ADDENDUM
| KSP Post 4 Elizabethtown Facilities Exterior Lighting Improvements Addendum.pdf |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Per General Sheet Note J, add the following: “The Contractor shall remove all existing building mounted and ground mounted lights, including the flag lights”. |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Add General Sheet Note K: “Directional Boring is an acceptable method of conduit installation. Depth of boring shall be 24” minimum. The Contractor is responsible for all utility locates, rock and utility repairs if encountered”. |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Pull boxes are not acceptable in roadways or sidewalks. In the event that Contractor provides pull boxes in grassy areas, they shall be equal to Quazite, 18x24 heavy duty closed bottom Tier 15 with “ELECTRICAL” cover, location coordinated with Engin... |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o Contractor to remove existing site lighting Timer/Contactor in Mechanical/Electrical Room #500A. |
| DRAWING SE1.01 SITE ELECTRICAL PLAN |
| - Refer to Drawing |
| o The Three (3) shown Light Fixtures OLF8 on the plan east side of the main Post 4 KSP Building are incorrectly labeled. They are new installations and not replacments. Contractor to provide new fixture in new location with elevation and mounting simi... |
File details come from the government source that posted it. Updated .