Addendum_1.pdf
PDF 232 KB Posted
- Solicitation number
- BPM047409
- Issued by
- Baltimore City, Maryland
About this file
This is an addendum document (#1) issued by Baltimore City Public Schools Office of Procurement for IFB-25024, regarding an Elevator Replacement project at Abbottston Building #050. The addendum, dated December 6, 2024, contains one revision to the bid documents - the addition of the pre-bid sign-in sheet which is attached to the memo.
The addendum includes a sign-in sheet showing attendees of the pre-bid meeting, which appears to be handwritten. Vendors are required to acknowledge receipt of this addendum in their bid proposal forms, and failure to do so may result in their bid being considered non-responsive. The document retains all other original terms and conditions unchanged from the initial solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_Document.pdf | ||
| Addendum_2_New_Bid_Due_Date.pdf | ||
| Addendum_3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
200 E. North Avenue, Room 401 Baltimore, MD 21202 Phone: (410) 396-8757
Fax: (410) 545-6977 http://www.bcps.k12.md.us
Revised: October 25, 2019
Baltimore City Public Schools Office of Procurement
200 E. North Avenue, Room # 401 Baltimore, MD 21202
December 6, 2024 Addendum #1
Solicitation Number: IFB-25024 Solicitation Title: Elevator Replacement at
Abbottston Building #050
The following changes, additions, deletions, and clarifications are hereby made part of the solicitation for the above referenced project and shall be considered in the preparation of the solicitation response and execution of all work. Vendors shall acknowledge receipt of this addendum.
Notice: The following changes and additions should be considered as amendments to the above referenced bid documents.
BID DOCUMENT REVISIONS:
Item # 1: Pre-Bid Sign in Sheet: To post the pre-bid sign in sheet. Sign in sheet is attached this memo.
All other terms and conditions shall remain unchanged.
Failure to acknowledge and respond to this all addenda on your Bid Proposal Form may result in the bid proposal being considered non-responsive.
Date Issued: December 6, 2024 By: Stuart Feldman
| Addendum 1 Pre-Bid Sign in Sheet |
| Pre-BID Sign-in Sheet |
File details come from the government source that posted it. Updated .