Addendum 1.pdf
PDF 6 MB Posted
- Attached to
- Hangar Site Development
- Solicitation number
- PE-61600-NONST-2025-000000021
- Issued by
- Brooks County, Georgia
About this file
This document is an Addendum for a state and local contract opportunity for the Hangar Site Development at the Statesboro-Bulloch County Airport in Georgia.
The addendum provides clarifications, revisions, and additions to the project manual, drawings, and scope of work for the construction of a 10-unit T-Hangar site and a corporate hangar site. Key details include changes to pay items, responses to bidder questions, and updated quantities and measurements for items such as unclassified excavation, crushed aggregate base course, asphalt concrete surface and leveling courses, and sodding. The bids are due on December 4, 2024 at 2:00 PM EST, with a pre-bid meeting scheduled for November 19, 2024. The Bulloch County Board of Commissioners reserves the right to reject any and all bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hangar Site Development Bid Ad.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G o o d w y n M i l l s C a w o o d
1 9 0 6 E T h r e e N o t c h S t r e e t
A n d a l u s i a , A l a b a m a 3 6 4 2 1
T 3 3 4 . 2 2 2 . 2 6 9 9
T R A N S M I T T A L C O V E R S H E E T
DATE: NOVEMBER 15, 2024
TO: ALL PLAN HOLDERS
FROM: PATSY STINSON
PROJECT: HANGAR SITE DEVELOPMENT
STATESBORO-BULLOCH COUNTY AIRPORT
STATESBORO, GEORGIA
GMC PROJECT NOS.: TATL230003 & TAUG230007
RE: ADDENDUM #1
PLEASE COMPLETE BELOW AND RETURN IMMEDIATELY VIA FAX or EMAIL to:
PATSY STINSON
Email: patsy.stinson@gmcnetwork.com
I, the undersigned, hereby acknowledge receipt of this Addendum #1.
Authorized Representative Date
Company Name mailto:patsy.stinson@gmcnetwork.com
ADDENDUM NO. 1 – PAGE 1 of 2
ADDENDUM NUMBER 1
HANGAR SITE DEVELOPMENT
STATESBORO-BULLOCH COUNTY AIRPORT
GMC PROJECT NOS: TATL230003 & TAUG230007
I. General
A. The following clarifications, revisions, additions are hereby made a part of same, and shall be incorporated in the Project Manual, Drawings, and Work of the Contract the same as if originally included in the Bid and Construction Documents.
B. Bidders shall acknowledge receipt of this Addendum in writing, as provided on the Transmittal Cover Sheet and the Proposal Form.
C. When a revision and/or addition is called for to the Drawings or Project Manual, they shall be fully coordinated with and carried through all applicable Drawings and portions of the Project Manual, including in part, all related Civil, Landscaping, Architectural, Structural, Electrical, and other Documents.
II. Revisions to Plans and Project Manual
A. Plans - Revisions have been made to Plan Sheets o Corporate Hangar Plans Sheet 3.
o Corporate Hangar Plans Sheet 7.
o T-Hangar Plans Sheet 6.
B. Project Manual o Unclassified excavation changed from P-152-1 to 205-0001 o Unclassified embankment -in-place (off site borrow) changed from P-152-3 to
208-0100.
o GAB unit rate changed from SY to TON unit rate.
III. Response to Comments
1. T-Hangar full plan set, sheet 20 of 27 calls out Ds4 in the area of the basin slopes but there is no bid item for sod in the base bid. Will an item be added or should that be added to the mobilization item?
a. Line-item T-904-1 Sodding was added to the base bid for the T-Hangar full plan set.
2. Corp Hangar full plan set does not specify if we are to recess the 2-pad area to allow for slap and capillary material or bring it to finish grade. Can you specify what finish elevation we are to use there?
a. Two notes were added to Sheet 7 Site Grading and Drainage Plan
b. 10. Contractor needs to recess the building pad areas 1.5” below the final asphalt
FFE and grade the pad area to ensure positive drainage away from the apron.
ADDENDUM NO. 1 – PAGE 2 of 2
c. 11. Any finished grading that is unpaved or left sitting for 14 days will need to be stabilized with seeding, topsoil, and mulch.
3. Add Alternate #1 Bid form lists Asph. Conc Surface and Leveling as a SY quantity.
Shouldn’t that be per ton like the base bid and Alt #2?
a. Alternate #1 Bid form Asph. Conc Surface and Leveling changed to TON quantity.
4. In both alternates the leveling quantity is higher than the surface course quantity. If both thicknesses are 2” per the detail, where is the additional leveling going?
a. This is due to a higher tolerance used for estimating the leveling course quantity as compared to the tolerance used for the surface course quantity.
5. The T-Hangar portion of the bid form lists a SY quantity for the 6” GAB that would be enough to cover the pad and pavement. Is that the intent?
a. That is correct. 6” GAB quantity changed to TON.
6. The Alt #1 and Alt #2 portions of the bid form list the GAB as per ton unit rate. I would like to verify that there is no typo error in the way this is set up.
a. No typo. GAB is set up as per TON unit rate.
7. I have also found that the printed scale on your plan drawings is ½ what the actual scale measures on the station layout.
a. When the plans are printed to full size, the scale should be correct.
IV. Conclusion A. This is the end of Addendum Number 1
SP
EC
N O
Q
TY
U N
IT
U
N
IT
P
RI
CE
TO
TA
L
CO
ST
C-
5-
LS
C-
2-
LF
C-
2-
SY
C-
2-
EA
D-
1-
LF
D-
1-
EA
D-
2-
EA
D-
2-
EA
L-
5-
EA
L-
5-
EA
P-
1-
SY
5-
CY
8-
CY
P-
9-
TO
N
P-
3-
GA
L
P-
0-
CY
P-
0-
SF
P-
0-
SF
T-
1-
AC
T-
4-
SY
SO
DD
IN
G
T-
5-
CY
T-
8-
SY
3-
EA
3-
EA
5-
EA
0-
TO
N
0-
TO
N
3-
SY
3-
SY
6-
SY
H-
LS
LS
BA
SE
B
ID
T
O
TA
L
T-ha ng ar
S ite
D ev el op m en t P
RO
JE
CT
S ub
To ta l:
PL
AS
TI
C
FI
LT
ER
F
AB
RI
C
ER
O
SI
O N
C O
N
TR
O L
M
AT
S, S
LO
PE
S
U N
IT
T
-H
AN
GA
R
, D O
O
RS
, L
IG
HT
S, C O
M
PL
ET
E
IN
P
LA
CE
(I N
LC
U
DE
S
CO
N
CR
ET
E
SL
AB
FO
U
N
DA
TI
O
N S)
*H
AN
GA
R
W
AT
ER
S
ER
VI
CE
C
O N
N
EC
TI
O
N A
N D
AP
PU
RT
EN
AN
CE
S
*P ro vi de a pp ro xi m at el y
0’ o f 1 sc he du le pv c.
C on tr ac to r s ha ll fie ld v er ify a nd ro ut e to c ity p ro vi de d m et er se t a nd in st al l 8 b ra ss b od y ho se b ib bs w ith
¾ in le t s ize in st an da rd si ze (2
0” x1
0” )c as t i ro n va lv e bo x w ith li d be tw ee n ea ch T
-h an ga r s pa ce
Co or di na te e xa ct lo ca tio n w ith o w ne r.
U N
CL
AS
SI
FI
ED
E
M
BA
N
KM
EN
T-
IN
-P
LA
CE
(O
FF
S
IT
E
BO
RR
O
W
CR
U
SH
ED
A
GG
RE
GA
TE
B
AS
E
CO
U
RS
E
(6 " C
O M
PA
CT
ED
ST
N
D U
M
PE
D
RI
P
RA
P, T
P 1, IN
CL
AS
S B
CO
N
CR
ET
E
PE
RM
AN
EN
T
PA
VE
M
EN
T M
AR
KI
N G, R
EF
LE
CT
IV
E
YE
LL
O W
(T
YP
E
II)
W
IT
H
TY
PE
II
I B
EA
DS
IN
CL
U
DE
M
IC
RO
BI
CI
DE
TE
M
PO
RA
RY
P
AV
EM
EN
T M
AR
KI
N G, Y
EL
LO
W
(T
YP
E
II)
IN
CL
U
DE
M
IC
RO
BI
CI
DE
SE
ED
IN
G
TO
PS
O
IL
(F U
RN
IS
HE
D
FR
O
M O
FF
T
HE
S
IT
E)
M U
LC
HI
N G
CO
N
ST
RU
CT
A
N D
RE
M
O
VE
S
TO
N E
FI
LT
ER
R
IN
G
SK
IM
M
ER
M
AI
N
TE
N
AN
CE
O
F
ST
O N
E
FI
LT
ER
R
IN
G
AS
PH
C
O N
C
SU
RF
AC
E
CO
U
RS
E
.5 m m S
U
PE
RP
AV
E, G
P
O N
LY
, I
N
CL
B
IT
U M
M
AT
L (A
PP
X.
L
BS
/S Y)
AS
PH
C O
N C
LE
VE
LI
N
G
CO
U
RS
E
.5 m m S
U
PE
RP
AV
E, G
P
O N
LY
, I
N
CL
B
IT
U M
M
AT
L (A
PP
X.
L
BS
/S Y)
FL
AR
ED
E
N D
SE
CT
IO
N
IN
. S
TO
RM
D
RA
IN
RE
M O
VE
E
XI
ST
IN
G
L-
TA
XI
W
AY
L
IG
HT
S L-
ST
AK
E M
O U
N
TE
D
TA
XI
W
AY
E
DG
E
LI
GH
TS
, L
ED
, I
N
ST
AL
LE
D M
IL
L
2" A
SP
HA
LT
P
AV
EM
EN
T
U N
CL
AS
SI
FI
ED
E
XC
AV
AT
IO
N
EM
U
LS
IF
IE
D
AS
PH
AL
T
TA
CK
C O
AT
BA
SE
B
ID
PR
O
PO
SE
D
T-
HA
N G
AR
S
IT
E
DE
VE
LO
PM
EN
T
DE
SC
RI
PT
IO
N
M O
BI
LI
ZA
TI
O N
DE
M O
BI
LI
ZA
TI
O N
IN
ST
AL
LA
TI
O
N A
N D
RE
M
O
VA
L O
F
SI
LT
F
EN
CE
BI
D
PR
O
PO
SA
L
FO
RM
HA
N G
AR
S
IT
E
DE
VE
LO
PM
EN
T
ST
AT
ES
BO
RO
-B
U
LL
O
CH
C O
U N
TY
A
IR
PO
RT
BU
LL
O
CH
C
O U
N
TY
, G
EO
RG
IA
G M
C
PR
O
JE
CT
N
O : T
AT
L2
T
AU
G
DR
O
P
IN
LE
T, G P
DE
TE
N
TI
O
N P
O N
D O
U
TL
ET
S
TR
U
CT
U
RE
CO
N
ST
RU
CT
IO
N E
XI
T
ST
O
RM
D
RA
IN
P
IP
E, IN
, C
LA
SS
II
I (
IN
CL
U
DE
A
SP
HA
LT
P
AT
CH
IN
G)
TE
M
PO
RA
RY
S
EE
DI
N G
AN
D
M U
LC
HI
N G
Re vi se d pe r A dd en du m
PF
Co nt ra ct or
SP
EC
N O
Q
TY
U N
IT
U
N
IT
P
RI
CE
TO
TA
L
CO
ST
C-
5-
LS
C-
2-
LS
C-
2-
1, LF
C-
2-
LF
C-
2-
8, SY
C-
2-
EA
C-
2-
TO
N
P-
1-
0.
AC
5-
,7
CY
8-
,7
CY
P-
9-
2, TO
N
0-
TO
N
0-
TO
N
P-
3-
GA
L
D-
1-
LF
D-
1-
LF
D-
2-
EA
D-
2-
EA
D-
2-
EA
T-
1-
AC
T-
4-
1, SY
T-
5-
2, CY
T-
8-
SY
3-
EA
L-
5-
LS
AD
D
A
LT
Co rp or at e
H an ga r S ite D ev el op m en t P
RO
JE
CT
S ub To ta l:
AD
D
AL
TE
RN
AT
E #2
CO
RP
O
RA
TE
H
AN
G
AR
A
DD
IT
IO
N
AL
P
AV
IN
G
P-
9-
1, TO
N
0-
TO
N
0-
TO
N
P-
3-
GA
L
AD
D
A
LT
Co rp or at e
H an ga r A dd iti on al
P av in g
Su bT ot al
HA
N
G
AR
S
IT
E
DE
VE
LO
PM
EN
T
PR
O
JE
CT
B
ID
T
O
TA
L:
DE
SC
RI
PT
IO
N
HE
AD
W
AL
L
FO
R
" R
CP
SO
DD
IN
G
TO
PS
O
IL
IN
G
RA
IS
E
EX
IS
TI
N G
TA
XI
W
AY
L
IG
HT
S
TO
G
RA
DE
M O
BI
LI
ZA
TI
O N
DE
M O
BI
LI
ZA
TI
O N
TA
CK
C O
AT
" R
EI
N
FO
RC
ED
C O
N
CR
ET
E
PI
PE
(R
CP
" R
EI
N
FO
RC
ED
C O
N
CR
ET
E
PI
PE
(R
CP
DE
TE
N
TI
O
N P
O N
D O
U
TL
ET
S
TR
U
CT
U
RE
HE
AD
W
AL
L
FO
R
" R
CP
U N
CL
AS
SI
FI
ED
E
XC
AV
AT
IO
N
GR
A
GG
R
BA
SE
C
RS
, 6
IN
CH
, I
N
CL
M
AT
L (6
" C O
M
PA
CT
ED
T
HI
CK
N
ES
S)
AS
PH
C O
N C
SU
RF
AC
E
CO
U
RS
E
.5 m m
S U
PE
RP
AV
E, G P
O
N
LY
, I N
CL
B
IT
U
M M
AT
L
(A
PP
X.
L
BS
/S
Y)
AS
PH
C
O N
C
LE
VE
LI
N G
CO
U
RS
E
.5 m m
S U
PE
RP
AV
E, G P
O
N
LY
, I N
CL
B
IT
U
M M
AT
L
(A
PP
X.
L
BS
/S
Y)
SE
ED
IN
G
TA
CK
C O
AT
GR
A
GG
R
BA
SE
C
RS
, 6
IN
CH
, I
N
CL
M
AT
L (6
" C O
M
PA
CT
ED
T
HI
CK
N
ES
S)
AS
PH
C O
N C
SU
RF
AC
E
CO
U
RS
E
.5 m m
S U
PE
RP
AV
E, G P
O
N
LY
, I N
CL
B
IT
U
M M
AT
L
(A
PP
X.
L
BS
/S
Y)
AS
PH
C
O N
C
LE
VE
LI
N G
CO
U
RS
E
.5 m m
S U
PE
RP
AV
E, G P
O
N
LY
, I N
CL
B
IT
U
M M
AT
L
(A
PP
X.
L
BS
/S
Y)
M U
LC
HI
N G
CO
N
ST
RU
CT
A
N D
RE
M
O
VE
R
ET
RO
FI
T / S
TO
N
E
FI
LT
ER
R
IN
G
AD
D
AL
TE
RN
AT
E #1
CO
RP
O
RA
TE
H
AN
G
AR
S
IT
E
DE
VE
LO
PM
EN
T
CO
N
ST
RU
CT
IO
N E
N
TR
AN
CE
/E
XI
T
AN
D
HA
U L
RO
U
TE
ER
O
SI
O N
C O
N
TR
O L
- T
EM
PO
RA
RY
S
IL
T
FE
N
CE
ER
O
SI
O N
C O
N
TR
O L
- T
EM
PO
RA
RY
S
TR
AW
W
AT
TL
E
ER
O
SI
O
N C
O N
TR
O
L
- B
LA
N
KE
T
ER
O
SI
O
N C
O N
TR
O
L
- T
EM
PO
RA
RY
R O
CK
C
HE
CK
D
AM
ER
O
SI
O
N C
O N
TR
O
L
- R
O
CK
C
HA
N N
EL
L
IN
IN
G
CL
EA
RI
N G
AN
D
GR
U
BB
IN
G
U N
CL
AS
SI
FI
ED
E
M
BA
N
KM
EN
T-
IN
-P
LA
CE
(O
FF
S
IT
E
BO
RR
O
W
Re vi se d pe r A dd en du m
PF
Co nt ra ct or
12/21/2018 AC 150/5370-10H
Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control 1
Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control
DESCRIPTION
102-1. This item shall consist of temporary control measures as shown on the plans or as ordered by the
Resident Project Representative (RPR) during the life of a contract to control pollution of air and water, soil erosion, and siltation through the use of silt fences, berms, dikes, dams, sediment basins, fiber mats, gravel, mulches, grasses, slope drains, and other erosion control devices or methods.
Temporary erosion control shall be in accordance with the approved erosion control plan; the approved
Construction Safety and Phasing Plan (CSPP) and AC 150/5370-2, Operational Safety on Airports
During Construction. The temporary erosion control measures contained herein shall be coordinated with the permanent erosion control measures specified as part of this contract to the extent practical to assure economical, effective, and continuous erosion control throughout the construction period.
Temporary control may include work outside the construction limits such as borrow pit operations, equipment and material storage sites, waste areas, and temporary plant sites.
Temporary control measures shall be designed, installed and maintained to minimize the creation of wildlife attractants that have the potential to attract hazardous wildlife on or near public-use airports.
MATERIALS
102-2.1 Grass. Grass that will not compete with the grasses sown later for permanent cover per Item T-
901shall be a quick-growing species (such as ryegrass, Italian ryegrass, or cereal grasses) suitable to the area providing a temporary cover. Selected grass species shall not create a wildlife attractant.
102-2.2 Mulches. Mulches may be hay, straw, fiber mats, netting, bark, wood chips, or other suitable material reasonably clean and free of noxious weeds and deleterious materials per Item T-908. Mulches shall not create a wildlife attractant.
102-2.3 Fertilizer. Fertilizer shall be a standard commercial grade and shall conform to all federal and state regulations and to the standards of the Association of Official Agricultural Chemists.
102-2.4 Slope drains. Slope drains may be constructed of pipe, fiber mats, rubble, concrete, asphalt, or other materials that will adequately control erosion.
102-2.5 Silt fence. Silt fence shall consist of polymeric filaments which are formed into a stable network such that filaments retain their relative positions. Synthetic filter fabric shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum of six months of expected usable construction life. Silt fence shall meet the requirements of ASTM D6461.
102-2.6 Other. All other materials shall meet commercial grade standards and shall be approved by the
RPR before being incorporated into the project.
Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control 2
CONSTRUCTION REQUIREMENTS
102-3.1 General. In the event of conflict between these requirements and pollution control laws, rules, or regulations of other federal, state, or local agencies, the more restrictive laws, rules, or regulations shall apply.
The RPR shall be responsible for assuring compliance to the extent that construction practices, construction operations, and construction work are involved.
102-3.2 Schedule. Prior to the start of construction, the Contractor shall submit schedules in accordance with the approved Construction Safety and Phasing Plan (CSPP) and the plans for accomplishment of temporary and permanent erosion control work for clearing and grubbing; grading; construction; paving;
and structures at watercourses. The Contractor shall also submit a proposed method of erosion and dust control on haul roads and borrow pits and a plan for disposal of waste materials. Work shall not be started until the erosion control schedules and methods of operation for the applicable construction have been accepted by the RPR.
102-3.3 Construction details. The Contractor will be required to incorporate all permanent erosion control features into the project at the earliest practicable time as outlined in the plans and approved
CSPP. Except where future construction operations will damage slopes, the Contractor shall perform the permanent seeding and mulching and other specified slope protection work in stages, as soon as substantial areas of exposed slopes can be made available. Temporary erosion and pollution control measures will be used to correct conditions that develop during construction that were not foreseen during the design stage; that are needed prior to installation of permanent control features; or that are needed temporarily to control erosion that develops during normal construction practices, but are not associated with permanent control features on the project.
Where erosion may be a problem, schedule and perform clearing and grubbing operations so that grading operations and permanent erosion control features can follow immediately if project conditions permit.
Temporary erosion control measures are required if permanent measures cannot immediately follow grading operations. The RPR shall limit the area of clearing and grubbing, excavation, borrow, and embankment operations in progress, commensurate with the Contractor’s capability and progress in keeping the finish grading, mulching, seeding, and other such permanent control measures current with the accepted schedule. If seasonal limitations make such coordination unrealistic, temporary erosion control measures shall be taken immediately to the extent feasible and justified as directed by the RPR.
The Contractor shall provide immediate permanent or temporary pollution control measures to minimize contamination of adjacent streams or other watercourses, lakes, ponds, or other areas of water impoundment as directed by the RPR. If temporary erosion and pollution control measures are required due to the Contractor’s negligence, carelessness, or failure to install permanent controls as a part of the work as scheduled or directed by the RPR, the work shall be performed by the Contractor and the cost shall be incidental to this item.
The RPR may increase or decrease the area of erodible earth material that can be exposed at any time based on an analysis of project conditions.
The erosion control features installed by the Contractor shall be maintained by the Contractor during the construction period.
Provide temporary structures whenever construction equipment must cross watercourses at frequent intervals. Pollutants such as fuels, lubricants, bitumen, raw sewage, wash water from concrete mixing operations, and other harmful materials shall not be discharged into any waterways, impoundments or into natural or manmade channels.
Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control 3
102-3.4 Installation, maintenance and removal of silt fence. Silt fences shall extend a minimum of 16 inches (41 cm) and a maximum of 34 inches (86 cm) above the ground surface. Posts shall be set no more than 10 feet (3 m) on center. Filter fabric shall be cut from a continuous roll to the length required minimizing joints where possible. When joints are necessary, the fabric shall be spliced at a support post with a minimum 12-inch (300-mm) overlap and securely sealed. A trench shall be excavated approximately 4 inches (100 mm) deep by 4 inches (100 mm) wide on the upslope side of the silt fence.
The trench shall be backfilled and the soil compacted over the silt fence fabric. The Contractor shall remove and dispose of silt that accumulates during construction and prior to establishment of permanent erosion control. The fence shall be maintained in good working condition until permanent erosion control is established. Silt fence shall be removed upon approval of the RPR.
METHOD OF MEASUREMENT
102-4.1 Temporary erosion and pollution control work required will be performed as scheduled or directed by the RPR. Completed and accepted work will be measured as follows:
a. Temporary Silt Fence will be measured by the linear foot.
b. Temporary Straw Wattle will be measured by the linear feet.
c. Blanket will be measured by the square yard.
d. Temporary Rock Check Dam will be measured by the each.
e. Rock Channel Lining will be measured by the per ton.
f. Temporary Seeding and Mulching will be measured by the square yard.
g. Construction Exit will be measured by the each.
102-4.2 Control work performed for protection of construction areas outside the construction limits, such as borrow and waste areas, haul roads, equipment and material storage sites, and temporary plant sites, will not be measured and paid for directly but shall be considered as a subsidiary obligation of the
Contractor.
BASIS OF PAYMENT
102-5.1 Accepted quantities of temporary water pollution, soil erosion, and siltation control work ordered by the RPR and measured as provided in paragraph 102-4.1 will be paid for under:
Item C-102-1 Temporary Silt Fence - per linear feet
Item C-102-2 Temporary Straw Wattle - per linear feet
Item C-102-3 Blanket - per square yard
Item C-102-4 Temporary Rock Check Dam - per each
Item C-102-5 Rock Channel Lining - per ton
Item C-102-6 Temporary Seeding and Mulching - per square yard
Item C-102-7 Construction Exit - per each
Where other directed work falls within the specifications for a work item that has a contract price, the units of work shall be measured and paid for at the contract unit price bid for the various items.
Temporary control features not covered by contract items that are ordered by the RPR will be paid for in accordance with Section 90, paragraph 90-05 Payment for Extra Work.
Item C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control 4
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
Advisory Circulars (AC)
AC 150/5200-33 Hazardous Wildlife Attractants on or Near Airports
AC 150/5370-2 Operational Safety on Airports During Construction
ASTM International (ASTM)
ASTM D6461 Standard Specification for Silt Fence Materials
United States Department of Agriculture (USDA)
FAA/USDA Wildlife Hazard Management at Airports, A Manual for Airport Personnel
END OF ITEM C-102
Item C-105 Mobilization 1
Item C-105 Mobilization
105-1 Description. This item of work shall consist of, but is not limited to, work and operations necessary for the movement of personnel, equipment, material and supplies to and from the project site for work on the project except as provided in the contract as separate pay items.
105-2 Mobilization limit. Mobilization shall be limited to 10 percent of the total project cost.
105-3 Posted notices. Prior to commencement of construction activities, the Contractor must post the following documents in a prominent and accessible place where they may be easily viewed by all employees of the prime Contractor and by all employees of subcontractors engaged by the prime
Contractor: Equal Employment Opportunity (EEO) Poster “Equal Employment Opportunity is the Law” in accordance with the Office of Federal Contract Compliance Programs Executive Order 11246, as amended; Davis Bacon Wage Poster (WH 1321) - DOL “Notice to All Employees” Poster; and
Applicable Davis-Bacon Wage Rate Determination. These notices must remain posted until final acceptance of the work by the Owner.
105-4 Engineer/RPR field office. An Engineer/RPR field office is not required.
105-5 Basis of measurement and payment. Based upon the contract lump sum price for “Mobilization” partial payments will be allowed as follows:
a. With first pay request, 25%.
b. When 25% or more of the original contract is earned, an additional 25%.
c. When 50% or more of the original contract is earned, an additional 40%.
d. After Final Inspection, Staging area clean-up and delivery of all
Project Closeout materials as required by Section 90, paragraph 90-11, Contractor Final Project Documentation, the final 10%.
105-6 Payment will be made under:
Item C-105-1 Mobilization
Item C-105 Mobilization 2
The publications listed below form a part of this specification to the extent referenced. The publications
Office of Federal Contract Compliance Programs (OFCCP)
Executive Order 11246, as amended
EEOC-P/E-1 – Equal Employment Opportunity is the Law Poster
United States Department of Labor, Wage and Hour Division
(WHD) WH 1321 – Employee Rights under the Davis-Bacon
Act Poster
END OF ITEM C-105
Item C-105 Mobilization 3
Page Intentionally Blank
Item P-101 Preparation/Removal of Existing Pavements 89
Item P-101 Preparation/Removal of Existing Pavements
101-1 This item shall consist of preparation of existing pavement surfaces for overlay, surface treatments, removal of existing pavement, and other miscellaneous items. The work shall be accomplished in accordance with these specifications and the applicable plans.
EQUIPMENT AND MATERIALS
101-2 All equipment and materials shall be specified here and in the following paragraphs or approved by the Resident Project Representative (RPR). The equipment shall not cause damage to the pavement to remain in place.
101-3.1 Removal of existing pavement.
CONSTRUCTION
The Contractor’s removal operation shall be controlled to not damage adjacent pavement structure, and base material, cables, utility ducts, pipelines, or drainage structures which are to remain under the pavement.
a. Concrete pavement removal. Full depth saw cuts shall be made perpendicular to the slab surface.
The Contractor shall saw through the full depth of the slab including any dowels at the joint, removing the pavement and installing new dowels as shown on the plans and per the specifications. Where the perimeter of the removal limits is not located on the joint and there are no dowels present, the perimeter shall be saw cut the full depth of the pavement. The pavement inside the saw cut shall be removed by methods which will not cause distress in the pavement which is to remain in place. If the material is to be wasted on the airport site, it shall be reduced to a maximum size of 3 inches. Concrete slabs that are damaged by under breaking shall be repaired or removed and replaced as directed by the
RPR.
The edge of existing concrete pavement against which new pavement abuts shall be protected from damage at all times. Spall and underbreak repair shall be in accordance with the plans. Any underlaying material that is to remain in place, shall be recompacted and/or replaced as shown on the plans. Adjacent areas damaged during repair shall be repaired or replaced at the Contractor’s expense.
Item P-101 Preparation/Removal of Existing Pavements 90
b. Asphalt pavement removal. Asphalt pavement to be removed shall be cut to the full depth of the asphalt pavement around the perimeter of the area to be removed. If the material is to be wasted on the airport, it shall be broken to a maximum size of 3 inches.
c. Repair or removal of Base, Subbase, and/or Subgrade. All failed material including surface, base course, subbase course, and subgrade shall be removed and repaired as shown on the plans or as directed by the RPR. Materials and methods of construction shall comply with the applicable sections of these specifications. Any damage caused by Contractor’s removal process shall be repaired at the
Contractor’s expense.
101-3.2 Preparation of joints and cracks prior to overlay/surface treatment. Remove all vegetation and debris from cracks to a minimum depth of 1 inch (25 mm). If extensive vegetation exists, treat the specific area with a concentrated solution of a water-based herbicide approved by the RPR. Fill all cracks greater than 1/4 inch (6 mm) wide) with a crack sealant per ASTM D6690. The crack sealant, preparation, and application shall be compatible with the surface treatment/overlay to be used. To minimize contamination of the asphalt with the crack sealant, underfill the crack sealant a minimum of
1/8 inch (3 mm), not to exceed ¼ inch (6 mm). Any excess joint or crack sealer shall be removed from the pavement surface.
101-3.3 Removal of Foreign Substances/contaminates prior to overlay or seal-coat.
Removal of foreign substances/contaminates from existing pavement that will affect the bond of the new treatment shall consist of removal of rubber, fuel spills, oil, crack sealer, at least 90% of paint, and other foreign substances from the surface of the pavement. Areas that require removal are designated on the plans and as directed by the RPR in the field during construction. rotary grinding or sandblasting may be used. Removal methods used shall not cause major damage to the pavement, or to any structure or utility within or adjacent to the work area. Major damage is defined as changing the properties of the pavement, removal of asphalt causing the aggregate to ravel, or removing pavement over 1/8 inch (3 mm) deep. If it is deemed by the RPR that damage to the existing pavement is caused by operational error, such as permitting the application method to dwell in one location for too long, the Contractor shall repair the damaged area without compensation and as directed by the RPR.
Removal of foreign substances shall not proceed until approved by the RPR. Water used for high-pressure water equipment shall be provided by the Contractor at the Contractor's expense. No material shall be deposited on the pavement shoulders. All wastes shall be disposed of in areas indicated in this specification or shown on the plans.
101-3.5 Cold milling. Milling shall be performed with a power-operated milling machine or grinder, capable of producing a uniform finished surface. The milling machine or grinder shall operate without tearing or gouging the underlaying surface. The milling machine or grinder shall be equipped with grade and slope controls, and a positive means of dust control. All millings shall be removed and disposed off Airport property. If the Contractor mills or grinds deeper or wider than the plans specify, the
Contractor shall replace the material removed with new material at the Contractor’s Expense.
c. Clean-up. The Contractor shall sweep the milled surface daily and immediately after the milling until all residual materials are removed from the pavement surface. Prior to paving, the Contractor shall wet down the milled pavement and thoroughly sweep and/or blow the surface to remove loose residual material. Waste materials shall be collected and removed from the pavement surface and adjacent areas by sweeping or vacuuming. Waste materials shall be removed and disposed off Airport property.
d. Clean pavement surface immediately prior to placing the surface treatment so that it is free of dust, dirt, grease, vegetation, oil or any type of objectionable surface film.
Item P-101 Preparation/Removal of Existing Pavements 91
101-3.7 Maintenance. The Contractor shall perform all maintenance work necessary to keep the pavement in a satisfactory condition until the full section is complete and accepted by the RPR. The surface shall be kept clean and free from foreign material. The pavement shall be properly drained at all times. If cleaning is necessary or if the pavement becomes disturbed, any work repairs necessary shall be performed at the Contractor’s expense.
101-3.8 Preparation of Joints in Rigid Pavement prior to resealing. Prior to application of sealant material, clean and dry the joints of all scale, dirt, dust, old sealant, curing compound, moisture and other foreign matter. The Contractor shall demonstrate, in the presence of the RPR, that the method used cleans the joint and does not damage the joint.
101-3.8.1 Removal of Existing Joint Sealant. All existing joint sealants will be removed by plowing or use of hand tools. Any remaining sealant and or debris will be removed by use of wire brushes or other tools as necessary. Resaw joints removing no more than 1/16 inch (2 mm) from each joint face.
Immediately after sawing, flush out joint with water and other tools as necessary to completely remove the slurry.
101-3.8.2 Cleaning prior to sealing. Immediately before sealing, joints shall be cleaned by removing any remaining laitance and other foreign material. Allow sufficient time to dry out joints prior to sealing.
Joint surfaces will be surface-dry prior to installation of sealant.
101-3.8.3 Joint sealant. Joint material and installation will be in accordance with Item P-605.
101-3.9 Preparation of Cracks in Flexible Pavement prior to sealing. Prior to application of sealant material, clean and dry the joints of all scale, dirt, dust, old sealant, curing compound, moisture and other foreign matter. The Contractor shall demonstrate, in the presence of the RPR, that the method used cleans the cracks and does not damage the pavement.
101-3.9.1 Preparation of Crack. Widen crack with router or random crack saw by removing a minimum of 1/16 inch (2 mm) from each side of crack. Immediately before sealing, cracks will be blown out with a hot air lance combined with oil and water-free compressed air.
101-3.9.2 Removal of Existing Crack Sealant. Existing sealants will be removed by routing or random crack saw. Following routing or sawing any remaining debris will be removed by use of a hot lance combined with oil and water-free compressed air.
101-3.9.3 Crack Sealant. Crack sealant material and installation will be in accordance with Item
P-605.
Item P-101 Preparation/Removal of Existing Pavements 92
101-4.1 Pavement removal. The unit of measurement for pavement removal shall be the number of square yards (square meters) removed by the
Contractor. Any pavement removed outside the limits of removal because the pavement was damaged by negligence on the part of the Contractor shall not be included in the measurement for payment. No direct measurement or payment shall be made for saw cutting. Saw cutting shall be incidental to pavement removal. Dowel bar installation shall be incidental to pavement removal.
101-4.2 Joint and crack repair. The unit of measurement for joint and crack repair shall be the linear foot (meter) of joint.
101-4.3 Removal of Foreign Substances/contaminates. The unit of measurement for foreign Substances/contaminates removal shall be the square foot (meter).
101-4.6 Cold milling. The unit of measure for cold milling shall be 2 inches of milling per square yard (square meter). The location and average depth of the cold milling shall be as shown on the plans. If the initial cut does not correct the condition, the Contractor shall re-mill the area and will be paid for the total depth of milling.
101-5.1 Payment. Payment shall be made at contract unit price for the unit of measurement as specified above. This price shall be full compensation for furnishing all materials and for all preparation, hauling, and placing of the material and for all labor, equipment, tools, and incidentals necessary to complete this item.
Item P-101-1 Cold Milling – per square yard
Item P-101 Preparation/Removal of Existing Pavements 93
The publications listed below form a part of this specification to the extent referenced. The publications
Advisory Circulars (AC)
AC 150/5380-6 Guidelines and Procedures for Maintenance of Airport Pavements.
ASTM D6690 Standard Specification for Joint and Crack Sealants, Hot Applied, for
Concrete and Asphalt Pavements
END OF ITEM P-101
Item P-101 Preparation/Removal of Existing Pavements 94
Item P-151 Clearing and Grubbing 1
Item P-151 Clearing and Grubbing
151-1.1 This item shall consist of clearing or clearing and grubbing, including the disposal of materials, for all areas within the limits designated on the plans or as required by the Resident Project
Representative (RPR).
a. Clearing shall consist of the cutting and removal of all trees, stumps, brush, logs, hedges, the removal of fences and other loose or projecting material from the designated areas. The grubbing of stumps and roots will not be required.
b. Clearing and grubbing shall consist of clearing the surface of the ground of the designated areas of all trees, stumps, down timber, logs, snags, brush, undergrowth, hedges, heavy growth of grass or weeds, fences, structures, debris, and rubbish of any nature, natural obstructions or such material which in the opinion of the RPR is unsuitable for the foundation of strips, pavements, or other required structures, including the grubbing of stumps, roots, matted roots, foundations, and the disposal from the project of all spoil materials resulting from clearing and grubbing.
c. Tree Removal. Tree Removal shall consist of the cutting and removal of isolated single trees or isolated groups of trees, and the grubbing of stumps and roots. The removal of all the trees of this classification shall be in accordance with the requirements for the particular area being cleared.
CONSTRUCTION METHODS
151-2.1 General. The areas denoted on the plans to be cleared and grubbed shall be staked on the ground by the Contractor as indicated on the plans.
The removal of existing structures and utilities required to permit orderly progress of work shall be accomplished by local agencies, unless otherwise shown on the plans. Whenever a telephone pole, pipeline, conduit, sewer, roadway, or other utility is encountered and must be removed or relocated, the
Contractor shall advise the RPR who will notify the proper local authority or owner to secure prompt action.
151-2.1.1 Disposal. All materials removed by clearing or by clearing and grubbing shall be disposed of outside the Airport’s limits at the Contractor’s responsibility, except when otherwise directed by the RPR.
When embankments are constructed of such material, this material shall be placed in accordance with requirements for formation of embankments. Any broken concrete or masonry that cannot be used in construction and all other materials not considered suitable for use elsewhere, shall be disposed of by the
Contractor. In no case, shall any discarded materials be left in windrows or piles adjacent to or within the airport limits. The manner and location of disposal of materials shall be subject to the approval of the RPR and shall not create an unsightly or objectionable view. When the Contractor is required to locate a disposal area outside the airport property limits, the Contractor shall obtain and file with the RPR permission in writing from the property owner for the use of private property for this purpose.
151-2.1.2 Blasting. Blasting shall not be allowed.
Item P-151 Clearing and Grubbing 2
151-2.2 Clearing. The Contractor shall clear the staked or indicated area of all materials as indicated on the plans. Trees unavoidably falling outside the specified clearing limits must be cut up, removed, and disposed of in a satisfactory manner. To minimize damage to trees that are to be left standing, trees shall be felled toward the center of the area being cleared. The Contractor shall preserve and protect from injury all trees not to be removed. The trees, stumps, and brush shall be cut flush with the original ground surface. The grubbing of stumps and roots will not be required.
Fences shall be removed and disposed of as directed by the RPR. Fence wire shall be neatly rolled and the wire and posts stored on the airport if they are to be used again, or stored at a location designated by the
RPR if the fence is to remain the property of a local owner or authority.
151-2.3 Clearing and grubbing. In areas designated to be cleared and grubbed, all stumps, roots, buried logs, brush, grass, and other unsatisfactory materials as indicated on the plans, shall be removed, except where embankments exceeding 3-1/2 feet (105 cm) in depth will be constructed outside of paved areas.
For embankments constructed outside of paved areas, all unsatisfactory materials shall be removed, but sound trees, stumps, and brush can be cut off flush with the original ground and allowed to remain. Tap roots and other projections over 1-1/2 inches (38 mm) in diameter shall be grubbed out to a depth of at least 18 inches (0.5 m) below the finished subgrade or slope elevation.
Any buildings and miscellaneous structures that are shown on the plans to be removed shall be demolished or removed, and all materials shall be disposed of by removal from the site. The cost of removal is incidental to this item. The remaining or existing foundations, wells, cesspools, and like structures shall be destroyed by breaking down the materials of which the foundations, wells, cesspools, etc., are built to a depth at least 2 feet (60 cm) below the existing surrounding ground. Any broken concrete, blocks, or other objectionable material that cannot be used in backfill shall be removed and disposed of at the Contractor’s expense. The holes or openings shall be backfilled with acceptable material and properly compacted.
All holes in embankment areas remaining after the grubbing operation shall have the sides of the holes flattened to facilitate filling with acceptable material and compacting as required in Item P-152. The same procedure shall be applied to all holes remaining after grubbing in areas where the depth of holes exceeds the depth of the proposed excavation.
151-3.2 The quantities of clearing and grubbing as shown by the limits on the plans shall be the number of acres or fractions thereof of land specifically cleared and grubbed.
151-4.2 Payment shall be made at the contract unit price per acre for clearing and grubbing. This price shall be full compensation for furnishing all materials and for all labor, equipment, tools, and incidentals necessary to complete the item.
Payment will be made under:
Item P-151-1 Clearing and grubbing - per acre
END OF ITEM P-151
Item P-209 Crushed Aggregate Base Course 173
Item P-209 Crushed Aggregate Base Course
209-1.1 This item consists of a base course composed of crushed aggregate base constructed on a prepared course in accordance with these specifications and in conformity to the dimensions and typical cross-sections shown on the plans.
MATERIALS
209-2.1 Crushed aggregate base. Crushed aggregate shall consist of clean, sound, durable particles of crushed stone, crushed gravel, and shall be free from coatings of clay, silt, organic material, clay lumps or balls or other deleterious materials or coatings. The method used to produce the crushed gravel shall result in the fractured particles in the finished product as consistent and uniform as practicable. Fine aggregate portion, defined as the portion passing the No. 4 (4.75 mm) sieve shall consist of fines from the coarse aggregate crushing operation. The fine aggregate shall be produced by crushing stone, gravel, that meet the coarse aggregate requirements for wear and soundness. Aggregate base material requirements are listed in the following table.
Item P-209 Crushed Aggregate Base Course 174
Crushed Aggregate Base Material Requirements
Material Test Requirement Standard
Coarse Aggregate
Resistance to Degradation Loss: 45% maximum ASTM C131
Soundness of Aggregates by Use of Sodium Sulfate or
Magnesium Sulfate
Loss after 5 cycles:
12% maximum using Sodium sulfate - or -
18% maximum using magnesium sulfate
ASTM C88
Percentage of Fractured
Particles
Minimum 90% by weight of particles with at least two fractured faces and 98% with at least one fractured face1
ASTM D5821
Flat Particles, Elongated
Particles, or Flat and
Elongated Particles
10% maximum, by weight, of flat, elongated, or flat and elongated particles 2
ASTM D4791
Bulk density of slag
Weigh not less than 70 pounds per cubic foot (1.12 Mg/cubic meter)
ASTM C29
Clay lumps and friable particles
Less than or equal to 3 percent ASTM C142
Fine Aggregate
Liquid limit Less than or equal to 25 ASTM D4318
Plasticity Index Not more than five (5) ASTM D4318
1 The area of each face shall be equal to at least 75% of the smallest mid-sectional area of the piece. When two fractured faces are contiguous, the angle between the planes of fractures shall be at least 30 degrees to count as two fractured faces.
2 A flat particle is one having a ratio of width to thickness greater than five (5); an elongated particle is one having a ratio of length to width greater than five (5).
209-2.2 Gradation requirements. The gradation of the aggregate base material shall meet the requirements of the gradation given in the following table when tested per ASTM C117 and ASTM C136.
The gradation shall be well graded from coarse to fine and shall not vary from the lower limit on one sieve to the high limit on an adjacent sieve or vice versa.
Item P-209 Crushed Aggregate Base Course 175
Gradation of Aggregate Base
Sieve Size Design Range
Percentage by Weight passing
Contractor’s Final
Gradation
Job Control Grading Band
Tolerances1
(Percent)
2 inch
(50 mm)
100 0
1-1/2 inch
(37.5 mm)
95-100 ±5
1 inch
(25.0 mm)
70-95 ±8
3/4 inch
(19.0 mm)
55-85 ±8
No. 4
(4.75 mm)
30-60 ±8
No. 402
(425 µm) 10-30 ±5
No. 2002
(75 µm)
0-10 ±3
1 The “Job Control Grading Band Tolerances for Contractor’s Final Gradation” in the table shall be applied to
“Contractor’s Final Gradation” to establish a job control grading band. The full tolerance still applies if application of the tolerances results in a job control grading band outside the design range.
2 The fraction of material passing the No 200 (75 µm) sieve shall not exceed two-thirds the fraction passing the No 40 (425 µm) sieve.
209-2.3 Sampling and Testing.
a. Aggregate base materials. The Contractor shall take samples of the aggregate base in accordance with ASTM D75 to verify initial aggregate base requirements and gradation. Material shall meet the requirements in paragraph 209-2.1. This sampling and testing will be the basis for approval of the aggregate base quality requirements.
b. Gradation requirements. The Contractor shall take at least two aggregate base samples per day in the presence of the Resident Project Representative (RPR) to check the final gradation. Sampling shall be per ASTM D75. Material shall meet the requirements in paragraph 209-2.2. The samples shall be taken from the in-place, un-compacted material at sampling points and intervals designated by the RPR.
209-2.4 Separation Geotextile. Not used.
CONSTRUCTION METHODS
209-3.1 Control strip. The first half-day of construction shall be considered the control strip. The
Contractor shall demonstrate, in the presence of the RPR, that the materials, equipment, and construction processes meet the requirements of the specification. The sequence and manner of rolling necessary to obtain specified density requirements shall be determined. The maximum compacted thickness may be increased to a maximum of 12 inches (300 mm) upon the Contractor’s demonstration that approved equipment and operations will uniformly compact the lift to the specified density. The RPR must witness this demonstration and approve the lift thickness prior to full production.
Item P-209 Crushed Aggregate Base Course 176
Control strips that do not meet specification requirements shall be reworked, re-compacted or removed and replaced at the Contractor’s expense. Full operations shall not continue until the control strip has been accepted by the RPR. The Contractor shall use the same equipment, materials, and construction methods for the remainder of construction, unless adjustments made by the Contractor are approved by the RPR.
209-3.2 Preparing underlying subgrade and/or subbase. The underlying subgrade and/or subbase shall be checked and accepted by the RPR before base course placing and spreading operations begin. Re-proof rolling of the subgrade or proof rolling of the subbase in accordance with Item P-152, at the
Contractor’s expense, may be required by the RPR if the Contractor fails to ensure proper drainage or protect the subgrade and/or subbase. Any ruts or soft, yielding areas due to improper drainage conditions, hauling, or any other cause, shall be corrected before the base course is placed. To ensure proper drainage, the spreading of the base shall begin along the centerline of the pavement on a crowned section or on the high side of the pavement with a one-way slope.
209-3.3 Production. The aggregate shall be uniformly blended and, when at a satisfactory moisture content per paragraph 209-3.5, the approved material may be transported directly to the placement.
209-3.4 Placement. The aggregate shall be placed and spread on the prepared underlying layer by spreader boxes or other devices as approved by the RPR, to a uniform thickness and width. The equipment shall have positive thickness controls to minimize the need for additional manipulation of the material. Dumping from vehicles that require re-handling shall not be permitted. Hauling over the uncompacted base course shall not be permitted.
The aggregate shall meet gradation and moisture requirements prior to compaction. The base course shall be constructed in lifts as established in the control strip, but not less than 4 inches (100 mm) nor more than 12 inches (300 mm) of compacted thickness.
When more than one lift is required to establish the layer thickness shown on the plans, the construction procedure described here shall apply to each lift. No lift shall be covered by subsequent lifts until tests verify that compaction requirements have been met. The Contractor shall rework, re-compact and retest any material placed which does not meet the specifications at the Contractor’s expense.
209-3.5 Compaction. Immediately after completion of the spreading operations, compact each layer of the base course, as specified, with approved compaction equipment. The number, type, and weight of rollers shall be sufficient to compact the material to the required density within the same day that the aggregate is placed on the subgrade.
The field density of each compacted lift of material shall be at least 100% of the maximum density of laboratory specimens prepared from samples of the subbase material delivered to the jobsite. The laboratory specimens shall be compacted and tested in accordance with ASTM D1557. The moisture content of the material during placing operations shall be within ±2 percentage points of the optimum moisture content as determined by ASTM D1557. Maximum density refers to maximum dry density at optimum moisture content unless otherwise specified.
209-3.6 Weather limitations. Material shall not be placed unless the ambient air temperature is at least
40°F (4°C) and rising. Work on base course shall not be conducted when the subgrade or subbase is wet or frozen or the base material contains frozen material.
209-3.7 Maintenance. The base course shall be maintained in a condition that will meet all specification requirements. When material has been exposed to excessive rain, snow, or freeze-thaw conditions, prior to placement of additional material, the Contractor shall verify that materials still meet all specification requirements. Equipment may be routed over completed sections of base course, provided that no damage results and the equipment is routed over the full width of the completed base course. Any damage
Item P-209 Crushed Aggregate Base Course 177 resulting to the base course from routing equipment over the base course shall be repaired by the
Contractor at the Contractor’s expense.
209-3.8 Surface tolerances. After the course has been compacted, the surface shall be tested for smoothness and accuracy of grade and crown. Any portion lacking the required smoothness or failing in accuracy of grade or crown shall be scarified to a depth of at least 3 inches (75 mm), reshaped and recompacted to grade until the required smoothness and accuracy are obtained and approved by the RPR.
Any deviation in surface tolerances shall be corrected by the Contractor at the Contractor’s expense. The smoothness and accuracy requirements specified here apply only to the top layer when base course is constructed in more than one layer.
a. Smoothness. The finished surface shall not vary more than 3/8-inch (9 mm) when tested with a
12-foot (3.7-m) straightedge applied parallel with and at right angles to the centerline. The straightedge shall be moved continuously forward at half the length of the 12-foot (3.7-m) straightedge for the full length of each line on a 50-foot (15-m) grid.
b. Grade. The grade and crown shall be measured on a 50-foot (15-m) grid and shall be within +0 and -1/2 inch (12 mm) of the specified grade.
209-3.9 Acceptance sampling and testing. Crushed aggregate base course shall be accepted for density and thickness on an area basis. Two tests shall be made for density and thickness for each 1200 square yds (1000 m2). Sampling locations will be determined on a random basis per ASTM
D3665
a. Density. The Contractor’s laboratory shall perform all density tests in the RPR’s presence and provide the test results upon completion to the RPR for acceptance.
Each area shall be accepted for density when the field density is at least 100% of the maximum density of laboratory specimens compacted and tested per ASTM D1557. The in-place field density shall be determined per ASTM D6938 using Procedure A, the direct transmission method, and ASTM D6938 shall be used to determine the moisture content of the material. The machine shall be calibrated in accordance with
ASTM D6938.If the specified density is not attained, the area represented by the failed test must be reworked and/or recompacted and two additional random tests made. This procedure shall be followed until the specified density is reached. Maximum density refers to maximum dry density at optimum moisture content unless otherwise specified.
b. Thickness. Depth tests shall be made by test holes at least 3 inches (75 mm) in diameter that extend through the base. The thickness of the base course shall be within +0 and -1/2 inch (12 mm) of the specified thickness as determined by depth tests taken by the Contractor in the presence of the RPR for each area. Where the thickness is deficient by more than 1/2-inch (12 mm), the Contractor shall correct such areas at no additional cost by scarifying to a depth of at least 3 inches (75 mm), adding new material of proper gradation, and the material shall be blended and recompacted to grade. The Contractor shall replace, at his expense, base material where depth tests have been taken.
METHOD OF MEASUREMENT
209-4.1 The quantity of crushed aggregate base course will be determined by measurement of the number of tons of material actually constructed and accepted by the RPR as complying with the plans and specifications.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .