Addendum 1.pdf
PDF 2 MB Posted
- Solicitation number
- RFB-785-2300000379-2
- Issued by
- Trigg County, Kentucky
About this file
This document is an Addendum to Invitation to Bid No. RFB-181-23 issued by the Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration for the Waste Water Infrastructure Upgrade Phase 1 project at the Lake Barkley State Resort Park in Cadiz, Kentucky. The addendum provides changes to the specifications and drawings, including work restrictions and daily work hours, restoration requirements, and the addition of a construction permit from the Kentucky Division of Water. The project involves the construction of a duplex pump station, four duplex grinder pump stations, and installation of approximately 20,000 linear feet of various sizes of PVC force main and sanitary sewer piping.
The addendum clarifies that work within the campground area shall be completed after July 15, 2023, and that removal or trimming of trees 3 inches or larger in diameter is prohibited. It also specifies requirements for topsoil placement, seeding, fertilizing, and mulching, as well as the maintenance of the seeded areas until the grass is well-established.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_785_2300000379_2_SO_FORM.PDF | ||
| Final_RFB_785_2300000379_1_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMMONWEALTH OF KENTUCKY
DEPARTMENT FOR FACILITIES AND SUPPORT SERVICES
DIVISION OF ENGINEERING AND CONTRACT ADMINISTRATION
INVITATION TO BID NO: RFB-181-23
FOR: Waste Water Infrastructure Upgrade Ph1 Lake Barkley State Park Cadiz, Kentucky
DATE: January 18, 2023
RFB-785-2300000379
ADDENDUM NO. One (1)
BIDDER SHALL CONFORM TO THE FOLLOWING CHANGES AS SAME SHALL BECOME BINDING
UPON THE CONTRACT TO BE ISSUED IN RESPONSE TO THIS INVITATION TO BID.
Item 1: Refer to the addendum below for all additions, deletions, and/or changes to specifications and/or drawings.
END OF ADDENDUM
Invitation to Bid No. RFB-181-23 For: Waste Water Infrastructure Upgrade Ph1 Lake Barkley State Park Cadiz, Kentucky
Kyla Satterly, Statewide Procurement Analyst II Division of Engineering and Contract Administration
Commonwealth of Kentucky Department for Facilities and Support Services Division of Engineering and Contract Administration Waste Water Infrastructure Upgrade Phase 1 Kentucky Dam Village State Resort Park
RFB-181-23
Addendum No. 1
SPECIAL CONDITIONS
1. Paragraph 3. Times of Completion
REPLACE Work Restrictions and “Black-Out” Dates with the following:
“Work within the campground area shall be completed after July 15, 2023.
Removal or trimming of trees 3 inch diameter breast height and larger is prohibited. Trees smaller than 3 inch diameter breast height may be removed, subject to prior approval by Owner.
The wastewater collection and treatment system must remain in continuous operation during construction, with the exception of the campground after July 15, 2023. Any disruptions to the wastewater service shall be coordinated with Park Operations staff. It shall be the responsibility of Contractor to not in any way impair the normal operation of the facilities, regardless of the work under way. Contractor shall provide all temporary piping and temporary construction required to complete the Work.”
REPLACE Limitations on Daily Work Times with the following:
“Unless otherwise approved by Owner, work hours shall be confined to between 8 am and 7 pm, Monday through Friday. These work hour limitations shall not apply to the campground area after July 15, 2023.”
SPECIFICATIONS
1. Page 31 23 00-10, SECTION 31 23 00-EXCAVATION,FILL, BACKFILL AND GRADING, PART 3-EXECUTION
ADD the following:
“3.10 RESTORATION
A. Topsoil shall be placed at completion of finish grading.
B. Seed mix shall comply with Standard Specifications No. II. Seed shall be applied at rates specified in Section 212 of the Standard Specifications.
C. Fertilizer shall be FS O-F-241, Type I, Grade A with the following proportions: Nitrogen 10%; Phosphoric Acid 10%; Soluble Potash 10%.
Fertilizer shall be applied at the rates Specified in Section 212 of the Standard Specifications.
D. All areas receiving seed shall be mulched in accordance with Section 212 of the Standard Specifications.
E. Seeding shall be maintained by CONTRACTOR until grass is well established. Grass is well established when it covers the entire seeded areas to a height of 2 inches.”
2. PERMITS
ADD attached Kentucky Division of Water Construction Permit.
DRAWINGS
1. DRAWING E1-ELECTRICAL DETAILS
REPLACE DETAIL C/E1-ELECTRICAL SERVICE POLE with attached DETAIL C/E1-
ELECTRICAL SERVICE POLE.
An Equal Opportunity Employer M/F/D
ANDY BESHEAR
GOVERNOR
REBECCA W. GOODMAN
SECRETARY
ENERGY AND ENVIRONMENT CABINET
DEPARTMENT FOR ENVIRONMENTAL PROTECTION
300 SOWER BOULEVARD
FRANKFORT, KENTUCKY 40601
TELEPHONE: 502-564-2150
TELEFAX: 502-564-4245
ANTHONY R. HATTON
COMMISSIONER
December 9, 2022
Frank Phillips Commonwealth of Kentucky 403 Wapping St Frankfort, KY 40601
Re: Lake Barkley State Resort Park WSI Trigg County, Kentucky Lake Barkley SRP Marina Activity ID #: 4040, APE20220001 Receiving Treatment Plant KPDES #: KY0024473
Dear Mr. Phillips:
We have reviewed the plans and specifications for the above referenced project. The plans include the construction of duplex pump station with pumps capable of 80 gpm at 264 ft TDH each, 4 duplex grinder pump station with pumps capable of 30 gpm and up to 200 ft TDH each with approximately 4,665 linear feet of 2-inch PVC, 2,490 linear feet of 2.5-inch PVC, 2,090 linear feet of 3-inch PVC, 11,600 linear feet of 4-inch PVC force main and 49 linear feet of 8-inch PVC sanitary sewer. This is to advise that plans and specifications for the above referenced project are APPROVED with respect to sanitary features of design, as of this date with the requirements contained in the attached construction permit.
If we can be of any further assistance or should you wish to discuss this correspondence, please do not hesitate to contact Daniel Kulik at 502-782-6998.
Sincerely, X Terry Humphries, P.E.
Supervisor, Engineering Section Water Infrastructure Branch
Division of Water
TH / DK
Enclosures c: Trigg County Health Department Strand Associates Inc.
Division of Plumbing
REMOVE 3 EXISTING TRANSFORMERS AND
REPLACE WITH 3 NEW 50 KVA SINGLE PHASE
TRANSFORMERS TO PROVIDE 480/277 VOLT,
3 PHASE, 4 WIRE SECONDARY SERVICE FOR
NEW PUMP CONTROL PANEL.
LAKE BARKLEY STATE RESORT PARK
WASTE WATER INFRASTRUCTURE UPGRADE PH1
ATTACHMENT TO ADDENDUM 1
01.18.2023
5/8" DIA. X 8'-0" LG. C/W
GND. ROD
200A CIRCUIT BREAKER
DISCONNECT
IN NEMA 4
ENCLOSURE
BOND TO DISCONNECT
EXISTING WOOD POLE
WEATHERHEAD
3~#3/0,1~#4", 2"C.
#8 COPPER
GND.
STRAPS @ 8'-0" O.C.
(MAX.)
GND. GUARD
3~#3/0, 1~#4, 1~#6 GND
IN 2"C
7'-0''
6'-6''
MAX
12''
5'-0''
MIN.
18'' MIN.
GRADE
480/277V, 3ø, 4W
ELECTRICAL
SERVICE DROP FROM
TRANSFORMER
| Addendum 1 |
| Addendum 1 RFB 181-23 |
File details come from the government source that posted it. Updated .