This document is an Addendum #1 related to a roof replacement contract opportunity for the Westwood Community School District in Michigan, covering the Thorne Elementary and Daly Elementary schools. The addendum addresses questions raised at the pre-bid meeting and provides clarification on various aspects of the project, including core information for different roof sections, requirement for a base sheet, expansion joint installation, and flashing work at the Daly Elementary. The contract opportunity involves the jurisdictions of Wayne County and Dearborn City.
The addendum specifies that a bid bond and performance bond are required for the project, and the contractor is responsible for the cost of permits. It also includes the pre-bid attendance sign-in sheet as an attachment. The key details of the roof replacement work, such as insulation types, tapered insulation, and specific requirements for various roof sections, are outlined in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2.pdf | ||
| Westwood Schools Pre-Bid Sign-in.pdf | ||
| Bid Advertisement.docx | DOCX document | |
| 2024 Thorne_ | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Westwood Schools Thorne Elementary & Daly Elementary Addendum #1 10-25-23 The following addresses questions raised at the pre-bid meeting. Should any discrepancies be found between the following information and the specifications, the specifications shall supersede.
General Items
1) Pre-bid attendance sign-in sheet is attached.
2) Bid Bond and Performance Bond is required for the project.
3) Contractor is responsible for cost of permits Thorne Elementary
1) Section #6 Core information: Gypsum Decking, ½” Wood Fiber, BUR
2) Section #7 Core information: Metal Decking, 1.5” Polyiso, ½” Wood Fiber, BUR
3) Section #11 Core Information: Metal Decking, 2” Polyiso, 1” Perlite, BUR
4) Section #12 Core Information: Metal Decking, 1” Perlite, BUR
5) Section #13 Core Information: Gypsum Decking, 1.5” Polyiso, ½” Wood Fiber, BUR
6) At Sections with Gypsum Decking, a base sheet will be required. The base sheet will be the VersiPly 40 and will be nailed/augered per the wind uplift requirements
7) Section #7 has sloped metal decking, therefore only tapered saddles between the drain locations is required.
8) A wood nailer will be required at any coping areas, specifically on section #7
9) Expansion joint between sections 11 & 12 shall be raised and a metal expansion joint shall be installed.
10) At panels in the pit area of section #6, the bottom panel fastener shall be removed to install the flashings above the bottom of the panels. A termination bar and slip flashing will be installed and panels re-secured.
Daly Elementary
1) Sections 3 & 4 Core Information: Metal decking, 2” perlite, 1” wood fiber, BUR
2) Copper flashings at window infill areas are to be re-soldered at joints. Where flashing is damaged, a new sill flashing shall be installed.
3) A new slip flashing at the reglet will be required. A termination bar, three-course, and slip flashing is required at the reglet flashings.
4) Tapered insulation system (1/8”) starting at 1” shall be installed. No insulation base due to height restrictions.
GARLAND COMPANY, INC.
Matt Verhey
Email: mverhey@garlandind.com
Learn More: � HYPERLINK "http://www.garlandco.com" ��www.garlandco.com�
File details come from the government source that posted it. Updated .