This document is an Addendum for the National Guard Readiness Center - Sioux Falls (MVSC Paving) project located in Sioux Falls, South Dakota. The project is owned by the Department of the Military and engineered by Stockwell Engineers. This Addendum clarifies, revises, and supersedes information in the Project Manual, Drawings, and previously issued Addenda. It includes revisions to drawings, such as removing concrete pavement, adding curb and apron pavement, and modifying grading and the UTES site plan. The bid date remains unchanged. An optional pre-bid conference is scheduled for October 2, 2024 at 4:00 PM CT at the project site.
The project will involve removing existing crushed concrete aggregate base to construct 9" non-reinforced concrete pavement. Contractor will need to salvage and stockpile the existing crushed concrete material at the UTES facility. Additional work includes installing curb and gutter, grading, and upgrading the UTES site with new crushed concrete surfacing. This is a South Dakota Department of Military project located in Minnehaha County, South Dakota.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Manual.pdf | ||
| MVSC Paving Bid Set.pdf | ||
| IFB Document.pdf | ||
| MVSC Paving Bid Set.pdf | ||
| Project Manual.pdf | ||
| IFB Document.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #1 National Guard Readiness Center – Sioux Falls (MVSC Paving) – CFMO# 460158
Sioux Falls Readiness Center
Sioux Falls, SD
SEI No: 24215
ADDENDUM 1-1
1.1 PROJECT INFORMATION
1.1.1 Project Name: National Guard Readiness Center – Sioux Falls (MVSC Paving)
1.1.2 Owner: Department of the Military
1.1.3 Engineer: Stockwell Engineers
1.1.4 Engineer Project Number: 24215
1.1.5 Date of Addendum: October 07, 2024
1.2 NOTICE TO BIDDERS
1.2.1 This Addendum is issued to all registered plan holders pursuant to the Instructions to Bidders. This Addendum serves to clarify, revise, and supersede information in the Project Manual, Drawings, and previously issued Addenda. Portions of the Addendum affecting the Contract Documents will be incorporated into the Contract by enumeration of the Addendum in the Owner/Contractor Agreement.
1.2.2 The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
1.2.3 The date for receipt of bids is unchanged by this Addendum. The time and locations are unchanged.
1.3 ATTACHMENTS
1.3.1 This Addendum includes the following attached Sheets:
1. Civil Sheet 2 – Pavement Plan - ADD #1 (Reissued).
2. Civil Sheet 3 – Grading Plan - ADD #1 (Reissued).
3. Civil Sheet 5 – UTES Site Plan - ADD #1 (Issued).
1.4 REVISIONS TO DRAWING SHEETS
1.4.1 Sheet 2 – Pavement Plan (Reissued).
1. Removed approximately 300 SY of 9” concrete pavement along the SW fence line where indicated. This area currently has rock mulch installed. Contractor to install new pavement up against existing rock mulch that currently extends out approximately 20’ from the existing fence line. Edge of concrete pavement shall match existing top of rock elevations.
2. Saw cut in 15’ drop curb and 5’ curb tapers and install 9” non-reinforced concrete apron along the back side as shown at the very south end of the access road to the back-of-house (11 SY).
3. Saw cut in 15’ drop curb and 5’ curb tapers and install 9” non-reinforced concrete apron approach pavement out to the edge of the rock mulch along the east side of the MVSC where shown (42 SY). This drop and approach can move slightly north/south as needed to utilize existing fence posts as needed. Remove rock mulch where new pavement is to be installed.
4. Install 15’ wide cantilever gate to fully access the 15’ wide concrete apron. Provide locking mechanism so gate can be locked in closed position. Gate to match existing perimeter fencing. American Fence was the contractor that installed the site perimeter fencing of the Readiness Center.
1.4.2 Sheet 3 – Grading Plan (Reissued).
1. Revised the crown elevation up to help minimize the amount of additional aggregate base course to be removed.
1.4.3 Sheet 5 – UTES Site Plan (Issued).
1. Plan of the existing UTES site located at the NE corner of Bahnson Avenue and Benson Street.
2. Add additional 6” of salvaged crushed concrete surfacing to the north access road off of Bahnson Avenue where indicated.
This will require approximately 4500 cubic feet of compacted salvaged material.
GAARD A.
ROPS
Addendum #1 National Guard Readiness Center – Sioux Falls (MVSC Paving) – CFMO# 460158
Sioux Falls Readiness Center
Sioux Falls, SD
SEI No: 24215
ADDENDUM 1-2
3. From the north fence line of the existing UTES motor pool area, strip an approximate 12” of existing topsoil and subgrade and place stripped material across the existing concrete north/south access road where indicated.
4. Once stripping of soil is completed, contractor shall sheepsfoot compact existing subgrade. Once compacted, proof roll area for approval prior to the installation of a geotextile fabric (Mirafi HP 370 or approved equal) and install 12” of compacted salvaged crushed concrete surfacing. This will require approximately 34,100 cubic feet of compacted material.
5. Place stripped material just north of the area that houses the bridge units where indicated. Contractor to fill in area to provide a level pad to match existing pad to the south and slope off to the east at no more than a 4:1 slope. Extend level area at the top to the north as far as possible until the stripped material is fully used.
1.4.4 General Note. Contractor will have full access of the site. Close and lock gates at the end of each day.
End of Addendum
TV
H
P
TV
P
H
B
V
V
V
V
B
S
S
T
B
T H
T
T
V
D
B
S
D
D
D
B
B
B
R
V
TV
H
P
TV
P
H
V
V
V
V
S
S
H
V
D
S
D
D
D
V
SE
I P
RO
JE
C T
Revisions:
Drafted By:
Review ed By:
STOCKWELL ENGINEERS, INC.
801 N. PHILLIPS AVE., SUITE 100
SIOUX FALLS, SD 57104
PH: 605.338.6668
FAX: 605.338.8750
File Location: S:\Projects\2024\P24215 - SF Readiness Center M VSC Paving\Construction Docum ents\W orking Files\Draw ings\24215 - C2 - Pavem ent Plan.dw g
WWW.STOCKWELLENGINEERS.COM
REG
IS T
ERE
D PROFESS I ONAL ENGI NEER
REG . NO .
S O U T H D A K O T A
ROPS
GAARD A.
Time Stamp: 10/7/2024 5:22 PM
PAVEMENT PLAN
SI
OU
X
FA
LL
S, S
OU
TH
D
AK
OT
A
M
VS
C
PA
VI
N
G
NA
TI
ON
AL
G
UA
RD
R
EA
DI
NE
SS
C
EN
TE
R
GAR
BAS
1 ADD #1 10/07/2024
3015 600
READINESS CENTER
FUTURE COLD
STORAGE
TRAINING BAY
ALT #1
FUTURE FUEL
CONTAINMENT
BAHNSON AVENUE LEGEND
KEYNOTES
1. REMOVE EXISTING CRUSHED CONCRETE
AGGREGATE BASE COURSE AS NEEDED TO
CONSTRUCT 9” NON-REINFORCED CONCRETE
PAVEMENT.
2. REMOVE EXISTING CRUSHED CONCRETE
AGGREGATE BASE COURES AS NEEDED TO
INSTALL SF69 CONCRETE CURB AND GUTTER
(TIP-OUT).
3. PROVIDE 3' CURB TAPER.
4. SAW CUT AND REMOVE A FEW FEET OF CURB
AND GUTTER AS NEEDED TO CONNECT WITH
NEW CURB AND GUTTER TO PROVIDE FULL CURB
AT THE CORNER AND POSITIVE DRAINAGE.
5. CORE DRILL 24" NO. 5 DEFORMED TIE BARS INTO
EXISTING GUTTER PAN SPACED AT 30" ON
CENTER.
26.5'
470.0'
78.6' 59.4'
194.3'
184.5'
159.0'
151.3'
128.7'
FUTURE MEP
PARKING
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
STLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
KTLJ
STLJ
STLJ
STLJ
KTLJ
STLJ
KTLJ
ST
LJ
KT
LJ
ST
LJ
KT
LJ
STLJ
STLJ
3 GENERAL NOTES
A. CONTRACTOR SHALL REMOVE APPROXIMATELY
9” OF EXISTING CRUSHED CONCRETE
AGGREGATE BASE COURSE TO INSTALL NEW
PAVEMENT.
B. ALL MATERIAL SHALL BE SALVAGED,
TRANSPORTED AND STOCKPILED AT THE UTES
FACILITY AT THE NE CORNER OF BAHNSON
AVENUE AND BENSON ROAD. COORDINATE WITH
OWNER ON EXACT LOCATION OF STOCKPILE
AREA.
C. FOLLOWING FINAL PAVING OPERATIONS,
CONTRACTOR SHALL PLACE BACK TOPSOIL
ALONG THE BACK OF CURB, FINE GRADE, SEED
AND FERTILIZE.
- PROPOSED CURB & GUTTER
- PROPOSED CONCRETE
- TRANSVERSE JOINT
- SAWED TIED LONGITUDINAL JOINT
- KEYED & TIED LONGITUDINAL JOINT
- KEYED CONSTRUCTION JOINT
- INLET PROTECTION
STLJ
KTLJ
KCJ
5 5
EXISTING ROCK MULCH
TV
H
P
TV
P
H
V
V
V
V
S
S
H
D
S
D
D
D
V
P P
P
P
P
P
P
XXXXXXXXXXXXX
Field
Field
1462.00 TC1462.70 TC
1462.83 TC
1460.50 TC1461.86 TC
1463.31 TC
1465.48 TC
1.00%
1467.80 TC BT
1468.29 TC TT
1468.00 TC
1467.39 TC
1467.42 TC
1465.60 TC
0.33%
1.01%
0.
2.
1462.42 TOP ME
1460.09 TOP ME
1465.10 TOP ME
1461.27 TOP ME
1462.60 TOP ME 1461.51 TOP ME
3.01%
0.50%
1467.10 TOP
1465.18 TOP
SE
I P
RO
JE
C T
Revisions:
Drafted By:
Review ed By:
STOCKWELL ENGINEERS, INC.
801 N. PHILLIPS AVE., SUITE 100
SIOUX FALLS, SD 57104
PH: 605.338.6668
FAX: 605.338.8750
File Location: S:\Projects\2024\P24215 - SF Readiness Center M VSC Paving\Construction Docum ents\W orking Files\Draw ings\24215 - C3 - Grading Plan.dw g
WWW.STOCKWELLENGINEERS.COM
REG
IS T
ERE
D PROFESS I ONAL ENGI NEER
REG . NO .
S O U T H D A K O T A
ROPS
GAARD A.
Time Stamp: 10/7/2024 5:22 PM
GRADING PLAN
SI
OU
X
FA
LL
S, S
OU
TH
D
AK
OT
A
M
VS
C
PA
VI
N
G
NA
TI
ON
AL
G
UA
RD
R
EA
DI
NE
SS
C
EN
TE
R
GAR
BAS
1 ADD #1 10/07/2024
3015 600
BAHNSON AVENUE
LEGEND
- EXISTING CONTOUR
- PROPOSED MAJOR CONTOUR
- SPOT ELEVATIONS
ABBREVIATIONS
TC - TOP OF CURB
TT - TOP OF TAPER
BT - BOTTOM OF TAPER
TOP - TOP OF PAVEMENT
ME - MATCH EXISTING
X
SE
I P
RO
JE
C T
Revisions:
Drafted By:
Review ed By:
STOCKWELL ENGINEERS, INC.
801 N. PHILLIPS AVE., SUITE 100
SIOUX FALLS, SD 57104
PH: 605.338.6668
FAX: 605.338.8750
File Location: S:\Projects\2024\P24215 - SF Readiness Center M VSC Paving\Construction Docum ents\W orking Files\Draw ings\24215 - C5 - UTES Site.dw g
WWW.STOCKWELLENGINEERS.COM
REG
IS T
ERE
D PROFESS I ONAL ENGI NEER
REG . NO .
S O U T H D A K O T A
ROPS
GAARD A.
Time Stamp: 10/7/2024 5:18 PM
UTES SITE PLAN
SI
OU
X
FA
LL
S, S
OU
TH
D
AK
OT
A
M
VS
C
PA
VI
N
G
NA
TI
ON
AL
G
UA
RD
R
EA
DI
NE
SS
C
EN
TE
R
GAR
BAS
1 ADD #1 10/07/2024
4020 800
BAHNSON AVENUE
GENERAL NOTES
1. ALL DISTURBED AREAS DUE TO TRAFFIC ALONG ANY ACCESS ROUTE INTO THE SITE SHALL BE
FINE GRADED, SEEDED, FERTILIZED AND INSTALL EROSION CONTROL BLANKET.
2. SEEDING SHALL BE TYPE C SDDOT MIX AND INSTALLED AT A RATE OF 18 POUNDS/ACRE.
3. FERTILIZER SHALL BE A MINIMUM GUARANTEED ANALYSIS OF 13-13-13 AND INSTALLED AT A
RATE OF 100 LBDS PER ACRE
4. EROSION CONTROL BLANKET FROM BE FROM THE APPROVED PRODUCT LIST FOR EROSION
CONTROL BLANKET AT THE SDDOT WEBSITE. INSTALL PER MANUFACTURES
RECOMMENDATIONS.
5. WATER FOR VEGETATION CONSISTS OF APPLYING WATER TO SEEDED AREAS TO ENHANCE
GERMINATION AND/OR ROOT GROWTH. WHEN WATERING, USE THE FOLLOWING GUIDELINES:
IMMEDIATELY AFTER SEEDING:
· KEEP THE TOPSOIL MOIST BUT NOT EXCESSIVELY WET UNTIL THE SEED HAS GERMINATED.
· WATER A MINIMUM OF 3 DAYS A WEEK FOR 2 WEEKS PREFERABLY WATERING 2 OR 3 TIMES
A DAY IN SMALL QUANTITIES.
· USE FINE SPRAY AND LOW PRESSURE TO AVOID TOPSOIL WASH AND TO PREVENT
UNCOVERING BURIED SEEDS.
AFTER EMERGENCE:
· TOPSOIL WILL BE KEPT THOROUGHLY MOISTENED BY SPRINKLING, AS NECESSARY, FOR 6
WEEKS. AFTER THE 6-WEEK PERIOD, AN INSPECTION WILL BE MADE TO DETERMINE IF
GRASS IS ESTABLISHED ENOUGH TO SUSPEND WATERING. CONTINUE WATERING UNTIL
GRASS HAS BEEN THOROUGHLY ESTABLISHED.
· NEVER APPLY WATER AT A RATE FASTER THAN THE TOPSOIL CAN ABSORB.
· WATER DURING EARLY MORNING HOURS OR EARLY EVENING HOURS.
· DO NOT WATER WHEN RAIN IS FORECASTED FOR THE AREA.
· IF RAINFALL OCCURS, SUSPEND WATERING ACCORDING TO RAINFALL AMOUNT.
CONTRACTOR TO PLACE 6” OF COMPACTED CRUSHED CONCRETE AGGREGATE
BASE COURSE ALONG ACCESS ROAD FROM BAHNSON AVENUE UP TO EXISTING
PAVED ACCESS ROAD NORTH OF THE EXISTING CHIPS BUILDING. WIDTH TO
BE 15' WIDE CENTERED ON THE EXISITNG ROADWAY. SHALL REQUIRE
APPROXIMATELY 4500 CF OF COMPACTED CRUSHED CONCRETE MATERIAL.
CONTRACTOR TO STRIP APPROXIMATELY 12” OF EXISTING TOPSOIL AND SUBSOIL AND
REPLACE WITH A MINIMUM OF 12” OF CRUSHED CONCRETE AGGREGATE BASE COURSE
(COMPACTED). FOLLOWING STRIPING, SHEEPSFOOT COMPACT EXISTING SUBGRADE,
INSTALL GEOTEXTILE FABRIC (MIRAFI HP 370 OR APPROVED EQUAL), AND INSTALL CRUSHED
CONCRETE SURFACING. CONTRACTOR TO PLACE FINISH GRADE OF CRUSHED CONCRETE TO
MATCH TOP OF EXISTING GRADE. SHALL REQUIRE APPROXIMATELY 34,100 CF OF
COMPACTED CRUSHED CONCRETE MATERIAL.
ONCE SURFACE MATERIAL IS FULLY PLACED. FILL IN PERIMETER EDGING WITH TOPSOIL,
SEED, FERTILIZE AND INSTALL EROSION CONTROL BLANKET OVER ALL DISTURBED AREAS.
100.0'
342.2'
PLACE STRIPPED UNCLASSIFIED MATERIAL AND TOPSOIL FROM THE MOTOR POOL
EXPANSION AREA IN THIS LOCATION. FILL IN DROP-OFF AREA FROM BEHIND
EXISTING PAVEMENT TO PROVIDE A LEVEL PAD THAT EXTENDS OUT EAST TO
MATCH EXISTING PAD ELEVATIONS TO THE SOUTH. EXTEND NORTH AS NEEDED
UNTIL ALL STRIPPED MATERIAL US USED. PROVIDE A MINIMUMOF 4:1 SLOPE ON
EAST END. PLACE A MINIMUM OF 6” OF TOPSOIL OVER THE ENTIRE AREA, SEED,
FERTILIZE AND INSTALL EROSION CONTROL BLANKET.
| 24215 - Addendum #1.pdf |
| 24215 - C2 - Pavement Plan-2 - ADD#1.pdf |
| Sheets and Views |
| 2 |
| 24215 - C3 - Grading Plan-3 - ADD#1.pdf |
| Sheets and Views |
| 3 |
| 24215 - C5 - UTES Site-5 - ADD#1.pdf |
| Sheets and Views |
| 5 |
File details come from the government source that posted it. Updated .