Addendum 1 - Bid Set - Extrusion Utilities.pdf

PDF 8 MB Posted

Attached to
Kimbrell Fiber Innovation Center - Machine Connections FIC Extrusion Project
Solicitation number
98-20250072
Issued by
Gaston County, North Carolina

About this file

This document is a comprehensive set of engineering and construction drawings for the Machine Connections FIC Extrusion project at Gaston College, located at 7224 Wilkinson Blvd. in Belmont, North Carolina. The project is being designed by AeroRaq Engineering Inc., a Charlotte-based engineering services firm. The drawings cover multiple disciplines including mechanical, plumbing, electrical, and lighting systems for what appears to be a manufacturing or research facility focused on fiber extrusion technologies. The documents are dated June 1, 2025, with a project number of 01-2025007, and include detailed plans for equipment installations, power distribution, HVAC systems, compressed air lines, and electrical infrastructure.

The drawings provide extensive technical specifications for electrical panels, transformers, power distribution, conduit routing, and equipment connections across various voltage systems (120/208V and 480V). The electrical design includes multiple panel boards (DNH3, DNH4, DNL3, etc.), transformers ranging from 45 to 75 kVA, and detailed circuit mapping for different areas including the Reactor, Small Spin, Large Spin, and Chemical Storage areas. The mechanical plans show precise locations for equipment installations, ductwork, and rooftop mechanical units, while the plumbing drawings outline compressed air and water line configurations. The overall design emphasizes compliance with North Carolina building and electrical codes, with specific attention to installation requirements, support structures, and system integration.

View the file

Other files

File Type Posted
FIC Extrusion - Gaston College v2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Drawings A0.1 Cover Sheet A0.2 Appendix B M0.1 Mechanical Schedules M1.1 Mechanical Plan M2.1 Mechanical Details P0.1 Plumbing Schedules P1.1 Plumbing Plan P1.2 Plumbing Plan E0.1 Electrical Schedules E1.1 Electrical Plan E1.2 Electrical Plan E1.3 Electrical Plan E1.4 Electrical Plan E2.1 Lighting Plan E3.1 Electrical Details E3.2 Electrical Details

Abbrevations and References NFPA - National Fire Protection Agency SMANCA - Sheet Metal & Air Conditioning Contractor's National Association NCFG - North Carolina Fuel Gas Code NCMC - North Carolina Mechanical Code NEC - National Electric Code NEMA - National Electrical Manufacturers Association ANSI - American National Standards Institute UL - Underwriters Laboratory

AFF - Above Finished Floor AFG - Above Finished Grade AFUE - Annual Fuel Utilization Effiency APPROX - Approximate ALUM - Aluminum BFF - Below Finished Floor BFG - Below Finished Grade BHP - Brake Horse Power CAP. - Capacity CFM - Cubic Feet per Minute CONN. - Connection COORD. - Coordinate CU. FT. - Cubic Foot DB - Dry Bulb DISTR. - Distribution DWG. - Drawing DX - Direct Expansion ETR - Existing to remain ESP - External Static Pressure EQUIV. - Equivalent EXH. - Exhaust FPM - Feet per Minute GALV. - Galvanized Hp - Horse Power KW - Kilowatt MCA - Minimum Circuit Ampacity MIN. - Minimum NC - Normally Closed NO - Normally Open NPSH - Net Positive Suction Head O.A. - Outside Air Occup. - Occupancy PSI - Pounds per Square Inch QTY. Quantity RECT. - Rectangular RPM - Revolutions per Minute SCH. - Schedule SEER - Seasonal Energy Efficiency Rating SENS. - Sensible SPEC. - Specification Sq ft. - Square Feet TYP. - Typical Installation / Materials UON - Unless Otherwise Noted VAV - Variable Air Volume VRV - Variable Refrigerant Volume WB - Wet Bulb

Gaston College

Belmont, North Carolina Machine Connections FIC Extrusion

Site Address: 7224 Wilkinson Blvd. Belmont NC 28012 General Requirements & Notes:

1. All work shall comply with the North Carolina Building Code

2. All mechanical work shall be done by trained and qualified technicians

3. All electrical work shall be done by trained and qualified electricians

4. Install mechanical equipment in accordance with manufacturers recommendations

5. Drawings and documents are diagrammatic and are intended to convey scope and general arrangements unless otherwise indicated

6. Contractor is responsible for surveying site conditions and determining the best route for equipment, wiring, ducting, piping and conduits

7. Contractor will notify engineer immediately if an issue arises that cannot be immediately resolved

8. Install equipment to allow manufacturers recommended clearances

9. Provide a 48 hour notice before any power or gas shutdown

10. Seal Penetrations through floors or fire walls to maintain the integrity of the fire and acoustic ratings of the walls and floors.

11. All trades shall coordinate their work with the other disciplines to maintain schedule integrity.

12. Submittals drawings and paperwork will be approved by engineer before equipment and materials will be ordered

13. Not all abbreviations may apply to this project.

Design Complies with the 2018 North Carolina Building Code

Scope of Work This project involves the addition of electrical and plumbing utilities to industrial training equipment. The addition of HVAC equipment to provide fume removal is also included.

Location Map

G0.1

COPYRIGHT

Project No:

01-2025007

Scale: N/A

Date: 06-01-2025

Title: Cover Sheet

M a c h i n e

C o n n e c t i o n s

F

I C

E x t r u s i o n

G a s t o n

C o l l e g e

W i l k i n s o n

B l v d

B e l m o n t

N o r t h a r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is L ak e

Pa rk w ay

, S ui te C

6-

C ha rl ot te

, N or th C ar ol in a

Fi rm L ic en se

C -3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

09/08/2025

G0.2

COPYRIGHT

Project No:

01-2025007

Scale: N/A

Date: 06-01-2025

Title: Appendix B

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is L ak e

Pa rk w ay

, S ui te C

6-

C ha rl ot te

, N or th C ar ol in a

Fi rm L ic en se

C -3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written

Rect. Diffuser, 4

Way Distr.

Rect. Diffuser, 3

Way Distr.

Rect. Diffuser, 2

Way Distr.

Rect. Diffuser, 1

Way Distr.

Round Diffuser

Return Air Grille

Exhaust Grille or

Exhaust Fan

Register and Grille, adjustable

Register, Diffuser &

Grille, Call out

Neck Size

Air Volume Flow

Spec. Type

Legends, Symbols & Icons

10 x 12

Rect. Rigid Duct

10 Dia

Round Rigid Duct

Rigid Duct Transition

10 x 12

Lined Rect. Rigid Duct

Rect. Corner

Diffuser, 2 Way

Distr.

Flexible Duct

Vertical Duct Conn.

Normal to viewing plane

Stand. Rect. Take-off w. Vol. Damper

Rect. to Round Take-off

Round. to Round Take-off

90 deg. Turn Elbow w.

Turning Vanes

Smooth Turn Elbow

Raduis = 1.5 Duct Depth

Manual Damper

S D

Smoke Damper

F D

Fire Damper

D D

Duct Smoke Detector

T,1

Thermostat

Spec. Type

TS,1

Temperature Sensor

Spec. Type

PS,1

Pressure Sensor

Spec. Type

HS,1

Humidity Sensor

Spec. Type

BK,1

Boiler Kill Switch

Spec. Type

DH

Duct Heater

VAV,

A1

Variable Air Volume

Box, Static or Fan

Spec. Type

FS,1

Flow Switch

Spec. Type

Gate Valve

Ball Valve

Butterfly Valve

Check Valve

Actuated Valve

Pressure Reducer

Pressure Safety

Valve (Relief)

Strainer

Line Reducer

HWS

Hot Water Supply

HWR

Hot Water Return

CHWS

Chilled Water Supply

CHWR

Chilled Water Return

COND

Condensate Line

GAS

Gas Supply Line

Angle Valve

Three Way Valve

Connect to existing at this point

Remove to this point

Key Note Icon

A , 10" x 12"

400 CFM 1

Accessories:

1. Roof mounted

2. Coating Permatector

3. NEMA 3R housing

4. UL Listed

5. VFD Rated

Fan Schedule

Plan ID Service Manufacturer Model #

Air Flow

(CFM)

ESP

(in w.c.)

Fan Speed

(rpm)

Motor Hp /

Watts

Voltage/

Phase

Controller Accessories Comments

F-1 Exhaust Greenheck FJ-12, Series 300

1000 1.0 1770

HP

480 V/ 3ɸ

Switch 1,2,3,4,5 1,2,3,4

F-2 Exhaust Greenheck FJ-4, Series 300

500 1.0 1770

HP

480 V/ 3ɸ

Switch 1,2,3,4,5 1,2,3,4

F-3 Exhaust Greenheck FJ-12, Series 300

1000 1.0 1770

HP

480 V/ 3ɸ

Switch 1,2,3,4,5 1,2,3,4

Comments:

1. Base equation is Vbz = (Rp* Pz + Ra * Az) / Ez for single zone systems

2. Each area treated as single zone.

3. Fiber Extrusion area is served by RTU 6 & 7.

4. Filament Area is served by RTU 3, 4, & 5.

Outside Air Requirements per North Carolina Mechanical Code:

Area

Rp

CFM/person

(pp OA

Rate)

Pz

Zone

Population

Ra

CFM/Sqft

(area OA rate)

Az

Zone occupiable floor area

CFM/Sqft

(exhaust air flow rate)

Vbz

Breathing

Zone Air

Ez

Zone

Efficiency

Voz

Outdoor Air

Requirement

(single zone)

Outdoor Air

Provided

Fiber Extrusion 0.06 3316 199 0.8 249

Filament Area 0.06 6554 393 0.8 492

Totals: 741

General Installation Requirements

1. Drawings are diagrammatic and are intended to convey scope and general arrangements unless otherwise indicated. They do not show every rise, fitting, offset and detail. It is the contractor's responsibility to read and understand the scope and intent of the drawings and specifications and deliver a complete and operational system that performs to the specifications and documents provided.

2. All mechanical permits and inspection fees shall be obtained and paid by the mechanical contractor.

3. Contractor is responsible for materials and installing the work in accordance with all applicable local, state and national codes.

4. Do not scale drawing for measurements.

5. It is the contractor's responsibility to verfiy duct and pipe paths are free of obstruction and reroute as necessary should an obstruction occur.

6. It is the contractor's responsibility to coordinate with the gas and power company to arrange and facilitate shutdown of utilities as necessary to integrate new system.

7. It is the contractor responsibility to survey existing conditions and make adjustments to duct size, route and configurations to deliver the required air to the system zones.

8. Install all equipment using the manufacturer's recommended installation procedures.

9. It is the contractor's responsiblity to notify and coordinate with building owner when work will cause any interruption in services to building whether utilities, path obstruction, etc..

10. The contractor will provide protection of materials, tools and equipment during the construction phase including protective covers, skids, plugs, caps, boxs and temporary fences.

11. All equipment shall be U.L. Listed.

12. All cutting and patching of walls and floors for mechanical equipment shall be the responsibility of the mechanical contractor.

13. The roof warranty is maintained by Piedmont Commercial Roofing, Inc. Contact Mike Stewart; (704

624 5544 - Office) PiedmontRoofing@charlotte.twcbc.com. The roof warranty must be remain intact by using the warranty contractor for flashing and sealing curbs and penetrations.

Mechanical Installation Requirements

1. Furnish all labor, material and equipment required for the complete installation and operation of all systems in this section of work in accordance with recommended practice and all applicable codes.

2. Mechanical contractor shall guarantee all work and materials for one year, effective the day the project is accepted by the owner. Refrigerant compressors shall be guaranteed for five years.

3. Seal the joints airtight between package units and supply ducts. Seal joints above the roof and not transversing through the target spaces.

4. Airtight seals shall be field applied mastic complying with UL 181 A-M or mastic tape complying with UL 181 A-P

5. Provide and install permanent tags in a location that is readily visible on all installed equipment that includes all pertinent operating information including; make, model no., capacity, voltage, ampacity, heating data, cooling data. See specs for details.

6. Contractor will locate equipment as such so that maintenance personnel will have access to panels, control boards and valves.

7. Contractor will perform a test and balance of the system in accordance with the 2018 NCECC section 503.2.9. Test shall result in +5% to -5% of design flow.

8. Contractor will follow the latest SMANCA HVAC Duct Construction Standards for duct sheet thickness and fastening methods.

9. All control wire shall be provided by Mechanical Contractor.

10. Support the duct routes with a maximum of 10' between centerline of supports.

11. All equipment supports are required to meet ASCE 9.6

Comments:

1. Ceiling mounted

2. Steel Fixed nozzle at 7' stack height

3. Controlled by VFD

4. Comparable manufacturers are Greenheck, Dayton and Loren Cook

D

D

X

Y

B: CFM

X

X

X

X

A: CFM

B: CFM

A: CFM

C

C

F M

C

C

F M

Y Y

D

D

Y

Y

20deg Max

R = D

1.5 x D

R2 = X + Y

R1 = (x+y)/2

Volume Dampers, typ.

Note: Duct turns and bends details are for low pressure duct only.

C: cfm x Y=X

A: cfm

C: cfm x Y=X

A: cfm

For C < 12" For C >= 12"

For D < 12" For X or Y < 12"

For Round take-offs to rectangular duct.

Volume

Dampers, typ.

Angle Iron

Anchor rod with nuts with locking washer and locking nut

Fasten to load bearing structure using tap and drill concrete anchors with expansion shields

Fasten to load bearing structure using tap and drill concrete anchors with expansion shields

Support metal shall be the same gauge or thickness as the duct wall

Angle brackets

Hanger rods sized for duct weight with min.

3/8" diameter

Raised Curb

Wood Nailer

Alternate curb bearing location for heavy weight loading conditions

Wood nailer

Sealing Material

Gasketed fasteners, min.

two fasteners per side

Removable sheet metal counterflashing

Fasteners approx. 8" O.C., sealed with flashing cement

Extended field plies above head of cant

Multiple-ply membrane base flashing

(8" min. height) feathered at the field of roof (for roof systems with factory applied granule surfacing, the multi-ply membrane base flashing can be installed between the base ply and granule-surfaced sheet)

Multiple-ply modified bitumen roof membrane

Coverboard Insulation

Thermal Insulation

Roof Deck

Min. 24"

Min. 2' stripping of existing material around curb and patching to form new system

Duct Turns and Bends Scale: N/AM0.1

Duct Supports Scale: N/AM0.1

Roof Curb Detail Scale: N/AM0.1

Custom Fume Hood Detail Scale: N/AM0.1

4 Duct Penetration Detail Scale: N/AM0.1

Min. 16 gauge flashing, same material is duct;

Aluminum or galvanized steel

20 Mil coat MBR

Flashing cement

30 Mil tack coat MBR

Flashing cement

Insulate opening with 2" rigid

3lb insulation

60 mil coat of MBR flashing cement.

Completely cover scrim and flashing

Flashing cement Extend horizontally

6" pass flashing along roof top

Sized by approved shop drawings

Min. 8"

Min. 6" 24"

Min. 2' stripping of existing material around curb and patching to form new system

Install a min. of two plies over strip

Use metal capped nails, secured with flashing cement, spaced no more than 8" apart

Base sheet

Structural roof decking, Steel or concrete depending on section

Multiple-ply modified bitumen roof membrane

Overlayment insulation

Roof Tapered Insulation

Roof Thermal Insulation

Aggregate surfacing

Height of Switches Scale: N/AM0.1

Note: Support screws must connect to roof deck and not the concrete joists.

10'

9"

14"

36"

50"

Fasten to load bearing structure using tap and drill concrete anchors with expansion shields

Notes:

1. Hood shall be made of 304L sheet metal, 20 gauge, minimum 6 supports of 1/4" threaded rods or 1" x 20" gauge straps.

2. Support screws must connect to roof deck and not the concrete joists.

3. Hood shall be installed 7 feet from the top of protected equipment.

3'

9"

12"

36" 16"

Fasten to load bearing structure using tap and drill concrete anchors with expansion shields

FRONT VIEW SIDE VIEW

M0.1

COPYRIGHT

Project No:

01-2025007

Scale: N/A

Date: 06-01-2025

Title: Mechanical

Schedules

M a c h i n e

C o n n e c t i o n s

F t r u s i o n

G a s t o n

C o l l e g e

W i l k i n s o n

B l v d

B e l m o n t

N o r t h

C a r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

09/08/2025

AutoCAD SHX Text

OTHER DEVICES SHALL BE INSTALLED

AutoCAD SHX Text

ALL THERMOSTATS, SWITCHES, AND

AutoCAD SHX Text

RECEPTACLE WHERE APPLICABLE

AutoCAD SHX Text

EACH ITEM BEING PLUMB & SQUARE.

AutoCAD SHX Text

IN A NEAT AND ORDERLY FASHION, WITH

AutoCAD SHX Text 54"

AutoCAD SHX Text

THIS DIMENSION MAY BE MODIFIED UNDER

AutoCAD SHX Text

CERTAIN CONDITIONS TO A MAXIMUM

AutoCAD SHX Text

OF 5"

AutoCAD SHX Text

FLOOR

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

CEILING

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

LIGHT SWITCH

AutoCAD SHX Text

NOTED.

AutoCAD SHX Text 2"

AutoCAD SHX Text

OR COMPUTER OUTLET EXCEPT AS NOTED.

AutoCAD SHX Text

FIRE ALARM MANUAL PULL STATION

AutoCAD SHX Text

TYPICAL WALL RECEPTACLE OR PHONE

AutoCAD SHX Text 18"

AutoCAD SHX Text 48"

AutoCAD SHX Text

FIRE ALARM SIGNALING DEVICE

AutoCAD SHX Text

WALL OR CASED OPNG.

AutoCAD SHX Text

TO BE FLUSH WITH EDGE OF LIGHT SWITCH

AutoCAD SHX Text

THERMOSTAT - EDGE OF T'STAT (OR EDGE

AutoCAD SHX Text

OF GUARD COVER WHEN APPLICABLE)

AutoCAD SHX Text

OR COMPUTER OUTLET, UNLESS OTHERWISE

AutoCAD SHX Text

COUNTER HEIGHT RECEPTACLE, OR PHONE

AutoCAD SHX Text

EDGE OF DOOR FRAME OR

AutoCAD SHX Text

FRAME WHERE APPLICABLE).

AutoCAD SHX Text

COVER PLATE BELOW.

AutoCAD SHX Text

(ALIGN TOP WITH TOP OF DOOR

AutoCAD SHX Text 3"

AutoCAD SHX Text L

AutoCAD SHX Text x

F x

" F

F x

R o u e d u c t u n d e r w a t e r l i n e s a d u p p o r t j o i s t s

P e n e t r a r o o f a t t h e s e p r e c i l c a t i o n

P e n e t r a o f a t t h e s e p r e c i c a t i o n

P e n e t r a o f a t t h e s e p r e c i c a t i o n

M1.1

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Mechanical Plan

M a c h i n e

C o n n e c t i o n s

F t r u s i o n

G a s t o n

C o l l e g e

W i l k i n s o n

B l v d

B e l m o n t

N o r t h

C a r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Mechanical Plan Scale: 14" = 1' - 0"M1.1

09/08/2025

Key Plan

AutoCAD SHX Text Chem

AutoCAD SHX Text Storage

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text One Shot

AutoCAD SHX Text Reactor

AutoCAD SHX Text Melt Spin

AutoCAD SHX Text Compounding

AutoCAD SHX Text Work Bench/Pack Storage

AutoCAD SHX Text 480277400A

AutoCAD SHX Text Blow Down Tank

AutoCAD SHX Text Work Bench

AutoCAD SHX Text Rheology

AutoCAD SHX Text Chip Drying

AutoCAD SHX Text Ultra Sonic

AutoCAD SHX Text Small Cleaning Oven

AutoCAD SHX Text Soak Tank

AutoCAD SHX Text Big Cleaning Oven

AutoCAD SHX Text Large Spin

Small Spin

Legends, Symbols & Icons

TM,1

Thermometer

Spec. Type

TS,1

Temperature Sensor

Spec. Type

PS,1

Pressure Sensor

Spec. Type

HS,1

Humidity Sensor

Spec. Type

BK,1

Boiler Kill Switch

Spec. Type

FS,1

Flow Switch

Spec. Type

Gate Valve

Ball Valve

Butterfly Valve

Check Valve

Actuated Valve

Pressure Reducer

Pressure Safety

Valve (Relief)

Strainer

Line Reducer

Domestic cold water supply

ECW

Domestic existing cold water supply

Domestic 120° hot water supply

Domestic existing 120° hot water supply

Gas supply line

Angle Valve

Three Way Valve

Connect to existing at this point

Remove to this point

Key Note Icon

E120

GAS

Domestic 140° hot water supply

Domestic existing 140° hot water supply

E140

Tempered water supply

TW

Filtered water supply

FW

Sanitary sewer line

Vent line

SD - A

Storm drain (above ground)

Storm drain (below ground)

Condensate line

SD - B

CL

Grease waste line

GW

Sump pump discharge

SPD

Pipe turning down

Pipe turning up

Pipe capped

Fixture supply with shut-off

Domestic 120° hot water return

Domestic 140° hot water return

120R

140R

Fire line

F

Wet stand pipe

WSP

Dry stand pipe

DSP

Main sprinkler supply

MS

Branch and head sprinkler

Floor drain fd

Hub drain hd

Roof drain rd

Floor cleanout fco

End of line cleanout co

Wall cleanout wco

Union

Hose bibb

Gas Cock

SA - "1"

Shock arrestor

(number indicates pdi size)

Backflow preventer

Fire proof wall hydrant

FPH

Fire proof wall hydrant box

FPHB

EJ

Expansion joint

Pipe anchor

Trap primer

Pipe sleeve

Flexible connection

M

P1

Pump

Meter

TP

Air vent (manual - auto)

M

Globe Valve

Plumbing Installation Requirements

1. Furnish all labor, material and equipment required for the completion and operation of all systems in this section of work in accordance with applicable codes.

2. All plumbing fixtures and plumbing system equipment shall be provided complete with all accessories, hangers, valves, stops, tailpieces, traps, faucets, strainers, etc. See fixture schedule.

3. All plumbing work shall be installed in compliance with the current issue of the local and state plumbing codes and the relevant NFPA codes.

4. Provide access panels as required at valve locations to provide access to control valves.

Coordinate for type and location.

5. Provide for access to all equipment requiring cleaning or adjustment.

6. Provide a pressure reducing valve where water main pressure entering building exceeds 80 PSI.

7. Provide full port valves in all branch lines of the hot and cold water distribution systems on

" and larger cold water and hot water and as shown on plans, risers and schematic details.

General Installation Requirements

1. Furnish all labor, materials and equipment required for the completion and operation of all systems in this section of work in accordance with all applicable codes.

2. Furnish and install complete systems of soil, waste, vent, hot and cold water piping from all plumbing fixtures and other equipment.

3. Coordinate with structural, mechanical and electrical trades to ensure no conflicts and code compliance is maintained by the systems.

4. Any substituted equipment that is submitted and approved with connections other than what is shown on drawings and schedules, it is the responsibility of the contractor to provide proper connections to the equipment.

5. Copper piping shall be protected against contact with masonry or dissimilar metals. All hangers, supports, anchors and clips shall be copper or copper plated. Where copper piping is carried on iron or steel trapeze hangers with other piping, then permanent electrolytic isolation material shall protect the copper against contact with other materials.

6. All pipe insulation shall run continuously through floors, walls and partitions.

7. Domestic water piping above slab shall be Type "L" copper. Domestic water piping below slab shall be Type "K" copper.

8. Compressed air lines shall be carbon steel schedule 40. New lines and extensions shall be painted and stenciled to match existing lines.

Compressed Air - Three drop detail Scale: N/A

P0.1

44"

3"

Sediment leg

Isolation Valve

Branch

Isolation Valve

Compressed Air - Two drop detail Scale: N/A

P0.1

44"

3"

Sediment leg

Isolation Valve

Branch

Isolation Valve

Compressed Air - One drop detail Scale: N/A

P0.1

44"

3"

Sediment leg

Isolation Valve

Branch

Isolation Valve

Floor Floor Floor

Potable Water Air - Two drop detail Scale: N/A

P0.1

44"

Isolation Valve

Branch

Isolation Valve

Floor

P0.1

COPYRIGHT

Project No:

01-2025007

Scale: N/A

Date: 06-01-2025

Title: Plumbing

Schedules

M a c h i n e

C o n n e c t i o n s

F t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r t h

C a r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written

CA

CA3" 3"

3" CA

1 1 /4"

C A

1 1 /4"

C A

3"3"

3/4 " C

A

3" CA

3/4

3/4 " C

A

3" CA

1 1 /2"

D

CW

2" D

HW

3/4" DCW

1 1/2" DHW

3/4" DCW

2" DHW

1" DCW

1 1 /2"

3/4

FILAMENT

EXTRUDERS

REACTOR

102 103

1 1 /2"

3/4

1" C

A

1 1 /4"

C A

4" CA

4" CA

1"

P1.1

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Plumbing Plan

M a c h i n e

C o n n e c t i o n s

F t r u s i o n

G a s t o n

C o l l e g e

W i l k i n s o n

B l v d

B e l m o n t

N o r t h

C a r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Plumbing Notes Keyed to Plan

1. Connect to 1

" compressed air line here. Extend CA pipe to 44" above finish floor and add three valved hose connections. See detail 1:P0.1.

2. Connect to 1" compressed air line here. Extend CA pipe to near small spin machine.

3. Route 1" compressed air line here to 44" above finish floor and two valved hose connections. See detail 2:P0.1.

4. Connect to 1

" compressed air line here. Extend pipe to near small Dynisco machine.

5. Tee off the main CA line and route a

" compressed air line here to 44" above finish floor with one valved hose connections. See detail 3:P0.1.

6. Tee off the main CA line and route a

" compressed air line here to 44" above finish floor with one valved hose connections. See detail 3:P0.1.

7. Tee off the main potable cold water line and route a 1" line here to 44" above finished floor with two valved hose connections. See detail 4:P0.1.

Plumbing Plan Scale: 14" = 1' - 0"P1.1

09/08/2025

Key Plan

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text Reactor

AutoCAD SHX Text Work Bench/Pack Storage

AutoCAD SHX Text 480277400A

AutoCAD SHX Text Blow Down Tank

AutoCAD SHX Text Work Bench

AutoCAD SHX Text False Twist

AutoCAD SHX Text Rheology

AutoCAD SHX Text Chip Drying

AutoCAD SHX Text Draw Frame

AutoCAD SHX Text Ultra Sonic

AutoCAD SHX Text Small Cleaning Oven

AutoCAD SHX Text Soak Tank

AutoCAD SHX Text Big Cleaning Oven

AutoCAD SHX Text Large Spin

1/2"

1/2"

3" 3"

C A

3" CA

1 1

/4" C

A

1 1 /4"

C A

3"3"

3/4 " C

A

3" CA

3"

D

CW

3" D

HW

2" DCW

3" DHW

1/2

3" D

HW

2" D

CW

EXTRUDERS

CHEMICAL

STORAGE

1 1/2"

1 1/2"

3/4" 3" DHW

2" DCW

3/4"

1" C

A

1 1 /4"

C A

4" CA

P1.2

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Plumbing Plan

M a c h i n e

C o n n e c t i o n s

F t r u s i o n

G a s t o n

C o l l e g e

W i l k i n s o n

B l v d

B e l m o n t

N o r t h

C a r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Plumbing Notes Keyed to Plan

1. Connect to 1

" compressed air line here. Extend CA pipe to 44" above finish floor and add three valved hose connections. See detail 1:P0.1.

2. Connect to 1" compressed air line here. Extend CA pipe to near small spin machine.

3. Route 1" compressed air line here to 44" above finish floor and two valved hose connections. See detail 2:P0.1.

4. Connect to 1

" compressed air line here. Extend pipe to near small Dynisco machine.

5. Tee off the main CA line and route a

" compressed air line here to 44" above finish floor with one valved hose connections. See detail 3:P0.1.

6. Tee off the main CA line and route a

" compressed air line here to 44" above finish floor with one valved hose connections. See detail 3:P0.1.

7. Tee off the main potable cold water line and route a 1" line here to 44" above finished floor with two valved hose connections. See detail 4:P0.1.

Plumbing Plan Scale: 14" = 1' - 0"P1.2

09/08/2025

Key Plan

AutoCAD SHX Text Chem

AutoCAD SHX Text Storage

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text One Shot

AutoCAD SHX Text Reactor

AutoCAD SHX Text Melt Spin

AutoCAD SHX Text Compounding

AutoCAD SHX Text Rheology

AutoCAD SHX Text Chip Drying

AutoCAD SHX Text Draw Frame

AutoCAD SHX Text Small Cleaning Oven

AutoCAD SHX Text Big Cleaning Oven

Legends, Symbols & Icons Duplex Outlet, 15 Amp, 3W, 125V, Flush mounted

Switch, inline, 125V, single pull. flush mounted

Non-metallic cable (romex type) wiring

General Installation Requirements

1. All installation work will be completed during normal business hours, exceptions will be made.

2. Competitive equipment may be used in lieu of models specified.

3. Drawing are diagrammatic, contractor will verify equipment positions and adjust power and controls conduit path accordingly.

4. Support conduit per NEC 2020.

5. Coordinate installation with other trades.

6. All wire must 75° C rated or higher, THW, THHW.

Electrical Installation Requirements

1. All electrical work must be done by a NC licensed electrician.

2. All electrical work must comply with the NEC 2020.

3. Wire connection shall be twist tied with appropriate sized cap.

4. All contractor provided electric materials, devices, appliances and equipment shall be label-listed by a North Carolina approved third party testing agency.

5. The new circuit breakers shall match existing breakers for actual interrupt capacity.

6. Conductors shall match existing color code as follows.

6.1. 277/480V, 3 Phase, 4 - Wire 208/120V, 3 Phase, 4-Wire

6.2. Phase A - Brown Phase A - Black

6.3. Phase B - Orange Phase B - Red

6.4. Phase C - Yellow Phase C - Blue

6.5. Neutral - Grey Neutral - White

7. Relocate light fixtures from under the location of the designated hood locations.

8. Surge Protector shall be Siemens TPS3 C 12 10 0 X 02 or equivalent.

9. Lockout breakers are required where lockable disconnect are not present.

10. Contractor to install circuits and update panels as shown in schedules.

Conduit and Wire for Power

Conduit and wire concealed under floor

Low voltage control wire

Home run to panelboard

Empty Conduit

Connect to existing at this point

Remove to this point

EC

NM

S a

Switch, inline, 125V, three way. flush mounted S

Switch, inline, low voltage, single pull. flush mounted

S

L

Switch, inline, 125V, double pull. flush mounted S dp

Switch, inline, 125V, 4 way. flush mounted S

Switch, inline, 125V, key operated. flush mounted S k

Switch, door operated see spec for details S d

Switch, weather proof enclosure see spec for details

S wp

Switch, momentary contact S mc

Quad Outlet, 15 Amp, 3W, 125V, Flush mounted

Outlet, 20 Amp, 3W, 250V, NEMA 6-20R a

Outlet, 20 Amp, 3W, 250V, NEMA L6-20R b

Outlet, 15 Amp, 3W, 250V, NEMA 6-15R c

GFCI Duplex Outlet, 15 Amp, 3W, 125V, Flush Mount

GFCI

GFCI Duplex Outlet, 15 Amp, 3W, 125V, WP, Outdoor Duty

GFCI-WP

D

Outlet - Box - Mounted Dimmer

D

Outlet - Box - Mounted Switch and Dimmer

S

R

Outlet - Box - Relay

J

Junction Box

DS

Disconnect Box, see specs for details

Automatic transfer switch, see specs for details

T

S

Data Communications Outlet

Residential Telephone jack, typ.ph

SD

Smoke detector, see specs for details

Audible horn or annunciator, see specs for details

TV

AV Outlet

Panelboard, see schedule for details

PNL - A

Transformer, dry type, see schedule for details

M Motor, Type 1,see schedule for specs

M C

Motor controller, Type 1,see schedule for specs

M C

Combination motor controller & disconnect, Type 1,see schedule for specs

M C

Combination motor controller & circuit breaker, Type 1,see schedule for specs

CB

DS

Push button station, momentary contact

Push button station, maintained contact

H

A

O

Hand - Off - Auto type, motor control unit

A1

H1

M1

MD1

D1

R1

Lighting fixture, flourescent, 4 bulb, see schedule for details

Lighting fixture, high pressure sodium, see schedule for details

Lighting fixture, metal halide, see schedule for details

Lighting fixture w/ motion detector, 2 bulb, see schedule for details

Lighting fixture, directional, single bulb, see schedule for details

Lighting fixture, recessed, single bulb, see schedule for details

E1

FL1

E

Emergency exit sign, see schedule for details

Emergency exit sign and egress lighting, see schedule for details

Emergency notification appliance

Emergency pull station

M

Power supply meter

Emergency annunciator appliance F

L1

Lighting fixture, miscellaneous, see schedule for details

Occupancy Sensor and Switch S

Disconnect Schedule

Tag

Manufacturer

Description

Fuse/ C/B Volts/Ph

Mounting

D1 Generic

NEMA 1, 100 Amp Rated Disconnect, Heavy Duty

480/3ɸ

Wall

D2 Generic

NEMA 1, 60 Amp Rated Disconnect, Heavy Duty

480/3ɸ

Wall

D3 Generic

NEMA 1, 60 Amp Rated Disconnect, Heavy Duty

480/3ɸ

Wall

D4 Generic

NEMA 3R, 30 Amp Rated Disconnect, Heavy Duty

480/3ɸ

Rack

D5 Generic

NEMA 1, 30 Amp Rated Disconnect, Heavy Duty

480/3ɸ

Rack

D6 Generic

NEMA 3R, 60 Amp Rated Disconnect, Heavy Duty

250/3ɸ

Wall

Conductor Sizing Table

For 120V - 20A Branch Circuits Only, Unless Otherwise Noted

These tables are based on an evenly distributed load allowing 3% voltage drop at last outlet:

For 277V - 20A Branch Circuits Only, Unless Otherwise Noted

If distance A + B in feet is (see diagram below)

0' to 100'

100' to 175'

175' to 300'

300' to 450'

Use copper wire in metallic conduit, AWG size as follows on entire circuit and size conduit accordingly

#12 (min.)

#10

#8

#6 (max.)

If distance A + B in feet is (see diagram below)

0' to 250'

250' to 400'

400' to 700'

700' to 1000'

Use copper wire in metallic conduit, AWG size as follows on entire circuit and size conduit accordingly

#12 (min.)

#10

#8

#6 (max.)

PNL - A

R1

R1

A (FT)

B (FT)

1st device on CKT

Last device on CKT wire length from first to last device on CKT

PNL - A

R1

R1

A (FT)

B (FT)

1st device on CKT

Last device on CKT wire length from first to last device on CKT

SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings: E0.1, E1.1, E1.2, E3.1 and E3.2

1.2 SUMMARY

A. This section includes the following

1. Electrical equipment coordination and installation.

2. Common electrical installation requirements.

1.3 COORDINATION

A. Coordinate arrangement, mounting, and support of electrical equipment:

1. To allow maximum possible headroom unless specific mounting heights that reduce headroom are indicated.

2. To provide for ease of disconnecting the equipment with minimum interference to other installations.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by standard electrical supply manufacturers.

2.2 INSPECTIONS

A. Contractor shall contact the Gaston County Inspections to schedule electrical inspections and to schedule a final inspection.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Comply with NEC C. Comply with North Carolina Electrical Building Code D. Equipment: Install to facilitate service, maintenance, and repair or replacement of components of both electrical equipment and other nearby installations. Connect in such a way as to facilitate future disconnecting with minimum interference with other items in the vicinity.

E. EMT to be used only in dry indoor locations with steel compression fittings and connectors.

END SECTION 260500

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings: E0.1 and E1.1

1.2 SUMMARY

B. This section includes the following

1. Requirements for building wire and cable

1.3 COORDINATION

A. Coordinate electrical testing of electrical items, so equipment and systems that are functionally interdependent are tested to demonstrate successful interoperability.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by standard electrical supply manufacturers.

B. All building wire and cables should be listed by a North Carolina “approved” third party testing agency

2.2 INSPECTIONS

A. Contractor shall contact the Gaston County Inspections to schedule electrical inspections and to schedule a final inspection.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Comply with NEC C. Comply with North Carolina Electrical Building Code

3.2 WORK REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Provide and install an individual neutral wire for each branch circuit.

B. Conductors for power and lighting that are sized #10 AWG and smaller shall be solid copper conductors. All power conductors that are #8 AWG and larger shall be class B stranded copper conductors.

C. The minimum size for power branch circuit wiring is #12 AWG.

D. Fire alarm and control wiring may be equipped with stranded conductors that are sized #14

AWG.

E. Branch circuit conductors should be sized to prevent a voltage drop exceeding (3%) and the maximum voltage drop on both feeders and branch circuits should not exceed (5%)

F. Provide and install a full size individual neutral wire for each circuit.

G. The insulation type for interior wiring shall be dual-rated THHN/THWN or XHHW.

H. Where the conductor length from the panel to the first outlet on a 277 volt circuit exceeds 125 feet, the branch circuit conductors from the panel to the first outlet shall not be smaller than #10 AWG.

I. Where the conductor length from the panel to the first outlet on a 120 volt circuit exceeds 50 feet, the branch circuit conductors from the panel to the first outlet shall not be smaller than #10 AWG.

J. Joints in solid conductors shall be spliced using Ideal "wirenuts", 3M Company "Scotchlock" or T&B connectors in junction boxes, outlet boxes and lighting fixtures.

K. "Sta-kon" or other permanent type crimp connectors shall not be used for branch circuit connections.

L. Joints in stranded conductors shall be spliced by approved mechanical connectors and gum rubber tape or friction tape. Solderless mechanical connectors for splices and taps, provided with U/L-approved insulating covers, may be used instead of mechanical connectors plus tape.

M. Conductors, in all cases, shall be continuous from outlet to outlet and no splicing shall be made except within outlet or junction boxes, troughs and gutters.

N. The feeder, branch circuits shall be color coded.

END SECTION 260519

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings: E0.1 and E1.1

1.2 SUMMARY

C. This section includes the following

2. Grounding and bonding for raceways

1.3 COORDINATION

A. Coordinate electrical testing of electrical items, so equipment and systems that are functionally interdependent are tested to demonstrate successful interoperability.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by standard electrical supply manufacturers.

B. All building wire and cables should be listed by a North Carolina “approved” third party testing agency

2.2 INSPECTIONS

A. Contractor shall contact the Gaston County Inspections to schedule electrical inspections and to schedule a final inspection.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Comply with NEC C. Comply with North Carolina Electrical Building Code

3.2 WORK REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. The raceway system shall be not be relied on for ground continuity. A green grounding conductor, properly sized per NEC Table 250-122, shall be run in all power raceways.”

B. Provide and install a green grounding conductor in all power C. Test grounding and bonding system with a ground resistance tester demonstrating the resistance to ground is less than 25 ohms. Where the resistance is more than 25 ohms additional grounding will be required.

D. Grounding conductors, where insulated, shall be colored solid green. Conductors intended as neutral shall be colored solid white on 120/208 volt circuits and natural gray on 277/480 volt circuits.

END SECTION 260526

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings: E0.1 and E1.1

1.2 SUMMARY

A. This section includes the following

1. Identification and labeling electrical systems

1.3 COORDINATION

A. Electrician will properly label all electrical equipment with labels.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Comply with NEC C. Comply with North Carolina Electrical Building Code

3.2 WORK REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Furnish and install engraved laminated phenolic nameplates for all safety switches, panelboards, transformers, switchboards, motor control centers and other electrical equipment supplied for the project for identification. Nameplates shall be securely attached to equipment with self-tapping stainless steel screws; if the screw sharp end is protected;

otherwise Rivets shall be used. Letters shall be approximately 1/2 inch high minimum.

Embossed, self-adhesive plastic tape is not acceptable for marking equipment. Nameplate material colors shall be:

1. Blue surface with white core for 120/208 volt equipment.

2. Black surface with white core for 277/480 volt equipment.

3. Bright red surface with white core for all equipment related to fire alarm system.

4. Dark red (burgundy) surface with white core for all equipment related to security.

5. Green surface with white core for all equipment related to "emergency" systems.

6. Orange surface with white core for all equipment related to telephone systems.

7. Brown surface with white core for all equipment related to data systems.

8. White surface with black core for all equipment related to paging systems.

9. Purple surface with white core for all equipment related to TV systems.

B. All empty conduit runs and conduit with conductors for future use shall be identified for use and shall indicate where they terminate. Identification shall be by tags with string or wire attached to conduit or outlet.

C. All outlet boxes, junction boxes and pull boxes shall have their covers and exterior visible surfaces painted with colors to match the surface color scheme outlined above. This includes covers on boxes above lift-out and other type accessible ceilings.

END SECTION 260553

SECTION 262726 - WIRING DEVICES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings: E0.1 and E1.1

1.2 SUMMARY

A. This section includes the following

1. Specifications for the installations of wiring devices

1.3 COORDINATION

A. Coordinate electrical testing of electrical items, so equipment and systems that are functionally interdependent are tested to demonstrate successful interoperability.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by standard electrical supply manufacturers.

B. Device shall be third party tested as noted per sub-section 3.2 part B.

2.2 INSPECTIONS

A. Contractor shall contact the Gaston County Inspections to schedule electrical inspections and to schedule a final inspection.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Comply with NEC C. Comply with North Carolina Electrical Building Code

3.2 WORK REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Toggle switches shall be single pole, three-way, or four-way as indicated on the drawings.

Switches shall be of the grounding type, with hex-head grounding screw, rated 20A, 120/277 volt, A.C only. Lighted handle switches shall have neon lights of the correct voltage rating where indicated on the drawings. All switches shall have quiet operating mechanisms without the use of mercury switches. All switches shall be listed by an "approved" third-party agency, approved for the voltage and amperage indicated.

B. Cover plates for flush mounted wiring devices and for telephone outlets shall be Type "302" stainless steel or nylon type, standard size, single or ganged as shown on the drawings. Cover plate mounting screws shall be slotted head oval screws and shall match the finish and material of the plate, and shall be furnished with the plate by the plate manufacturer.

Quantity of 2% spare cover plates of each type shall be provided to the owner.

C. Switch and receptacle cover plates on exposed work shall be galvanized cast ferrous metal, standard size, and shall be single or ganged as indicated on the drawings.

D. Exterior mounted switch and receptacle plates, and those noted to be weatherproof, shall be weatherproof PVC cover plates, standard size, single or ganged as indicated on the drawings, and shall be "approved” third party listed as "rain-tight while in use."

E. All receptacles (unless otherwise noted) shall be federal specification grade duplex receptacles.

END SECTION 262726

SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings: E0.1 and E1.1

1.2 SUMMARY

A. This section includes the following

1. Specifications for the installations of safety switches

1.3 COORDINATION

A. Coordinate electrical testing of electrical items, so equipment and systems that are functionally interdependent are tested to demonstrate successful interoperability.

PART 2 - PRODUCTS

2.01 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by standard electrical supply manufacturers.

B. Device shall be third party listed.

2.2 INSPECTIONS

A. Contractor shall contact the Gaston County Inspections to schedule electrical inspections and to schedule a final inspection.

PART 3 - EXECUTION

3.1 COMMON REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Comply with NECA 1.

B. Comply with NEC C. Comply with North Carolina Electrical Building Code

3.2 WORK REQUIREMENTS FOR ELECTRICAL INSTALLATION

A. Safety switches shall be the "heavy duty" type. General duty switches are not acceptable.

B. Switches shall have defeatable door interlocks that prevent the door from opening when the operating handle is in the "on" position.

C. Switches shall have handles whose positions are easily recognizable in the "on" or "off" position. For safety reasons, padlock shall be provided for switches located in the public areas.

D. Switches shall have non-teasible, positive, quick make-quick break mechanisms.

E. Switches shall be properly labeled.

END SECTION 262816

Transformer Schedule

Tag

Manufacturer

Description kVA

Rating

Primary

Voltage

Secondary

Voltage

Weight (lbs) Mounting

T 5 Maddox

Dry Type, Ventilated

480 / 3 ph 400 / 3ph

220 Floor

Notes:

1. Model Maddox or equivalent

2. 150° C Rise, 45 DB

3. Comparable Manufacturers are: Schneider Electric, Siemens

E0.1

COPYRIGHT

Project No:

01-2025007

Scale: N/A

Date: 06-01-2025

Title: Electrical Schedules

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e

N um be r:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written

09/10/25

PNL 'DNH2'

T4

PNL 'DNL2'

PNL 'DNH3'

PNL 'DNH4'

PNL 'DNL3'

Pnl "DNH3", ckt 19,21,23 3 - #3/0, 1 - #6G in 2" C

FGB Main Controller

New Panel

Desiccant Dryer, power thru disconnect mounted on uni-strut support

Pnl "DNH3", ckt 25,27,29 3 - #12, 1 - #12G in 3 4" C

Pnl "DNH3", ckt 28,30,32 3 - #12, 1 - #12G in 3 4" C

LBGB Main

Pnl "DNH3", ckt 22,24,26 3 - #12, 1 - #12G in 3 4" C

Preheater, (on platform mezzanine), thru 1st level

Tx (XF-003). Install on unistrut

Pnl "DNH4", ckt 8,10,12 3 - #4, 1 - #8G in 1 14" C

T5

Pnl "DNH2", ckt 7,9,11 3 - #10, 1 - #10G in 3 4" C

Pnl "DNH2", ckt 8,10,12 3 - #10, 1 - #10G in 1" C

DNH4, ckt

14,16,18, 4 - #12, "C

Hopper 3, daisy chain power thru hopper 4, Hopper 4

D2

D3

D5

D5

D5

Desiccant Dryer, power thru disconnect mounted on uni-strut support

D5

DNH4, ckt 20,22,24, 4 - #12, "C

D5

Hopper 2

Hopper 1, daisy chain power thru hopper 2, D5

DNH4, ckt

26,28,30, 4 - #12, "C

W100, Dehum machine

AEC,

GPAC-20

D6

DNL3, ckt

15,17,19, 4 - #10, "C

Draw Frame, power from disconnect to equipment Tx.

E1.1

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Electrical Plan

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e

N um be r:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Electrical Plan - 480 V Power Scale: 14" = 1' - 0"E1.1

09/10/25

Key Plan

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text Reactor

AutoCAD SHX Text Work Bench/Pack Storage

AutoCAD SHX Text 480277400A

AutoCAD SHX Text Blow Down Tank

AutoCAD SHX Text Work Bench

AutoCAD SHX Text False Twist

AutoCAD SHX Text

BR-FD425

AutoCAD SHX Text

BR-MS

AutoCAD SHX Text

FD-S

AutoCAD SHX Text Rheology

AutoCAD SHX Text Chip Drying

AutoCAD SHX Text Draw Frame

AutoCAD SHX Text Ultra Sonic

AutoCAD SHX Text Small Cleaning Oven

AutoCAD SHX Text Soak Tank

AutoCAD SHX Text Big Cleaning Oven

AutoCAD SHX Text Large Spin

Pnl "DNH3", ckt 7,9,11 3 - #4, 1 - #8G in 1 14" C

D1

Compounder, power from disconnect to equipment Tx.

"C

Dehum machine

E1.2

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Electrical Plan

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e

N um be r:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Electrical Plan - 480 V Power Scale: 14" = 1' - 0"E1.2

09/10/25

Key Plan

AutoCAD SHX Text Chem

AutoCAD SHX Text Storage

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text One Shot

AutoCAD SHX Text Melt Spin

AutoCAD SHX Text Compounding

AutoCAD SHX Text Crimp Cut

PNL 'DNH2'

T4

PNL 'DNL2'

PNL 'DNH3'

PNL 'DNH4'

PNL 'DNL3'

New Panel

Pnl "DNL3", ckt 7 2 - #12, 1 - #12G in 12" C

Pnl "DNL3", ckt 5 2 - #12, 1 - #12G in 12" C

Pnl "DNL3", ckt 1,3 2 - #12, 1 - #12G in 12" C

Pnl "DNL3", ckt 2 2 - #12, 1 - #12G in 12" C

Pnl "DNL3", ckt 4 2 - #12, 1 - #12G in 12" C

Loaders and gravity feeders, route conduit under platform and install recepts on uni-strut

Pnl "DNL3", ckt 6 2 - #12, 1 - #12G in 12" C

Pnl "DNL3", ckt 8 2 - #12, 1 - #12G in 12" C

Winder c

E1.3

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Electrical Plan

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e

N um be r:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Electrical Plan - 120/208 V Power Scale: 14" = 1' - 0"E1.3

09/10/25

Key Plan

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text Reactor

AutoCAD SHX Text Work Bench/Pack Storage

AutoCAD SHX Text 480277400A

AutoCAD SHX Text Blow Down Tank

AutoCAD SHX Text Work Bench

AutoCAD SHX Text False Twist

AutoCAD SHX Text

BR-FD425

AutoCAD SHX Text

BR-MS

AutoCAD SHX Text

FD-S

AutoCAD SHX Text Rheology

AutoCAD SHX Text Chip Drying

AutoCAD SHX Text Draw Frame

AutoCAD SHX Text Ultra Sonic

AutoCAD SHX Text Small Cleaning Oven

AutoCAD SHX Text Soak Tank

AutoCAD SHX Text Big Cleaning Oven

AutoCAD SHX Text Large Spin

Pnl "DNL3", ckt 9,11 2 - #12, 1 - #12G in 12" C b b

Pnl "DNL3", ckt 10,12 2 - #12, 1 - #12G in 12" C

Pnl "DNL3", ckt 13 2 - #12, 1 - #12G in 12" C a a

Pnl "DNL2", ckt 13,15 2 - #12, 1 - #12G in 12" C

Pnl "DNL2", ckt 22,24 2 - #12, 1 - #12G in 12" C

E1.4

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 06-01-2025

Title: Electrical Plan

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e l k i n s o n

B l v d

B e l m o n t

N o r r o l i n a

A er oR aq

E ng in ee ri ng

In c

En gi ne er in g

Se rv ic es

D av is P ar kw ay , S ui te

C 6-

C ha rl ot te , N or th

C ar ol in a

Fi rm

L ic en se

C

-3

Ph on e

N um be r:

Revisions

No. Date

Seal:

Note:

This drawing is the property of the firm, AeroRaq Engineering.

Reproduction in part or in whole is forbidden without written permission.

Electrical Plan - 120/208 V Power Scale: 14" = 1' - 0"E1.4

09/10/25

Key Plan

AutoCAD SHX Text Chem

AutoCAD SHX Text Storage

AutoCAD SHX Text Small PET Reactor

AutoCAD SHX Text One Shot

AutoCAD SHX Text Melt Spin

AutoCAD SHX Text Compounding

AutoCAD SHX Text Crimp Cut

AutoCAD SHX Text

BR-FD425

M

WP

EF-3

DNH4-13,15,17

DNH4-19,21,23

DNH4-25,27,29

RTU-6

RTU-7

RTU-8

CU-3

EF-6

F-1

F-2

F-3

E1.5

COPYRIGHT

Project No:

01-2025007

Scale:

" = 1' - 0"

Date: 08-01-2025

Title: Electrical Roof

Plan

M a c h i n e

C o n n e c t i o t r u s i o n

G a s t o n

C o l l e g e…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .