Addendum 1 BDC43-21-22 Rish - Shade Structure.pdf
PDF 200 KB Posted
- Solicitation number
- ITB-01709
- Issued by
- Leon County, Florida
About this file
This document is an Addendum to Bid No. BDC43-21/22 issued by the Florida Department of Environmental Protection for the William J. Rish Recreation Area - ADA Improvements - Shade Structure project. The addendum provides two key changes to the original specifications: 1) the shade structures should be constructed using 316 Stainless Steel throughout, and 2) all bolts and hardware above ground should also be 316 Stainless Steel. Bids for this project are due to Laurinda Micheels, Government Operations Consultant II, Bureau of Design and Construction, by the date specified, and failure to include this signed addendum may result in bid rejection.
The addendum does not provide any additional details on pricing, set asides, funding sources, or other contractual terms. It simply updates the technical specifications for the shade structure materials to be used in this project.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BDC Bid No. BDC43-21/22, Addendum #1, Page 1 of 1
FLORIDA DEPARTMENT OF
Environmental Protection
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard Tallahassee, FL 32399
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
June 23, 2022
NOTICE TO APPLICANTS
ADDENDUM NO. One (1)
William J. Rish Recreation Area – ADA Improvements – Shade Structure
DEP Bid NO. BDC43-21/22
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED
PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE WITH YOUR BID
SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Government Operations Consultant II, Bureau of Design and Construction, 3900 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000. Failure to do so may be grounds for rejection of the Bid.
Signature of Contractor and Date
The Following statements supersede & supplement the corresponding items in the specifications & drawings:
1. The structures should be 316 Stainless Steel throughout.
2. All bolts and hardware above ground should be 316 Stainless Steel.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.