Addendum 1 BDC43-21-22 Rish - Shade Structure.pdf

PDF 200 KB Posted

Attached to
Addendum 1 BDC43-21/22 Rish Recreation Area - Shade Structure
Solicitation number
ITB-01709
Issued by
Leon County, Florida

About this file

This document is an Addendum to Bid No. BDC43-21/22 issued by the Florida Department of Environmental Protection for the William J. Rish Recreation Area - ADA Improvements - Shade Structure project. The addendum provides two key changes to the original specifications: 1) the shade structures should be constructed using 316 Stainless Steel throughout, and 2) all bolts and hardware above ground should also be 316 Stainless Steel. Bids for this project are due to Laurinda Micheels, Government Operations Consultant II, Bureau of Design and Construction, by the date specified, and failure to include this signed addendum may result in bid rejection.

The addendum does not provide any additional details on pricing, set asides, funding sources, or other contractual terms. It simply updates the technical specifications for the shade structure materials to be used in this project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BDC Bid No. BDC43-21/22, Addendum #1, Page 1 of 1

FLORIDA DEPARTMENT OF

Environmental Protection

Marjory Stoneman Douglas Building

3900 Commonwealth Boulevard Tallahassee, FL 32399

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

June 23, 2022

NOTICE TO APPLICANTS

ADDENDUM NO. One (1)

William J. Rish Recreation Area – ADA Improvements – Shade Structure

DEP Bid NO. BDC43-21/22

TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED

PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE WITH YOUR BID

SUBMISSION.

NOTICE

It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Government Operations Consultant II, Bureau of Design and Construction, 3900 Commonwealth Blvd. MS520, Tallahassee, Florida 32399-3000. Failure to do so may be grounds for rejection of the Bid.

Signature of Contractor and Date

The Following statements supersede & supplement the corresponding items in the specifications & drawings:

1. The structures should be 316 Stainless Steel throughout.

2. All bolts and hardware above ground should be 316 Stainless Steel.

In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.