About this file
This is an Addendum #1 issued by the Florida Department of Environmental Protection (FDEP) for the Rookery Bay National Estuarine Research Reserve - Briggs Boardwalk project, identified as BDC Bid No. BDC42-24/25. The addendum addresses multiple contractor questions regarding project specifications, including vegetation clearing methods, permits, debris removal, material standards, and boardwalk construction details. The project involves boardwalk renovation, with specific requirements for maintenance paths, mechanical clearing, and ADA grab rail installation. The Notice to Proceed is contingent upon receiving county permits and FDEP project manager's acceptance of the contractor's safety plan, project schedule, and schedule of values.
The addendum clarifies several key project parameters, including that stainless steel components must be grade 316, all cleared debris must be removed from the site, and no stored materials will be billable - only installed materials will be paid. WEC has submitted site improvement plans to Collier County for permit review. The exact project start date remains unavailable. Notably, the FDEP expects no change orders on this project, and any potential change order-related bond cost increases would need to be addressed through specific billing procedures after full change order execution and completion of associated work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BDC Bid No. BDC42-24/25, Addendum #1, Page 1 of 2
FLORIDA DEPARTMENT OF
Environmental Protection
Marjory Stoneman Douglas Building
3900 Commonwealth Boulevard Tallahassee, FL 32399
Ron DeSantis Governor
Alexis A. Lambert
Secretary
March 19, 2025
NOTICE TO APPLICANTS
ADDENDUM NO. ONE (1)
Rookery Bay National Estuarine Research Reserve - Briggs Boardwalk
DEP BID NO. BDC42-24/25
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED
PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH
YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Laurinda Micheels, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
1. Question: For the 3 foot wide maintenance path on each side of boardwalk, may we use mechanical means to clear vegetation as we perform demolition activities?
As in tractor, backhoe or skid steer.
Answer: Yes, as long as adjacent vegetation outside the 3ft area is not disturbed.
2. Question: As much of the vegetation to be cleared is mangrove of some type, will
DEP provide a Mangrove trimming/clearing permit for this project?
Answer: The contractor shall pull all necessary Building Department Permits.
3. Question: As the cleared pathway debris are decomposing plant matter, may we spread such debris adjacent to the project boardwalk? Or should all cleared plant material be removed off site completely?
BDC Bid No. BDC42-24/25, Addendum #1, Page 2 of 2
Answer: All debris should be removed from the site.
4. Question: Is the stainless steel referred to for bolts, nut washers, fasteners and the like grade 304 or grade 316?
Answer: 316.
5. Question: Has the consultant of record, WEC, submitted plans to Collier County Building Department for permit review?
Answer: WEC submitted for a Collier County site plan permit (Site Improvement Plan- PL20230003580).
6. Question: Drawing S102 detail 1 shows ADA grab rail only without bottom rail on the cross section of the boardwalk. But detail 3 on S104, detail 2 on S103 as well and detail 2 on S102 show handrail with bottom rail. Please confirm bottom rail is required. If bottom railing is required can the detailed drawing with distances between rail be provided?
Answer: The bottom rail of an ADA grab rail is not required. The top rail of the ADA grab rail is required at a height of 34” to 38” above standing surface.
7. Question: Once the bid tabulation is posted, do you have a timeline for issuing a Notice to Award?
Answer: Notice to proceed may be scheduled upon receipt of county permits, and FDEP project manager’s receipt and acceptance of contractor’s safety plan, project schedule and schedule of values.
8. Question: What is the anticipated start date for this project?
Answer: unavailable
9. Question: Are stored materials for this project billable?
Answer: No, we only pay for installed materials.
10. Question: In the case of a change order once the contract has been issued where our P&P bond cost goes up accordingly, how do you propose that we address this additional, directly related cost? ITB documents state on pg. 82 that the bond cost is to be paid by contractor and included in the contract price. When contract price increases due to change order, how do we bill to recover this additional cost?
Answer: Bonds must match any adjustments made to the contract amount. Change Order costs (including additional bonding) can be billed once a CO is fully executed and that work completed. It is fully expected that there will not be any COs on this project.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.