Addendum 1-Additional Scope and Answered Questions.pdf
PDF 103 KB Posted
- Attached to
- OCH Phase I Landscaping
- Solicitation number
- 76-20260811
- Issued by
- Union County, North Carolina
About this file
This Addendum 1 document pertains to the OCH Phase 1 Landscaping project at South Piedmont Community College (SPCC), a component of the North Carolina Community College System, and clarifies scope additions and addresses questions raised during the procurement process. The project encompasses site demolition, grading, hardscape installation, landscape planting, and stormwater management features at the Old Charlotte Highway Campus in Monroe, North Carolina. A pre-proposal meeting was held on August 19, 2026, with bids opening on September 3, 2026 at 2:00 p.m. The project must be completed within 120 days of the Notice to Proceed from SPCC. The addendum identifies an additional scope element consisting of an existing stockpile of approximately 800 to 1,000 cubic yards of fill material located at the northeast corner of campus between Old Charlotte Highway and Building A that contractors may utilize for grading and landform work within the project's disturbance limits per the Grading Plans. Any excess fill material not consumed during the project must be hauled off and disposed of in compliance with applicable regulations.
The addendum clarifies that SPCC will pay all permit fees associated with the project, and there is no electrical work included in the scope. Contractors are responsible for providing all maintenance, upkeep, and replacements during the required warranty periods as specified in the Project Specifications, particularly sections 329200 (Turf and Grasses) and 329300 (Plants), both referencing a warranty period detailed in Section 1.9 of each specification. Bidders must be North Carolina general contractors with a minimum of five years' recent experience in commercial or industrial structural concrete, roadway construction, and site redevelopment, and must provide three professional references. A 12-month warranty for materials and workmanship is required following final acceptance, with performance and payment bonds, worker's compensation insurance ($100,000 employer's liability), comprehensive general liability insurance ($500,000 bodily injury/$100,000-$300,000 property damage), and builder's risk insurance mandated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OCH Phase I Landscaping Drawing Set.pdf | ||
| 76-20260811 OCH Phase I Landscaping.pdf | ||
| OCH Phase I Landscaping Project Manual.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 24th , 2026
OCH Phase 1 Landscaping South Piedmont Community College NCCCS Project ID #2787 SCO Project ID # 26929 eVP Solicitation Number: 76-20260811
ADDENDUM NO. 1
The purpose of this addendum is to answer questions received during the open question and answer Period to date, including questions asked at the August 19th, 2026, onsite preproposal meeting; and this addendum also includes additional scope information to be added to the project. All other Terms and conditions given in this request for proposals are in full force and effect.
Additional Scope of Work:
The Client has identified an existing stockpile of excess fill brought onto site and stockpiled along the NE corner of the campus between Old Charlotte Highway and Building A. This fill material can be used for the purposes of grading within this project’s disturbance limits (including the alternate area) for any landforms per the Grading Plans (L15x series) provided. Per the Client, a total of approximately 800-100 cubic yards of this dirt is available within this stockpile. Any excess fill not used in this project will have to get hauled off and disposed per regulations.
Questions & Answers:
Question: Who will provide maintenance during the warranty period?
Answer: Per the Project Specifications, including but not limited to 329200-Turf and Grasses Section 1.9, and 329300-Plants Section 1.9, the Contractor is to provide all maintenance, upkeep, and replacements during the required warranty periods as noted.
Question: Are there any Permit fees?
Answer: SPCC will pay all permit fees associated with this project.
Question: Is there any electrical work on this project?
Answer: There is no electrical scope in this project.
Question: What is the timing for this project?
Answers: Bids will be opened on September 3rd , 2026 at 2pm and awarded shortly thereafter if all requirements are met and adequate number of bids received. The scope of work should be completed within 120 days of the Notice to Proceed from SPCC.
END OF ADDENDUM #1