This is Addendum 1 to a state and local contract opportunity issued by Chatham County, Georgia for the removal and replacement of epoxy flooring. The addendum modifies the original solicitation terms and conditions for this flooring project. As an addendum document, it contains clarifications, modifications, or supplementary information to the base solicitation that bidders must incorporate into their proposals. Specific details regarding project scope, quantities, timelines, site visit requirements, and bid submission deadlines would be outlined in this addendum to ensure all prospective bidders have consistent and current information prior to proposal submission.
The addendum establishes updated requirements and procedures that all bidders must follow when responding to the flooring removal and replacement opportunity. Any pricing adjustments, clarifications on specifications, changes to evaluation criteria, set-aside provisions, or modifications to contract terms would be detailed within this document. Bidders are required to acknowledge receipt and compliance with the addendum terms when submitting their proposals to Chatham County's purchasing department through the designated online bidding portal.
Text of this file
CHATHAM COUNTY PURCHASING DEPARTMENT
ADDENDUMNO. 1 TO BrD# 22-0009-5
FOR: REMOVE AND REPLACE EPOXY FLOOR COATING AT THE CHATHAM
COUNTY DETENTION CENTER
PLEASE SEE THE F'OLLOWING ADDITIONS, CLARIFICATIONS AND/OR
CHANGES:
L Clarification: A General Contractor License is not required for this project.
2. Clarification: Please see attached material specifications.
3. Clarification: The patches called out in the specification shall be cleaned in accordance with ICRI-CSP 5 Surface Profile, minimum. A keyway of each patch shall be saw cut a with a 1/8" diamond blade, minimum 1/8" in depth. The patches shall be chipped out a minimum 25%o fiom the leading edge to assure that only tightly adherent coating is left in place. The shape of the patches shall be shaped to either a square or rectangle. Series 479 may be applied at a minimum thickness of 3/8 Inch to 10". The rep anticipates the average thickness tobe 112". Series 479 can be tinted to a red color.
BID DUE DATE WILL REMAIN 2:OOPM
FEBRUARY 16,2022
RInnI.p IS lItr'SP(lNSlRl .li' k'Jlll MAKIN(l'l'Hkl Nlil('kISSARV ('HAN(.lIilS
February 8,2022
DATE
GARET H. JOYNER
PURCHASING DIRECTOR
CHATHAM COLINTY
ll
TNEMEC
TPOXY POLYMER (ON(RETE
tNct|JDtS sERlEs 469 & 479
TNIi,lt( (0MPANY, lN(.
6800 [orporcfe 0tive, Krnsts Cily. lt10 641 20
+1816-483-3400 wvvlv.lneme(.tom
Published terhnkol dolo, instrutlions, lnd pticing ure subiect to rhonge l,t/iih0!f n0ti(e. [onttcl your lneme( te(hni(01 rrprssentolive for iunen? technitol dolo, instruclions, ond priring. $lononty in{otmntion: Jhe servite lile of Tnemett rootings will vory. Fot wrronty, limilotion ol sellert lishility, ond product in{orrnotion, pleose te{et to Tnemec's Product 0ltl Sheels ot www.tneme..r0m 0r totlo(t your inemec Tethnkol
Represenlotive. 06,/2020
TABLI OF (ONIiNTS lnlroduclion
Produrl lnlrodutlion
5el-up
Equipmenl
Surfore Prep0r01i0n
Primer lnslollolion
Produrl lnslollolion 0verview..
Verlirol Applirolions & Finish (ools
(leon-up.
5ofely
I
I
I
I
I
.....2-3
.3-4
SURFATT PREPARATION
AND APPTICATION GUIDE
INNOVATIrN IN EVERY COAT.TM
M lrr?ilirlrilE
1'hc purpose of this gr"ride is to :rcqtlaint applicators with tl-re basic information nece.ssary for properly ordering, storing and installing 'l-ncmcc's Series 469 & 4-71) LavacreIe.
Prior to starting work, please rcad tl'ris cntire guide carefully. If you have questions, conlact your 1'nenrcc representative. It is impor-tant that you obtain answers to any qucstions before work begins.
Please reference the proiect specifications and compare thcm with this guidc and lhe product data shcct, Resolvc any inconsistcncies prior to starting s,'ork.
'l'his application guidc cannot covcr cvery issuc that rllay be en-countered in the field. If issues arise that are not addressed in this guide or the product data sheet, please contact your Tncmec rep-rcscntativc cir call +1-U16-483-34OO ttr cmail tcchsvcs@tncmec.com fol tecl-rnical assistancc.
Selies 469 & 479 LavaCrele are non-shrinking, epoxy polymer concrctcs uscd for tlrc rchabilitation of scvcrcly crodcd concrctc or the corrosion proofing of new conct'ete whefe chemical resistance is rcquired tht'oughout the con-rplete topping system, Extrcmcly fast sctting, allowing for rcbttilds of proccss floor-s and sccondary containment stl'uctures. Also used to cast sumps, drains and trenches and is an outstanding grouting matcrial fbr vibration dampcning in base plates and on motof pads. Series 46p & 479kits are packagecl for casting and standard placement of material. A grouting mix may be madc by adjusting the kit fbr a m()re fluid application.
Rcfore mixing, all scree d guidcs, membrancs and forms should be in placc and checkcd prior to pouling the nratclial.
5.I PREPARATION OI (ON(RETI
Prcpare concrete sut'faces in accordance with SSPGSP13,/\ACE No.
6Joint Surface Preparation Standalds and ICRI l'cchnical Guidelines.
Alrrasive Ulast, shot$last, water jet or mcchanically abradc concrete sulfaces to rcnrove laitance, cut'ing cotrrpounds, hardenet's, .sealers and other contaminants and to providc a mininrunt ICRI CSP 5 surfacc plofile. Note: For grouting polymer concl'cte and tying multiplc lifts over cnred material a minintum OSP 8 trtay be te<1r"tired.
5.2 STEEL & l\{IST METAI.S
Scrics 469 & 479 arc not typica'lly applied ovcr stcel; howcver incidental contact or ovcfcoating of sonre fertous mctals may be cncountered dulir-rg applicatior-rs.
5.4 REINFOR(ING STIEL
'$/herr applying Series 459 ot 479 t<l deep ot large horizontal area.s or vertical pours of polymer concrctc, suitable rcinforccments suclr as corrosion resistant rebal shoulcl be considered. Wl-ren rnaking large horizontal pours, applying the material in a "checkerboard" pattcrn can avoid hcat build-up and potential cracking fi'onr culing strcsses. When nraking hear.y pouts grcater than cight (8) inches (20 cm) in depth it is rccomrnended to consuh with Tnemec 'l'echnical Scrvices.
5.5 TERMINATIONS
I3elore beginning application, all tcrminations should be planned.
Tcrminations should bc madc into saw-cuts, kcying thc matcrial not less than Vz-inch (12.7 mm) depth. Expansion and control joints are to be provided on 14-foot (4.3 m) centers, around fixed objects at the pefiphery of the floor and/or at any existing expansion joint.
These joints shall have an appropriate sizcd closed-cell foam backcr rod inscrted and fillcd flush with'l'nemcc'lank Armor@ Scries 351 or othcr seruice-spccific, flexible chenrical-resistant compound. All perforations, gaps or other areas of expected movement or flex shall also rcceive an application of selcctcd flcxible linings fbr complete chcnrical reststance .
5.6 IRAMIN6
If walls, curbs or other vertical strllctures at'e to he pouled and cast ftom Series 469 or 479, formwork will need to be built to retain the polymer concrcte , Prior to assembly or ercction of the fornrwork lhe pieces shall be coverecl with hea\y plastic and or (xher suitable lelease agcnts to assist in preventing attachment of thc polymer concrctc to thcsc surfaccs. Vhcn casting into fbrnrs it is impcrativc that all joints ancl mating sudaces are complctcly sealed to prevent
Scries 459/479 from flowing out. All seals and joints must be tight cnough to hold watcr. Vhcrc forms mcct irrcgular surfaccs such as concrete, it is a good idea to place a hear'1' caulk bead or putty at this intelf-ace fbr additional "weep" resistance.
Prior to starting installation, pleasc note the fbllowing:
. Itcmize all materials ordcred {iorn Tnemec.
. E.stablish sut'face preparation t'erluirements.
. Ensure all equipment is readily available and in working ordcr.
. Sct-up a mixing arca clcarly dcsignatcd at lcast 5O fcct (15.2 meters) away from hcat, sparks, open flame, welding, or other sources of ignition.
. Comn-runicatc thc installation, safcty proccdurcs, ancl rcquircmcnts with all persons involved.
Note: Polyrner concrctes should never be pourecl, placed or grouted in direct sunlight, Further temperatulc conditions and protection tiorn rain and other elcments must bc assured prior to bcginning any preparation or application of thcse matel'ials. if necessary, tenting and introduction of conditioned air may be reqr.rired. Many timcs, a pop-up awning is sulhcicnt to protcct the arca lrotn ovcr-heating and/ol from the direct sunlight.
'Whccl barrows and othcr convcyancc cquipmcnt should bc lined with hearry plastic to aid in cleanup.
Erluipment and unmixed contponents should be placed as closc to thc application sitc as possiblc.
Large pro.jects should have a back-up mortar mixer on sitc.
5.0 SURFAIE PREPARATION
2.0 PRODUCT OI/IRVIEW
4.0 TQUIPMENT OVERI/IEt,lJ
6.0 PRIMER INSTALLATION
6.r PR0B0ND 3600 ProRond 3600 is a 100% solids, low surfacc cncrgy, moisturc tolcrant, self-leveling prir-r-rer for use on concrcte and porous surfaces to hclp slow outgassing and improve adhesion to lnost substrates.
The use of tl-ris primer should be cliscussecl at the speciflcation phase to determine applicabilitv. This primer may not be required on all LavaClete pours. Contact Tnemec for specific details, ProBond
3600 is ideally fbrmulated for use on concrete and cementitious sub.s[rates.
6.2 PROB()ND 36OO (URING TIMES
Curing time varies with surface temperature, air movement, humid-ity and fllrn thickness. A wet-on-wet pour is acceptable plovided PloBond 3600 is allowed to cure for a minimum of 2 hours at 70'F (21'C) or 4 houls ar 4o"F (4"C). NoTE: Primer should be checked tbr "aminc blush-" If primer is sticky or amine blush is prescnt, wash with mild soap and water solution and dry before proceeding. If rccoat window is cxceeded, primer should be abraded and/<>r a licsh coat ol ProBond 3600 should bc app'licd.
6.3 PROBOND 36OO PA(l(AGING
6.4 PROBOND 36OO THIORETI(AI- COVIRAGI RATIS
6.5 PROBOND 36OO MIXINO
Slowly mix Part A and Palt R to resuspend any settled solids. IIse a power mixer with a 3/8-inch (9.5 mm) shaft and double helix blade or similar equipment at low speed. l)o not whip or entrain air into nraterial.
NOTE: Do not thin.
6.6 PROBOND 36OO POT tIFE
Pot life is approximately 30 to 40 minutes ^1
75'F (24C). Material should be poured out onto surface and used irrrmediately alter mix-ing.
6.7 PROBOND 36OO MATERIAL & STORAGE HANDLING
Minimum storage temperature is 40"F (4"C) and maximum is 80'F (27"C). Prior to application, the material tcmperature should be above 60"F (16"C). ft i.s suggested the material be stored at thi.s tem-perature at least 48 hours prior to use.
Temperatures will affect workability. Cool temperatures increase viscosity and decrease workability. Varm tempet'aturcs will de-crcasc viscosity and shortcn pot lifc.
6.8 PROBOND 36OO APPLI(ATION EOUIPMENT
Roller: tJse high-grade, solvent-resi.stant phenolic rollers, Other: Pin-rakes, flat or notched squeegee, trowels or othcr appro-priate application tools.
6.9 PROBOND 36OO APPLI(ATION (ONDITIONS
NOTE:'l'hc surface should bc dry and at least 5'F (3"C) abovc thc dew point. Coating will not cure below the nrinimum surFace tem-peratufe.
6.IO PR()BOND 36OO (LIANUP
Flush and clean all equipment immediately after use with the rec-ommended thinner or MEK.
7.I SERIES 469/479 I.AVA(RETE INTRODU(TION
Scrics 469 & 1+79 Lavacrctc arc cpoxy polymcr concrctcs uscd for the rehabilitation oF severely eroded concrete or the cori'osioll proofing of new concrete where chemical rcsistance is rcquired throughout the complete topping system.
7.2 SERIES 469/479 I.AVA(RITE (URING TIMTS
NOTE: Curing times are based upon 3/8-inch (9.5 mm) of material thicker ca.stings and pours may result in longer set tintcs.
7.3 sERIES 469/479 LAVA(REIE PA(l(AGING
Note: To create a grouting material refer to the mixing section for additional information.
7.4 5ERIE5 469/479 LAVA(RETE TOVERAGE RATES
Refer to the charts below for coverage rates based on kit size and application. IMPORTANT: Lava(i'ete products must be placed at a mininrum thickness of 3,/8 inch (9.5 mm) to minimize aggregate exposure.
MATI RIAI- sUBSTRATI AMBI INT(Ol'|DITION
50't (1 0'i) 40'F (4"i) 40't (4'c)Minimum
':il ': .:,'.;,;' .'.',, ,:'ti ', \t.,1,1.:: ,.: ;)) 't::l::', 'l:::):l ,1:'Ii'\t':,alti l),lj
:l\ 111:11: t :,li i;tli I li,i,,|i-i ,. ::it,rt:,/t tti i ti itil
MIN. RT(OAT MAX. Rt(OATTTMPT RAT IJ Rt
24 Hours70"t (2 r't) 6 Hours
. iliilliirirlr.:. ,ill'lrii:r,, .1,,t 1. tt :,t : . ti. , 'jl lil {r|,r. , I l, jiriat.,
7.0 IAIJA(RETT INSTALLATION OVERIIIEW
PART B Yl[[D tNixedtKtr stzt PART A
;r|'ti 'ili:ii:ll 'iirr;:
1r11]!ltiljr :1:l
ITMPE RATU Rt TO HANDII RTTURl'l TO STRVI(I
77"F p5"0 6 Hours 24 [lours
:: ir!1,.. ;l : ..111,:
50. FT./GAL (0VtRAGt RATI (M'?lGAt)DRY MItS (MI(R()NsI
PART B PART ( YlILD lNixed)KIT PART A
4.5 gollons (l 7.0 L)Smoll 1 gcllon ran 1 quart ran I .i0 lb (31 75 kg) bog
KIT (UBI( IItT ((U8I( METIRS)
Smoll 0.60 (.02)
: t:j.
Series 469 Casting/Topping Application:
(lJBt( trrT ((lJ8t( MrrrRS)KIT
0.69 (.02)Smoll
,,tt:.1: | .i,.,i"..::ti.'
Seies 479 Casting/Topping Application
Serie.s 469 Grouting Application:
Series 479 Grouting Application:
7.5 5ERIE5 469/419 LAVA(RETE MI)(ING
Powcr mix the contents of Series 469/479 Part A and Part R sepa-rately in their original containers prior to combining. Add tl're Series
469/479 Part Il into the pre-mixed Part A and power nrix the mate-rial approximately one to two minutes beforc placing malerial in a dnrm mixer or adding aggregate.
Immediately pour entire contents of caraTyzed liquid into the mortar mixcrs tub, making surc to scrapc as much rcsin out of thc con-tainer as possible . Start the mixing unit on low speect (i5-20 rpms) and immediately bcgin adding Serics 469/479 Part C into the mixer.
Allow thc first bag to bc fully mixcd bcforc adding additional bags.
For additional mixing instructions plcase referencc the charts be-low, Casting/Topping (Large Kit as supplied)
Casting/Topping (Small Kit as supplied):
crouting (Large Kit)
Grouting (Small Kit)
Additional LavaCrcte Parts A, R or C may be ordered as needed to adjust batching and placement characteristics. Addinpi Part C will in-crease the stiffness and thc coverage rate. By decreasing the amount of Part C, thc flowability or fluidity of thc material will increasc, however the coverage late will be reduced. The following adjust-ments may be made in the ficld at tlle installer's discretion to the standard & fluid mix fbr-mulas fbund on the product data sheet and in this guideline to create a mix that is p|eferred by the applicator.
To make the matcrial heavier, add up to 70Lbs. G1.75 kg) in a large kit (1.K) or' 20 lbs. (9 kg) in a snrall kit (SK) of Part C. To rnake thc
'nnatelial looser, leduce upto 44lbs. (20 kg) in a LK or 11 lbs. (5 kg) in a SK of Part C.
NOTE: Material and ambient tenrperature have a greal effect on thc handling charactcristics of polymcr concrctcs. Rcforc making adjustments to the mix, these conditions should be considered.
7.6 55rRtES 469/479 IAVAtRtTt SLUMP TtSTlN6 lWlren slump testing Series 469, rhe ideal material mixture should measure 8.5 in. (21.6 cm) slump wlien casting or topping, or 11 in.
(27.9 cm) slunrp when mixed for grouting.
Vhen s'lurnp testing Series 479, the ideal nratcrial mixturc should measure 9.5 in. (24.1 cm) slump when casting ot topping, or 11 in.
(.27.9 cm) slump when mixed for grouting.
7.7 5ERIE5 469/479 LAVA(RETE MAIIRIAL TEMPERATURE
For optimum application, handling and perfbrmance, the material tenrperaturc during application should bc between 60'F and 90"F (15'(l and J2o(i). Tenrperature will affect the workability. (lool tem-peratules increase viscosity and decrease workability. \iflarm tetn-pcraturcs will dccrcasc viscosity and shortcn pot lifc.
7.8 sIRIES 469/479 I.AI/A(RITE SURFA(E TEMPERATURE
Sulfacc tcmpcraturcs during application should bc no lcss than /+0'F
(5"C) and below 90'F (32"C). At minimums, tempelatlrres should be anticipatcd to be on thc rise. Do not apply ii tcmperaturcs are expected to fall below 40"F (5'C) within 24 houm of application.
7.9 SERIIS 469/419 LAVA(RETE WORl(ING TIME
\ilorking time is approximately 30 to 40 nrinutes at75P (24C') & 50% RIl. Note: Placement and finishing time is dependent on en-vironrnental conditions and temperature of components. Material should be transferred to suhstrate and placed imrlediately after mixing.
IMPORTANT: Do not attempt to letemper the polymer concrete with addilional resin or water. Matedal should be moved quickly from thc mixcl to thc arca of placcmcnt.
8.I sERIES 459/479 I.AVA(RETE MATERIAL TRANSIIR 'When the primel is ready (see Section 6.2), materials should have been appropriately mixed and moved to the placement location and the initial drops can bc made onto thc substrate.
Placement of the wet polymer concrete shall be from the transfer unit (wheel barrow or tub) and on to the substrate in a staggered drop fashion, If placed between screed guides, allow enor.rgh dis-tance between drops so the material will meet thc sides, rise up to the top of the rail and once pulled moving forward, each drop of material meets the previous dlop. Once a rhythrrr is established the transfer installel will know the screed applicator's preference for the location of cach drop.
If the area is small and no screed guides are in place, the material from a mixcd kit should still bc placccl in spaccd amounts to nrakc pulling or troweling of the material more manageable.
Unless a pour is more than rwo (2) inches (5 cm) in depth, it is never adviscd to drop all two cubic feet of material in one location.
(UBI( FEET ((UBI( MITERs)KIT
0.4r(.0r)Smoll
',: lli:, 1:.1ii.;:,,l,rtiti:
IUBI( IIET (TUBI( MITERS)KIT
0.43 (.0r)Smoll
, ). ti:l ti.' :"'',lrrllll;1
Porl (Port A Porl B t, .t :t)., 1. .. .t. .,1 ,;,::::.) .lttt:,';r:1i,ir:,rrtjt'trl;,lit,tilt: l;irri.l ,r rillli'l :r:i
Porl B Porl (Port A lirjr;ii ,i;!, ; .i ll ii, i'.:l : ,.' , il; r ir',, 8.0 TAVA(RETE TOPPING INSIALI.AIION
Porl B Porl (Porl A
'... .":.1::l: ii,',: lt ti't) r11,,:.'t, !iril;rtti riritr ,lril:,1,r:ii, ,lli rr'r: rrlllllll , l::'
Purl (Purl A Porl B
''r il:j '....r'l, .,t'tiit: ,;,r:
IMPORTANT: Final finishing should be complctcd within 30-4t) minLltcs.
8.2 SERIES 469/479 LAVA(RETE INITIAL IINISHIN('
Once matcrial has bccn dclivelccl and ploperly placcd in the arca to hc toppt d. finislring lrcgins.
Bctween the guides, adjust thc lay of polymer concretc drop to-wards the sidc rails so contact is made and jr-rst below thc top of the sclcccl guicle, using a trowel or other tool.
llcgin nroving thc wct polyrncr concrctc along thc guiderail patll by dragging a sct'eecl hoald or a hcarry straight vn<rocl 2x4, long enough to extend one{irot outsidc or past cach guidcrail, across the guidc-rail tops.'fhis lengtlr will allow cxtra movenlcnt ln thc "scissoring" ancl tanrprng of the matct'i:tl ancl allow the installers to be at anglcs frorn each other.
After dlagging scrcccl boald across material sevcral tinrcs, g:rps, low spots and matelial deficiencics shall I'ravc additional wct polyrncr concrctc placcd in thcsc arca.s and again tampcd into placc. Oon tinuc dosrn thc pathway avoiding creation of a cold joint in un-planned locations.
Make surc no dry pockcts are creatcd and the material has bccn fir-rnly pusl'rcd and in contact with thc plimed or prcparcd substtate, If not usir-rg gr-ride rails and scrced boards but hand-trowcling in smallcr f()otprints <;r locations, u.sc similar tcchniques to place and fini.sh thc material,
8.3 5ERII5 469/479 LAVA(RETE FINAI. FINISllING ()nce the material has been fully placcd, it is at thickness rcquitcd and whilc the arca is no largcr tl'ran what tlrc finishers can easily acccss, final finishing hcgrns.
Using a high-gtade stecl tlowcl final-fir-rish the polymcr concretc, adjusting pitchcs, wolking "pop-Lrp" aggrcgatcs back down and blinging some of the resin to the surfhce for a better appeal'ancc.
Thc following nray also bc cmploycd whcn trowcl finishing:
. LavaCrete may have Tnemec Thinner No. 2 used sparingly as a lubricant on the trowcl <lr mistcd on to the polymcr c()ncrctc to assist in smoothing.
. Another option, with or without the use of a smoothilrg agcnt, is tcr bloadcast 2O/4O slllc sand onto thc wct polyrner concrctc, 9.I 55ERIIS 469/479 LAVA(RETE (ASTING GINIRAL INFORMATION
. Forms and ft'atncwork should always be madc from 3/'1-1n thick exterior grade plylvood or similar stot"tt nratet'ials. rWhcre ap-plicablc they should be firmly anchored ol pinned.
. All fornrwork surf)ccs r.trust bc cithcr laycrcd with hcar'ry pla.stic
(+3-mil thickncss), q,axed or heavily greascd with a petroleum based relcase agent. All guidelails and for-mwotk should bc rcmovcd inrmcdiatcly aftcr matcrial has sct firmly.
. All minor gaps or surface irregularities in thc formwork must be filled wrth caulk or a putty prior to casting. 'l'hc fbrm n-rust be macle watcl tight to pl'cvcnt weeping of resins.
. Vibrating equipment is highly recommended lor efhcient conr-pacting and rcmoval of air pockcts.
. If the cxterior of a casting is founcl not to be of a finish gracle de.sired or a color change is desircd, it i.s imperativc that all ltaxes and greascs be removed plior to furtl'rer application. Af-tcr relcase agents ale tenrovecl a swccp blast is rccommendcd.
Apply a primc coat of appropriate plitner as t'ccornmendcd fot' thc spccific polymcr concrctc.
For color change, Llsc same ptllymct' based re.sin in specific color cl.roscn and apply ovcr thc polynrer c()ncrctc.
9.2 sERIES 469/479 IAVA(RETE (ASIING 'l'he mixed polynrer c()ncrcte should bc movcd to the sturdy fianle-work which has bccn lined ol lublicatccl for r-elcase once curccl, If using chains or a pig to hclp pull material into tighter or lotrgcr portions of the casting, tlrey should bc in placc with tltc exccss lengtlrs of chain or line at the other encl of tlre pull, easily grabbed fbr cluick rcmoval.
Tt is rcconrnrended that some lype of funncling or' "headbox" be fabricatcd t() assist in fi'lling the annular space from thc whcel bar-rc'l and that a constant head pressurc bc kept to assist flow into tl-rc sp21cc.
Scrics 46! & /+79 Lavacrctc should bc pourcd ft'onr onc sidc of thc casting only; this hclps to avoid air cntr'.rpment. It is important that there is vcnting available at thc opposite end of the pour; this al-lows air to movc out of thc fornr as thc polymcr concrctc is bcing poured.
'Whilc still flr.ricl, LavaCrctc shoulcl be workcd to complctcly fill the cavity or annular spacc using vibrating crluipn-rent, tan-rping or rod-ding deviccs, chains ur othcr tools to curpact thc space tlrercby limiting honeyconrbs ancl air pockets.
LavaCretc pour-s rn exccss of'ten (10) inchcs (25.4 crn) dccp should be nrade in rllultiple lifts. Subserluent lifts shor.rld be macle after the first pour has dissipated heat through thc cxotherm process and cooled down.
Ideally, bctwcen 60'F (16"C) and 80oF (27"C), thc subsequcnt lifts should bc rladc within four 111; hours of thc prcviotts pour to achieve bcst bonding.
If in cxccss of four (/r) hours, or whcn installing in warmcr ambicnt temperatLlres, pieces of rebar, chicken wirc or lath may nced to bc placed in thc prcvious casting prior to the set ot thc a new pour ancl allowed to protrudc to acccpt bonding ancl tic of sltbsequent pours. Also acceptable is l-rcaly scarification to no less than a visual standard ICRI,/CSP-8. NOTE: lt i.s recon'lmended that thc specific prinrcl for the selected polymel concrete'be applicd to thc intcrface of subserluent pours whenever four (4) hour.s or more have elapscd between lifts.
I O.I 55ERIES 469/479 [A\,A(RETI GROUTING GENERAI INFORMATION
. Work on grouting projccts should conform to ACI 351.5 15
"Specification fbf Installation of Epoxy Grouting Befi^'een
For:ndations and E<;uipnrent Bases" published by the American Concrctc Institutc (ACI). Ilcst practiccs ancl allowanccs arc dc-tailed, cspecially in Part J-Execution.
. Vhen grouting purnp/motor/enginc bascs or rail scttings, al-qr.rys use the "grouting" mix in lieu of thc "casting" fot'mula.
. The goal in vibration control and dampening is to have the grclut create a solid connection iiom thc ccluipment, through tlre baseplate to the fonndation antl finally into the soil: a tight and air-pocket-fiee fill is critical.
9.0 TAI,ACRTTT ftSTING INSTALLATION
I O.O LAVA(RTTI GROUTIN6 INSTATLAIION
Anchor bolts, leveling screws and fbrrns should always be in-stalled by cxperienced grout pcl'sonncl.
Polymcr conclctes are not uscd for "groutillg" bctween tiles as thc aggrcgatc sizc is too larllc.
Typically, an API compliant or other baseplate ol bedplate is sct on top of a ncs/ or in good condition concrctc founclation or pad.
If the concrcte is a ncw pollr it must be adequately cured prior to bcginning this rvork. If an cxisting fbundation is to bc uscd, chcck fol cherrrical contalttination, larease or oils and remove priol to nre-chanically cleanit-tg thc suriace to accept Series 469/479.
To achievc a good bond of the polynrcr concrete to the concrete foundation, the surface should be chipped using a pneumatic or air drivcn chipping hatttmer to expose no lcss than 5OVo of'the ag-grcgatc. 1'his irregular surt:rcc should not have pockets or holes any deeper than the ^ggreg lc itself as thesc cavitics can potentially hin-dclthe flow ol the grout and/or create air pockets. Additionally, the paramcter' of thc concretc pad shal! be chamfeted dot'n to providc a greater depth of thc grout matcrial along the edge of the pad. Al1 chips and dust shall bc blown clcan with oil-frcc dry ail and with thc assistancc of heavy- bristlc blushes.
IO.2 IAVA(RIIE GROUTING FRAMIWORK
Forms should be constructed in accordance with ACI 301 "Specifi-cations fbr Structural Concrctc." In gcneral, a fiamework fbrm shall bc' cleated around the prcparccl concretc pad and tightly affixecl to the outside parameter. This framcwork should be fabricated out of :/<-inch plywi-rod and/or 2x4 or '2x6 str-aiglrt studs, and all gaps or cracks caulkcd or putty-filled to retain grout nlaterial. The intcrior sides shall be hcavily waxed or petrolatum-bascd 'lubricatcd with thick paste to facilitate the releasc of the forms once tltc grout has set. In gener:rl, thc top of this containnrent franrewolk, slrould have a height level to the baseplate at the following corresponding levcls:
Engine franre platcs: a nrinimum of 1 inch (2.5 cm) below the top of the plate Rail or solcplatcs: a minimttm of Yz inch (1'.27 cn-t) from thc bottom of the plate.
Skid "1" beams: over the flangc and up the web a minirnum % lnch U.l/ cm).
NOTE: In order to fix a morc accuratc hcight of thc gt'tlut contain-ment frame, it is usually placed after the sctting and leveling of the baseplates or rails.
IO.3 LAVA(RITE GROUTING BASEPLATE
Tlrc baseplate shall be prepared by abrasive blasting the intcrnal side to SSPC-SP6 Commercial Blast ot'better. 'fhe cxterior side of the plate should also be abrasivc hlasted to remove paint whelc thc grout is specified to meet the metal.
Equipnrent alignment, levcling of plates including adiustnrent screws and anchor bolts and expansion ioints are tl-re responsibil-ity of thc owncr's installcr. Thc contractor should bc familiar with best-ptactice procedures and have expedence in these disciplines.
Lcvcling scrcws for thc bascplatc should havc thc bottorn of thc screw resting on a leveling pad that underneath ha.s had this small area filled with a quick setting lcvcling compound. I'ad should have a 3-inch (7.6 cm) diamctet'and be gluecl to the preparcd founclation substrate to offset twisting.
Anchol holt jackets/sleeves placed in the concrete foundation shall protrude slightly above the foundation and receive expansion joint compound betwecn the jacket and sleeve.
l'hc anchor bolt sleeve to bc surroundcd by Lava(iletc sllall be plo-tcctcd from thc grout by placing foam pipc insulation picccs (At'-maflex or similar) of a matching size, diameter and length around thc shaft. Spray-applicd urethane ioam nray also be uscd.
It should be confirmed that appropriatc vent holes have becn re-movcd pliol to pouring grout.
I 0.4 I.AVA(REII GROUTING APPLI(ATION
It will be ncccssary thzlt some typc of funncling or "hcadbox" bc fabricated to as.si.st in grouting application. Depending on thc loca-tion and configuration of the foundation top to bc flrouted thc box fbr concentrating tlrc pour may need to bc lairly largc. For small haseplatcs with fill holes up to threc (3) inches (7.6 cn't) in diameter, many times a plastic traffic cone with a smooth interior and the tip r:ut off to allow flow is sufficicnt, The hcad box ot cone should always be al an elevation above the highcst point of tl-rc pout. Matcrial placcd in thc hcad box or funncl should never bc allowc'd to fall below the highcst point of the grout fill as air or pockets will bc introduccd when these gaps occur.
Uninterruptcd filling of thc head box/funnel to maintain hydraulic pressurc or head prc.ssulc should bc rnaintaincd fbr maximurn flow-ability and push of thc grout.
. Grout should cnter through a singular inlet of the baseplate at one end and flow until it has rcachcd an adjaccnt inlct. Move headbox ol funnel to that inlet and continuc grouting until complcte .
. If grouting using a lance or lrose, it should be insertcd under the plate to the point ftr|thest from extraction. The lancc/hose shall be withdrawn as grout is pumped, keeping it cmbedded in the grout at all times.
The outer perimeter edges of the surface pour shall be |elieved with a 45" chamfcr strip.
Lavacrete should bc pour-ed from one side of the casting only; this hclps to avoicl air cntrapmcnt. It is important that thcrc is vcnting available at the opposite end of the pour; this allows air to move out of thc fbrm as the polymcr concrcte is bcing pourcd.
If expansion joints are necessary, thc following at'e guidelines:
. Expansion ioints must be situatcd from thc top ol tllc grout to the bottonr meeting the concrete base ot pad.
. Expansion joints should bc placed every 3-7 feer (7-2 m), iso-late each grout plate or rail fiom each other and run the lcngth of the pour.
' Pour grout into adjoining expansion ioint areas once the previ-ous cxpansion joint is at least 50Vo f'ull of grout.
. They may be madc flom rigid Styrofoam or hald rubber or othcr non-oi1 absorbing material.
. An altcrnatc n-rcthod is to plastic wlap wood strips and pour the grout around them at thc desired expansion ioint locations.
Once the LavaCrete has firmly sct, these strips al'e removed and fillcd with an appropriatc chcmical-rcsistant flcxiblc loint material.
I I.O VERTI$L APPLICATIONS & FINISH COAT
50 46 (4.3)VIRY WTT r0 (4.5)
60 38 (3 5)
33 (3 t)70
80 29 (2 7)
23 (2 r)
YIILDS
1.3 GAL
(4.e0 L) r00 r5 (6.8) 50 53 (4 9)wtT/stuRRY
44 (4.r)60 t0 37 (3.4)
BO 33 (3 r)
26 (2 4)
YIETDS
I 5 GAtS
(5 i0 L) r00
20 (9) 50 60 (5.6)SIAt'IDARD'
50 (4.6)60
70 42 (3 9)
37 (3.4)BO
r 00 30 (2.8)
YIII,DS
I.7 GAtS
(6.45 r_)
SIAI{DARD + 25 (l i.3) 50 66 (6.r)
55 (5.r)60
70 47 (4.41
4r (3.8)80
YtttDs
I.9 GALS
(7.20 r-) r00 33 (3.r)
73 (6.8)HTAVY 30 03.6) 50
60 6r (5 7) s2 (4.8)70
BO 46 (4.3)
YIILDS
2. I GAtS
(7 95 L)
100 J6 IJ.J)
ii'ijj!l i;,-i'r'':.r i'r i:il';r-l: i;l iir :iri].1;,r,','.,:l:l,,,li'i t:.:'ti'ii't,,"
'llil:ill,i:i:i'l,i ilirl.'i .,);:'1..):::l.il .t).it::1. \t)..1)i:i'r''i.'1,:'t"l "
,i:il lilr;: ri,ri .i;i : il:l.r . i":.tii;, :iiiiili;
r.:i, : I t: rll. i,, t t iirll/ ,i i., i t,l:t' t " t:tr .,1,1,I irr:tii 'iiri.rr '1,Ir'
II.I sERIIS 469/419 I.AVA(RETE VIRTI(AL APPLI(ATION & FINISH
(OAI
Series 469/479 Lavacrete may be applied to vertical and overhead surfaccs in applications in a general range of 50-tJ0 mils (1270-2032 nricrons). Ll<;wever, applications to these surfaces above this thick-ness will requirc mulriple lifts or reverting to the usual placement of the material as a casting, between fbrms. The standald Part A anci Palt R liquid resin components at'e usecl, the only chang,e is to substitute the Part C aggregate bags with appropliate amounts of Series 211-!111 tsulking Additivc. Series 211-9111 is a spccial blend of powder.s that thickens the mixed resin components to a wo|kable level to trowel or roll the material on to thcse substlates. Series 211-
211 may bc rrscd an altcrnalivc.
I I.2 sERIES 469/479 LAVA(REII (URING TIMES
NOTE: Curing times are based upon 3/8-inch (9.5 mm) of material, thickcf castings and pours may rcsult in longcr sct timcs.
I I.3 55ERIES 469/479 IAVA(RETE PA(l(AGING
Note: To create a grotlting matefial refer to the nrixing .section fbr additional information.
I I.4 55ERIES 469/479 LA'/A(RETE MIXING FOR VERTI(At
APPI.I(ATIONS
tJsing a low spccd, high torquc drill with a box stylc bladc, powcr mix the contents of Series 459/479 Part A and Part IJ separately in their original containers plior to combining together to catalyze lhe matcrial. Aftcr mixing Part A and Part Il tog,cthcr, split thc matclial into either two containers or one much larger container to allow for the increascd volumc when adding Series 211-9111 and to allow fbr the blending of the bulking powder into the liquid lesin.
Add thc Series 211-9111 to the catalyted series 469/479 at the rate of 20 to 25 pounds (9 to tt 3 kg) pel gallon and mix until consis-tency is at the level required for vertical or horizontal application
See tlre following chart for adjustments in viscosity and coverage per target thickness.
I I.5 SERIES 469/419 LA\,A(RETE MORTAR APPLI(ATION
After mixing to desired working viscosity, imrnediately begin apply-ing the semi-fluid mortar to the substrates using a trowel or other appropriate tool. Any heavy trowel marks may be addressed by lightly rolling over the fins using a 3/8-inch nap, solvent resistant roller slightly dampened with Tnemec No. 2 Thinner.
I I.6 sERIES 469/479 LAVA(RETI REINFOR(EMENT (OPTIONAI.)
If specified or desired, while the mortar coat in section 11.5 is still fluid, reinforcement, such as Series 21.1-227 Chopped Strand Mat or other appropriate fab|ics, can be impressed into the mortar coat, Using a steel ribbed-roller or similal tool, make full contact of the rcinforccmcnt into thc mortar coat bcd using additional catalyzcd 459/479 resin as a saturant coat to remove all entfapped ai| and orient stray wicking glass fibers flat to the surface. Allow to cure and lightly abradc thc surfacc to dc-gtoss and rcmovc stray wickcd glass, removing all detritus prior to proceeding to Finish Coat Ap-plication.
] I.7 5IRII5 469/419 LAVA(RETE TOP(OAT OR FINISH
APPLITATIONS
Finish or topcoats arc not r.rsually required. Iloweveq if desired, Se-ries 459/479 may be used as a self-leveling finish coat as suppiied.
l'he material is pigmcnted and necd only be mixcd and dircctly applied to the selected locations, RIIU RN JO SIRVI (ITTMPTRATURT TO HAl'|DTI
6 Hours 24 11ours17"t Qs"0 lri;j iitjlllrr',,".,'1 i,:) .:it iii r:lrtj., PART B PART T Yl[[D lttixed)KIT PART A
4.5 gollons (i /.0 [)Smoll I gollon con I quort ton I -70 lb (31.75 ks) bog
').,itll1ll::. .'. t)'t. ,1 1t :.i.t. ,"',j.;t.', rtiiil i
, ilriilrii ,l::: riii,itril,, ili'
,i::i ;1 , :.'lt:::::
",1111.
.,,,:1;: . ',1.' :t ,..: ' t
.t.:,,,1, :t,t, llsing a low speed, high rorcluc drill with a box style bladc, power nrix the content.s of Series 45ty479 Part A and Part 13 sepalately in thcir original containers plior to combining togethcr to catalyze thc matcrial. Aftcr rlixing Part A and Part Il togcthcr, irnmcdiatcly bcgin applying thc material as the pot life and working conclitions are limitcd. Pour in ribbons on to the horizontal surfaces and squcegee or roll thc matcrial out at a squarc foot ratc appropriatc to thc dc-sircd film thickncss. If desired, while still in a fluid condition light or hcavy broadcasring of aggregates into the applied filnr will create a slip lcsistant finish, ll applying thc finish coat to vertical sr:rfaces, 10 to 15 pounds (4.5 to 6,S k$ of 277-9111 or a .sufficient amount of Scrics 211-271 may be added to the material to assi.st in holding thc film thickness. In general, 10-12 nrils (254-305 microns) DFT can be achieved with thi.s rate of bulking additive addition and the film will not down gloss or appear gtitty.
Erirmilm ffi
It is recommendcd to cle2rn mortar mixcrs after mixing approx. 15 largc kits of Lavacrete to avoid acceleration or wotk tirne loss duc to flcsh matcrials bcing addcd to oldcr calalyzcd matcrial. Actual field conditions and temperatures may necessitatc mot'c frequcnt clcaning or cxtend thc numbcr of mixes. Schcdulcd cleaning lirnits the inaclvcrtent setting of materials on parts in thc mixer- th;rt may fall into the polymer concrete, potentially affecting the applicator's work prclgrcss or ruining thc tlixcr. I'roduction stops of onc (1) hour or more should have the mixing dlurn thoroughly cleaned before re-starting.
Cleaning is generally accomplished using solvent.s and scrub brush-es on the mixer blade. Sand can also be added to help scour the intcrnals as well as the empty LavaCrelc Part C bags can be thrown into the mixing clrunr. MEK is the pret-errcd clcaning solvcnt; how-evcr', abide by local VOC-r'egulations and plant site pem'rissions fot appropriatc solvcnts.
LavaCrctc is for industlial usc only and must bc installcd by quali ficd coating and lining application spccialists only. I'aint products contain chemical ingredients which are considered hazardous. Read containel label warning and Material Safety Data Sheet fol in-rpor-tant health ancl safety information prior to thc use of this product.
Kecp out of the rcach t-rf childrcn.
More detailed health and safety rcquirements fol Lava(irete prod-ucts are available in the Safety Data Sheet. Contact your local Tnem-cc repfcscntative fol more information.
GHfl(DSflM(,il oriloil usAcr
(0r.0s fllilsH
Ptltff scrics 3600
Epoxy Novolac Polymer Concrete
Series 479 is a non-shrinking novolac epoxy polymer concrete ideal for the rehabilitation of scvcrely eroded concrcte or frlr the corrosion-proofing of new concretc where srlperior chenrical rcsistance is reqnired throughotlt the contplete topping systent. Extremeiy fast seLtinla, allowing lor rebuilcls olsumps, purnp pads. [fcnchcs, plocess floors and secondaly coniainnrent stnlctrtrcs. Series 479 kits are packaged for casting and standard placement ol material. A grortting tttix tray be made by adjusting the kit lor a more fluid application.
905 Dark cray Note: color may vary fronr batch to batch.
Flat (as poured). Note: A semi-gloss finish can be achieved by troweling the surface.
oilfiEn
AtI.SUIFA(E v0r.utrslluDs ttotfl$tDtD DFI oflilGmt
Younu mGNK (otPoultN ilEllnEmtmnAct
PA(IAGIXG
ST(lilOEIITPTTAIUTT
IETPTTAIURT TSISTAIIfi sllEruE
NNll PIIIIIT-SETA
Hmlil &sAtEIY
Prepare concrete sulfaccs in accordance with NACE No. 6/SSPC-SPI3Joint Suface Preparalion Standards and ICRI Teclnical Guidelines. Abrasive blast, sliofblast, water jet or nechanically abrade concrete suf:tces to remove laitance, curing compounds, harclenerc. sealer: ancl other contaminants and to provide a minimum lCRl-CSP 5 suface prolilc-.
Note; A heavier ancltor prolile rnay be required for tie-ins and grotning, refer to the application gr.tide for additionztl inibrn)ation.
Must be clean and h'ee of oil, grease and other contanrinants. Always take precautions to prohibit the surface from becoming conlaminate.l prior to producl application.
100%o (mixed)
3/8" lo 10" (1.O - 2.5 cm) in a single pour
0.09 lbs/gallon (1 1.2 grams/litrc)
Covcragc ratcs bascd on Casting/Topping Application 88 sq ft (8.2 m,) at 3/8" per kit 66 sq ft (6.1 m2) at 1/2" per kit 33 sq ft (3.1 m'?) at 1" per kit
See APPI.ICATIoN- fbr additional co\/erage rates.
Note:'l'o crcatc a grouting matcrial rclcr to thc mixing scction lbr additional inlbrmation.
Minimum: 50'F (10"c) Maximum: 75"F (24"c)
(Dry) Continuous 300'F (93'C)
I 8 months at recommencled storage tenrperature.
>230"F (',l1O"C)
Paint products contain chemical ingredients which are considered hazardous. Read container label warning and Safety Data Shcct for inrportant hcalth and safcty inlormation prior to thc usc of this product.
Keep out of the reach of children.
Temperature Lisht Traffic/To Handle Return to Seruice
90'F (32"C) 4 horrrs 8 hours
17"F (25"C.) 6 hours 24 hours
35"F (2'C) 8 horrrs 48 hours
Part A Part B Part C Yield (mixed)
I-argc Kit 5 gallon ( oarrial pail iill) 1 gallon can 4 - 70 lb bags 18..31 gallons (69.1 L)
Small Kit I gallon can ()llarl Can 1-70 lb bas 4.58 sallons (17.3 L)
LAVA(RETE SERIIS 479,TNEMEC
PRODUO PROHLI
({)A]ING SYSIIM
SURIAG PRTPARATION
IITl,lNITAL DATA
@ June 22, 2020 by Tnemer (ompony, ln(. Hl[""1,f:]:H"lffl1o";:',:i!3:,'::l',3'.",,::'il'"1,':":',':;,*;J,',:','."i';?,1'::J,,x,ii:il:"":ti';5.11"r.o",0., PDS479 Poge I of 3 y(trrr'l'ncmcc rcprcscntatirc li)r currcnl tuclrnical dala and instru(li()nr.
LA II
PRODUff DATA SHiiT
SERIES 479VACR E
OYHAGE ttIE Before womilGlltt ilxtx0 ililil1{llt0
APPUqTOT obtain and thoroughly read the Lavacrete Surface Preparation and Application Guide.
Cubic Feet
Larse Kit 1 .72 (.O5\ small Kil 0.43 (.01)
Approxirlately J0-40 nrinutes al77"F (27"C), & 50% R.I.I. Note: \Vorking time decreases as tenlperattlres increase. Material slrould be translerred to substrate and placcd immediately alier mixing.
Powcr nrix the contents of Series 479 PzrL A and Part B separatcly in their original containers prior to contbining. Add the Scries 479 Part B into rhe pre-mixcd Part A and pou'er mix thc material approximately one lo two minutes befbre placing material in a dntn mixer or adding aggregate.
Pour entire contents of catalyzed liquid into the mofiar mixcr tub, rnaking sure to sc%pe as much resin out of thc conraincr as possiblc. Start thc nrixing unit on low spccd (15-20 rpms) and inrmcdiatcly bcgin adding Scrics 479 Pan C into the mixcr. Allow the first llag to be fully nrixed belore adding additional bags.
For additional mixing instrucLions please refcrcnce the charrs below:
Part A Part B Part C
5 sallon oail (oartiallv filled) 1 sallon can 4 - 70 lb bass
Part A Part B Pert C
I ,tallon can Ouarl can 1 70 lb bil,r
Part A Part B Part C
5 qallon pail (partiallv filled) I qallon can 2.5 - 70 lb baes
Part A Part B P^rt C 1 aallon can Quarl can 4t lbs
APrU(An0il t0utPttilI
SUTTAGITTPHfiUff flAITIIAI.IETPTTAIUNT
0fAiluP
Do not thin or attelnpt to retemper material.
Topping Application: Proiects 200 sq ft (18.6 m,) or less may be trowel applied. Pro,ccts exceeding_200 sq ft (18.6 In') sholild have ntixed material placed in appropriately sized and spaced drops between pre-set guide rails or ntetal scrceds that have bcen set ro rhe spCcilied deprh. tlie fluid material should be pulled along using a screecl boarcl in a sawing and compacting motion. Trowels may be used to assist in packing and the smali ulovemcn[ of material. Finishing should begih quickly using a high pirade steel trowel, wcttcd wilh No. 2 I'hinncr lo assist with smoolhing. Il ntaterial is too rcsin rich or sticky, sand may be broadcast over the surface during finishing.
Casting Application: If Series 479 ls to bc cast into forms, all fbrms should be properly built,. anchored and caulked lbr weep iitoti.-Fotnrs should be liberally waxed with reiea.se agents or lined with heary gauge plastic secllred to_the internal sides. Once thc lorltrs arc set, proceed with mixing the matcrial per the mixing instruclions above. Imnrediately move mixed polymer concrete to the fornr and porrr into a funnel or hcad-box. Pour into annrtlar space from one side-as this.
allowsior'airtoescapeattheoppositeendolthepour. Tampingrods,chainsandvibratingequipmentshouldbeused to assist in ntoving and packing the material to limit voids in tlie polymer concrete once cttfed. lmportaflt: Do not cast over 1O-inches (25 cnt) in dcplh, contact'l'nenrec l'echnical Services lbr additional inlbnrtalion.
Grouting Application: Scrics 479 can bc mixcd to clcatc a fluid polymcr concrctc that allows for good flow into thc annular spaces ol previously set and leveled baseplates. Note: Il using this material to r€store the sudace of a concrete pad prior-to baseplate seating, those surfaces shonld be scarified to an TCRI CSP-8, the existing edges chamfered and iramework buih prior to application. Vork on grouting projects should confom to AC,I 351.5-l5 "Specilication for Installation of Epoxy Grouting Between Foundations and Equipment tsases" published by the Anrerican Concrete Institute.
Hand troweling can be accomplished on small projects using steel concrete finishing trowels, broad knives, rubber floats, wooden floatsbr plastic floats. Plastic bottlcs for nristing the snroothing liquids onto the trowels or on the polynrer concrete surface tray also be needed.
Minimunr substratc and ambicnt application tcnrpcraturc 40"F (4"C) and risinSi. Do not apply if cxpcctcd to fall bclow this temperatLlre within 24 hours of application.
F-or optinurn application, handling and pcrlbrmance. lhe nra[erial Leorpcralure during application should be between 60'F and 9b"F (15"Cand 32'C). Temperarure will affect the workability. Cool temperatures increase viscosity and decrease workability. !/arn tcnrpcraturcs will dccrcasc viscosity and slrcrtcn pot lifc.
Flush and clean all equipntent iurmediately after nse with No. 2 Thinner or MEK and using plastic scntb bntshes on the mixing blades and mixing drurrr. Sancl and thc cliscarded Irart C bags can be aclded to the rnixer to help scour lhe material. Finish with soap and water.
Cubic Feet (Cubic Meter)
2.76 (.O8)l.arge Kit o69 ( oztSmall Kit
@ June 22, 2020 by Tnemet (ompony, lnc. P05479 Poge 2 of 3
LAVACRETE I SERIES 479
PRODU{I DATA SHEIT
WARRANT\'
WARRANl'Y WARRANTl'
LIIVIITED
proper
@ June 22, 2020 by Inemer (ompony, lnt. PDS479 Poge 3 of 3
Other files
| File | Type | Posted |
|---|---|---|
| Attendance Sheet | — | |
| Award Information | — | |
| Bid | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .