Addendum_1_32A0604.pdf
PDF 840 KB Posted
- Solicitation number
- 32A0604
- Issued by
- San Bernardino County, San Francisco City, California
About this file
This document is an Addendum No. 1 to Invitation for Bid (IFB) #32A0604 for a Spray Polyurethane Foam Roofing System Installation project in San Bernardino County, California. The project involves providing all labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to install the roofing system at the Caltrans Equipment Service Center Shop 8, Building B. The estimated budget for the project is $275,000. The site inspection is optional, and bidders should refer to the IFB Solicitation Package for the date, time, and location.
The IFB does not provide any information about pricing terms, set asides, incumbents, funding requirements or sources, or other salient details. The document focuses on clarifying the scope of work and providing responses to questions from prospective bidders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB_Solicitation_Package_32A0604.pdf | ||
| Addendum_2_32A0604.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CALIFORNIA------- CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM., Governor
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS MS-65
1727 - 30TH STREET
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6086
TTY - 711
INTERNET http://caltrans-dpac.ca.gov
Making Conservation a California Way of Life.
September 24, 2024
ADDENDUM No. 1 Invitation for Bid # 32A0604
Spray Polyurethane Foam Roofing System Installation, San Bernardino County
NOTICE TO ALL PROSPECTIVE BIDDERS:
Addendum No. 1 is hereby issued for the above referenced IFB. Bids for this work shall be with the full understanding of this Addendum.
Question 1: Is there an engineer’s estimate or budget/range for this project?
Answer: The estimated budget is $275,000.00.
Question 2: Is there a drawing to indicate which building it is so that the size of the scope can be reviewed?
Answer: See Building B per attached picture.
Question 3: Is there a mandatory job walk – if so what day and time and location?
Answer: The site inspection is optional. Please refer to IFB Solicitation Package, cover page and Section C, Bid Requirements and Information, Item 2, Optional Pre-Bid Site Inspection for date, time, and location.
NOTE: All other terms and conditions set forth in the IFB shall remain in full force and effect.
Sincerely, Phuong Vu Contract Analyst
IFB Number 32A0604 Addendum No. 1
DEPARTMENT OF TRANSPORTATION
File details come from the government source that posted it. Updated .