Addendum 1 22327.pdf
PDF 1005 KB Posted
- Attached to
- 472/22327. MAA; Thumb CF - Gun Range Development
- Solicitation number
- RFQ - 171 - 230000000137
- Issued by
- Lapeer County, Lansing City, Michigan
About this file
This document is an Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget (DTMB) for a construction bid related to the Thumb Correctional Gun Range Development project, file number 22327.MAA. The addendum provides updates and clarifications, including the requirement for contractors to remove all remaining above-ground debris, the need for 3rd party utility location services, and updates to the asphalt mix and plywood specifications. The related state and local contract opportunity involves the construction of a gun range facility at the Thumb Correctional Facility, located in Lapeer County, Michigan, and the cities of Lansing.
The addendum also includes the pre-bid meeting attendance sheet from the January 18, 2023, meeting. Contractors are required to acknowledge this addendum as part of the bid submission, and it will become part of the contract documents. The bid opening date is February 8, 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement 22327.pdf | ||
| LEIN Form 22327.pdf | ||
| Plans 22327.pdf | ||
| Specifications 22327.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 1
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
2/1/2023
PROJECT NAME
Thumb Correctional Gun Range Development
FILE NUMBER
22327.MAA
PROFESSIONAL
NFE Engineers
PROJECT DIRECTOR
Maria Alvaro
BID OPENING DATE:
2/8/2023
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
1. Pre-bid meeting attendance sheet from the January 18, 2023, meeting is attached herein.
2. Existing debris that remains upon commencement of contractor operations, including concrete blocks, wood debris, machinery, trash, etc. shall be removed as part of the base contract (whether contractor elects to use borrow material from this space, or not). A graphic has been provided to generally show the limits of removal area. Any below grade debris that is encountered, during grading in this area, cannot be estimated. If this material is encountered, removal will be quoted by the contractor and handled using contingency funds.
3. Contractors are required to include 3rd party utility locations services to verify that no unknown utilities exist in the work zone. This cost shall be included in base bid.
4. Plywood for the project is not required to be marine graded. Plywood shall be ¾” pressure treated ACX grade for exterior applications.
5. Planned asphalt mix noted on plans as 4MEL, should have been noted as 4EML. Required performance graded asphalt should be PG 64-22.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
Steve Sutton
PROFESSIONAL: DATE: 2/1/2023
APPROVED BY:
PROJECT DIRECTOR: Maria Alvaro DATE: 2/1/2023 ssutton Cloud ssutton Callout Remove all remaining above ground debris, including concrete blocks, equipment, wood, metals, etc.