Addendum 1 2027-026M26 Presentation.pptx
PPTX presentation 7 MB Posted
- Solicitation number
- RFQ1 IHHA 2026000047 2
- Issued by
- Pueblo County, Colorado
About this file
This is an Addendum 1 presentation document for a Colorado state contract (2027-026M26) involving the upgrade of heat plant controls systems in Building 35 at the Colorado Mental Health Institute at Pueblo (CMHHIP). The project scope includes upgrading the supervisory control and data acquisition (SCADA) systems and programmable logic controllers (PLCs) for the central heat plant that supplies steam to the CMHHIP campus, three Department of Corrections buildings, a central kitchen, and one youth service facility. The facility also provides soft water to the south campus and operates two coal boilers installed in 1988 and two dual-fuel boilers (natural gas and diesel) added in 2007. Key deadlines include a request for clarifications due July 31, 2026 at 2:00 PM, final addendum issuance on August 7, 2026, electronic submittals due August 14, 2026 at 2:00 PM, short list announcement on August 21, 2026, oral interviews scheduled for the week of August 31, 2026, and selection announcement on September 10, 2026.
The state is seeking an architecture and engineering firm with demonstrated experience in central boiler plant design, PLC migration and programmer interface coordination, and the ability to address mechanical, electrical, controls, energy, and life safety issues. The existing controls infrastructure, last updated between 2004 and 2007, relies on outdated Windows 10 and Windows XP platforms with legacy PLC equipment that cannot be sourced locally and exhibits inconsistent communication capabilities. The project evaluation should determine whether certain pneumatic control valves are candidates for conversion to electric systems while assessing associated safety concerns. Qualified firms should propose innovative solutions that provide long-term value and address the multiple equipment upgrades the boilers have undergone throughout their operational history.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ 2027-026M26 Phase 1 Main.SL.docx | DOCX document | |
| Appendix B Sample AE Agreement with T&C.pdf | ||
| Appendix A Evaluation Forms.pdf | ||
| 2027-026M26 Sign in.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Upgrade Heat Plant Controls System, Building 35, CMHHIP Ph 1 of 2
Facility Overview: Building 35
The central heat plant provides steam to the CMHHIP campus, 3 DOC buildings, a central kitchen and one youth service facility. This building also supplies soft water to south campus.
Heating equipment consists of 2 coal boilers and 2 dual-fuel boilers (natural gas and diesel).
Building was originally constructed in 1988 with the two coal boilers and the dual-fuel boilers were added in 2007.
Existing: Controls Controls last update 2004-2007 Supervisory panels operate on outdated software platforms (Windows 10 and Windows XP) PLCs are legacy items that cannot be sourced locally.
Communication between controls is inconsistent.
Dual Fuel Supervisory cabinet and display
Legacy PLC cabinet
Pneumatic controls Some valves may be candidates for upgrade to electric.
Need to evaluate safety concerns associated with changeover.
Existing: Boilers Cleaver-Brooks Dual Fuel Boilers 2007
Babcock and Wilcox Coal Boilers 1988
Boilers have undergone multiple upgrades through the years.
What we are looking for from an A/E firm Experience in a central boiler plant.
Experience interfacing with programmers and PLC migration.
Innovative solutions on prior projects that provide the best long-term solution.
Ability to address the mechanical, electrical, controls, energy and life safety issues associated with this project.
Important Dates Request for Clarifications to Jamie.gott@state.co.us – July 31, 2026 2:00 PM Final Addendum Issued – August 7, 2026 Electronic Submittals Due – August 14, 2026 2:00 PM Interview Short List Announced – August 21, 2026 Oral Interviews – Week of August 31, 2026 Selection Announced – September 10, 2026 image1.png image2.png image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg